One Capitol Mall Suite 4D-200 Little Rock, AR 72201 (501) 682.4261 www.arkansasfacilities..gov

Academic Facilities Master Plan Program - State Plan

For the Governor, the House Committee on Education, the Senate Committee on Education, and the Academic Facilities Oversight Committee

October 1, 2016 Academic Facilities Master Plan Program – State Plan

2016 Report on Academic Facilities Master Plan Program – State Plan

Preamble “…to ensure that adequate facilities and substantially equal facilities are, and will continue to be provided for Arkansas’ school children.”------Act 1181 of 2003

Arkansas Code Annotated (A.C.A.) § 6-21-807 mandates that “the Division of Public School Academic Facilities and Transportation develop a comprehensive state Master Plan for managing state financial participation in local academic facilities projects across the state”.

A.C.A. § 6-21-112 further states that “a report on the state Academic Facilities Master Plan will be made to the Governor, the House Committee on Education, the Senate Committee on Education, and the Academic Facilities Oversight Committee by October 1 of each even numbered year”.

The state Master Plan documents the state’s role to provide guidance through manuals, rules, and funding programs to raise the level of the academic facilities in the state of Arkansas through repair and new construction programs in conformance with those manuals and rules. The compilation of the individual school district Master Plans, which must be approved by the state, details the state’s plan to achieve suitable and adequate facilities for all Arkansas school districts.

The academic facilities program includes two primary components of planning and funding programs.

1. Planning

A. The Academic Facilities Master Plan Program is a program through which each school district develops and submits a Facility Master Plan for review and approval by the division. A Facility Master Plan is a six-year plan developed by a school district that contains current enrollment projections and details the school district’s strategy for maintaining, repairing, renovating, and improving through new construction or otherwise the school district’s academic facilities. The division is charged to analyze each local Master Plan and develop a statewide Master Plan which serves as a management tool for overseeing the state financial participation of

Division of Public School Academic Facilities and Transportation October 1, 2016 1 Academic Facilities Master Plan Program – State Plan

local academic facilities projects across the state. The statewide Master Plan includes the following:

i. A list of committed projects for public school academic facilities for the upcoming fiscal year characterized by program and method of state financial participation and,

a. The committed projects and the estimated costs are compiled after review and approval by the division and submitted to the Commission for Arkansas Public School Academic Facilities and Transportation for approval.

ii. the total estimated cost of each committed project and the estimated amount of state financial participation.

iii. A four-year rolling forecast of planned new construction projects related to public school academic facilities.

a. The compilation of the four-year rolling forecast is derived from the individual school district’s forecast detailing its anticipated needs.

B. The Arkansas Public School Academic Facility Manual (Facility Manual) was developed to provide uniform standards to guide the planning, design, and construction of new public school academic facilities and additions to existing public schools.

i. The Facility Manual outlines the construction standards for new construction and renovations. It is written to comply with the most current codes and construction procedures that are available at the time of the review and identifies which portions of the facility manual are considered standards and which portions may be considered guidelines.

ii. The Facility Manual contains the Program of Requirements that defines the number, size, and type of spaces required in the construction of new Arkansas school facilities. It explains the rationale for the determination of spaces and clarifies which spaces are required under the Arkansas facility program and those spaces which are optional in school construction. An explanation is also provided that explains standards and guidelines as they pertain to educational spaces.

Division of Public School Academic Facilities and Transportation October 1, 2016 2 Academic Facilities Master Plan Program – State Plan

2. Funding

Supplementing the aforementioned statutes is A.C.A. § 6-20-2501 – 6−20−2515 entitled “Arkansas Public School Academic Facility Funding Act”. These statutes provide the funding programs by which state financial assistance is rendered to school districts under the following academic facilities program.

Current Funding Programs

a. Academic Facilities Partnership Program - A.C.A. § 6−20−2507 is the principal funding program to support the long range goals and objectives of the school districts as defined in their Master Plan. State financial participation, based on a district’s Academic Facilities Wealth Index, is made available to a school district for eligible new construction projects as defined in A.C.A. §6-20-2502.

b. Academic Facilities Catastrophic Program - A.C.A. § 6−20- 2508 is the state program to provide state financial participation for eligible catastrophic repair and construction projects. State funding supplements insurance or other public or private emergency assistance received by or payable to the school district to rebuild or repair the damaged facility to current state facility standards.

c. High Growth School District Loan Program - A.C.A. § 6−20- 2511 establishes the Academic Facilities High-Growth School District Loan Program. This statute establishes a program to provide an interest free loan to high-growth school districts in which the mills required to service the bonded indebtedness incurred for academic facilities exceeds the maximum expected millage for the high-growth school district.

Division of Public School Academic Facilities and Transportation October 1, 2016 3 Academic Facilities Master Plan Program – State Plan

Attachments

Committed Projects

As mandated by A.C.A. § 6-21-807, attached is a list of committed projects for public school academic facilities for the upcoming fiscal year. The list indicates both the estimated state financial participation and estimated total project cost, and projects that have been completed.

Currently, the state has 146 Partnership Program projects committed with a total state financial participation amount of $261,072,356. There have been 1,418 Partnership Program projects completed with a total state financial participation of $766,661,394.

Including the combined total of $116,916,872 for the Catastrophic, Transitional, and Immediate Repair programs, the state has completed or committed a total of 2,039 projects and provided $1,027,733,750 of state financial participation as shown in the attached list of committed projects.

Four-Year Rolling Forecast

A.C.A. § 6-21-807 also mandates the four-year rolling forecast (see attachment) of planned new construction projects, related to academic facilities, as proposed by the school districts within their most recent Master Plan. This forecast represents the initial planning by the school districts. It will be refined as the process moves forward when applications are received for the Partnership Program and the Master Plan is updated each year.

Summary

As of this date, all school districts have submitted Master Plans of committed and planned projects for division review. These Master Plans show districts involved in both immediate and long-range planning. School districts have also submitted requests for state financial participation in the various funding programs. School districts that do not submit Partnership Project applications are reviewed by the division on a case-by-case basis in accordance with A.C.A. § 6-21-811. Many districts not submitting Partnership Program project applications have district funds committed to earlier biennium Partnership Program construction projects and are completing those before requesting more state funds for additional projects.

Division of Public School Academic Facilities and Transportation October 1, 2016 4 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Alma School District Not Specified Construct additional Classrooms 0607 Partnership $956,930.00 $652,202.49 Completed Alma School District Not Specified Construct additional Classrooms 0607 Partnership $1,527,949.00 $692,264.00 Completed Alma School District 1701 - Alma Primary School Multi-use Facility/Safe Room 0911 Partnership $1,167,227.93 $781,727.25 Completed

Alma School District 1701 - Alma Intermediate School Multi-use Facility/Safe Room 0911 Partnership $1,330,828.18 $891,295.21 Completed Replacement of cafeteria and kitchen to update and to accommodate Alma School District Alma Intermediate School growth 0607 Partnership $1,700,391.00 $1,158,913.65 Completed

Construction of additional classrooms Alma School District Alma Middle School to accommodate growth 0607 Partnership $3,624,423.00 $2,261,806.63 Completed Add 4 classroom to building because Alpena School District Alpena Elem.School of growth and space 0607 Partnership $565,185.60 $379,822.00 Completed Arkadelphia School District High School Install Security/Surveillance System 0607 Partnership $110,400.00 $39,610.00 Completed Arkadelphia School District High School Construct JROTC Facility 0709 Partnership $245,449.02 $70,405.02 Completed Arkadelphia School District 1002 - Goza MS Roof Project Main Goza Building 1113 Partnership $251,550.00 $91,138.82 Completed Arkadelphia School District Perritt Primary Install New Sloped Roof 0709 Partnership $265,280.76 $157,790.00 Completed Install New Sloped Roof over Arkadelphia School District Goza Middle School & Peake ES Cafeteria Room Area 0607 Partnership $274,747.47 $169,106.72 Completed Install New Sloped Roof (1/2 of Arkadelphia School District High School building) 0709 Partnership $907,828.00 $317,144.00 Completed Arkadelphia School District Not Specified New Middle School 1517 Partnership $10,039,050.00 $3,737,939.46 Committed Arkadelphia School District Not Specified New Elementary 1517 Partnership $13,963,678.96 $5,199,235.64 Committed Atkins Public Schools Atkins Middle School Strobe is missing and is needed 0607 Partnership $1,741.00 $1,136.98 Completed Classroom door lacks appropriate Atkins Public Schools Atkins High School hardware (Combined Projects) 0607 Partnership $12,360.00 $7,587.75 Completed HS ROOF - VOCATIONAL/CAFE/FINE Atkins Public Schools 5801 - Atkins High School ARTS 1517 Partnership $204,947.82 $127,026.97 Committed High School Classroom Addition & Atkins Public Schools 5801 - Atkins HS Safe room. 1113 Partnership $506,425.98 $316,909.03 Completed HS HVAC - VOCATIONAL/CAFE/FINE Atkins Public Schools 5801 - Atkins High School ARTS BLDGS 1517 Partnership $555,960.51 $344,585.17 Committed

Atkins Public Schools 5801 - Atkins High School Life Cycle HVAC - Senior High School 1315 Partnership $1,347,808.30 $451,504.48 Completed Atkins Public Schools Atkins Elementary New K-8 Facility 0709 Partnership $15,454,354.41 $10,018,850.19 Completed 7401 - Cotton Plant Elementary Fire Alarm System w/ Emergency Augusta School District School Lighting 0911 Partnership $22,992.20 $10,364.67 Completed Fire Alarm System w/ Emergency Augusta School District 7401 - Augusta High School Lighting 0911 Partnership $55,712.80 $25,114.80 Completed Augusta High School roof Augusta School District 7401 - Augusta High School replacement 1315 Partnership $620,682.00 $127,841.49 Completed

Bald Knob Public Schools BKMS Security system requires replacement 0607 Partnership $3,500.00 $1,256.01 Completed Install security/Surveillance System in Bald Knob Public Schools BKMS the main middle school building 0607 Partnership $4,000.00 $2,640.54 Completed

Bald Knob Public Schools H. L Lubker Elementary Security system requires replacement 0607 Partnership $4,000.00 $2,640.54 Completed

Bald Knob Public Schools H. L Lubker Elementary Security system requires replacement 0607 Partnership $4,800.00 $3,168.65 Completed

Bald Knob Public Schools BKMS Security system requires replacement 0607 Partnership $6,000.00 $3,960.81 Completed

Bald Knob Public Schools H. L Lubker Elementary Security system requires replacement 0607 Partnership $6,000.00 $3,960.81 Completed

Bald Knob Public Schools H. L Lubker Elementary Security system requires replacement 0607 Partnership $7,100.00 $4,686.96 Completed

Project is for a general renovation of this building. Cited Scopes include, Bald Knob Public Schools H. L Lubker Elementary Electrical, HVAC, Plumbing, Roof. 0709 Partnership $108,165.04 $71,403.48 Completed 7301 - H.L. Lubker Elementary Bald Knob Public Schools School Lubker Elem (0708) Roof replacement 1315 Partnership $330,164.48 $130,406.49 Completed High School/Middle School Bald Knob Public Schools --District Wide-- cafteria/kitchen 1315 Partnership $1,373,430.60 $542,469.80 Committed

Bald Knob Public Schools 7301 - Bald Knob MS Middle School addition (replacement) 1113 Partnership $5,680,247.40 $3,597,117.90 Completed Renovate existing restrooms in Barton-Lexa School District Barton Elementary elementary building to meet ADA 0607 Partnership $39,200.00 $28,438.61 Completed

Page 1 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Replace HVAC systems in Barton-Lexa School District Barton Elementary Elem/cafeteria 0607 Partnership $80,000.00 $58,037.98 Completed Construction of new restrooms for Barton-Lexa School District Barton Elementary elementary building 0607 Partnership $147,135.60 $106,743.16 Completed Barton-Lexa School District Barton Elementary New roof for elementary buiilding 0607 Partnership $224,313.00 $162,733.41 Completed Barton-Lexa School District 5401 - Barton HS HS Addition (Part 11-13) 1113 Partnership $276,007.25 $195,010.92 Completed Replace/Upgrade HVAC systems in Barton-Lexa School District Barton High School High school 0607 Partnership $424,000.00 $307,601.29 Completed Replace/Upgrade HVAC systems in Barton-Lexa School District Barton Elementary Elementary building 0607 Partnership $547,861.00 $397,459.31 Completed Construction of three elem Barton-Lexa School District Barton Elementary classrooms and 1 Art clsrm 0607 Partnership $602,439.75 $437,054.82 Completed Construction of a new cafeteria and 3 Barton-Lexa School District Barton High classrooms 0709 Partnership $2,874,629.45 $2,078,032.73 Completed 3201 - Batesville Junior High Batesville School District School JHS Roofing Replacement 1315 Partnership $796,477.95 $165,494.29 Completed Construction of six classrooms, a science lab, technology lab, communication lab, additional; restrooms, and expansion of Batesville School District Batesville High School counseling offices. 0709 Partnership $1,686,733.76 $527,728.39 Completed School District Settlement 0607 Partnership $2,369.58 $2,369.58 Completed 6301 - Pine Haven Elementary Pine Haven ES Roof Replacement @ Bauxite School District School Cafe & Main 1517 Partnership $436,904.70 $305,484.87 Committed High School- Old Gym Bauxite School District 6301 - Plumbing/HVAC/Electric Upgrades 1517 Partnership $576,197.16 $402,878.51 Committed Bauxite School District 6301 - Bauxite High School Band Building/Choir 1315 Partnership $629,669.81 $449,520.29 Completed Bauxite School District 6301 - Bauxite High School Replace High School and Gym Roof 1315 Partnership $776,036.30 $515,891.56 Completed High School New Gym HVAC & Bauxite School District 6301 - Bauxite High School Electric 1517 Partnership $809,780.10 $566,200.29 Committed 6301 - Pine Haven Elementary Pine Haven Elementary Addition Bauxite School District School Phase II 1315 Partnership $1,358,848.44 $970,079.77 Completed Bauxite School District 6301 - Bauxite High School PE/Saferoom at High School 1315 Partnership $1,641,628.56 $1,171,956.05 Completed 6301 - Pine Haven Elementary Bauxite School District School Pine Haven Elementary Phase 3 1517 Partnership $2,121,604.84 $1,483,431.46 Committed 6301 - Pine Haven Elementary Phase 1 Kindergarten/Special Ed Bauxite School District School addition 1315 Partnership $2,876,314.02 $2,053,396.07 Completed HS Media Center/Science/Admin Bauxite School District 6301 - Bauxite High School Addition 1517 Partnership $3,603,987.01 $2,519,916.81 Committed Bauxite School District Middle School Middle school 0607 Partnership $10,383,700.00 $7,224,885.00 Completed Bay School District Bay HS Two additional classrooms 0607 Partnership $255,975.00 $160,173.82 Completed New roof primary high school Bay School District 1601 - Bay High School building (Part 15-17) 1517 Partnership $306,844.64 $197,022.18 Committed New construction and demolition of Bay School District Bay Elementary old facility 0607 Partnership $316,431.62 $198,003.95 Completed New construction and demolition of Bay School District Bay HS old facility 0607 Partnership $403,143.56 $252,263.09 Completed Bay School District 1601 - Bay Elementary School ES New Roof (Part 15-17) 1517 Partnership $440,483.60 $282,830.55 Committed Wellness Choir and Band Facility Bay School District Bay Elementary School Addition 1113 Partnership $1,387,591.92 $843,978.23 Completed New construction and demolition of Bay School District Bay HS old facility 0607 Partnership $1,674,861.70 $1,048,028.13 Completed Upgrade/remodel 2 bathrooms in E.S. Bearden School District Bearden Elementary School to meet ADA 0607 Partnership $30,000.00 $9,991.02 Completed Replace/Upgrade1300ft covered Bearden School District Bearden Elementary School walkways on BMS campus 0607 Partnership $79,800.00 $22,606.95 Completed Bearden School District Bearden HS Replace HVAC units at HS. 1113 Partnership $692,547.35 $245,450.85 Completed ADA Accessible sidewalks, curbs, Beebe Public Schools Beebe Junior High School parking, etc. 0607 Partnership $5,000.00 $3,164.50 Completed Beebe Primary/Elementary Beebe Public Schools School Replace Doors and Door Hardware 0607 Partnership $6,000.00 $3,797.40 Completed Beebe Primary/Elementary Beebe Public Schools School Replace Doors and Door Hardware 0607 Partnership $6,000.00 $3,797.40 Completed Middle School Gym Life Safety Beebe Public Schools 7302 - Beebe Middle School Installation 1315 Partnership $21,523.40 $5,980.00 Completed Install suitable Flooring for PE Beebe Public Schools High School PE Building Activities 0607 Partnership $22,400.00 $7,427.72 Completed

