Design Commission Meeting Agenda Monday, September 30, 2013
Total Page:16
File Type:pdf, Size:1020Kb
Design Commission Meeting Agenda Monday, September 30, 2013 Public Meeting 3:35 p.m. Consent Items 24839: Conversion of Building 28, Building 123 and Building 128 into a green manufacturing center, Brooklyn Navy Yard Industrial Park, Market Street, Fifth Street, Morris Avenue and Sixth Street, Brooklyn. (Final) (CC 33, CB 2) BNYDC 24840: Conservation of Modern Tapestry (circa 1970) by Roy Lichtenstein, Bronx Family-Criminal Courthouse, 215 East 161st Street, Bronx. (Preliminary) (CC 16, CB 4) DCAS/CJC 24841: Conservation of Red Square (circa 1970) by Theodoros Stamos, Bronx Family- Criminal Courthouse, 215 East 161st Street, Bronx. (Preliminary) (CC 16, CB 4) DCAS/CJC 24842: Conservation of an untitled banner (circa 1970) by Jack Youngerman, Bronx Family-Criminal Courthouse, 215 East 161st Street, Bronx. (Preliminary) (CC 16, CB 4) DCAS/CJC 24843: Conservation of an untitled banner (circa 1970) by Ivan Chermayeff, Bronx Family-Criminal Courthouse, 215 East 161st Street, Bronx. (Preliminary) (CC 16, CB 4) DCAS/CJC 24844: Conservation of Development with Red & Blue (circa 1970) by Robert Goodnough, Bronx Family-Criminal Courthouse, 215 East 161st Street, Bronx. (Preliminary) (CC 16, CB 4) DCAS/CJC 24845: Conservation of Mobile (circa 1970) by Alexander Calder, Bronx Family-Criminal Courthouse, 215 East 161st Street, Bronx. (Preliminary) (CC 16, CB 4) DCAS/CJC 24846: Conservation of Scissors Jack (circa 1970) by Larry Zox, Bronx Family-Criminal Courthouse, 215 East 161st Street, Bronx. (Preliminary) (CC 16, CB 4) DCAS/CJC 24847: Conservation of Diamond Cut (circa 1970) by Larry Zox, Bronx Family-Criminal Courthouse, 215 East 161st Street, Bronx. (Preliminary) (CC 16, CB 4) DCAS/CJC/DASNY 24848: Installation of a flue, louvers and doors, Five Borough Automotive Repair Facility, 20 Bronx Shore Road, Manhattan. (Preliminary and Final) (CC 8, CB 11) DCAS/DPR Design Commission Meeting/ Monday, September 30, 2013/ Page 2 24849: Installation of rooftop photovoltaic panels, John F. Kennedy High School, 99 Terrace View Avenue, Bronx. (Preliminary and Final) (CC 10, CB 8) DCAS/DOE 24850: Installation of rooftop photovoltaic panels, Herbert Lehman High School, 3000 East Tremont Avenue, Bronx. (Preliminary and Final) (CC 14, CB 5) DCAS/DOE 24851: Installation of rooftop photovoltaic panels and adjacent site work, Port Richmond Wastewater Treatment Plant, 1801 Richmond Terrace, Staten Island. (Preliminary and Final) (CC 49, CB 1) DCAS/DEP 24852: Long-term loan of Civic Virtue (1922) by Frederick MacMonnies to Green-Wood Cemetery, Meadow Avenue and Garland Avenue, Brooklyn. (Final) (CC 38, CB B7) DCAS 24853: Installation of Four Directions at Hunters Point by Julianne Swartz, Hunter’s Point Community Library, Queens West Development, Parcel 8, 4-56 47th Road, Queens. (Preliminary) (CC 26, CB 2) DCLA%/DDC/QL 24854: Conservation of Lighthouse and Bridge on Staten Island (1996) by Siah Armajani, North Shore Esplanade, adjacent to the Staten Island Ferry Terminal and former U.S. Coast Guard Light House Depot, St. George, Staten Island. (Preliminary) (CC 49, CB 1) DDC/DCLA%/DOT 24855: Reconstruction of East 168th Step Street between Teller Avenue and Clay Avenue, Bronx. (Preliminary) (CC 16, CB 4) DDC/DOT 24856: Construction of an environmental learning center (Solar 2) as Phase III of the construction of Stuyvesant Cove, 2420 FDR Drive at Peter Cooper Road, Manhattan. (Preliminary) (CC 6, CB 4) DDC 24857: Construction of a paint warehouse and a perimeter fence, beneath the Williamsburg Bridge, 424 Wythe Avenue, Brooklyn. (Preliminary