Hot Projects in Bay Area Houston!

Total Page:16

File Type:pdf, Size:1020Kb

Hot Projects in Bay Area Houston! Hot Projects in Bay Area Houston! Clear Lake Shores – a new Town Kemah’s planned transportation center/parking Center along Clear Lake Road and garage and city hall, 6th at Bradford Aspen Street. Infrastructure completed. Looking for developers. Kemah & Clear Lake Shores SH 146 bridge between Seabrook and Kemah Residential build out – Hidden Lakes – along South Shore Blvd., north of FM 646 and south of SH 96. 800 homes on 350 acres. 100 acres for commercial development. Tuscan Lakes- 1,850. Marbella – 1,400 Under construction: Watermark at Walker Commons, 21 acres. 368-unit multi-family. League City The Crossings – Methodist Healthy Living Newport at Marina Bend Community - $75 million project on 18 ac.; Egret Bay Newport at Marina Bend Planned multi-family project on Wesley Drive, 203 units Blvd. near FM 518. Under construction. Proposed multi-family project on Wesley Drive, 203 units League City $82 million expansion close to completion at Cypress Bay – 99 canal-front lots UTMB Health League City campus. Hospital with labor / delivery rooms and medical / surgery rooms. 142,000 SF. 175 – 210 new full-time jobs. Rendering by Randall-Porterfield Architects Proposed professional office/retail development along Under construction: 20,000 SF the League City Parkway at Tuscan Lakes Blvd. medical/professional complex on FM 646 near 29,000 SF Walker Street Veranda Townhomes Beacon Island Veranda Townhomes – South Shore plans 218 townhomes on approx. 26.4 acres on Clear Lake along Enterprise Blvd. Currently, the first phase of the development is under construction. 2,800 – 3,000 SF starting in the $400’s. Under construction. Veranda Townhomes under construction Undeveloped tracts on 35-acre island are available for homes. Approved plan calls for 69 patio homes, 95 townhomes, 301 mid- rise and 385 high-rise multi- family units. Tuscan Lakes Master Planned Community of 1,850 residential units. More than 900 homes are on the ground. Builders: Westin, CastleRock, DR Horton, KB Homes, Pulte Under construction: The Shops at Tuscan Lakes, SH 96 at FM 270. 12,450 SF Bay Colony League City Town Center Towne Center Pollo Tropical opening soon Photo courtesy of New Quest Properties Pinnacle Park 100 -ac mixed-use town center development planned on Gulf Freeway between League City Parkway and FM 646. Under construction -- 72,000 SF Cabela’s will open here in 2016. This is the first store for the greater Houston area! • 15,000 SF retail/commercial under construction soon • Phase 2: 35 acre mixed-use Marketplace at Ninety-Six • 38 acre retail project • NE and SE corners -- League City Parkway and Hobbs Road • 123,000 SF Kroger will anchor the project. • 2 story office buildings • Pad sites for banks, pharmacy and restaurants • Next door to Perry Family YMCA Walmart Neighborhood Market - 40,000 SF at FM 518 and Landing Boulevard. Under construction. Watermark at Walker Commons The Crossings Newport at Marina Bend UTMB Health League City Campus Shops at Tuscan Lakes Proposed: 29,000 SF office/retail Under const: 20,000 SF medical Kemah Trans. Center Available 30 & 90 acre tracts Hidden Lakes Tuscan Lakes Marbella Cypress Bay Clear Lake Shore Town Center Veranda Townhomes – So Shore Beacon Island Pinnacle Park Cabelas Marketplace at Ninety-Six Walmart Neighborhood Market 8.3 miles in Galveston County (League City) 1.0 Mile in Brazoria County (Alvin) • Environmental clearance expected later this year, then ROW acquisition. Construction could start in 2017. • Estimated construction time about 24 months • Ball park cost $10 million / mile or about $100 Million. • Funding will have to come from local sources (City and Counties via bonds or other avenues) • This segment will tie into FM 646 on the East side of I-45 which will be designated Business 99/646 Courtesy photos by Landrys, Inc. The $60 million Galveston Island Historic Pleasure Pier juts out 1,000 feet over the