Page 2 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Build Parking lot to provide for Beebe Public Schools Beebe Middle School increased enrollment at school 0607 Partnership $31,500.00 $11,819.41 Completed Beebe Primary/Elementary Install suitable Flooring for PE Beebe Public Schools School Activities 0607 Partnership $28,440.00 $12,298.52 Completed Beebe Primary/Elementary Install suitable Flooring for PE Beebe Public Schools School Activities 0607 Partnership $36,800.00 $15,385.49 Completed Beebe Primary/Elementary Beebe Public Schools School Replace Doors and Door Hardware 0607 Partnership $30,000.00 $18,987.01 Completed Beebe Public Schools Beebe Middle School Replace/Upgrade roof 0607 Partnership $57,744.00 $36,546.20 Completed 7302 - Beebe Middle School, Beebe Public Schools McRae Campus Cafeteria Re-roof 0911 Partnership $217,037.22 $139,859.06 Completed Addition to the cafeteria for additional 5-6 grade students Re-roof Beebe Public Schools Beebe Middle School math/science bldg. 0607 Partnership $265,093.00 $167,777.45 Completed conversion for PE Beebe Public Schools 7302 - Beebe High School space- GCE Building 0911 Partnership $371,680.00 $239,511.06 Completed Beebe High School Conversion for additional classroom space - Agri Beebe Public Schools 7302 - Beebe High School Building 0911 Partnership $419,748.00 $270,486.14 Completed Addition to 11-12 Senior High - 6 Beebe Public Schools Beebe High School Classrooms 0709 Partnership $1,051,049.80 $660,961.97 Completed Beebe Public Schools 7302 - Beebe JHS 9-10 Cafeteria Building 1113 Partnership $1,267,431.48 $800,462.31 Completed Addition to the front of the Junior High 7-8 with new offices and six Beebe Public Schools Beebe Junior High School classrooms 0607 Partnership $1,912,768.00 $1,210,591.52 Completed Vocational Complex that includes Agricultural Program, Carpentry Beebe Public Schools Beebe High School Program,… 0709 Partnership $3,565,350.00 $2,242,101.91 Completed

Beebe Public Schools Beebe Middle School New Building Middle School Campus 1113 Partnership $3,558,400.00 $2,247,352.32 Completed Beebe Public Schools Elementary School Beebe Public Elementary K-1 0709 Partnership $10,115,323.34 $6,361,110.63 Completed Benton Public Schools Ringgold ES Exterior doors and hardware 0709 Partnership $48,000.00 $1,531.39 Completed Replace doors, doorframe and door Benton Public Schools Caldwell ES hardware (2 sets) 0709 Partnership $12,000.00 $3,557.98 Completed Benton Public Schools Howard Perrin ES Replace exterior doors 0709 Partnership $48,000.00 $4,584.55 Completed Benton Public Schools Angie Grant Elementary School Entrance improvement, HVAC, roof 0911 Partnership $221,910.00 $48,585.71 Completed Fire alarm requries rplacement/ Combined Projects for Better accuracy of area to be upgraded at Benton Public Schools Benton High School the High Campus Level. 0709 Partnership $128,227.50 $55,659.21 Completed 6302 - Benton Junior High Benton Public Schools School New Roof & External Remodel 1315 Partnership $165,048.00 $75,469.56 Completed Benton Public Schools 6302 - Benton High School Upgrade roof HS Auditorium 1315 Partnership $210,149.16 $96,092.44 Completed Benton Public Schools 6302 - Benton MS Middle School Library Renovation 1113 Partnership $270,467.02 $121,225.16 Completed Benton Public Schools Benton Junior High Renovation of middle school 0709 Partnership $952,810.00 $229,901.00 Completed Benton Public Schools Benton Middle School Construct 6 new classrooms 0709 Partnership $865,580.53 $375,719.14 Completed Benton Public Schools Ringgold ES 4 Additional classrooms & P.E. 0709 Partnership $1,306,956.65 $567,305.54 Completed Benton Public Schools Angie Grant ES Construct 4 Additional Classrooms 0709 Partnership $1,338,375.20 $580,943.26 Completed Benton Public Schools Caldwell ES Elementary Addition 0709 Partnership $1,426,279.01 $619,099.32 Completed Benton Public Schools Benton Junior High Construct 6 new classrooms 0709 Partnership $1,527,663.00 $663,106.67 Completed Benton Public Schools Howard Perrin ES Music, Art, PE classroom additions 0709 Partnership $1,683,390.81 $730,702.83 Completed Middle School - Addition / Benton Public Schools 6302 - Benton Middle School Reconfiguration 1517 Partnership $6,135,925.74 $3,024,017.64 Committed Benton Public Schools Benton High School Phase 2 of Campus Master Plan 0709 Partnership $21,282,154.00 $9,237,860.93 Completed Development of a New Elementary Bentonville Public Schools Bella Vista Elementary school resulting from growth 0607 Partnership $8,925,251.90 $810,883.00 Completed Bentonville Public Schools --NEW SCHOOL-- 5-6 Middle School 1517 Partnership $11,880,056.32 $3,649,689.29 Committed Bentonville Public Schools --NEW SCHOOL-- K-4 Elementary School 1517 Partnership $12,936,790.34 $3,974,330.08 Committed Bentonville Public Schools 0401 - Bentonville High School High School (9-12) 1315 Partnership $58,384,365.69 $15,440,805.77 Committed

Bergman School District 0502 - Bergman High School New HVAC at High school P.E. / gym 1315 Partnership $269,363.29 $62,533.62 Completed

Physical education facility expansion Bergman School District Bergman High School at North side of existing gymnasium 0607 Partnership $424,060.80 $188,652.48 Completed Construct new elementary school Bergman School District Bergman Elementary School building on existing campus 0607 Partnership $6,730,263.90 $4,633,807.14 Completed

Page 3 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Current facility unuseable, Public RR Berryville School District and concession 0607 Partnership $285,000.00 $143,108.97 Completed Renovate present band building into Berryville School District Berryville High School PE facility 0607 Partnership $1,000,863.62 $502,570.40 Completed Band & choir classes due to Berryville School District Berryville High School expanding enrollment 0607 Partnership $1,613,598.76 $810,247.23 Completed Berryville School District Not Specified Negotiated Settlement 0607 Partnership NULL $1,024,000.00 Completed Elementary PE, Band use, graduation, Berryville School District Berryville Elementary honors 0607 Partnership $2,165,920.00 $1,087,588.02 Completed New school for grades 3-5 due to Berryville School District Berryville Elementary enrollment growth 0607 Partnership $6,018,833.00 $3,022,277.21 Completed Bismarck School District Bismarck Middle Replace Failing Roof Bldg E 0709 Partnership $52,322.40 $32,617.53 Completed 3001 - Bismarck Elementary HVAC System Upgrade at A-Bldg and Bismarck School District School multiple buildings 1315 Partnership $437,808.00 $232,048.43 Completed Bismarck School District --Multiple Schools-- Districtwide HVAC Replacements 1517 Partnership $2,159,683.16 $1,335,920.26 Committed Bismarck School District Bismarck H.S. New High School 0709 Partnership $12,458,600.28 $7,766,630.83 Completed Blevins Public Schools Blevins High School Construct Addition for Science Lab. 0607 Partnership $153,714.00 $109,239.01 Completed Blevins Public Schools 2901 - Blevins High School Ag renovation 1315 Partnership $194,240.00 $126,539.34 Completed Const. Addition for Science/Computer Blevins Public Schools Old Emmet Elementary School Lab. 0607 Partnership $555,388.00 $394,694.27 Completed Blytheville Public Schools Central Elementary School New Parking & Drainage 0607 Partnership $92,318.00 $36,604.24 Completed Blytheville Public Schools Replace/Upgrade Roof 0607 Partnership $120,910.00 $71,075.16 Completed Blytheville Public Schools Blytheville High School Replace Green House 0607 Partnership $124,128.00 $74,911.36 Completed Blytheville Public Schools Blytheville High School Replace/Upgrade Roof 0607 Partnership $204,948.00 $99,876.64 Completed Blytheville Public Schools 4702 - Fairview Charter Fairview/Charter Roof* 0911 Partnership $252,182.58 $152,878.11 Completed 4702 - Blytheville Intermediate Blytheville Public Schools Sch HVAC Replacement 0911 Partnership $344,849.45 $209,054.61 Completed Make stage in cafeteria ADA Booneville School District Middle School compliant 0607 Partnership $2,460.00 $1,440.63 Completed Booneville School District High School Install fire alarm panel 0607 Partnership $4,182.00 $1,504.28 Completed Booneville School District Middle School Install fire alarm panel 0607 Partnership $5,789.00 $2,775.63 Completed

Booneville School District 4201 - Booneville Jr. High School Jr. High HVAC Upgrade 1315 Partnership $402,300.00 $41,156.54 Completed Armory PE Roof Replacement and Booneville School District 4201 - Booneville New ES Upgrade 0911 Partnership $117,682.50 $52,223.48 Completed Replace/upgrade defective roofing Booneville School District High School system 0607 Partnership $224,000.00 $85,975.03 Completed

Booneville School District Elementary School Demolition of old elementary building 0607 Partnership $211,120.00 $123,636.32 Completed Bradford School District --District Wide-- Bradford Multi-Roof Replacement 1315 Partnership $815,368.00 $231,202.87 Completed new art, choir, band, elementary Bradford School District Bradford Elementary physical education building 0607 Partnership $2,071,200.00 $837,745.37 Completed Bradford K-12 Campus Bradford School District --District Wide-- Renovation/Addition 0911 Partnership $3,844,829.52 $2,708,059.07 Completed High School/Jr. High/Middle School Brookland School District 1603 - cafeteria roof 0911 Partnership $135,369.48 $75,131.33 Completed Replace/upgrade shingle roof with Brookland School District Middle School efficient metal roof. 0607 Partnership $540,225.00 $164,998.07 Completed Brookland School District Elementary Add 4 new classrooms to current ES 0709 Partnership $485,715.55 $257,878.73 Completed 1603 - Brookland Elementary Brookland School District School ES 4 classroom addition (Part 13-15) 1315 Partnership $637,296.00 $383,246.53 Completed Add 4 new classrooms & science lab Brookland School District High to current JHS 0709 Partnership $1,044,248.76 $554,418.20 Completed Add 4 new classrooms and P.E. facility Brookland School District High to existing M.S. 0709 Partnership $1,053,058.14 $559,095.32 Completed Brookland School District 1603 - Brookland HS HS Addition (Part 11-13) 1113 Partnership $1,598,187.02 $932,968.30 Completed Brookland School District 1603 - Brookland High School JHS/HS PE Complex (Part 15-17) 1517 Partnership $3,625,825.00 $2,227,110.36 Committed Brookland School District Brookland Middle School New Middle School (Part 13-15) 1315 Partnership $9,549,136.44 $5,742,501.76 Committed

Bryant Public Schools Bryant High School Install vent-a-hoods in 3 science labs. 0607 Partnership $4,000.00 $1,886.70 Completed Install thermal energy-saving film on Bryant Public Schools Bryant Middle School cafeteria windows. 0607 Partnership $5,000.00 $2,358.37 Completed Bryant Public Schools Middle School Install HVAC systems in kitchen. 0607 Partnership $18,000.00 $8,490.13 Completed

Bryant Public Schools Bryant High School Install new HVAC systems in kitchen. 0607 Partnership $25,000.00 $11,131.51 Completed

Bryant Public Schools Bryant High School Install new HVAC systems in kitchen. 0607 Partnership $25,000.00 $11,791.85 Completed

Page 4 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Renovate existing gravel road and Bryant Public Schools Bryant High School install asphalt overlay. 0607 Partnership $33,478.00 $15,790.70 Completed Bryant Public Schools Bryant High School Upgrade fire alarm system. 0709 Partnership $67,975.50 $32,062.27 Completed Bryant Public Schools Bryant Middle School Install A/C In Elementary Gym 0709 Partnership $500,736.00 $58,932.62 Completed Roofing Replacements/Upgrades Bryant Public Schools 6303 - Bryant High School (Buildings 15,22,601) 1315 Partnership $272,312.32 $123,548.94 Completed Expand Cafeteria, Construct Five (5) New Kindergarten Classrooms @ Bryant Public Schools 6303 - Springhill ES SPES 1113 Partnership $1,338,874.68 $603,484.71 Completed Expand Cafeteria, Construct New Classrooms & Office Space @ Salem Bryant Public Schools 6303 - Salem ES ES 1113 Partnership $1,530,411.72 $689,818.17 Completed Conversion/Expansion Collegeville 6303 - Collegeville Elementary Elementary to Accommodate 624 Bryant Public Schools School Students 1315 Partnership $1,762,573.39 $842,122.20 Committed Conversion/Expansion Davis 6303 - Robert L. Davis Elem. Elementary to Accommodate 624 Bryant Public Schools School Students 1315 Partnership $1,779,229.98 $850,080.38 Committed Upgrade Electrical Systems & Technology (Buildings Bryant Public Schools 6303 - Bryant High School 1,3,8c,9,13,14,15,17,18,22,23) 1315 Partnership $2,009,416.50 $960,058.88 Committed Additions/Conversions for Grades 8-9 in Building 30 (Media, Bryant Public Schools 6303 - Bryant Middle School Cafeteria/Classrooms/Gym 1517 Partnership $5,639,738.25 $2,788,023.67 Committed Construct a New 624 Student Bryant Public Schools New Elementary Elementary School 1113 Partnership $10,404,403.52 $4,689,683.47 Completed Construct 30 new classrooms for Bryant Public Schools Bryant High School future needs. 0709 Partnership $16,028,370.87 $7,560,165.00 Completed Buffalo Island Central Schools High School Tech Upgrades 0607 Partnership $9,395.00 $1,697.88 Completed Buffalo Island Central Schools Jr. High School ADA upgrades Ext doors 0607 Partnership $5,000.00 $2,648.27 Completed Buffalo Island Central Schools Jr. High School Fire/Safety upgrades 0607 Partnership $13,670.00 $3,034.99 Completed Buffalo Island Central Schools West Elementary Tech Upgrades 0607 Partnership $10,500.00 $5,561.37 Completed Buffalo Island Central Schools East Elementary Tech Upgrades 0607 Partnership $11,500.00 $6,091.03 Completed Buffalo Island Central Schools Administration Building Conversion to classrooms 0607 Partnership $30,000.00 $15,889.64 Completed Buffalo Island Central Schools --Multiple Schools-- New BIC K-12 (Part 15-17) 1517 Partnership $21,545,825.00 $11,110,439.96 Committed Cabot Public School District High School Demolition 0607 Partnership $30,000.00 $18,075.88 Completed Cabot Public School District High School Demolition 0607 Partnership $30,000.00 $18,075.88 Completed Cabot Public School District High School Demolition 0607 Partnership $40,000.00 $24,101.18 Completed Remodel old Media/EAST lab to Cabot Public School District High School accommodate AFJROTC 0607 Partnership $50,000.00 $30,126.47 Completed Cabot Public School District High School Construct Amphitheater 0607 Partnership $200,000.00 $105,232.32 Completed Additional parking spaces and bus Cabot Public School District High School drive 0607 Partnership $488,000.00 $218,226.13 Completed Remodel HS Cafeteria for Science Cabot Public School District High School Labs 0709 Partnership $659,341.20 $389,846.62 Completed Cabot Public School District All Physical Education Facilities HVAC UNITS 0709 Partnership $1,876,493.80 $403,014.78 Completed 4 new classroom added to existing Cabot Public School District Westside Elementary School elementary school 0709 Partnership $734,356.80 $434,200.86 Completed 4304 - Southside Elementary Cabot Public School District School Southside ES Addition (Part 15-17) 1517 Partnership $775,722.12 $473,148.07 Committed 4304 - Northside Elementary Cabot Public School District School Northside ES Addition (Part 15-17) 1517 Partnership $800,010.58 $487,962.71 Committed Cabot Public School District Cabot High School Auditorium Renovation 1113 Partnership $1,247,839.22 $744,345.76 Completed 4304 - Cabot Middle School MS South Add'l Classrooms (Part 13- Cabot Public School District South 15) 1315 Partnership $1,244,056.00 $752,004.25 Committed

Cabot Public School District 4304 - Cabot Junior High School Jr. High School South Science Lab 0911 Partnership $1,571,382.40 $917,931.12 Completed Construct a new elementary on the Cabot Public School District New Elementary School West Central side 0709 Partnership $7,219,818.70 $4,268,839.73 Completed Construct a new elementary school on the Southeast side of the school Cabot Public School District New Elementary School district 0607 Partnership $8,562,121.00 $5,158,930.42 Completed New Cafeteria and Health,Physical Cabot Public School District High School Education, Recreation Building 0607 Partnership $12,612,000.00 $7,599,101.95 Completed New 9 High School - Freshman Cabot Public School District New 9 High School Academy 1113 Partnership $25,541,688.00 $15,235,814.72 Completed Caddo Hills School District Caddo Hills Elementary 8 Battery pack light replacement 0709 Partnership $1,927.36 $1,255.04 Completed

Page 5 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Caddo Hills School District Caddo Hills High School Replace exterior doors 0709 Partnership $9,000.00 $1,476.00 Completed

Combination Fire Protection System Upgrade for All Buildings at Caddo Hills School District Caddo Hills Campus Elementary and some exterior doors 0709 Partnership $13,514.64 $8,800.33 Completed Caddo Hills School District Caddo Hills Middle School Middle School addition grades 5-8 0607 Partnership $2,216,893.00 $1,450,887.11 Completed Calico Rock School District 3301 - Calico Rock ES HVAC Renovation 1517 Partnership $675,200.00 $335,519.00 Committed Security System added to new Camden Fairview School District Camden Fairview MS addition 0607 Partnership $11,241.00 $1,033.81 Completed