and Final) (CC 33, CB 1) DDC/DOT 24858: Restoration of the 96th Street Branch Library, 112 East 96th Street, Manhattan. (Preliminary and Final) (CC 4, CB 8) DDC 24859: Construction of Hunter’s Point Community Library, Queens West Development, Parcel 8, 4-56 47th Road, Queens. (Final) (CC 26, CB 2) DDC/QL 24860: Installation of Spotlight on Broadway, Broadway between West 46th Street and West 47th Street, Manhattan. (Final) (CC 3, CB 5) DDC/DPR/MOME 24861: Installation of streetscape improvements, Center Street between Arthur Kill Road and St. Patrick’s Place and Tysen Court and Court Place between Clarke Avenue and Richmond Road, Historic Richmond Town, Staten Island. (Preliminary and Final) (CC 50, CB 3) DDC Design Commission Meeting/ Monday, September 30, 2013/ Page 3 24862: Construction of an addition, Engine Company 96, 1689 Story Avenue, Bronx. (Final) (CC 18, CB 9) DDC 24863: Installation of entrance gates and adjacent site work, Ashokan Reservoir, adjacent to Route 28A, Olive, Ulster County. (Preliminary and Final) DEP 24864: Installation of seven benches by Tom Joyce, Museum of Arts and Design, 2 Columbus Circle, Manhattan. (Preliminary and Final) (CC 6, CB 5) DOT 24865: Reconstruction of the Wild West Playground, West 93rd Street and Central Park West, Central Park, Manhattan. (Final) (CC 9, CB 7) CPC/DPR 24866: Construction of a swale and rain gardens, Westerleigh Park, Willard Avenue, Springfield Avenue, Neal Dow Avenue and Maine Avenue, Staten Island. (Final) (CC 49, CB 1) DPR 24867: Installation of the First Responders Memorial by Masayuki Sono, an addition to the Staten Island September 11 Memorial (2004) by Masayuki Sono, Staten Island Promenade, Richmond County Bank Ballpark, North Shore, Staten Island. (Preliminary) (CC 49, CB 1) EDC 24868: Installation of rooftop photovoltaic panels, Anheuser-Busch warehouse/distribution facility and recycling center, 500 Food Center Drive, Hunts Point, Bronx. (Preliminary and Final) (CC 17, CB 2) EDC 24869: Installation of a book return vestibule and prototypical signage, Flushing Community Library, 41-17 Main Street, Queens. (Amended Final) (CC 20, CB 7) QL WITHDRAWN 24870: Installation of an automated material handler (AMH) and prototypical signage, Cambria Heights Community Library, 218-13 Linden Boulevard, Queens. (Preliminary and Final) (CC 27, CB 13) QL Public Hearing 3:40 p.m. 24871: Rehabilitation of the Shake Shack kiosk and adjacent site work, southeast corner of Madison Square Park, Madison Avenue, East 23rd Street, Fifth Avenue and East 26th Street, Manhattan. (Preliminary) (CC3, CB 5) DPR 4:10 p.m. 24872: Reconstruction of the façade, 29-10 Thomson Avenue, LaGuardia Community College, Queens. (Preliminary and Final) (CC 26, CB 2) DOT Design Commission meetings are held in the conference room on the fifth floor of 253 Broadway, unless otherwise indicated. Please note that all times are approximate and subject to change without notice. Design Commission Meeting/ Monday, September 30, 2013/ Page 4 Members of the public are encouraged to arrive at least 45 minutes in advance of the estimated time; those who also plan to testify are encouraged to submit their testimony in writing at least three (3) business days in advance of the meeting date. Please note that items on the consent agenda are not presented. If members of the public wish to testify on a consent agenda item, they should contact the Design Commission immediately, so the project can be rescheduled for a formal presentation at the next appropriate public hearing, per standard procedure. Design Commission 253 Broadway, Fifth Floor Phone: 212-788-3071 Fax: 212-788-3086 .