Gulf of Mexico. More entertainment news: A possible redevelopment of the famed Balinese Room on the seawall is in the works! Carnival Cruise Lines will have 3 cruise ships sailing from Galveston next year … 600,000 passengers yearly! On the island … • UTMB plans $1.2 billion in nearly 200 new construction projects. UTMB broke ground on $438 million Jennie Sealy Hospital featuring 310 patient rooms. It will be operational in 2016. • Six-story, 93,000 SF, $42 million building for UTMB’s research facilities planned at 11th & Strand in Galveston. Construction begins March 2015; completion expected March 2017. Jennie Sealy Hospital under construction Galveston New! Sea Scout Base Galveston -- 5 stories, 60,000 SF -- dorms, classrooms and offices that can house up to 300 on ocean adventures. The project also boasts a large dining hall, resort- style pool, outdoor pavilion, volleyball courts, a 200-person amphitheater and a chapel. On I-45 just past Harborside. Tanger Outlets of Texas City on 55 acres -- Gulf Texas City Freeway at Holland Road. First phase is 90 stores, 350,000 SF. More shopping - 50,000 SF - is planned. Planned – Adventure Pointe, a proposed theme park on 35 acres. Construction expected to begin soon. Vintage trains, iceless skating rink, zip line, go-carts, amphitheater and hotel. Four main theme areas including a ‘Land of Oz’. Expansion plans for Tanger Outlets Dickinson Development opportunity -- Cedar Oaks, a 17-acre proposed development bordered by Dickinson Bayou along the Gulf Freeway, just south of FM 517. Under construction: NOAH’S Event Venue, 8,700 SF • Bay Colony Crossing, phase 3 to break ground soon - 19,232 SF for retail and commercial users. New waterfront restaurant will Location is along FM 517 near FM 646. be announced soon! Waterfront land tracts – In the planning stage: Arcadia • 65-acre site for sale -- 1,600 FT frontage on Station, ~400 acres fronting FM Dickinson Bayou and 1,400 FT frontage on FM 517. 517 at Cemetery Road for residential development. • 35-acre waterfront tract for sale • 45-acre waterfront tract available for development on Hughes Rd. near the Gulf Fwy. NOAH’s Cedar Oaks Bay Colony Crossing Tanger Outlet Adventure Point 65 acre & 35 acre tracts 45 acre tract Proposed: Arcadia Station West Ranch West Ranch reports - • More estate home sites have been platted to keep up with demand. • A new section, West Lake, has opened. • West Ranch builders – David Weekley Homes, Village Builders, Highland Homes, Coventry Homes and Partners in Building West Ranch – 766 ac., 1,500 homes, 213 ac. commercial. West Boulevard will connect FM 518 to Friendswood Lakes Blvd. First commercial development site plan proposed. Friendswood Under construction: 2-story, 10,050 SF office building at 211 W. Edgewood Drive. $1.95 million building. Under construction: one-story 14,000 SF professional office building at 215 W. Edgewood. New building: Manison Plaza, a 2-story office building at FM 518 and Hunters Lane Friendswood New buildings … Clearwood Business Park, 4122 FM 2351 Available AprilClearwood 2015, near Beamer Business Rd. Park, FM 2351. 16 ft. span. 7,000 sf freestanding45,000 office SF warehouse total. Five building office/warehouse for lease. 1000 ft.² office buildingsbuild to suit. 3 andphase power. 16 feettwo clear retail span, fullybuildings insulated. planned for development. AcadianaAcadiana Plaza, Plaza, W. 306 ParkwoodW. Parkwood Ave.Avenue, Available December 2014 3,400 sf for lease, accessavailable from FM in 528 December. and Sunset Dr., anchored by other office and retail tenants including Birraporetti's, Pinnacle Construction, Melange, Law Offices of Jerome Karam, Lone Star Taco, Nature's Garden Market Café Tannos Professional Park, FM 518.15,000 Tannos Professional Park, FM 518/Friendswood Drive Near completion: Masa Sushi restaurant and 5,000 SF, 2-story. Retail and office use. Available January 2015 SF retail center – FM 518 at Hunters Lane 15,000 sf two-story building, zoned Downtown District allows both