Camden Fairview School District Camden Fairview MS Replace doors exiting theater 0607 Partnership $11,000.00 $3,228.16 Completed Add battery back-up lighting to Camden Fairview School District Camden Fairview MS interior rooms 0607 Partnership $8,354.00 $3,385.73 Completed Add a student pick up area to the Camden Fairview School District Camden Fairview MS north side of the school 0607 Partnership $12,458.19 $6,068.87 Completed

Camden Fairview School District 5204 - Ivory Primary School Ivory Roof (Part 15-17) 1517 Partnership $608,950.26 $361,729.61 Committed

Camden Fairview School District Camden Fairview HS HS Roof Improvement 0709 Partnership $1,961,470.68 $366,660.38 Completed 5204 - Camden Fairview Middle Camden Fairview School District School MS HVAC Upgrades 0911 Partnership $710,344.76 $430,558.57 Completed

Camden Fairview School District 5204 - Camden Fairview MS Middle School Roof 1113 Partnership $1,425,600.00 $605,348.81 Completed 5204 - Camden Fairview High Camden Fairview School District School HS HVAC Upgrades 1315 Partnership $2,707,211.08 $1,272,560.95 Completed

Carlisle School District Carlisle High School Construct a New High School Campus 0607 Partnership $11,590,832.28 $4,685,368.00 Completed Cave City School District Parking Lot Lighting 0607 Partnership $20,000.00 $13,561.41 Completed Cave City School District Cave City High School Video Surveillance System 0607 Partnership $21,100.00 $14,307.28 Completed Voice/Data- Cabling & Wiring; Cave City School District Cave City High School Network Switches 0607 Partnership $55,000.00 $37,293.86 Completed Ground prep and Paving for Roads Cave City School District Cave City High School and Parking for Handicapped 0607 Partnership $439,084.00 $297,729.81 Completed 6802 - Cave City Elementary Cave City School District School Kindergarten Center 1315 Partnership $870,026.85 $603,461.55 Completed 1702 - Cedarville Elementary Plumbing & sewar renovation of Cedarville School District School Elementary School 0911 Partnership $190,905.52 $136,966.10 Completed

Cedarville School District 1702 - Cedarville Middle School DrainageSee project 0910-1702-1.1 0911 Partnership $200,116.56 $143,574.61 Completed 1702 - Cedarville Elementary Cedarville School District School Elementary School Cafeteria 1315 Partnership $385,350.00 $272,450.76 Completed 1702 - Cedarville Elementary Electrical, & fire alarm renovation of Cedarville School District School Elementary School 0911 Partnership $518,250.72 $371,821.52 Completed 1702 - Cedarville Elementary Roof renovation of Elementary School Cedarville School District School blds. 0911 Partnership $559,512.72 $401,425.15 Completed

Cedarville School District 1702 -Elementary School Elementary School Drainage/Sitework 0911 Partnership $615,335.60 $441,475.55 Completed 1702 - Cedarville Elementary HVAC Renovation of Elementary Cedarville School District School School 0911 Partnership $946,775.00 $538,088.94 Completed HVAC Renovation at High School, & new dining/clsrm addition. HVAC Cedarville School District 1702 - Cedarville High School renovation @ MS & MS addition. 0911 Partnership $1,194,710.50 $857,150.91 Completed Wastewater System, High School - Cedarville School District 1702 - Cedarville HS Middle School -Elementary School 1113 Partnership $1,889,732.32 $1,355,161.68 Completed High School + Middle School Addition. 2 Science labs and additional dining space = 5806 SF. PE bld., 6 classrooms & 2 dressing rooms = 17,385 SF. plm Cedarville School District 1702 - Cedarville High School 9-23-11 0911 Partnership $3,167,720.17 $2,272,696.39 Completed Centerpoint School District 5502 - Centerpoint High School Band Hall Cafeteria 0911 Partnership $1,126,349.62 $689,204.05 Completed 5502 - Centerpoint Elementary Centerpoint School District School New K-5 School 1315 Partnership $8,405,888.80 $5,220,213.92 Committed Charleston School District Elementary Add surveillance system 0607 Partnership $12,000.00 $7,223.22 Completed Charleston School District Elementary Add surveillance system 0607 Partnership $12,000.00 $7,223.22 Completed Remodel classroom for additional Charleston School District High School program of study 0607 Partnership $20,000.00 $12,038.70 Completed

Page 6 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Move counselors office and demo walls to enlarge the Elementary Charleston School District Elementary Support Offices 0607 Partnership $35,000.00 $21,018.32 Completed 1314 ELEM CAFETERIA BLDG HVAC 2402 - Charleston Elementary HEATING AND COOLING PACKAGED Charleston School District School UNITS 1315 Partnership $155,484.48 $30,015.25 Completed Add weather covering on front of Charleston School District Elementary Annex 0607 Partnership $75,000.00 $45,145.11 Completed Charleston School District 2402 - Charleston High School TECH BLDG ROOFING SYSTEM 1 1315 Partnership $185,605.67 $55,806.66 Completed Charleston School District 2402 - Charleston ES ES Bldg Roof 1113 Partnership $530,558.88 $314,285.62 Completed MS Old Main Demolition - Classroom Charleston School District 2402 - Charleston High School Addition 0911 Partnership $2,854,200.00 $1,693,266.05 Completed H.S. Cafeteria Renovations to HVAC Clarendon School District 4802 - Clarendon HS and Roof 1113 Partnership $146,824.96 $63,456.02 Completed Renovation and conversion of interior spaces, in conjunction with Clarendon School District Clarendon ES catastrophic loss 0709 Partnership $975,480.00 $251,053.00 Completed HS Walls & HVAC Renovations (Part Clarendon School District 4802 - Clarendon High School 13-15) 1315 Partnership $947,210.24 $402,936.86 Completed Clarksville School District Pyron Elementary Expansion of Parking Lot 0607 Partnership $65,070.00 $31,018.66 Completed Clarksville School District 3601 - Kraus MS Kraus MS Roof 1113 Partnership $383,045.00 $222,977.32 Completed Clarksville School District Krause Classroom Addition 0607 Partnership $692,667.17 $323,940.00 Completed Clarksville School District 3601 - Pyron ES Pyron ES Roof 1113 Partnership $674,375.00 $392,565.70 Completed 3601 - Clarksville Junior High Clarksville School District School Clarksville JHS Roofing 1315 Partnership $751,672.56 $449,273.65 Completed Addition of Classrooms and Support Clarksville School District Clarksville Primary School Areas to Current Building 0607 Partnership $973,217.00 $463,929.40 Completed Clarksville School District --NEW SCHOOL-- New 10-12 High School 1517 Partnership $7,455,000.00 $4,562,678.31 Committed Kingsland Elementary Campus Roof Cleveland County School District 1305 - Kingsland Elementary Replacement 1315 Partnership $252,047.52 $57,025.63 Completed Clinton Public Schools Clinton High School Security/surveillance System 0607 Partnership $15,900.00 $7,659.68 Completed Elementary Complex Classroom Clinton Public Schools 7102 - Cowsert ES Addition 1113 Partnership $3,306,940.80 $176,383.56 Completed Construct fully equipped chemistry/science lab: Adding Concord Public School Concord High School additional squarefootage. 0607 Partnership $142,504.00 $73,689.28 Completed Increase seating of cafeteria area to accomodate 50% of student Concord Public School Concord Elementary School population. 0709 Partnership $339,881.76 $170,102.43 Completed Concord Public School Concord High School New VO-Ag Building 0607 Partnership $489,713.00 $388,972.00 Completed Replacing Grades 4-6 Building - ABC Concord Public School Concord Elementary School Building - Gifted/Talented 0607 Partnership $1,393,699.00 $720,686.24 Completed Conway Public Schools Conway High West Replace Roof 0709 Partnership $166,212.00 $41,479.90 Completed Conway Public Schools New Elementary School New Elementary School 1113 Partnership $198,392.88 $48,982.25 Completed Conway Public Schools Carl Stuart Middle School Replace roof 0709 Partnership $971,878.50 $242,542.20 Completed Construction of New Elementary Conway Public Schools Future New Elementary School School 0607 Partnership $8,928,551.00 $2,340,378.82 Completed CHS West - Addition. Phase 1 Conway Public Schools 2301 - Conway High West Classroom Bld. 1113 Partnership $15,133,323.00 $3,736,344.61 Completed Corning Public Schools Corning H.S. Install Water Shut Off Valves 0607 Partnership $10,000.00 $1,142.08 Completed Replace sidewalks and raise above Corning Public Schools Corning H.S. ground level 0607 Partnership $11,687.00 $4,642.45 Completed Corning Public Schools Corning H.S. Paving Gravel Parking Lot 0607 Partnership $15,000.00 $4,687.34 Completed Corning Public Schools Park Elementary School Replace and Upgrade Roof 0709 Partnership $137,048.30 $54,439.70 Completed Corning Public Schools Park Elementary School Upgrade to a pitched metal roof 0709 Partnership $159,789.69 $63,473.26 Completed Corning Public Schools Corning H.S. Upgrade to a pitched metal roof 0709 Partnership $215,415.33 $85,569.43 Completed Corning Public Schools Central Elementary School Upgrade to a pitched metal roof 0709 Partnership $422,943.28 $168,008.60 Completed

Corning Public Schools Central Elementary School Construct New Art and Music Building 0709 Partnership $545,332.29 $216,622.35 Completed Corning Public Schools Park Elementary School Construct new PE Facility 0709 Partnership $1,118,747.40 $444,402.40 Completed Cossatot River School District Van Cove HS Install exit signs 0607 Partnership $300.00 $229.08 Completed Cossatot River School District Van Cove HS Install emergency lighting 0607 Partnership $300.00 $229.08 Completed Cossatot River School District Van Cove HS Install emergency lighting 0607 Partnership $550.00 $419.98 Completed Cossatot River School District Van Cove HS Install exit signs 0607 Partnership $560.00 $427.61 Completed Cossatot River School District Van Cove ES Install emergency lighting 0607 Partnership $600.00 $458.16 Completed Cossatot River School District Van Cove ES Install emergency lighting 0607 Partnership $600.00 $458.16 Completed Cossatot River School District Van Cove HS Install exit signs 0607 Partnership $800.00 $610.88 Completed

Page 7 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Cossatot River School District Van Cove HS Install emergency lighting 0607 Partnership $850.00 $649.06 Completed Cossatot River School District Van Cove HS Install emergency lighting 0607 Partnership $900.00 $687.24 Completed Cossatot River School District Van Cove HS Install exit signs 0607 Partnership $900.00 $687.24 Completed Cossatot River School District Van Cove HS Install emergency lighting 0607 Partnership $900.00 $687.24 Completed Cossatot River School District Van Cove ES Install exit signs 0607 Partnership $2,400.00 $705.56 Completed Cossatot River School District Van Cove ES Install emergency lighting 0607 Partnership $1,200.00 $705.56 Completed Cossatot River School District Van Cove ES Install exit signs 0607 Partnership $1,200.00 $705.56 Completed Cossatot River School District Van Cove ES Install emergency lighting 0607 Partnership $1,600.00 $705.56 Completed Cossatot River School District Van Cove HS Install exit signs 0607 Partnership $1,200.00 $705.56 Completed Cossatot River School District Van Cove HS Install emergency lighting 0607 Partnership $1,800.00 $705.56 Completed Cossatot River School District Van Cove HS Install exit signs 0607 Partnership $1,800.00 $705.56 Completed Cossatot River School District Van Cove HS Install emergency lighting 0607 Partnership $1,600.00 $705.56 Completed Cossatot River School District Van Cove HS Install exit signs 0607 Partnership $1,800.00 $705.56 Completed Cossatot River School District Van Cove HS Install emergency lighting 0607 Partnership $1,800.00 $705.56 Completed Cossatot River School District Van Cove HS Install exterior lighting 0607 Partnership $1,650.00 $1,259.93 Completed Cossatot River School District Van Cove HS Install Additional lighting 0607 Partnership $2,400.00 $1,557.73 Completed Cossatot River School District 5705 -Old Umpire High School Umpire High School Roof 1315 Partnership $68,548.92 $44,857.64 Completed

Cossatot River School District Wickes Mid. School Music Room,Spec Ed, Media, Workrm 0709 Partnership $1,787,857.00 $58,002.10 Completed Construction of a new Phsical Ed. Cossatot River School District Wickes Elem. Facility 0607 Partnership $507,871.00 $316,855.47 Completed Cossatot River School District Wickes Elem. Addition of six (6) classrooms 0607 Partnership $812,166.00 $506,701.98 Completed Building six (6) Cossatot River School District New Umpire ES classroom/restrooms/office 0709 Partnership $1,598,890.59 $602,802.17 Completed BUILD NEW CAFETERIA AND ADDITIONAL EDUCATIONAL AREAS/ Cossatot River School District VAN COVE ELEMENTARY with connecting walks 0709 Partnership $1,753,511.10 $1,294,019.15 Completed New HS & MS w/cafetorium, kitchen, Cossatot River School District New High School gym, and admin. 1113 Partnership $13,085,086.12 $8,997,260.00 Completed Cotter Public Schools --District Wide-- District Wide Fire Alarm System 1315 Partnership $168,082.56 $40,508.27 Completed 2 new classrooms added onto existing Cotter Public Schools Amanda Gist Elementary ES building 0709 Partnership $239,598.00 $116,899.86 Completed 2403 - County Line High School County Line School District Addition HS Addition 1113 Partnership $505,089.20 $143,576.08 Completed County Line School District Elementary School Roof, HVAC, Electrical 1113 Partnership $954,837.76 $195,632.90 Completed Wastewater Treatment System County Line School District --Multiple Schools-- Renovation/Replacement 1517 Partnership $1,488,629.48 $473,115.92 Committed Build 7 CR, Prin. Office and County Line School District County Line High School Auditorium 0709 Partnership $2,903,733.11 $797,318.87 Completed Replacement of 4 sets of exterior Cross County School District Cross County High School double doors w hardware 0607 Partnership $44,000.00 $7,705.10 Completed Redesign South Canopy and ADA Cross County School District Cross County High School compliant 0607 Partnership $40,000.00 $18,023.19 Completed Redesign/replacement of worn-out Cross County School District Cross County High School sidewalks and ADA compliant 0607 Partnership $50,000.00 $22,528.99 Completed Cross County School District 1901 - Cross County ES ES Addition (Part 13-15) 1315 Partnership $797,111.20 $408,443.96 Completed Renovation and upgrade of HS Cross County School District Cross County High facilities 0709 Partnership $1,863,973.00 $839,868.69 Completed Cross County School District Cross County High Build new ES on HS Campus (K-12) 0709 Partnership $6,224,643.00 $2,804,698.76 Completed Crossett School District 0201 - Crossett HS New High School Building 1517 Partnership $16,325,767.22 $1,134,925.47 Committed Cutter-Morning Star Public 2601 - Cutter-Morning Star High Schools Sch. Roof-HS Gymnasium 0911 Partnership $100,320.00 $61,397.00 Completed Cutter-Morning Star Public 2601 - Cutter-Morning Star High Schools Sch. Roof - Middle School 0911 Partnership $152,570.00 $93,374.61 Completed Cutter-Morning Star Public 2601 - Cutter-Morning Star Schools Elem. Sch. Elementary School Roof Replacement 1517 Partnership $699,895.28 $400,321.85 Completed Cutter-Morning Star Public 2601 - Cutter-Morning Star Schools Elem. Sch. Elementary School HVAC Upgrade 1517 Partnership $1,769,993.79 $1,021,359.23 Committed Cutter-Morning Star Public 2601 - Cutter-Morning Star High Schools Sch. New High School 1517 Partnership $8,961,925.00 $5,171,399.40 Committed Life Cycle Electrical - Sr High School Danville Public Schools --District Wide-- and Elementary/Primary 1315 Partnership $717,825.24 $40,173.28 Completed Danville Public Schools S.C. Tucker ES Elementary School Roof 1315 Partnership $749,329.62 $443,900.06 Completed Danville Public Schools --District Wide-- K-12 Addition 1315 Partnership $2,929,692.50 $2,086,152.13 Completed Electrical Distribution/Ceiling Dardanelle Public Schools 7504 - Replacement HS Gym 1315 Partnership $179,714.70 $121,180.65 Completed Dardanelle Public Schools 7504 - Dardanelle High School HS Safe Room 1315 Partnership $524,702.24 $353,803.88 Committed

Page 8 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Renovation Sr. High School - HVAC, Dardanelle Public Schools 7504 - Dardanelle High School Roofing & Plumbing Systems 0911 Partnership $606,879.60 $384,462.64 Completed Dardanelle Public Schools 7504 - Dardanelle ES Primary K-3 New School 1113 Partnership $10,901,661.82 $7,394,536.97 Completed ADA - Bring existing curb ramps into De Queen School District De Queen High School compliance 0607 Partnership $8,616.00 $513.88 Completed ADA - Existing curb ramps are not De Queen School District De Queen Primary fully compliant 0607 Partnership $8,616.00 $579.41 Completed De Queen School District De Queen Middle School ADA - Make curb ramps accessible 0607 Partnership $8,616.00 $627.70 Completed ADA - Make routes between building De Queen School District De Queen Middle School and facilities accessible 0607 Partnership $10,020.00 $979.48 Completed ADA - Accessible routes between buildings and facilities are not De Queen School District De Queen Primary compliant 0607 Partnership $10,020.00 $983.62 Completed ADA - Bring handicap parking spaces De Queen School District De Queen High School into compliance 0607 Partnership $8,382.00 $989.83 Completed ADA - Make routes from sidewalks/parking to building De Queen School District De Queen Middle School accessible 0607 Partnership $10,020.00 $1,125.02 Completed ADA - Handicap parking spaces are De Queen School District De Queen Primary not fully compliant 0607 Partnership $8,382.00 $1,179.51 Completed ADA - Accessible routes from parking or sidewalks to building are not De Queen School District De Queen Primary compliant 0607 Partnership $10,020.00 $1,273.32 Completed ADA - Bring routes from parking/sidewalks to building into De Queen School District De Queen High School compliance 0607 Partnership $10,020.00 $1,451.98 Completed De Queen School District De Queen High School Install fire protection system 0607 Partnership $2,571.86 $1,718.05 Completed

ADA - Bring accessible routes from De Queen School District De Queen High School building and facilities into compliance 0607 Partnership $10,020.00 $1,824.46 Completed ADA - Bring playgrounds and athletic De Queen School District De Queen Middle School fields into compliance 0607 Partnership $11,190.00 $1,872.05 Completed ADA - Bring playgrounds and athletic De Queen School District De Queen Primary fields into compliance 0607 Partnership $9,435.00 $1,893.43 Completed ADA - Bring access to playgrounds/athletic field into De Queen School District De Queen High School compliance 0607 Partnership $9,435.00 $1,967.11 Completed De Queen School District De Queen Parkhill Install fire protection system 0607 Partnership $5,463.00 $3,649.39 Completed De Queen School District De Queen Middle School Install canopy 0607 Partnership $32,513.00 $20,878.94 Completed De Queen School District De Queen Middle School Install fire protection system 0607 Partnership $36,138.00 $24,140.87 Completed De Queen School District De Queen Middle School Asphalt parking lot 0607 Partnership $86,400.00 $55,231.82 Completed De Queen School District De Queen Middle School Replace window system 0709 Partnership $134,061.63 $88,497.93 Completed De Queen School District 6701 - Lockesburg ES Lockesburg ES Roof 1113 Partnership $491,625.80 $286,921.75 Completed New band building and Cafeteria and De Queen School District De Queen High School 4 Classrooms plus design fee 0607 Partnership $2,106,104.00 $1,406,917.65 Completed Construction of new Elementary De Queen School District De Queen Elementary Building 0709 Partnership $7,941,886.30 $4,997,946.74 Completed 0402 - Decatur Elementary Decatur Public Schools School Northside Physical Education 1315 Partnership $754,834.60 $270,774.12 Completed Deer/Mt. Judea School District Deer ES Modify ADA Entrance Door 0607 Partnership $1,200.00 $781.27 Completed Deer/Mt. Judea School District Deer Campus Modify HVAC Systems 0607 Partnership $18,000.00 $11,719.09 Completed Deer/Mt. Judea School District Mt. Judea Campus Modify HVAC Systems 0607 Partnership $18,000.00 $11,719.09 Completed Deer/Mt. Judea School District --Multiple Schools-- Deer Campus Fire Alarms 1517 Partnership $119,618.76 $12,715.45 Completed Deer/Mt. Judea School District --Multiple Schools-- Mt Judea Fire Alarm Installation 1517 Partnership $28,365.44 $13,412.86 Completed Dermott School District 0901 - Dermott High School Gym fire safety 1315 Partnership $24,046.40 $11,637.43 Committed 0901 - Dermott Elementary Dermott School District School Elementary roofing project 0911 Partnership $428,879.25 $241,005.17 Completed 0901 - Dermott Elementary HVAC replacement with electrical Dermott School District School upgrade 1517 Partnership $2,163,922.80 $1,017,670.69 Committed Remove asbestos floor tile and Des Arc Public Schools Des Arc HS replace floor tile in cafeteria 0607 Partnership $22,410.00 $6,550.02 Completed Des Arc Public Schools 5901 - Des Arc High School Roof improvement - gym 0911 Partnership $165,730.94 $82,082.50 Completed DeWitt High School Roofing Dewitt School District 0101 - Dewitt High School Replacement 1315 Partnership $313,561.82 $90,442.61 Completed Dewitt School District 0101 - Dewitt Middle School New DeWitt Middle School 1315 Partnership $3,950,545.50 $1,404,824.42 Committed Roofing repairs made in phases - Dierks Public Schools Dierks High School Phase I 0607 Partnership $300,000.00 $122,493.00 Completed

Page 9 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status 3102 - Joann Walters Dierks Public Schools Elementary Sch. 2 classroom addition 0911 Partnership $275,599.82 $125,580.34 Completed Dollarway School District Replace/Expand 0607 Partnership $557,048.00 $307,230.00 Completed Matthews ES Roof Renovations (Part Dollarway School District Matthews Elementary School 15-17) 1517 Partnership $653,212.80 $345,967.10 Committed Dollarway School District 3502 - Dollarway High School HS Gym Renovations (Part 13-15) 1315 Partnership $1,077,694.56 $618,873.84 Completed HS Addition & Renovation (Part 11- Dollarway School District 3502 - Dollarway HS 13/stimulus) 1113 Partnership $3,181,160.00 $945,750.33 Completed Replace DMS, Gym/Band/P. E., Home Economics, & Class Room (combined Dollarway School District Dollarway Middle School project) 0607 Partnership $7,405,382.00 $5,185,887.00 Completed Add an exterior surveillance system Dover School District Dover High School for high school campus. 0607 Partnership $12,000.00 $7,879.92 Completed Dover School District Dover Middle School Add HVAC units 0607 Partnership $47,700.00 $31,322.68 Completed Dover School District 5802 - Dover MS MS Roof 1113 Partnership $273,190.32 $146,548.13 Completed Dover School District 5802 - Dover High School AGRI CLASSROOM ADDITION 1517 Partnership $525,691.00 $327,341.13 Committed Dover School District 5802 - Dover Middle School MS Renovation 1315 Partnership $911,989.14 $578,729.38 Committed Dover School District 5802 - Dover HS HS HVAC 1113 Partnership $2,617,020.00 $1,009,491.55 Completed Dover School District 5802 - Dover Middle School New MS Addition 1315 Partnership $6,120,529.03 $3,883,960.72 Committed Dover School District Dover Primary School Construct K-4 Facility 0607 Partnership $9,126,269.00 $5,992,855.67 Completed Address fire and safety priority 1 Drew Central Schools Drew Central Elementary School issues in def. report. 0607 Partnership $7,000.00 $3,685.00 Completed Address fire and safety priority 1 Drew Central Schools High School Drew Central issues in def. report. 0607 Partnership $7,000.00 $3,685.00 Completed Address fire and safety priority 1 Drew Central Schools Drew Central Elementary School issues in def. report. 0607 Partnership $8,000.00 $4,211.00 Completed Address fire and safety priority 1 Drew Central Schools High School Drew Central issues in def. report. 0607 Partnership $12,000.00 $6,317.00 Completed Address fire and safety priority 1 Drew Central Schools High School Drew Central issues in def. report. 0607 Partnership $12,000.00 $6,317.00 Completed

Drew Central Schools 2202 - Drew Central HS Replace and upgrade auditorium roof 1113 Partnership $318,158.10 $39,817.05 Completed Vocational Building Roof Drew Central Schools 2202 - Drew Central HS Replacement 1113 Partnership $369,901.48 $58,792.76 Completed Drew Central Schools 2202 - Drew Central HS high school roof replacement 1113 Partnership $258,772.80 $58,792.76 Completed Admin/Cafeteria/Gym HVAC Drew Central Schools 2202 - Drew Central High School Replacement 1517 Partnership $610,713.75 $318,676.66 Committed 2202 - Drew Central Elem. Kindergarten and lower elementary Drew Central Schools School buildings HVAC 0911 Partnership $594,453.11 $329,578.66 Completed Drew Central Schools 2202 - Drew Central HS High School and Vocational HVAC 1113 Partnership $1,064,978.74 $611,098.83 Completed Drew Central Schools Drew Central Elementary Replace building with new 0709 Partnership $1,893,292.00 $996,679.32 Completed Install HVAC System Compliant with Dumas School District Junior High ASHRAE 0607 Partnership $16,000.00 $9,468.13 Completed

Dumas School District 2104 - Dumas Junior High School Air condition Jr. High Gym 1315 Partnership $246,685.55 $117,998.74 Completed District wide alarm and emergency Dumas School District Reed Elementary School light upgrade 0911 Partnership $231,628.00 $143,222.00 Completed Dumas School District Reed Elementary Replace and demolish 0709 Partnership $454,841.76 $269,156.32 Completed

Dumas School District 2104 - Reed Elementary School Replacement of Reed A,B F, 0911 Partnership $1,436,112.99 $887,989.44 Completed Installation of surveillance and alarm Earle School District Earle Elementary School system 0607 Partnership $5,807.69 $4,341.84 Completed Installation of surveillance and alarm Earle School District Earle Elementary School system 0607 Partnership $5,807.69 $4,341.84 Completed Installation of surveillance and alarm Earle School District Earle Elementary School system 0607 Partnership $5,807.70 $4,341.85 Completed Installation of surveillance and alarm Earle School District Earle Elementary School system 0607 Partnership $5,807.70 $4,341.85 Completed Installation of surveillance and alarm Earle School District Earle Elementary School system 0607 Partnership $6,109.23 $4,567.27 Completed Installation of surveillance and alarm Earle School District Earle Elementary School system 0607 Partnership $6,109.24 $4,567.28 Completed Installation of surveillance and alarm Earle School District Dunbar Middle School system 0607 Partnership $9,037.33 $4,686.18 Completed Installation of surveillance and alarm Earle School District Dunbar Middle School system 0607 Partnership $9,243.48 $4,793.08 Completed

Page 10 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Installation of surveillance and alarm Earle School District Dunbar Middle School system 0607 Partnership $9,252.00 $4,797.50 Completed Installation of surveillance and alarm Earle School District Dunbar Middle School system 0607 Partnership $9,798.32 $5,080.78 Completed Installation of surveillance and alarm Earle School District Dunbar Middle School system 0607 Partnership $10,585.49 $5,468.22 Completed Installation of surveillance and alarm Earle School District Dunbar Middle School system 0607 Partnership $10,676.91 $5,536.36 Completed Installation of surveillance and alarm Earle School District Earle Elementary School system 0607 Partnership $9,609.97 $7,184.43 Completed Installation of surveillance and alarm Earle School District Dunbar Middle School system 0607 Partnership $13,855.05 $7,184.86 Completed Installation of surveillance and alarm Earle School District Earle Elementary School system 0607 Partnership $12,679.16 $9,478.96 Completed Earle School District Earle ES ES Fire Alarm - Renovation 1113 Partnership $72,240.96 $56,291.38 Completed ADA-Handicap parking spaces are not East End School District Anne Watson Elementary fully compliant 0607 Partnership $137.00 $93.99 Completed Classroom door lacks the appropriate East End School District Anne Watson Elementary vision panel. 0607 Partnership $1,561.00 $103.26 Completed School lacks an appropriate East End School District Anne Watson Elementary surveillance system. 0607 Partnership $9,250.00 $6,346.34 Completed Fire Alarm, Horn/Storbes, Smoke East End School District Bigelow High School Detectors[Combined Projects] 0709 Partnership $46,395.00 $31,231.79 Completed End of Life:Emergency Lighting Standby Battery Lighting System requires replacement and fire alarm East End School District Anne Watson Elementary system 0709 Partnership $79,003.50 $53,182.91 Completed 5301 - Anne Watson Elementary East End School District School ES WASTE WATER TREATMENT PLANT 1517 Partnership $226,450.00 $138,612.76 Committed East End School District 5301 - Bigelow HS HS Addition 1113 Partnership $2,993,889.60 $1,879,773.03 Completed East Poinsett County School Tyronza ES Ext/Int Renovations (Part District 5608 - Tyronza ES 11-13) 1113 Partnership $400,000.00 $237,478.59 Completed East Poinsett County School LePanto ES Int/Ext Renovations (Part District 5608 - Lepanto ES 11-13) 1113 Partnership $400,000.00 $285,833.80 Completed East Poinsett County School HS/JHS Band/Choir Building (Part 13- District 5608 - HS 15) 1315 Partnership $691,200.00 $486,919.94 Completed Provide battery pack emergency El Dorado Public Schools Old Union Elementary lights 0607 Partnership $1,000.00 $378.19 Completed Provide exit signs, battery pack El Dorado Public Schools Old Union High School emergency lights, & exit sign. 0607 Partnership $1,000.00 $378.19 Completed Provide battery pack emergency El Dorado Public Schools El Dorado High School lights & exit signs 0607 Partnership $1,300.00 $491.65 Completed Provide battery pack emergency El Dorado Public Schools El Dorado High School lights & exit signs 0607 Partnership $1,300.00 $491.65 Completed Provide battery pack emergency El Dorado Public Schools Washington Middle School lights & exit signs 0607 Partnership $1,600.00 $605.11 Completed Provide battery pack emergency El Dorado Public Schools El Dorado High School lights & exit signs 0607 Partnership $2,100.00 $794.21 Completed Provide battery pack emergency El Dorado Public Schools Washington Middle School lights 0607 Partnership $2,100.00 $794.21 Completed Provide battery pack emergency El Dorado Public Schools Washington Middle School lights & exit signs 0607 Partnership $2,100.00 $794.21 Completed Provide battery pack emergency El Dorado Public Schools El Dorado High School lights & exit signs 0607 Partnership $3,200.00 $1,210.22 Completed Provide battery pack emergency El Dorado Public Schools El Dorado High School lights & exit signs 0607 Partnership $4,800.00 $1,815.33 Completed Provide battery pack emergency El Dorado Public Schools El Dorado High School lights & exit signs 0607 Partnership $6,400.00 $2,420.44 Completed Provide battery pack emergency El Dorado Public Schools Washington Middle School lights & exit signs 0607 Partnership $8,600.00 $3,252.46 Completed Provide battery pack emergency lights, exit signs, heat detectors, & El Dorado Public Schools Retta Brown Elementary horn/strobes 0607 Partnership $15,000.00 $5,672.90 Completed Provide battery pack emergency El Dorado Public Schools El Dorado High School lights & exit signs 0607 Partnership $16,100.00 $6,088.91 Completed Provide battery pack emergency El Dorado Public Schools Hugh Goodwin Elem. lights, horn/strobes, & pull stations. 0607 Partnership $16,100.00 $6,088.91 Completed

Page 11 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Provide battery pack emergency lights, exit signs, heat detectors, & El Dorado Public Schools Murmil Heights Elem. horn/strobes 0607 Partnership $16,100.00 $6,088.91 Completed Provide horns, battery pack El Dorado Public Schools Washington Middle School emergency lights, & heat detectors 0607 Partnership $17,100.00 $6,467.10 Completed Install Comprehensive Fire/Safety El Dorado Public Schools Barton Junior High Equipment 0607 Partnership $19,300.00 $7,299.13 Completed Install Comprehensive Fire/Safety El Dorado Public Schools Barton Junior High Equipment 0607 Partnership $19,300.00 $7,299.13 Completed Provide battery pack emergency El Dorado Public Schools El Dorado High School lights & exit signs 0607 Partnership $20,300.00 $7,677.32 Completed Provide horn/strobes, battery pack El Dorado Public Schools West Woods Charter Elem. emergency lights, & heat detectors 0607 Partnership $25,700.00 $9,719.57 Completed Install Comprehensive Fire/Safety El Dorado Public Schools Barton Junior High Equipment 0607 Partnership $28,000.00 $10,589.41 Completed Provide battery pack emergency El Dorado Public Schools Barton Junior High lights 0607 Partnership $30,000.00 $11,345.80 Completed Install Comprehensive Fire/Safety El Dorado Public Schools Barton Junior High Equipment 0607 Partnership $30,000.00 $11,345.80 Completed Provide battery pack emergency lights, heat detectors, horn/strobes, El Dorado Public Schools Northwest Elementary pull stations, & smoke detectors 0607 Partnership $35,300.00 $13,350.22 Completed Provide battery pack emergency El Dorado Public Schools El Dorado High School lights 0607 Partnership $39,720.00 $15,021.83 Completed El Dorado Public Schools Old Union High School Provide fire protection system 0607 Partnership $43,716.00 $16,533.09 Completed El Dorado Public Schools Yocum Elementary Replace Upgrade HVAC 0607 Partnership $69,600.00 $26,322.25 Completed