retail & office use, located in Downtown Neighborhood Empowerment Zone which waives City-related development and impact fees Minimum 998 sf to maximum 3500 sf size Proposed development on 130+ acres. Land has 2,518 ft. frontage on FM 528; one mile frontage on Clear Creek in Friendswood. Ideas are retail and hospitality development, office buildings, medical/professional offices, and/or a movie theater. Beamer Road Extension - $10.3 million project. Construction has begun to extend Beamer Rd. one mile south to connect with West Bay Area Blvd. by Baybrook Mall. Completion expected in 12 months. West Ranch Beamer Road Extension Clearwood Business Park Acadiana Plaza Tannos Professional Park Under const: 10,050 office building Under const: 14,000 office building Masa Sushi restaurant Manison Plaza 130+ acre proposed development Ellington Airport … a multi-purpose commercial and general aviation facility and also a joint reserve military base. All four of the military branches are represented as well as the Texas Air National Guard. Ellington Airport • Lone Star Flight Museum will be under construction soon • Recently completed … Training center, battle command center • In the works … U.S. Customs and Border Protection -- $10.8 million investment • New public hangars - $60 to $70 million investment Approximately 600 acres available for development in Ellington Airport area. Best uses: office, aviation, institutional and industrial. Ellington Airport Just completed - U. S. Coast Guard Sector Houston-Galveston command center $50+ million investment 117,000 SF More than 350 work at this new regional facility. Lone Star Flight Museum, $35 million, 130,000 SF project. Includes gift shop, café, auditorium, exhibit hall & vintage aircraft displays. 2016 completion Ellington Airport …exciting opportunities! The Federal Aviation Administration (FAA) has granted the city of Houston a Launch Site License that enables Ellington Airport to establish itself as a launch site for Reusable Launch Vehicles (RLV), making it the 10th commercial spaceport in the United States. The Reserve at Clear Lake City Houston Trendmaker and Village Builders: 372 acres for 740+ new homes, a recreation/community center and numerous parks and green belts.
Recommended publications
  • Suppresion of Hurricane Surge Forerunner and Peak Surge in Galveston and West Bay Achieved with A
    Proceedings THC-IT-2018 Conference & Exhibition SUPPRESION OF HURRICANE SURGE FORERUNNER AND PEAK SURGE IN GALVESTON AND WEST BAYS ACHIEVED WITH A WESTERN SEGMENT OF THE COASTAL SPINE. Bruce A. Ebersole, Thomas W. Richardson and Robert W. Whalin Jackson State University Jackson, Mississippi Abstract The original Ike Dike concept was a coastal barrier, or “spine”, comprised of a continuous line of dike/wall sections that followed the coastline from Freeport, TX to Sabine Pass, TX, with storm surge gate systems at the two tidal passes, San Luis Pass and Bolivar Roads. The Ike Dike concept has evolved slightly to a shorter alignment, which turns inland at High Island and follows Texas State Highway 124 north to Winnie, TX. This latest alignment, referred to herein as Alignment 1a and comprised of western, middle and eastern dike sections, is shown in Figure 1. Figure 1 The Gulf Coast Community Protection and Recovery District (GCCPRD) conducted a Storm Surge Suppression Study; and, in their 2016 Phase 3 Report they recommended a different alignment for a coastal spine. The approximate alignment they recommended is shown in Figure 2, referred to here as Alignment 2. Their recommended alignment had only a middle section, without any eastern or western sections, and it had a storm surge gate system only at Bolivar Roads. The tidal inlet at San Luis Pass is left open in their recommended plan. The alignment shown in Figure 2 is approximate, in the sense that it is situated at the coastline; whereas, the actual alignment recommended by the GCCPRD is situated along the highways on both Galveston Island and Bolivar Peninsula.