El Dorado Public Schools Yocum Elementary Replace Upgrade HVAC/Boiler System 0607 Partnership $900,000.00 $340,373.89 Completed Construct New High school for 1600 El Dorado Public Schools New High School students 0709 Partnership $36,525,380.00 $13,615,177.54 Completed Elkins Public Schools 7201 - Elkins HS Elkins High School New 1113 Partnership $10,516,118.29 $6,954,338.24 Completed Emerson-Taylor-Bradley School District --District Wide-- Fire Alarm Project 1315 Partnership $69,054.76 $15,693.69 Completed Emerson-Taylor-Bradley School 1408 - Old Taylor Elementary District School Classroom Addition to Taylor Primary 1517 Partnership $566,236.17 $147,122.43 Completed New High School (39152 SF) and New Emerson-Taylor-Bradley School Gymnasiium (23016 SF) at the District New High Emerson campus 0709 Partnership $6,896,441.47 $1,918,266.39 Completed England School District 4302 - England High School Multi-purpose/Saferoom 1315 Partnership $537,488.74 $303,844.57 Completed 7202 - George R. Ledbetter Farmington School District Elem. Sch. Annex Roof 1315 Partnership $187,748.08 $61,473.01 Completed Farmington School District 7202 - Farmington High School Roof 1315 Partnership $261,360.00 $57,459.40 Completed Farmington School District 7202 - Farmington High School Drama/Choir/Band/Auditorium 1315 Partnership $3,400,679.73 $1,941,797.20 Completed Farmington School District Elementary School New ElementarySchool K-4 0607 Partnership $5,077,403.37 $2,841,737.87 Completed Farmington School District --NEW SCHOOL-- New High School Phase 2 1517 Partnership $11,996,075.00 $7,093,485.70 Committed Flippin School District --Multiple Schools-- K-5 Elementary School 1517 Partnership $3,382,423.68 $652,418.62 Committed Installation of appropriate Fordyce Public Schools Fordyce Elementary School surveillance system 0607 Partnership $11,765.00 $7,255.02 Completed Installation of appropriate Fordyce Public Schools Fordyce Elementary School surveillance system 0607 Partnership $26,715.00 $11,640.75 Completed Expansion of undersized surveillance Fordyce Public Schools Fordyce Middle School system 0607 Partnership $19,800.00 $12,017.91 Completed Foreman School District Foreman High School Install fire /intercom/bell system 0607 Partnership $91,536.37 $39,710.90 Completed

General Renovations-H.S. Cafeteria Foreman School District 4102 - Foreman High School HVAC, Electrical, and Plumbing Added 0911 Partnership $109,948.80 $50,660.03 Completed Foreman School District Oscar Hamilton Elementary Refurbish into a P.E. Facility 0709 Partnership $338,754.87 $146,961.44 Completed New Cafetorium/Art/Music/2 Foreman School District Oscar Hamilton Elementary Classrooms/Parent Center 0709 Partnership $1,811,635.65 $785,938.74 Completed fire protection/ emergency lights, Forrest City School District FC HS eyewash/emergency shower 0709 Partnership $25,513.34 $16,139.99 Completed Projects 70-72. Emergency and Forrest City School District FC Jr High Window Upgrades 0709 Partnership $59,599.00 $37,702.91 Completed Forrest City School District FC HS Interior Renovations and Roofing 0709 Partnership $84,177.60 $53,251.57 Completed Forrest City School District Madison ALE Interior Renovations and Roofing 0709 Partnership $188,711.61 $119,380.80 Completed Interior Renovations -- Roofing, Forrest City School District Old Stewart ES Electrical 0709 Partnership $275,624.79 $174,362.92 Completed

Page 12 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Old Stewart HVAC Replacement (Part Forrest City School District 6201-Old Stewart Elementary 11-13/stimulus) 1113 Partnership $314,262.00 $188,796.09 Completed Forrest City School District Lincoln MS Interior Renovations and HVAC 0709 Partnership $591,647.20 $340,965.52 Completed Forrest City School District Stewart ES Interior Renovations and Roofing 0709 Partnership $673,879.07 $426,302.45 Completed Interior Renovations: End of life duct work, HVAC controls/cooling package, & backflow preventer is Forrest City School District Stewart ES missing. 0709 Partnership $688,336.44 $435,448.32 Completed Forrest City School District Central ES HVAC and Electrical Upgrade 0709 Partnership $952,590.00 $602,617.69 Completed Forrest City School District Lincoln MS Interior Renovations (see 29 also) 0709 Partnership $2,423,232.00 $1,387,043.01 Completed Install floor covering from concrete Fort Smith Public Schools Kimmons JHS finished floor to approved covering 0607 Partnership $88,025.00 $13,418.87 Completed Administration offices, nurse room, Fort Smith Public Schools Howard ES reception. 0709 Partnership $398,454.30 $100,892.00 Completed 6601 - Raymond E. Orr Elem. Fort Smith Public Schools School Orr Roof Replacement 1315 Partnership $521,282.90 $167,340.09 Completed 6601 - Euper Lane Elementary Euper Lane HVAC/Electrical Fort Smith Public Schools School Renovation 1315 Partnership $652,146.00 $209,349.23 Completed Fort Smith Public Schools 6601 - John P. Woods ES Woods ES Addition 1113 Partnership $1,002,223.64 $310,930.81 Completed Orr 6601 - Raymond E. Orr Elem. HVAC/Elec/Lighting/Ceiling/Window/ Fort Smith Public Schools School Restroom Upgrades 1315 Partnership $1,304,734.02 $316,799.01 Completed 6601 - Carnall Elementary Fort Smith Public Schools School Carnall Classroom Addition 0911 Partnership $1,516,880.65 $443,148.90 Completed Fort Smith Public Schools 6601 - Sutton ES Sutton ES Addition 1113 Partnership $1,444,720.64 $448,211.50 Completed Construct additional classrooms, a media center, and administrative Fort Smith Public Schools Cavanaugh ES office space 0709 Partnership $2,013,953.72 $509,950.12 Completed Fort Smith Public Schools 6601 - Euper Lane ES Euper Lane ES Addition 1113 Partnership $1,985,589.62 $616,011.21 Completed Construct additional classrooms, a media center, and administrative Fort Smith Public Schools Pike ES office space 0607 Partnership $2,787,478.00 $705,814.00 Completed Media Addition/Classroom Fort Smith Public Schools 6601 - Northside High School Conversions 0911 Partnership $2,473,285.00 $722,557.00 Completed Additional classrooms and a redesign Fort Smith Public Schools Barling ES of the cafeteria 0709 Partnership $2,874,040.36 $727,731.33 Completed Chaffin JHS Addition/Conversion,Classrooms/Ban Fort Smith Public Schools 6601 - L. A. Chaffin JHS d; Media Cntr; Admin. 1113 Partnership $2,494,015.68 $773,745.79 Completed 6601 - William O. Darby Jr. High Darby Jr. High HVAC/Air Fort Smith Public Schools Sch. Handler/Elect. Renovation 1315 Partnership $2,717,520.00 $872,367.10 Committed 6601 - Harry C. Morrison Elem. Morrison Classroom Addition & Fort Smith Public Schools School Renovations 1315 Partnership $2,808,054.00 $901,429.96 Completed

Fort Smith Public Schools 6601 - Sunnymede ES Sunnymede ES Addition/Conversion 1113 Partnership $3,147,428.05 $976,461.07 Completed Surveillance system for safe Fouke School District Fouke Elementary School environment 0607 Partnership $16,200.00 $11,129.66 Completed Renovate/add window systems & Fouke School District Fouke Middle School covered entry ways(yr 2 of 2) 0709 Partnership $121,376.00 $83,387.26 Completed Add 2 classrooms (Fine Arts & Foreign Fouke School District Fouke High School Lang.(yr 2 of 2) 0709 Partnership $456,123.51 $313,364.19 Completed New Construction-4 rooms Fouke School District Fouke Elementary School (Art/Music, Media, Multi Purpose) 0607 Partnership $1,104,068.00 $732,861.47 Completed

Fouke School District Fouke High School Plan vo/ag & family con. Sci.(yr 1 of 2) 0607 Partnership $1,159,094.00 $796,316.22 Completed 4602 - Gary E. Cobb Middle Genoa Central School District School New Gym Roof 0911 Partnership $137,095.59 $103,805.17 Completed Genoa Central School District Genoa Central High High School Cafeteria 0709 Partnership $744,397.64 $571,411.93 Completed Eight additional classrooms and 2 Genoa Central School District Genoa Central Elementary speciality offices 0607 Partnership $905,033.00 $694,719.00 Completed Install Parking Lot Lighting For Gentry Public Schools Gentry High School Auditorium 0607 Partnership $49,145.50 $13,567.73 Completed Gentry Public Schools Gentry Primary School Playground w/Equipment 0607 Partnership $75,000.00 $20,705.46 Completed 0403 - Gentry Intermediate Gentry Public Schools School Replace HVAC at Main Building 0911 Partnership $603,990.00 $74,716.14 Completed Replace roof of main building of Gentry Public Schools 0403 - Gentry MS Middle School 1113 Partnership $602,464.00 $99,871.75 Completed

Page 13 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Replace roof of main high school Gentry Public Schools 0403 - Gentry HS building 1113 Partnership $750,400.00 $160,299.07 Completed 8700 Sq. Ft. Addition to building Gentry Public Schools Gentry Primary School currently under construction 0607 Partnership $930,900.00 $256,996.14 Completed Upgrade HVAC system at Middle Glen Rose School District Glen Rose Middle School School building 1517 Partnership $1,289,383.02 $871,080.73 Committed Awning for handicapped accessible Gosnell School District Gosnell Elementary School ramp - west end of building 0607 Partnership $3,933.00 $2,805.97 Completed ADA Ramp - 5/6 bldg. & Band/gym Gosnell School District Gosnell ES & HS bldg. 0607 Partnership $71,370.00 $50,588.63 Completed Gosnell School District Gosnell Elementary New roof 0709 Partnership $87,670.00 $62,348.79 Completed 4708 - Gosnell Elementary Gosnell School District School Roof Replacement 0911 Partnership $151,200.00 $119,554.12 Completed Gosnell School District Gosnell Elementary New roof 0709 Partnership $188,540.00 $134,085.11 Completed Gosnell School District Gosnell High New roof 0709 Partnership $283,482.16 $186,494.12 Completed Gosnell School District Gosnell Elementary School Expand size of kitchen and remodel 0607 Partnership $265,000.00 $189,062.49 Completed Gosnell School District New upgraded roof 0607 Partnership $387,161.00 $276,217.45 Completed

Gosnell School District Gosnell High Add four classrooms (student growth) 0709 Partnership $708,112.74 $503,592.72 Completed 4708 - Gosnell Elementary Elementary HVAC/Fresh Air Gosnell School District School Renovation (Part 13-15) 1315 Partnership $1,651,038.85 $722,016.45 Completed JHS HVAC/Fresh Air Renovation (Part Gosnell School District 4708 - Gosnell High School 14-15) 1315 Partnership $1,340,905.40 $1,064,550.11 Completed Replace flat membrane roof with Green Forest School District Green Forest Elementary School sloped standing seam metal roof 0607 Partnership $104,745.00 $60,133.10 Completed Green Forest School District High School-Gym Gymnasium Roof Replacement 1113 Partnership $306,897.50 $109,720.75 Completed Replace flat membrane roof with Green Forest School District Green Forest Elementary School sloped standing seam metal roof 0607 Partnership $293,284.00 $168,371.54 Completed

Green Forest School District 0803 - Green Forest High School Cafeteria Renovation 1315 Partnership $691,296.72 $409,462.26 Completed Construction of a new 6, 7 & 8th Green Forest School District Green Forest Middle School grade building. Year 1 of 2 0709 Partnership $4,171,800.00 $2,391,071.26 Completed Replace old door knobs w/handicapped accesible locking Greenbrier School District Greenbrier Middle School door mechanisms 0607 Partnership $2,000.00 $671.37 Completed Greenbrier School District Greenbrier High School Surveillance Systems 0607 Partnership $1,300.00 $817.37 Completed Greenbrier School District Greenbrier Jr. High School Surveillance Systems 0607 Partnership $3,250.00 $1,162.00 Completed Replace old door knobs w/handicapped accesible locking Greenbrier School District Greenbrier Middle School door mechanisms 0607 Partnership $4,000.00 $1,303.27 Completed Replace old door knobs w/handicapped accesible locking Greenbrier School District Greenbrier Jr. High School door mechanisms 0607 Partnership $6,000.00 $1,974.65 Completed Greenbrier School District Greenbrier High School Surveillance Systems 0607 Partnership $3,250.00 $2,043.42 Completed Greenbrier School District Greenbrier Middle School Surveillance Systems 0607 Partnership $8,000.00 $2,229.02 Completed Greenbrier School District Greenbrier Jr. High School Surveillance Systems 0607 Partnership $6,000.00 $3,772.47 Completed

Greenbrier School District Greenbrier Westside Elem. Sch. Covered Walkway to parking Lot 0607 Partnership $11,360.00 $7,142.54 Completed

Greenbrier School District Greenbrier Westside Elem. Sch. Add insulation above classrooms 0607 Partnership $25,700.00 $16,158.73 Completed

Greenbrier School District 2303 - Greenbrier High School Electrical System - Senior High school 0911 Partnership $44,537.60 $26,940.29 Completed Greenbrier School District 2303 - Greenbrier High School Fire alarm systems. 0911 Partnership $136,952.58 $67,069.82 Completed New facility for P.E. and Health that will replace a building built in 1952. Greenbrier School District Greenbrier Jr. High Additional classrooms for growth 0709 Partnership $1,289,955.99 $799,821.68 Completed Greenbrier School District 2303 - Greenbrier HS Classroom Addition 1113 Partnership $1,544,069.14 $904,408.04 Completed New Auditorium and band facility to be located on existing High School Greenbrier School District Greenbrier High School campus 0709 Partnership $3,761,883.00 $2,332,509.00 Completed Replace existing Dean Martin Bldg. with a larger facility designed for Greenbrier School District Greenbrier Middle School middle school students 0709 Partnership $4,507,564.50 $2,794,861.09 Completed Greenbrier School District --District Wide-- New elementary school. 1315 Partnership $6,392,465.73 $3,557,076.70 Committed Greenbrier School District Wooster ES New K-4 Elementary School 0607 Partnership $7,139,099.00 $4,488,668.11 Completed

Page 14 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Installation of UPS systems to meet facilities manual suggestion of 30 Greene County Tech School minute runtime on network District High School equipment 0607 Partnership $2,000.00 $1,064.54 Completed Greene County Tech School Home run cables to building TR to District High School provide necessary backbone access 0607 Partnership $6,000.00 $3,193.63 Completed

Greene County Tech School Route network cables to building MC District Junior High to provide required backbone access 0607 Partnership $8,000.00 $4,258.17 Completed

Greene County Tech School Upgrade building backbone to 1Gbps District Elementary as required by facilities manual 0607 Partnership $9,000.00 $4,790.44 Completed Installation of UPS systems to meet facilities manual suggestion of 30 Greene County Tech School minute runtime on network District Primary equipment 0607 Partnership $10,000.00 $5,285.99 Completed

Installation of secure rack to house network equipment in Fine Arts TR Greene County Tech School (including UTP and fiber patch panels, District High School rack, and cable management) 0607 Partnership $10,000.00 $5,322.72 Completed Replace/ upgrade split system unit on Greene County Tech School stage with roof mounted packaged District High School unit 0607 Partnership $12,000.00 $6,387.26 Completed Install layer 3 switches to provide Greene County Tech School QOS/VoIP/port trunking per facilities District High School manual 0607 Partnership $20,000.00 $10,645.43 Completed Install layer 3 switches to provide Greene County Tech School QOS/VoIP/port trunking per facilities District Intermediate manual 0607 partnership $25,000.00 $13,306.79 Completed Greene County Tech School Add drainage around track and District Primary playground area 0607 Partnership $29,880.00 $15,904.28 Completed Install layer 3 switches to provide Greene County Tech School QOS/VoIP/port trunking per facilities District Elementary manual 0607 Partnership $30,000.00 $15,968.15 Completed Install layer 3 switches to provide Greene County Tech School QOS/VoIP/port trunking per facilities District Junior High manual 0607 Partnership $30,000.00 $15,968.15 Completed Greene County Tech School 2807 - Green Co. Tech Jr. High District School Junior High Sub Drainage 0911 Partnership $428,000.00 $228,890.54 Completed Greene County Tech School District High School Build a new High School 0709 Partnership $27,910,835.57 $14,856,146.03 Completed Greenland School District 7204 - Greenland High School GHS Structural Repair 1315 Partnership $150,000.00 $50,208.40 Completed Greenland School District 7204 - Greenland High School High School HVAC 0911 Partnership $337,515.52 $113,217.36 Completed Greenland School District 7204 - Greenland High School High School Roof Upgrade 0911 Partnership $425,845.34 $142,847.01 Completed Greenwood Public Schools Greenwood High Renovation of the Rock Gym 0709 Partnership $264,168.96 $113,379.43 Completed Construction of a Safe Greenwood Public Schools Westwood Primary Room/Multipurpose Room 0607 Partnership $887,650.00 $387,382.85 Completed Renovation of the old High School Greenwood Public Schools Greenwood High School Cafeteria to classroom areas 0607 Partnership $1,909,579.74 $833,367.25 Completed Greenwood Public Schools --District Wide-- Freshman Center 1315 Partnership $5,454,750.00 $2,305,023.77 Committed Gurdon Public School District Gurdon Primary School Construct 4 additional classrooms 0607 Partnership $737,310.20 $261,270.14 Completed Gurdon Public School District Gurdon School District Construction of Auditorium 0607 Partnership $1,780,350.00 $539,175.00 Completed Exit sign, battery Pack lighting, horn/strobes,fire alarm-Combined 10 Guy-Perkins School District Guy-PerkinsElementary School Projects 0709 Partnership $20,669.25 $14,058.50 Completed End of life-Exterior Doors require Guy-Perkins School District Guy-PerkinsElementary School replacement 0709 Partnership $36,000.00 $24,485.95 Completed Roof -Music, Old Gym, Cafeteria, Old Guy-Perkins School District --District Wide-- Main, & FACS 0911 Partnership $242,886.88 $159,662.85 Completed Construct a New K-12 Educational Guy-Perkins School District K-12 Facility 0607 Partnership $5,274,836.00 $3,058,966.69 Completed Hackett Public Schools --District Wide-- Fire alarm system 0911 Partnership $130,501.80 $89,953.08 Completed 6603 - Hackett Elementary Hackett Public Schools School Roof Replacement at Old Main 1517 Partnership $158,348.00 $102,313.28 Committed Hackett Public Schools 6603 - Hackett High School Roof Replacement 0911 Partnership $229,041.12 $157,874.87 Completed Hackett Public Schools 6604 - Hartford High School HVAC replacement 0911 Partnership $614,755.04 $190,331.92 Completed

Page 15 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Hackett Public Schools --District Wide-- Safe Room /Multipurpose room 0911 Partnership $279,734.40 $192,817.05 Completed Hackett Public Schools 6604 - Hartford HS HS Main - Roof Upgrade 1113 Partnership $446,835.72 $218,697.35 Completed Hackett Public Schools K-12 K-12 Addition Cafeteria 1113 Partnership $486,428.88 $337,801.79 Completed 6603 - Hackett Elementary Hackett Public Schools School Old Main System Renovation 1315 Partnership $540,640.00 $363,660.34 Committed

Construction of six new classrooms, support services space, admin/counseling space, restrooms, and mechanical to establish a middle Hackett Public Schools Hackett High School in conjunction with elementary. 0709 Partnership $868,050.26 $609,047.54 Completed

Construction of eight new elementary classrooms, support services space, admin./counseling space, plus Hackett Public Schools Hackett Elementary restrooms and mechanical 0709 Partnership $1,013,964.70 $711,425.06 Completed Hamburg School District Fountain Hill elementary Abandon and demolish 0607 Partnership $20,000.00 $3,400.02 Completed Hamburg School District Allbritton Upper Elem. School Demolition 0607 Partnership $40,428.00 $9,518.00 Completed Kitchen equipment replacement/plumbing/electrical Hamburg School District Noble Lower Elementary upgrade 0607 Partnership $100,000.00 $29,120.87 Completed upgrade fire alarm, intercom, and Hamburg School District Wilmot Elem. phone systems may be replacement 0709 Partnership $55,170.00 $31,263.19 Completed Fireand safety/warning systems Hamburg School District Hamburg Junior High modifications and improvements 0709 Partnership $65,072.43 $36,874.60 Completed fire/safety/warning system Hamburg School District Hamburg High modifications and improvements 0709 Partnership $96,495.00 $54,680.83 Completed Bring to current standard HVAC Hamburg School District Portland Elem. system 0709 Partnership $157,874.88 $89,462.98 Completed Hamburg School District 0203 - Hamburg Middle School gym structural repairs 1315 Partnership $180,000.00 $118,011.41 Completed Hamburg School District 0203 Portland ES Portland Elementary roofing project 1517 Partnership $290,378.40 $193,174.00 Committed

Hamburg School District 0203 - Portland ES Portland Elementary Electrical Project 1517 Partnership $309,446.40 $205,858.97 Committed 0203 - Portland Elementary Hamburg School District School Classroom addition 0911 Partnership $447,649.95 $284,166.44 Completed Hamburg School District 0203 - Wilmot ES Wilmot Elementary roofing project 1113 Partnership $554,642.40 $295,875.75 Completed Hamburg School District 0203 - Hamburg Middle School Jr. High roof 1315 Partnership $634,887.46 $319,101.43 Completed 0203 - Hamburg Junior High Hamburg School District School Classroom addition 0911 Partnership $567,210.00 $360,062.69 Completed HVAC vocational, band, auditorium, Hamburg School District 0203 - Hamburg HS classroom bldg 1113 Partnership $573,000.82 $375,430.64 Completed Hamburg School District 0203 - Hamburg High School Roof system 0911 Partnership $621,785.00 $394,706.69 Completed Hamburg School District 0203 - Hamburg High School Science labs 0911 Partnership $918,340.00 $582,958.64 Completed Hamburg School District 0203 - Hamburg High School High School classroom addition 0911 Partnership $969,794.05 $615,621.47 Completed Hamburg School District 0203 - Hamburg Middle School Hvac replacement with fresh air 1315 Partnership $2,896,968.60 $806,001.04 Completed HVAC replacement at Noble & Hamburg School District Noble/Allbritton ES Chambers Buildings 1517 Partnership $1,621,292.54 $1,078,563.56 Committed Remodel restrooms to meet ADA Hampton School District Hampton Elementary codes 0607 Partnership $15,000.00 $2,243.67 Completed Replace all light fixtures in hallways Hampton School District Hampton Elementary and classrooms 0607 Partnership $22,000.00 $2,864.62 Completed Hampton School District Hampton Elementary Install suspended ceiling 0607 Partnership $35,000.00 $2,946.04 Completed

Demolish old west wing building and Hampton School District 0701 - Hampton High School construct new high school building 0911 Partnership $5,842,032.56 $1,535,875.40 Completed Harmony Grove School District (Benton) 6304 - Harmony Grove MS Upgrade M.S. Roof 1113 Partnership $136,449.60 $55,368.33 Completed Harmony Grove School District HS Building 8 Roof Replacement (Benton) 6304 - Harmony Grove HS (phase1) 1113 Partnership $136,803.30 $60,276.41 Completed Harmony Grove School District HS Roof replacement phase (Benton) 6304 - Harmony Grove HS 2Buildings 5, 6, &7 1113 Partnership $129,454.20 $76,341.75 Completed Harmony Grove School District 6304 - Harmony Grove Middle (Benton) School Middle School Classrooms 0911 Partnership $2,693,826.24 $1,698,582.79 Completed

Harmony Grove School District Demolish old Café construct addition (Benton) 6304 - Westbrook ES with academic spaces and cafeteria 1113 Partnership $3,146,377.00 $2,069,981.32 Completed

Page 16 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Harmony Grove School District 5205 - Old Sparkman High Fire Alarm Installation-Main, (Camden) School Agriculture, and Gym Building 0911 Partnership $17,865.00 $12,365.94 Completed Harmony Grove School District 5205 - Harmony Grove High Cafeteria (Camden) School Conversion/Renovation/Addition 1315 Partnership $116,282.40 $82,471.71 Completed Harmony Grove School District 5205 - Harmony Grove Elem. (Camden) School Roof Replacement 0911 Partnership $253,132.97 $175,215.62 Completed Harmony Grove School District Renovation (HVAC, Electric, Kitchen (Camden) Harmony Grove HS Suppression) 1315 Partnership $274,989.16 $195,032.32 Completed Harmony Grove School District 5205 - Harmony Grove High (Camden) School Roof replacement 0911 Partnership $529,580.62 $366,569.38 Completed Harmony Grove School District 5205 - Harmony Grove Elem. HVAC replacements at the main (Camden) School building 0911 Partnership $749,140.94 $518,546.42 Completed Harmony Grove School District 5205 - Harmony Grove High (Camden) School HVAC Replacements 0911 Partnership $900,201.77 $623,108.92 Completed Harmony Grove School District 5205 - Harmony Grove High PE/Classroom Addition to HG Campus (Camden) School (Part 15-17) 1517 Partnership $2,582,607.84 $1,810,128.82 Committed Add appropriate Surveillance System with Fire Alarm and Emergency Harrisburg School District Harrisburg-ES Lighting 0607 Partnership $24,766.00 $15,412.49 Completed Elementary Roof Replacement (Part Harrisburg School District 5602 - Harrisburg ES 11-13) 1113 Partnership $666,460.00 $281,887.28 Completed HS/MS Roof Replacement (Part 11- Harrisburg School District Harrisburg High School 13) 1113 Partnership $666,460.00 $453,490.12 Completed 5602 - Harrisburg Elementary Harrisburg ES HVAC & Elect. Renov. Harrisburg School District School (Part 15-17) 1517 Partnership $1,133,100.00 $596,859.63 Committed Harrison School District Skyline Heights ES Addition and Modifcation to ES 0709 Partnership $773,119.29 $159,790.47 Completed Woodland Heights Elementary Harrison School District School Addition and Modifcation to ES 0709 Partnership $994,754.52 $205,598.66 Completed Addition and Conversion to Existing Harrison School District 0503 - Harrison Jr. High School Middle School 1517 Partnership $824,260.86 $223,426.31 Committed Forest Heights Elementary Harrison School District School Addition and Modifcation to ES 0709 Partnership $2,142,852.00 $420,237.19 Completed Conversion and Addition to High Harrison School District 0503 - Harrison Jr. High School School 1517 Partnership $3,805,649.32 $1,031,569.27 Committed Hazen School District --District Wide-- Hazen K-12 Additions (Part 13-15) 1315 Partnership $2,080,210.89 $688,501.50 Completed 1202 - Heber Springs Elem. Heber Springs Public Schools School Elementary school addition 0911 Partnership $1,156,736.00 $68,264.82 Completed Construct band/physical education Heber Springs Public Schools Heber Springs complex 0607 Partnership $4,048,309.00 $73,568.51 Completed Covered walkways for High School Hector School District Hector High School campus 0607 Partnership $50,000.00 $36,454.77 Completed Demolish the Old High School Building and ready the site for Hector School District Hector High School building construction. 0607 Partnership $75,000.00 $54,682.16 Completed Life Cycle HVAC - Kindergarten/Pre- School, Fine Arts, SHS 1010 (Dome), & Hector School District --District Wide-- Vocational 0911 Partnership $355,022.01 $250,217.50 Completed HVAC - Elem Bldgs 901 & 904, SHS Hector School District --District Wide-- 1005, and HS Tech 0911 Partnership $562,423.50 $396,392.90 Completed

New construction of High School Self- Hector School District Hector High School Contained Special Education facility. 0607 Partnership $751,591.00 $547,981.58 Completed A new Health & Physical Education Hector School District Hector High School Multi-Purpose Facility 0607 Partnership $2,587,399.00 $1,886,460.85 Completed Helena/West Helena School District Central High School Roofing Improvement-Trocal 0607 Partnership $189,405.00 $131,796.43 Completed Helena/West Helena School District Central High School Roofing improvement required/Trocal 0607 Partnership $215,307.00 $132,734.43 Completed Helena/West Helena School New Building to house Alternative District Central High School School & At-Risk Students 0607 Partnership $1,129,854.20 $786,202.86 Completed Helena/West Helena School District --Multiple Schools-- HWH JF Wahl Addition (Part 15-17) 1517 Partnership $5,300,077.20 $2,818,721.37 Committed Helena/West Helena School Central HS HVAC Renovations (Part District 5403 - Central High School 13-15) 1315 Partnership $4,650,058.28 $2,842,450.76 Committed Hermitage Public Schools Hermitage Middle School Appropriate Door Hardware 0607 Partnership $1,000.00 $525.00 Completed Hermitage Public Schools Hermitage Elementary School Handicap Entrance Ramps/Parking 0607 Partnership $1,000.00 $527.49 Completed

Page 17 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Bus Loading/Unloading/Bus Dropoff Hermitage Public Schools Hermitage Elementary School Drive/Accessible 0607 Partnership $50,000.00 $1,835.66 Completed Hermitage Public Schools Hermitage Elementary School ADA Acessible Doors 0607 Partnership $3,729.00 $1,967.01 Completed Hermitage Public Schools Hermitage High School ADA Acessible Doors 0607 Partnership $4,000.00 $2,109.96 Completed Hermitage Public Schools Hermitage Middle School ADA Acessible Doors 0607 Partnership $6,000.00 $3,164.94 Completed Hermitage Public Schools Hermitage Elementary School Canopies & Sidewalks 0607 Partnership $8,000.00 $4,032.38 Completed Hermitage Public Schools Hermitage Elementary School Asphalt Parking 0607 Partnership $25,000.00 $13,187.24 Completed Upgrade Electrical & Technology Hermitage Public Schools Hermitage High School Wiring 0607 Partnership $30,000.00 $15,824.69 Completed Hermitage Public Schools Hermitage High School Parking Lot & Play Area 0607 Partnership $50,000.00 $26,374.49 Completed Hermitage Public Schools Hermitage Middle School New Metal Roof 0607 Partnership $160,000.00 $64,663.91 Completed Hermitage Public Schools 0601 - Hermitage High School HS Gym Roof Replacement 0911 Partnership $147,976.50 $82,495.14 Completed Roofing Replacement - Hermitage Public Schools 0601 - Hermitage High School Cafe/Agri/Admin 0911 Partnership $209,911.38 $90,775.94 Completed Two battery pack emergency lights Highland School District Highland High School will be installed. 0607 Partnership $4,456.00 $827.08 Completed Fire Protection System will be Highland School District Highland High School installed. 0709 Partnership $97,722.00 $1,761.60 Completed Surveillance system will be installed Highland School District Highland High School at the school. 0607 Partnership $10,700.00 $3,769.86 Completed Fire Protection System will be Highland School District Highland High School installed. 0709 Partnership $15,809.00 $4,580.16 Completed Plug-ins and data ports will be added Highland School District Cherokee Elementary in classrooms. 0607 Partnership $20,000.00 $5,292.25 Completed Highland School District 6804 - Highland Middle School Middle School Fire alarms 1315 Partnership $67,219.88 $9,964.32 Completed Hillcrest School District Lynn Elementary School Exterior Doors 0709 Partnership $48,000.00 $23,559.84 Completed Intercom, Fire Alarm, and Bell System Hillcrest School District Lynn JHS and ES Needed 0709 Partnership $74,467.50 $27,600.40 Completed Remodel Gym ceiling with drop in Hope Public Schools Hope High School ceiling to improve lighting. 0607 Partnership $165,000.00 $57,259.89 Completed Add drop ceiling to all classrooms, Hope Public Schools Yerger Junior High School covering exposed roof joist 0607 Partnership $382,500.00 $85,885.34 Completed 2903 - Beryl Henry Upper Elem. Roof Replacement Main building, Hope Public Schools School annex and brick addition 0911 Partnership $184,497.00 $92,310.95 Completed

Hope Public Schools 2903 - Yerger Middle School Roof Main Building H. C. Yerger M.S. 0911 Partnership $429,420.00 $214,875.28 Completed 2903 - Wm. Jefferson Clinton Hope Public Schools Primary CPS Roof replacement (Part 15-17) 1517 Partnership $706,491.67 $382,060.48 Committed 2903 - Beryl Henry Upper Elem. Beryl Henry PE and Classroom Hope Public Schools School Building (Part 15-17) 1517 Partnership $2,029,696.64 $1,097,630.60 Committed Horatio School District 6703 - Horatio High School Elementary PE Roof 1315 Partnership $278,192.64 $107,109.11 Completed Horatio School District 6703 - Horatio High School Cafeteria Renovations 0911 Partnership $220,099.00 $164,120.39 Completed Horatio School District 6703 - Horatio High School Elementary PE HVAC Addition 1315 Partnership $274,782.20 $200,950.31 Completed Horatio School District 6703 - Horatio High School Gymnasium Renovations 0911 Partnership $306,910.56 $228,852.84 Completed Renovations to Existing High School Horatio School District 6703 - Horatio High School to convert to K-4. 0911 Partnership $2,225,862.00 $1,517,169.30 Completed Horatio School District --District Wide-- New Jr/Sr High School Campus 0911 Partnership $10,079,291.04 $7,515,787.03 Completed Hot Springs School District Oaklawn Magnet School New PE Facility / Saferoom 1113 Partnership $561,600.00 $2,067.20 Completed Hot Springs Magnet Construction of New bldg. to open Hot Springs School District Intermediate 07/08 0607 Partnership $11,786,152.29 $1,639,544.00 Completed Hoxie Public Schools Administration Building will be demolished 0607 Partnership $25,000.00 $3,911.00 Completed Hoxie Public Schools Elementary Building will be demolished 0607 Partnership $25,000.00 $3,911.00 Completed Hoxie Public Schools --Multiple Schools-- Fire Alarm Project 1517 Partnership $252,823.68 $176,318.16 Committed Hoxie Public Schools 3804 - Hoxie High School HVAC Upgrade Hoxie HS 1517 Partnership $978,820.00 $682,624.91 Committed Multi-Purpose Building with Hoxie Public Schools 3804 - Hoxie HS Classrooms 1113 Partnership $1,173,279.31 $877,092.24 Completed Construct New Wing consisting of 12 Hoxie Public Schools High School Addition Academic Classrooms 0607 Partnership $2,208,755.10 $1,205,640.00 Completed Huntsville School District St. Paul High School Roofing System 1 0709 Partnership $114,200.28 $65,988.35 Completed Huntsville School District Watson Intermediate Add 6-8 New Classrooms 0709 Partnership $2,025,768.00 $1,170,545.00 Completed Izard County Consolidated Purchase Playground Equipment for School District Izard County Cons. High grades 5-6 0607 Partnership $20,000.00 $6,712.78 Completed Izard County Consolidated 3306 - Izard Co. Cons. Elem. School District School New Metal Roof for PE facility 0911 Partnership $65,808.66 $22,362.83 Completed Jackson County School District Old Swifton HS Bring current HVAC up to code 0709 Partnership $205,809.00 $109,045.84 Completed Bring current window systems up to Jackson County School District Tuckerman ES code 0709 Partnership $275,056.00 $140,063.73 Completed