    [Show full text]
  • THE TEXAS SHORELINE CHANGE PROJECT Coastal Mapping of West and East Bays in the Galveston Bay System Using Airborne Lidar
    THE TEXAS SHORELINE CHANGE PROJECT Coastal Mapping of West and East Bays in the Galveston Bay System Using Airborne Lidar Rebecca C. Smyth, James C. Gibeaut, John Andrews, Tiffany L. Hepner, and Roberto Gutierrez With assistance from Adrien Lindley, Shane Valentine, and Rachel Waldinger Prepared for the Texas General Land Office GLO Contract Number 02-520 C Bureau of Economic Geology Scott W. Tinker, Director The University of Texas at Austin John A. and Katherine G. Jackson School of Geosciences August 2003 CONTENTS ABSTRACT...............................................................................................................................1 INTRODUCTION .....................................................................................................................2 Goals of the Texas Shoreline Change Project......................................................................2 Airborne Lidar: A Tool for Monitoring Coastal Environments...........................................3 Tasks and Deliverables ........................................................................................................5 GALVESTON WEST AND EAST BAY LIDAR SURVEY ...................................................6 Airborne Lidar Technical Background ................................................................................7 Lidar Survey Operations......................................................................................................8 Global Positioning System Base Stations.......................................................................9
    [Show full text]
  • October 2017 Handouts
    October 2017, GBC Handouts, Page 1 of 18 Galveston Bay Estuary Program 17041 El Camino Real, Suite 210 Houston, TX 77058-2646 Telephone: (281) 218-6461 October 6, 2017 Dear Galveston Bay Council Members: The next quarterly meeting of the Galveston Bay Council is scheduled for: Wednesday, October 18, 2017 9:30 AM - 12:30 PM Meeting location: Harris-Galveston Subsidence District 1660 West Bay Area Blvd, Friendswood, TX 77546-2640 (281) 486-1105 Information for the October 18, 2017 meeting is attached as noted below. 1. Council Agenda for October 18, 2017 2. Draft July 19, Council Meeting Minutes Sincerely, Sarah P. Bernhardt Program Manager Galveston Bay Estuary Program (GBEP) /Texas Commission on Environmental Quality (TCEQ) October 2017, GBC Handouts, Page 2 of 18 GALVESTON BAY COUNCIL QUARTERLY MEETING Location: Harris-Galveston Subsidence District, 1660 West Bay Area Blvd, Friendswood, TX 77546-2640 AGENDA: Wednesday, October 18, 2017 9:30 A.M.: Call to Order: Introduction of Members and Delegates Action Item: Approval of July 19, 2017 Meeting Minutes Report of the Chair (Nancy Parra) Report of the Program (Sarah Bernhardt) including an update on the upcoming State of the Bay Report, 4th Edition by HARC. Action Item: Annual conflict of interest form completions 9:50 A.M.: Hurricane Harvey Lightning Round Presentations & Discussion: A series of short five-minute presentations by numerous Galveston Bay Council member organizations and partners 10:50 A.M.: Break 11:00 A.M.: Hurricane Harvey Lightning Round Presentations & Discussion: continued.
    [Show full text]
  • Classification of Shellfish Harvesting Areas of West Galveston
    6 LOOP 197 N 4 A Houston Ship Channel Marker #33 6 95°20'0"W 95°15'0"W 95°10'0"W 95°5'0"W 95N °0'0"W 94°55'0"W 94°50'0"W 94°45'0"W D N R I A T 4 5 M S M B F H PALMER HWY Y U 8 FM 1764 A S 0 R 1 RD B FM 1764 P N C O S S O R T 2 L D A T E TEXAS AVE T T 5 D S A E T R E - S H n 3 HWY 1765 d H 4 T of 3 0 T W 6 ex 0 as Y 2 C i ty Bolivar Lighthouse 1 D M i 4 ke HSC #25 F 6 A!. S T A T ' E ST FM 519 FM RD 519 MAIN H S W ne 7 an l Y 9 h 1 3 C P ip S O h O S D ST AT L R E n H WY o 6 6 t 4 s 6 e 29°20'0"N M lv F D a V L G Pelican Island B t L s Y L KW A e LF P WO W W SEA A E S A S I UE EN N AV A IC L E I 4 P 5 C Galveston au se wa 7 y WY 8 TE H North Deer Island STA 6 1 S T S Greens Lake South Deer Island T Southwest point of land D SM C LV B at Green's Lake Cut !.
    [Show full text]
  • Adaptive Management for Successful Marsh Restoration in Galveston West Bay
    ADAPTIVE MANAGEMENT FOR SUCCESSFUL MARSH RESTORATION IN GALVESTON WEST BAY Christian LaPann-Johannessen © 2015 HDR, Inc., all rights reserved. TEXAS LOUISIANA Houston Galveston TEXAS LOUISIANA Houston Galveston Galveston Entrance Channel Project Gulf of Mexico Location Galveston West Bay TEXAS LOUISIANA Houston Galveston Galveston Entrance Channel Bayside Project Gulf of Mexico Galveston Island Location Galveston West Bay State Park 8 Mile Rd Jamaica Beach MARSH LOSS ▪ Relative sea level rise ▪ Land subsidence ▪ Lack of sediment supply ▪ Wave induced erosion BAYSIDE N N 1955 2015 GALVESTON ISLAND STATE PARK N N 1954 1995 GISP: PHASE 1 RESTORATION ▪ Constructed in 1999 ▪ Terrace grid ▪ Geotube breakwater DELEHIDE COVE RESTORATION ▪ Constructed in 2003 ▪ Hydraulically dredged marsh mounds ▪ Geotube breakwater GISP: PHASE 2 RESTORATION ▪ Constructed in 2010 ▪ Hydraulically dredged marsh mounds ▪ Some coalescing mounds ▪ Sand ridge breakwater MARSH RESTORATION TECHNIQUES ▪ Create wide, gently sloped mounds from locally dredged material ▪ Overlap mounds to maximize plantable area ▪ Construct mounds to elevation suitable for marsh grass growth ▪ Construct rock breakwater to shelter restored marsh from wave impacts BAYSIDE ▪ 12 marsh mounds o 35,000 cy of dredged material ▪ 3,800 feet of rock breakwater o Shelters new and existing marsh ▪ Created 14 acres of marsh complex ▪ Construction o NTP: August 8, 2016 o Construction Status: Completed November 15, 2016 o Construction Cost: $2,338,000 N ~ 1 mile Marsh Restoration Borrow Area BAYSIDE BORROW
    [Show full text]
  • Directory for Reaching Minority Groups. NSTITUTION Manpower Administration (DOL), Washington, D.C
    DOCUMENT RESUME ED 052 356 VT 013 468 TITLE Directory for Reaching Minority Groups. NSTITUTION Manpower Administration (DOL), Washington, D.C. Bureau of Apprenticeship and Training. IVB DATE 70 HOTE 259 p. 4VAILABLE FROM Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402 (L23.2:/466, $2. 00) EDRS PRICE EDRS Price NF-$0.65 HC-$9.87 DESCRIPTORS *Agencies, Communications, *Directories, *Employment Opportunities, Information Sources, *Information Systems, Manpower Utilization, *Minority Groups, Vocational Education ABSTRACT This directory lists, alphabetically by state and city, the names, addresses, and telephone numbers of the organizations and people who are able to reach minority groups to tell them about affirmative action programs for job training and job opportunities. At the end o.2 many of the state entries are listed organizations which have statewide or regionwide contacts with special groups, such as Indians and Spanish-speaking persons. (Author) 2 . - 0 . % a0 s NNW V U.S. DEPARTMENT OF HEALTH, EDUCATION & WELFARE **0 OFFICE OF EDUCATION Lr4 THIS DOCUMENT HAS BEEN REPRO- DUCED EXACTLY AS RECEIVED FROM THE PERSON OR ORGANIZATION ORIG- INATING IT. POINTS OF VIEW OR OPIN- (-NJ IONS STATED DO NOT NECESSARILY REPRESENT OFFICIAL OFFICE OF EDU- CATION POSITION OR POLICY. Directory 4 for 4, it eaching Minority Groups U.S. DEPARTMENTOF LABOR J.D. Hodgson, Secretary MANPOWER ADMINISTRATION BUREAU OF APPRENTICESHIP AND TRAINING 1970 For sale by the Superintendent of Documents, U.S. Government Printing Office O Washington, D.C. 20402 - Price $2 rl PREFACE This directory lists, alphabetically by State and city, the names, addresses, and telephone numbers of theor- ganizations and people who are able to reach minority groups to tell them about affirmative action programs for job training and job opportunities.