Page 18 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Jacksonville North Pulsaki Improve the roofing system for CR School District Homer Adkins ES Building 300 at this facility. 0607 Partnership $30,000.00 $3,832.44 Completed Jacksonville North Pulsaki Improve the roofing system for CR School District Homer Adkins ES Building 200 at this facility. 0607 Partnership $30,000.00 $3,832.44 Completed Jacksonville North Pulsaki Improve the roofing system for CR School District Homer Adkins ES Building 100 at this facility. 0607 Partnership $30,000.00 $3,832.44 Completed Jacksonville North Pulsaki Improve the roofing system for School District Homer Adkins ES Cafeteria/Kitchen at this facility. 0607 Partnership $74,400.00 $4,910.86 Completed Eye wash stations, Shut off values- Jasper School District Kingston HS Science room 0709 Partnership $666.80 $357.82 Completed School lacks appropriate surveillance Jasper School District Oark HS system 0607 Partnership $18,500.00 $8,544.81 Completed Jasper School District Kingston ES Security system 0607 Partnership $22,100.00 $10,098.41 Completed Jasper School District Kingston HS Security system 0607 Partnership $22,100.00 $10,098.41 Completed School lacks appropriate intrusion Jasper School District Oark ES system 0607 Partnership $22,000.00 $10,098.41 Completed Jasper School District Oark Campus Fire Protection System 0709 Partnership $28,890.00 $15,503.24 Completed Jasper School District 5102 - Kingston High School Fire Alarm System 0911 Partnership $41,328.75 $22,152.53 Completed Jasper School District Jasper Classroom Ventilation 0709 Partnership $142,919.68 $76,694.99 Completed Jasper School District Jasper High School Expansion of Library 0607 Partnership $165,335.00 $93,814.00 Completed Jasper School District 5102 - Kingston ES Roofing at Kingston Campus 1113 Partnership $184,382.00 $101,092.41 Completed 5102 - Kingston Elementary Jasper School District School Sewer Treatment Plant at Kingston 1315 Partnership $586,129.64 $110,150.06 Completed Electrical Distribution/Service-Oark Elementary(K-12 Campus all under Jasper School District Bank ES one roof) 0911 Partnership $232,624.06 $124,688.29 Completed Roofing at SHS, Gym/Vo-ag, and Jasper School District 5102 - Jasper High School Cafeteria/Std Union 1315 Partnership $811,749.00 $383,430.12 Completed Electrical Distribution/Service-Jasper Jasper School District 5102 - Jasper HS Alt. Ed 1113 Partnership $808,836.00 $443,465.64 Completed Jasper School District 5102 - Oark HS Addition to Oark High School 1113 Partnership $931,017.00 $510,454.59 Completed New Construction: Jasper School District Oark ES Cafetorium/Classroom 0607 Partnership $951,476.50 $539,888.63 Completed Cafetorium and Classrooms at Jasper School District 5102 - Kingston HS Kingston HS/ES 1113 Partnership $1,214,040.00 $665,629.40 Completed Completion of High School addition Jasper School District Jasper High School and Auditorium 0607 Partnership $1,930,097.00 $695,070.00 Completed New Fine Arts Center & Field House Jessieville Public School 2604 - Jessieville High School Renovation / Addition 0911 Partnership $915,323.22 $4,576.62 Completed Replacement of interior classroom Jonesboro Public Schools MacArthur Junior High doors and hardware 0607 Partnership $6,000.00 $520.85 Completed Replacement of interior classroom Jonesboro Public Schools Sixth Grade Center doors and hardware 0607 Partnership $10,000.00 $1,971.93 Completed Replacement of original windows in Jonesboro Public Schools West Elementary the 1964 addition. 0607 Partnership $15,000.00 $3,371.22 Completed Replacement of interior classroom Jonesboro Public Schools Hillcrest Elementary doors and hardware 0607 Partnership $20,000.00 $3,488.79 Completed Replacement of interior classroom Jonesboro Public Schools Annie Camp Junior High doors and hardware 0607 Partnership $25,000.00 $4,019.70 Completed Replacement of classroom windows Jonesboro Public Schools Sixth Grade Center on the South hallway 0607 Partnership $25,000.00 $5,353.94 Completed Replacement of two existing fire alarm systems with one central Jonesboro Public Schools Hillcrest Elementary system to meet all codes. 0709 Partnership $74,000.00 $9,557.60 Completed Addtion of electrical service and data Jonesboro Public Schools Hillcrest Elementary wiring for classrooms 0709 Partnership $60,000.00 $13,200.00 Completed 1608 - Sixth Grade Academic Installation of a Standing Seam Metal Jonesboro Public Schools Center Roof on International Studies 0911 Partnership $242,190.00 $60,479.94 Completed MacArthur - Installation of metal Jonesboro Public Schools 1608 - Douglas Macarthur Jhs seam roofing 1315 Partnership $299,735.00 $109,365.13 Completed 1608 - Sixth Grade Academic Replace roof top units on Jonesboro Public Schools Center International Studies 0911 Partnership $638,010.00 $150,082.09 Completed Jonesboro Public Schools 1608 - Kindergarten Center Kindergarten Multipurpose Building 1315 Partnership $826,481.95 $301,560.74 Committed Addition of new kitchen and ten Jonesboro Public Schools South Elementary classrooms 0709 Partnership $2,753,721.00 $577,645.99 Completed Junction City School District JC High School Demolition and removel of building 0607 Partnership $150,000.00 $12,013.11 Completed Junction City School District 7003 - Junction City ES Admin and ES (2-3) Roof 1113 Partnership $103,800.00 $29,927.27 Completed

Page 19 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Replace Structural Wood Beams FACS Junction City School District 7003 - Junction City High School Buiding 1315 Partnership $200,000.00 $37,146.41 Completed Renovate and upgrade all bathrooms Kirby School District kirby high to meet ADA 0607 Partnership $16,200.00 $8,344.40 Completed Construct New Gym with 2 Kirby School District 5503 - Kirby High School Classrooms 0911 Partnership $359,422.44 $192,984.15 Completed Kirby School District 5503 - Kirby High School New agricultural building 0911 Partnership $747,240.00 $401,214.45 Completed Security System; cameras & Lafayette County School District Lafayette Co. MS microphones in classrooms 0607 Partnership $17,850.00 $8,785.88 Completed Security System; cameras & Lafayette County School District Lafayette Co. HS microphones in classrooms 0607 Partnership $25,650.00 $12,625.10 Completed

Lafayette County School District Lafayette Co. MS Add 2 bathrooms 0607 Partnership $29,862.00 $14,332.00 Completed

Lafayette County School District Lafayette Co. MS Construct Playground with pavilion 0607 Partnership $62,008.62 $30,521.04 Completed

Lafayette County School District 3704 - Lafayette Co. ES-West ES & Kindergarten Roof 1113 Partnership $211,405.20 $89,009.06 Completed

Lafayette County School District 3704 - Lafayette Co. HS HS Roof 1113 Partnership $563,172.72 $237,115.61 Completed 6 additional classrooms; approx. Lafayette County School District Lafayette Co. HS 7,350 sq. ft. 0607 Partnership $991,063.00 $487,807.58 Completed P.E. Facility/Gymnasium; approx. Lafayette County School District Lafayette Co. HS 19,500 sq. ft. (new) 0607 Partnership $2,376,887.00 $1,169,919.07 Completed The current electrical service supply entrance has reached it's capacity and needs to be cleaned up and modernized with new modern weather resistant service board. Until this project is completed, no expansion of electrical service will be Lake Hamilton School District LH High School possible. 0709 Partnership $298,998.42 $138,456.55 Completed Lake Hamilton School District 2605 - Lake Hamilton Primary P.E./SaferoomAddition 1113 Partnership $672,375.60 $263,599.11 Completed 2605 - Lake Hamilton Primary Primary School PE/Classroom Lake Hamilton School District School Addition 1517 Partnership $814,684.90 $359,422.24 Committed 2605 - Lake Hamilton Primary Lake Hamilton School District School Primary 8 Additional Classrooms 1315 Partnership $885,992.45 $374,295.92 Committed Addition/Renovation. Demolish Lake Hamilton School District LH Middle School Buildings 0607 Partnership $1,059,240.00 $491,886.06 Completed 2605 - Lake Hamilton Lake Hamilton School District Elementary School Elementary PE/Safe room Addition 1517 Partnership $1,329,660.00 $586,618.68 Committed Lake Hamilton School District 2606 - 8 Classroom Addition 8 Classroom Addition 1315 Partnership $1,461,842.20 $617,569.11 Completed Addition of science wing to high Lake Hamilton School District LH High School school 0709 Partnership $1,892,658.97 $876,429.50 Completed High School/Jr. High New Agricultural Lake Hamilton School District 2605 - Lake Hamilton HS Sciences Facility 1113 Partnership $2,276,814.00 $892,605.49 Completed 2605 - Lake Hamilton High Lake Hamilton School District School High School Gym Renovation 1517 Partnership $2,094,817.88 $924,190.61 Committed 2605 - Lake Hamilton Jr. High Lake Hamilton School District School 14 Classroom Addition 1315 Partnership $2,190,301.85 $925,313.81 Completed 2605 - Lake Hamilton High Lake Hamilton School District School HS Addition/Conversion 1517 Partnership $3,909,996.27 $1,725,010.03 Committed Middle School Addition Replace aproximately 77,000 sq of Lake Hamilton School District (Replacement) existing middle school 1113 Partnership $9,064,340.48 $3,093,761.79 Completed New Construction of Intermediate Lake Hamilton School District LH Intermediate Campus (Grades 4-5) 0607 Partnership $8,334,155.28 $4,208,863.00 Completed Lakeside School District (Hot Springs) Campus-wide Install Surveillance 0607 Partnership $80,600.00 $15,933.54 Completed Lakeside School District (Hot Springs) 2606 - Lakeside High School High School 0911 Partnership $565,460.00 $66,689.32 Completed Lakeside School District (Hot 2606 - Lakeside Intermediate Springs) School Lakeside Intermediate Roof 1315 Partnership $621,465.60 $73,556.35 Completed Lakeside School District (Hot Springs) 2606 - Lakeside High School HS Media Center Conversion 1517 Partnership $414,451.95 $76,203.50 Completed Lakeside School District (Hot Springs) Lakeside Primary/Intermediate PE addition/Saferoom 1113 Partnership $953,175.60 $110,607.50 Completed Lakeside School District (Hot High School/Junior High School Springs) 2606 - Lakeside HS Cafeteria 1113 Partnership $1,003,743.40 $116,475.44 Completed

Page 20 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Lakeside School District (Hot Springs) 2606 - Lakeside MS P.E. Addition/Saferoom 1113 Partnership $1,080,799.20 $125,417.07 Completed Lakeside School District (Hot Remodel Historic Building for useable Springs) Administration classroom space 0607 Partnership $750,000.00 $148,264.93 Completed Lakeside School District (Hot Springs) 2606 - Lakeside MS 8 Additional Classrooms 1113 Partnership $1,296,173.75 $150,409.36 Completed Lakeside School District (Hot Springs) 2606 - Lakeside HS LAB ADDITION AND RENOVATIONS 1113 Partnership $1,542,009.85 $178,936.44 Completed Lakeside School District (Hot Springs) 2606 - Lakeside Primary 11 Classrooms Addition 1113 Partnership $2,154,036.88 $249,956.70 Completed Lakeside School District (Hot Lakeside Intermediate Springs) School/Lakeside Primary Addition to an existing facility 0709 Partnership $2,672,081.81 $514,718.65 Completed Lakeside School District (Lake Village) 0903 - Lakeside High School Replace existing sewer lift station 0911 Partnership $63,198.89 $23,654.32 Completed Lakeside School District (Lake Village) Lakeside High new entrance doors & lock systems 0709 Partnership $63,702.03 $26,060.55 Completed Lakeside School District (Lake Fire safety alarm and emergency light Village) District Wide- All on one campus project 0911 Partnership $142,359.36 $53,282.80 Completed Lakeside School District (Lake Village) Lakeside High upgrade asphalt w/metal roofing 0709 Partnership $137,213.44 $56,134.13 Completed Lakeside School District (Lake HVAC Systems-Replace & bring to Village) Lakeside High current standards 0709 Partnership $581,854.03 $238,036.97 Completed Lakeside School District (Lake New classrooms to replace portable Village) Lakeside High buildings 0709 Partnership $962,831.20 $371,874.01 Completed Lakeside School District (Lake Village) Lakeside High new classroom wing 0709 Partnership $1,030,432.81 $421,550.93 Completed Lamar Public Schools Lamar District Water Fountains to meet ADA 0607 Partnership $5,000.00 $2,928.59 Completed Middle School Science Lab Lamar Public Schools Lamar Middle School Renovations 0607 Partnership $36,000.00 $5,807.58 Completed Lamar Public Schools Lamar High School Outdoor Classroom 0607 Partnership $16,200.00 $9,314.08 Completed Lamar Public Schools Lamar Elementary Canopies 0607 Partnership $31,635.00 $18,529.17 Completed Lamar Public Schools Lamar High School Canopies 0607 Partnership $31,635.00 $18,529.17 Completed Lamar Public Schools Lamar Middle School Canopies 0607 Partnership $31,635.00 $18,529.17 Completed Surveillance Equipment For All Lamar Public Schools Lamar District buildings 0607 Partnership $66,900.00 $26,723.01 Completed Change outdoor knobs to thumb bolt Lamar Public Schools Lamar District locks 0607 Partnership $122,626.00 $56,030.65 Completed Year one of two - replace fire and Lamar Public Schools Lamar District safety 0607 Partnership $400,000.00 $83,307.42 Completed Lamar Public Schools Lamar Elementary New High School Cafeteria 0607 Partnership $1,173,496.00 $687,337.07 Completed Lavaca Public Schools Lavaca High School Science Lab Roof Renovation 0709 Partnership $16,318.23 $8,823.00 Completed Lavaca Public Schools Lavaca Elem. School Install Fire Alarm/Sprinkler System 0709 Partnership $48,018.08 $17,343.03 Completed Replace and Upgrade all exterior doors and ada compliance with the Lavaca Public Schools Lavaca Elem. inclusion of a Smart-Key System 0709 Partnership $48,000.00 $28,049.75 Completed MS Roof, Parts 1,2,3,4, 5.See application & drawings for scope of Lavaca Public Schools Middle School work. 1113 Partnership $445,874.22 $248,349.73 Completed Lavaca Public Schools Lavaca High School New Auditorium 0709 Partnership $1,599,803.66 $945,085.37 Completed Additional Classrooms at Lavaca Public Schools Lavaca MS. School Elementary/MS 0709 Partnership $2,622,727.80 $1,094,198.22 Completed Construction of new wing of high school to replace Old Senior High Lavaca Public Schools Lavaca High School School 0607 Partnership $4,026,688.00 $2,428,504.00 Completed 3810 - Walnut Ridge Middle Lawrence County School District School Replace Roof System 0911 Partnership $242,503.95 $109,091.19 Completed 3810 - Administration Walnut Classroom Annex/Community Center Lawrence County School District Ridge Reroofing (Planned) 1315 Partnership $411,745.60 $137,467.51 Completed

Lawrence County School District 3810 - Walnut Ridge High School New Science Building (Planned) 0911 Partnership $1,153,407.60 $518,864.18 Completed Physical Education-Fine Arts Complex Lawrence County School District 3810 - Walnut Ridge High School (Planned) 0911 Partnership $3,513,014.93 $1,580,341.25 Completed Lee County School District Lee High Replace HVAC 0709 Partnership $1,205,270.82 $449,962.05 Completed Lincoln Consolidated School 7205 - Lincoln Elementary District School Life Cycle Roofing 0911 Partnership $279,849.28 $165,601.13 Completed Lincoln Consolidated School MS End of Life Plumbing, Elect, HVAC, District 7205 - Lincoln Middle School Structural 1315 Partnership $421,925.00 $272,925.00 Completed

Page 21 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Lincoln Consolidated School 7205 - Lincoln Elementary District School Life Cycle HVAC 0911 Partnership $1,185,699.48 $701,639.01 Completed Lincoln Consolidated School District 7205 - Lincoln High School Construct a New 8-12 High School 0911 Partnership $8,900,812.95 $5,278,438.00 Completed Lonoke Public School District Lonoke High School Upgrade exterior doors 0607 Partnership $1,933.00 $1,071.49 Completed Lonoke Public School District Lonoke High School Upgrade exterior doors 0607 Partnership $1,933.00 $1,071.49 Completed Lonoke Public School District Lonoke High School Upgrade door hardware 0607 Partnership $2,000.00 $1,108.62 Completed Lonoke Public School District Lonoke High School Install downspouts and gutters 0607 Partnership $7,000.00 $2,873.55 Completed Lonoke Public School District Lonoke Elementary School Install surveillance system 0607 Partnership $12,650.00 $7,012.05 Completed Lonoke Public School District Lonoke High School Replace fire and safety systems 0607 Partnership $14,630.00 $8,110.00 Completed Install surveillance systems for all Lonoke Public School District Lonoke High School buildings 0607 Partnership $15,900.00 $8,813.56 Completed Renovate sidewalks and exterior Lonoke Public School District Lonoke Primary School doors for ADA accessibility 0607 Partnership $20,000.00 $11,086.24 Completed Renovate two bathrooms in main Lonoke Public School District Lonoke Primary School building to meet ADA 0607 Partnership $33,250.00 $18,430.88 Completed Lonoke Public School District Lonoke Primary School Replace/ upgrade window units 0607 Partnership $100,000.00 $26,823.38 Completed Increase number of parking spaces by Lonoke Public School District Lonoke Primary School 60 0607 Partnership $51,250.00 $28,408.49 Completed Hazardous material abatement and Lonoke Public School District Lonoke Middle School building demolition 0607 Partnership $90,000.00 $30,781.50 Completed