    [Show full text]
  • San Luis Pass Must Be Gated for the Coastal Spine to Be Effective Bill
    San Luis Pass Must be Gated for the Coastal Spine to be Effective Bill Merrell The 2020 United States Army Corps of Engineers/Texas General Land Office Texas Coastal Plan does not gate San Luis Pass. Moreover, the Corps seems intent on not carefully examining this measure for substantially reducing flood risk for the region. Normally we would analyze the USACE engineering results but they provide none on this important subject. The USACE claims there is “limited surge risk” in leaving San Luis Pass ungated, but they. present no analysis of any modeling results or economic benefits to support their statements, just hand-waving and speculative arguments that seem to only target the effects of direct surge near the west end of Galveston Island. The USACE claims that “anticipated risk reduction benefits for protective features at San Luis Pass do not outweigh the potential negative environmental impacts of closing off the last remaining natural pass along the Texas coast,” more hand-waving without supporting analyses, not even a list of potential impacts, and the dubious notion that San Luis Pass is a natural pass. In reality it is silting up after being altered significantly by bridging years ago. The words “closing off” are misleading because the gates are only projected to be closed during hurricane conditions and would be open at all other times. Our response to USACE was to meet with them, including our expert, Bruce Ebersole with Jackson State University, performed detailed analysis on Bay conditions with San Luis Pass left open and closed. We outlined our concerns with leaving San Luis Pass ungated.
    [Show full text]
  • Motco, Inc. Epa Id: Txd980629851 Ou 02 La Marque, Tx 09/27/1989 Ou 1: Source Control
    EPA/ROD/R06-89/052 1989 EPA Superfund Record of Decision: MOTCO, INC. EPA ID: TXD980629851 OU 02 LA MARQUE, TX 09/27/1989 OU 1: SOURCE CONTROL OU 2: MANAGEMENT OF MIGRATION (MOM) THE EPA HAS PREVIOUSLY SELECTED A REMEDIAL ACTION FOR THE SOURCE CONTROL OPERABLE UNIT AND THE ROD PROCESS WAS COMPLETED ON MARCH 15, 1985, WHEN THE ROD FOR SOURCE CONTROL WAS SIGNED. SOURCE CONTROL INVOLVED THE REMEDIATION OF SEVERAL WASTE PITS THAT CONTAIN ABOUT 12 MILLION GALLONS OF CONTAMINATED WATER AND ORGANIC WASTE LIQUIDS. THIS REMEDY ALSO INCLUDES THE EXCAVATION OF THE EXISTING WASTE PITS TO THE SLUDGE/SOIL INTERFACE PLUS ONE FOOT AND INCINERATION OF THOSE WASTES. THE DESIGN AND CONSTRUCTION OF THE SOURCE CONTROL ROD REMEDY IS NOW UNDER WAY AND PRIMARILY CONSISTS OF AN ONSITE MOBILE INCINERATOR AND ANCILLARY FACILITIES. THE COMPLETION OF THE INCINERATOR CONSTRUCTION IS EXPECTED BY LATE 1989. AFTER THE TRIAL TURN IS CONDUCTED IN NOVEMBER, 1989, INCINERATION OF THE ONSITE WASTE SHOULD BEGIN, AND IS EXPECTED TO TAKE ABOUT THREE YEARS TO COMPLETE. THE MANAGEMENT OF MIGRATION OPERABLE UNIT ADDRESSES THE WASTES OR CONTAMINATED ENVIRONMENTAL MEDIA THAT HAVE MIGRATED BELOW THE WASTE PITS (WASTE SOURCES) AND BEYOND THE SITE BOUNDARIES IN BOTH THE SURFACE AND SUBSURFACE ENVIRONMENTAL MEDIA. FIGURE 5 ILLUSTRATES THE MOM ACTIVITY AREAS, INCLUDING THE TRAILER PARK. THE POTENTIAL FOR MIGRATION OF CONTAMINANTS THAT WERE INVESTIGATED IN THIS OPERABLE UNIT INCLUDE THE FOLLOWING MEDIA: 1. SURFACE SOILS 2. SURFACE SEDIMENTS 3. SURFACE WATER 4. NEARBY BIOTA 5. SUBSURFACE SOILS 6. SHALLOW GROUND WATER 7. DEEP GROUND WATER THE MANAGEMENT OF CONTAMINANT MIGRATION WITHIN THESE ENVIRONMENTAL MEDIA IS THE OBJECTIVE OF THE SECOND OPERABLE UNIT RI/FS PROCESS.
    [Show full text]
  • Chapter Two. Overview of Galveston
    CHAPTER TWO OVERVIEW OF GALVESTON BAY The Galveston Bay system constitutes the seventh largest estuary in the United States, with 600 square miles of shallow (10-12 foot) water. Because precipitation exceeds mean evaporation and an additional 10 million acre-feet of fresh water enter the estuary annually, the bay has a very low salinity, which in turn is one of the keys to its extraordinary productivity. A second factor is the large number of marsh, forest, and fresh water ponds and lakes that surround the bay, filtering runoff and providing a rich source of nutrients and valuable habitat. The bay supports a wide range of commercial and recreational fishing, producing nearly 7 million pounds of shrimp in 1987 along with oysters, redfish, flounder, and many other kinds of fish. It also provides rookeries for colonial nesting birds. More than 70 species of waterfowl and shorebirds live or migrate through the bay as do 90 species of amphibians and reptiles. Galveston Bay is composed of four main bodies of water and several smaller side bays. Galveston Bay proper, Trinity Bay, East Bay and West Bay. Galveston Bay proper is at the center of the bay complex. Trinity Bay, named after the Trinity River which empties into the bay there, is located in the northeast corner of the bay system. East Bay is a narrow stretch eastward from the center of the bay complex behind the Bolivar Peninsula. West Bay is long and narrow and runs the length of Galveston Island from Pelican Island to San Luis Pass. Texas mainland is separated from Galveston Island by the West Bay.
    [Show full text]
  • Date: 8/24/2017 To: Prospective Bidders Subject: Addendum No. 1
    CITY OF GALVESTON – RFP# 17-23 ADDENDUM 1 TRANSFER STATION AND RECYCLING CENTER OPERATIONS Date: 8/24/2017 To: Prospective Bidders Subject: Addendum No. 1 – Transfer Station and Recycling Center Operations Clarifications This addendum forms part of the bidding and contract documents and modifies the original bidding documents dated 7/12/2017. Acknowledge receipt of this addendum in the space provided below. FAILURE TO DO SO WILL SUBJECT BIDDER TO DISQUALIFICATION. Correction to Section V – Proposal Submittal Process, page 47, the proposals are due, Wednesday, October 18, 2017, at 2:00 p.m. CST. A list is attached with more detailed information of containers. The recycling center is not required to hold a TCEQ (Texas Commission on Environmental Quality) permit. Capital Improvement Projects possible for next fiscal year: glass crusher, styrofoam machine, and a metal building that would house equipment, two offices, and a breakroom for employees. Employees can be moved to other divisions or can be hired by the contractor depending on the needs of the parties and negotiations of the contract. I hereby certify receipt of this addendum and have incorporated its information or changes in preparation of my submittal. _______________________________ _____________________________ Authorized Signature Date _______________________________ _____________________________ Printed Name Company Name A COPY OF THE ADDENDUM MUST BE SIGNED AND RETURNED WITH YOUR BID Customer Name Service Frequency House # Street Name City State Zip Cont Type S H F STRAND
    [Show full text]
  • Long-Term Community Recovery Plan
    LONG-TERM COMMUNITY RECOVERY PLAN LONG-TERM COMMUNITY RECOVERY PLAN GALVESTON, TEXAS April 9, 2009 EXECUTIVE SUMMARY In addition to gathering input at community meetings, the committee established a Communications Committee that very quickly developed a website, On September 13, 2008, Hurricane Ike made landfall on Galveston Island, Texas. www.recoverygalveston.org, to dispense information to and gather input from More than 75 percent of the structures in the community had damage impacts as a Galvestonians…both those who were living on the island and those displaced by result of the storm. Ten weeks later, the Galveston City Council initiated the the storm. recovery planning process with the first appointments to the Galveston Community Recovery Committee (GCRC). At the same time, the City entered into the Federal Listening to a diversity of voices, the Committee broke into five focus areas, 13 Emergency Management Agency’s (FEMA) Long Term Community Recovery work groups, and 42 project teams. Members developed visions, goals, and Program, which provides coordination of resources and planning services to eventually projects to move Galveston along the road to recovery. The goals and support an area’s recovery planning efforts. Guided by commitment to an inclusive projects articulated in the Recovery Plan contribute to a Galveston that: process, over a six-week period, City Council made additional committee • Behaves in an environmentally responsible manner appointments until the GCRC numbered 330 members. The Committee was charged with developing a vision, goals and projects that would move Galveston • Protects its natural resources along the road to full recovery from the devastation of Hurricane Ike.
    [Show full text]
  • Galveston Island State Park Marsh Restoration
    TEXAS RECIPIENTS Texas General Land Office Galveston Island State Park Marsh Restoration AWARD AMOUNT and Protection in Carancahua Cove – Phase II $3,234,500 This project will create 5,400 linear feet of breakwater shoreline to protect 2 acres of PARTNERS Texas Parks & Wildlife estuarine emergent marsh and 12 acres of seagrass beds in West Galveston Bay. This Department critical habitat project will be complimented by the creation of an additional 73 acres of estuarine marsh complex slated for restoration under Phase I of this project. The marsh LOCATION West Bay, Galveston, Texas habitat created by this investment will serve as important nurseries for fisheries as well as foraging, roosting, and wintering habitat of numerous coastal and migratory bird species. AWARD DATE Additionally, this project will create 8,830 linear feet of hard substrate similar to oyster November 2015 reefs that will provide beneficial fish habitat. STATUS This project will restore critical coastal and near-shore habitats within West Galveston Bay, Active which is critical to numerous coastal-dependent and migratory bird species. This project PROGRESS UPDATE will enhance and preserve the ongoing habitat restoration and shoreline protection Year 1 monitoring is investments of local, State, and Federal partners dating back to 1997. This project will complete. Monitoring activities for year 2 will begin implement the major goals of over a dozen local, State, Federal, and NGO plans focused on in summer 2019. (January the ecological restoration and conservation of Galveston Bay, a priority estuarine complex 2019) along the Texas coast. Roseate Spoonbill l Credits: NPS The breakwater and estuarine marsh complex The Gulf Environmental Benefit created by this Fund, administered by the project will protect National Fish and Wildlife and expand Foundation (NFWF), supports existing marsh and projects to remedy harm and eliminate or reduce the risk of seagrass habitat harm to Gulf Coast natural that is important resources affected by the 2010 for numerous fish Deepwater Horizon oil spill.
    [Show full text]