Lonoke Public School District 4301 - Lonoke Primary School Replace HVAC in Primary (Part 13-15) 1315 Partnership $1,898,340.00 $823,717.24 Completed HS Final Addition (Phase 3 - Part 11- Lonoke Public School District 4301 - Lonoke HS 13) - Gina Cox Center 1113 Partnership $1,816,534.88 $1,046,013.59 Completed Lonoke Public School District 4301 - Lonoke High School Phase 2 - Replace LHS Classrooms 0911 Partnership $9,346,264.54 $5,208,763.48 Completed upgrade the electrical service for the Magazine School District JD Leftwich entire building 0607 Partnership $8,333.00 $4,306.97 Completed Replace and upgrade fixed exterior Magazine School District Magazine Elementary windows 0607 Partnership $15,125.00 $5,600.07 Completed Install surveillance & intrusion Magazine School District JD Leftwich system, smoke alarm/detectors 0607 Partnership $10,000.00 $6,658.97 Completed Install surveillance & intrusion Magazine School District JD Leftwich system, smoke alarm/detectors 0607 Partnership $10,000.00 $6,658.97 Completed Install surveillance & intrusion Magazine School District Magazine Elementary system, smoke alarm/detectors 0607 Partnership $15,000.00 $9,988.46 Completed Replace all interior doors, frames, and Magazine School District J.D. Leftwich High School hardware 0607 Partnership $15,071.00 $10,035.73 Completed Install surveillance & intrusion Magazine School District Magazine Elementary system, smoke alarm/detectors 0607 Partnership $15,653.00 $10,423.29 Completed Install surveillance & intrusion Magazine School District JD Leftwich system, smoke alarm/detectors 0607 Partnership $21,500.00 $14,316.79 Completed Replace interior doors, frames, Magazine School District JD Leftwich hardware 0607 Partnership $22,979.00 $15,301.65 Completed Replace interior doors, frames, Magazine School District Magazine Elementary hardware 0607 Partnership $24,000.00 $15,981.53 Completed

Magazine School District Magazine Elementary Upgrade interior doors and hardware 0607 Partnership $31,121.00 $20,723.38 Completed Magazine School District JD Leftwich Install smoke detectors, fire alarm 0607 Partnership $34,171.00 $22,754.37 Completed Replace all exterior window systems Magazine School District J.D. Leftwich High School do to inefficiency & life 0607 Partnership $34,206.00 $22,777.67 Completed Magazine School District Administration Pave new parking area 0607 Partnership $36,000.00 $23,972.29 Completed Install security,surveillance, and Magazine School District JD Leftwich intrusion system 0607 Partnership $38,402.59 $25,572.17 Completed Magazine School District JD Leftwich Replace/ upgrade metal roof 0607 Partnership $46,678.00 $26,355.91 Completed Replace exterior windows for energy Magazine School District J.D. Leftwich High School efficient windows 0607 Partnership $50,207.00 $30,392.17 Completed Install surveillance & intrusion Magazine School District Magazine Elementary system, smoke alarm/detectors 0607 Partnership $56,009.00 $37,296.23 Completed Install a surveillance, security & Magazine School District J.D. Leftwich High School intrusion system 0607 Partnership $72,394.41 $48,207.22 Completed New Physical Education/Storm Magazine School District Magazine Elementary Shelter 0607 Partnership $349,675.00 $232,847.54 Completed Renovation of Auditorium into Magazine School District JD Leftwich Cafeteria 0607 Partnership $676,543.00 $265,861.55 Completed Replace and upgrade all HVAC units Magazine School District Magazine Elementary at ES and HS Combined Projects 0709 Partnership $541,956.80 $345,561.32 Completed

Page 22 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Replace and install-horn/strobe and Magnet Cove School District Magnet Cove Elementary School emergency lighting 0607 Partnership $161,901.00 $38,865.48 Completed

Magnet Cove School District 3003 - Magnet Cove High School New Green House 1517 Partnership $252,198.00 $80,088.37 Completed 3003 - Magnet Cove Elementary Magnet Cove School District School Upgrade Elementary Roof 1315 Partnership $445,635.74 $157,901.03 Committed

Magnet Cove School District 3003 - Magnet Cove High School Roof High School 1315 Partnership $702,669.00 $248,975.00 Committed Magnet Cove School District Magnet Cove High School Building a new Gymnasium 0607 Partnership $3,665,147.20 $1,331,168.72 Completed 1402 - East-West Elementary East Pie Shaped building Media Magnolia Public Schools School Center Fire Alarm 0911 Partnership $4,754.16 $1,965.87 Completed 1402 - East-West Elementary East Pie Shaped building Media Magnolia Public Schools School Center Electrical Replacement 0911 Partnership $25,189.38 $10,415.96 Completed 1402 - East-West Elementary East First and Second Grade Hall Magnolia Public Schools School Renovation 0911 Partnership $28,405.92 $11,746.02 Completed Magnolia Public Schools Magnolia JHS Provide an upgrade in plumbing 0607 Partnership $87,068.00 $39,761.19 Completed Magnolia Public Schools 1402 - Central ES 4th grade wing roof replacement 1113 Partnership $173,885.76 $54,422.58 Completed Re-Roof of Campus-18 classrooms Magnolia Public Schools 1402 - Magnolia Jr. High School and Auditorium 0911 Partnership $285,325.22 $117,983.75 Completed Magnolia Public Schools East-West ES Provide upgrade in roofing 0607 Partnership $720,362.00 $132,909.88 Completed HVAC & electrical upgrades to the Magnolia Public Schools East-West ES building 0607 Partnership $563,800.00 $132,909.88 Completed HVAC & electrical upgrades to the Magnolia Public Schools East-West ES building 0607 Partnership $741,880.00 $132,909.89 Completed Interior Renovation & Electrical Magnolia Public Schools Magnolia JHS Upgrades 0607 Partnership $523,873.00 $138,396.04 Completed Magnolia Public Schools Magnolia JHS HVAC 0709 Partnership $428,277.19 $190,945.12 Completed HVAC Renovation of Campus-18 Magnolia Public Schools 1402 - Magnolia Jr. High School classrooms and Auditorium 0911 Partnership $593,366.32 $245,360.65 Completed Projects 76-78. Provide electrical upgrades to the building, & Provide Magnolia Public Schools Central ES an upgrade in HVAC 0709 Partnership $809,177.50 $360,767.51 Completed 1402 - East-West Elementary Magnolia Public Schools School EAST ELEMENTARY ADDITION 0911 Partnership $2,673,611.38 $1,105,554.87 Completed Malvern School District 3004 - Malvern High School Roof Upgrade 1315 Partnership $943,263.36 $389,711.41 Committed Malvern School District 3004 - Malvern High School New Gym 1315 Partnership $1,540,193.29 $636,334.38 Completed Malvern School District --District Wide-- New Middle School 0911 Partnership $7,783,740.00 $2,796,720.13 Completed Total Renovation of the High School Malvern School District 3004 - Malvern High School Main & Gym 1517 Partnership $14,797,819.50 $5,247,377.15 Committed 2501 - Mammoth Spring High Mammoth Spring School District School fire alarms high school 1315 Partnership $86,471.00 $8,336.15 Completed

Mammoth Spring School District Mammoth Spring Elem School New bathrooms and library addition 0607 Partnership $204,014.14 $20,609.60 Completed

Mammoth Spring School District Elementary School ES Window and Door Upgrade 1113 Partnership $42,448.28 $22,357.33 Completed

Mammoth Spring School District 2501 - Mammoth Spring ES Elementary School Roof 1113 Partnership $151,574.40 $79,833.61 Completed Build Jr. High Building to Address Manila Public Schools Manila High School Seismic upgrades (Yr.1of 2) 0607 Partnership $2,584,760.00 $1,114,468.60 Completed 4712 - Manila Elementary Manila Elementary School Manila Public Schools School Renovations 0911 Partnership $2,768,811.68 $1,962,636.65 Completed Manila Public Schools --NEW SCHOOL-- New Manila HS (Part 15-17) 1517 Partnership $20,535,200.00 $14,024,718.01 Committed Add additional electrical outlets for Mansfield School District Mansfield High School Agri facility 0607 Partnership $35,000.00 $2,388.00 Completed Mansfield School District Mansfield Middle School Replace/Upgrade HVAC 0607 Partnership $45,000.00 $6,021.00 Completed Fire Alarm System & Kitchen Hood Mansfield School District 6606 - Mansfield Middle School Suppression at Middle School 1315 Partnership $149,022.00 $54,110.34 Completed Marion School District 1804 - Marion MS MS Addition (Part 11-13) 1113 Partnership $582,817.25 $281,806.89 Completed Marion School District Marion Elementary Addition to campus 0709 Partnership $1,242,774.06 $656,614.93 Completed Addition of 4 Classrooms @ 1200 S.F. Marion School District Avondale Elementary each 0709 Partnership $1,493,381.04 $789,022.17 Completed Marion School District 1804 - Marion IS IS Addition (Part 11-13) 1113 Partnership $1,704,621.75 $824,227.76 Completed Marion School District Marion Jr. High School Build a New Jr. High School 0607 Partnership $19,968,567.00 $10,550,316.17 Completed HS Roof renovations - Vocational & Marked Tree School District 5604 - Marked Tree High School Cafeteria 0911 Partnership $123,599.10 $70,734.80 Completed Upgrade Fire Alarm Systems - district Marked Tree School District District Wide wide (Part 11-13) 1113 Partnership $163,456.32 $98,812.68 Completed

Page 23 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status 5604 - Marked Tree Elementary ES Gym Plumbing Renovations (Part Marked Tree School District School 15-17) 1517 Partnership $249,429.60 $153,105.90 Committed New PE Building with an art Marmaduke Public School Marmaduke ES/HS classroom and a music classroom 0607 Partnership $1,409,571.00 $895,569.04 Completed Marmaduke Public School Marmaduke ES/HS Senior High Addition 0607 Partnership $2,301,933.00 $1,462,530.04 Completed Marvell-Elaine Public Schools Marvell HS Upgrade/Replace Exterior Doors 0607 Partnership $25,000.00 $14,858.32 Completed Add HS labs, Phase 2 of 2-year project. 2- lab rooms and Media Marvell-Elaine Public Schools Marvell High Center 0709 Partnership $470,690.72 $220,102.66 Completed Add new Physical Education Building. Marvell-Elaine Public Schools Marvell ES Year 1 of 2-year project. 0607 Partnership $551,356.17 $327,689.08 Completed Phase 1 of 2 year project. Includes 2 Marvell-Elaine Public Schools Marvell High School classrooms, 2 offices, 2 restrooms 0607 Partnership $973,915.64 $578,830.05 Completed Replace door hardware to meet ADA Mayflower School District Mayflower SD requirements 0607 Partnership $16,000.00 $5,979.93 Completed Install new emergency lighting and Mayflower School District Mayflower High School update currentfire alarm system. 0709 Partnership $62,564.62 $33,886.70 Completed Mayflower School District 2305 - Mayflower HS HS Addition Agri 1113 Partnership $498,829.62 $279,636.03 Completed Addition of 10 classrooms and system Mayflower School District Mayflower Elementary renovation 0607 Partnership $2,785,240.00 $1,508,561.58 Completed Mayflower School District Mayflower MS Middle School Addition 0911 Partnership $3,707,977.21 $2,041,945.84 Completed Maynard School District Maynard HS Upgrade Roof 0709 Partnership $287,094.00 $114,786.95 Completed 6102 - Maynard Elementary Maynard School District School Replace Roof System 0911 Partnership $233,277.38 $158,564.97 Completed 6102 - Maynard Elementary Maynard School District School Elementary School Project 1315 Partnership $2,129,700.86 $1,394,368.32 Committed Maynard School District 6102 - Maynard High School High School Project 1315 Partnership $2,562,064.74 $1,677,447.75 Committed Mccrory School District 7403 - Mccrory High School Band/Music and Art Upgrade 1315 Partnership $245,380.80 $104,481.74 Committed McCrory School District 7403 - Mccrory HS High School Roof Project Upgrade 1113 Partnership $313,220.52 $167,651.66 Completed

Mccrory School District 7403 - Mccrory High School Safe room/Band and Music Addition 1315 Partnership $538,992.00 $229,499.71 Completed Mccrory School District 7403 - Mccrory High School Multi-Purpose Building (Auditorium) 1315 Partnership $617,525.88 $262,938.99 Committed McCrory School District McCrory High School New Agri Building 0607 Partnership $606,015.00 $318,028.98 Completed Mccrory School District 7403 - Mccrory High School HIGH SCHOOL UPGRADES 1315 Partnership $1,448,769.30 $430,581.84 Completed High School Physical McCrory School District 7403 - Mccrory HS Education/Health Building 1113 Partnership $1,043,140.44 $558,342.16 Completed McCrory School District McCrory Elementary Elementary Addition 0709 Partnership $1,503,130.00 $669,317.31 Completed Replace/ upgrade fire , warning, and McGehee School District Mcgehee elem school bell system to new standard 0607 Partnership $53,000.00 $14,310.00 Completed New dining, food service, music McGehee School District Mcgehee elem room, 5 K-classrooms 0709 Partnership $1,748,216.10 $466,500.02 Completed Replace/ upgrade partial electrical Melbourne School District Melbourne Elementary systems 0607 Partnership $10,000.00 $550.76 Completed Melbourne School District Mount Pleasant High Replace/ upgrade Lighting 0607 Partnership $8,000.00 $814.96 Completed

Melbourne School District Mount Pleasant High Replace/ upgrade ceiling tile and grid 0607 Partnership $12,000.00 $1,965.70 Completed Melbourne School District Melbourne High School Replace/ upgrade Exterior Doors 0607 Partnership $12,000.00 $5,551.91 Completed Melbourne School District Melbourne Elementary Replace/ upgrade Entry ADA Doors 0607 Partnership $18,000.00 $5,836.79 Completed Melbourne School District --District Wide-- New K-6 School 1315 Partnership $10,806,624.45 $5,381,504.92 Committed 5703 - Louise Durham Elem. Mena School District School Remodel Elementary 1315 Partnership $2,347,989.68 $1,217,752.18 Committed Mena School District New HS, Multi Purpose, New Agri 0709 Partnership $16,791,223.08 $8,626,323.00 Completed Midland School District 3211 - Midland High School Midland HS HVAC 1517 Partnership $1,050,568.50 $225,948.56 Committed Midland School District Not Specified Construct a New K-6 School 1113 Partnership $523,218.54 $246,639.73 Completed Mineral Springs Public Schools Mineral Springs High School Construction of Band Hall 0607 Partnership $300,000.00 $251,821.00 Completed Upgrade plumbing fixtures to meet Monticello School District Monticello Intermediate ADA 0607 Partnership $50,000.00 $12,294.89 Completed Monticello School District City Park Replace all emergency lights 0607 Partnership $25,000.00 $14,518.80 Completed Synthetic floor for PE Gym to cover Monticello School District Monticello Elementary concrete floor 0607 Partnership $25,000.00 $14,518.80 Completed Monticello School District Monticello Intermediate Replace all emergency lights 0607 Partnership $25,000.00 $14,518.80 Completed Synthetic floor for PE Gym to cover Monticello School District Monticello Intermediate concrete floor 0607 Partnership $25,000.00 $14,518.80 Completed Monticello School District Monticello Middle Replace all emergency lights 0607 Partnership $25,000.00 $14,518.80 Completed Monticello School District Monticello High Replace all emergency lights 0607 Partnership $50,000.00 $29,037.60 Completed Replace all exterior doors and locks Monticello School District Monticello Middle both exterior and interior 0709 Partnership $59,884.54 $34,768.24 Completed

Page 24 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status

Monticello - HVAC FOR PE BUILDINGS 13600 SQ Monticello School District Intermediate/Elementary FT at Elementary and Intermediate. 1113 Partnership $230,520.00 $114,707.93 Completed High School Gymnasium Air Monticello School District 2203 - Monticello High School Conditioning 1315 Partnership $235,576.00 $146,412.19 Completed Monticello School District District Wide Fire alarm safety project 0911 Partnership $253,846.27 $153,015.59 Completed Roofing project at Monticello Middle Monticello School District 2203 - Monticello Middle School School 1315 Partnership $1,393,678.00 $195,860.92 Completed Addition of restrooms and 5 Monticello School District Monticello Middle classrooms 0709 Partnership $1,003,969.00 $582,892.23 Completed Replace double hung steel door and Mount Ida Public Schools Mount Ida High School appropriate door hardware 0709 Partnership $12,000.00 $887.54 Completed Mount Ida Public Schools High School Install fire alarm 0709 Partnership $9,067.50 $2,410.44 Completed Mount Ida Public Schools Mount Ida High School Install fire protection system 0709 Partnership $16,938.00 $4,502.68 Completed SHS & HPER Roof Replacement. HPER Mount Ida Public Schools 4902 - Mount Ida HS is Metal over existing shingle. 1113 Partnership $563,938.92 $125,937.60 Completed

Replace 2 classrooms with 2 separate Mount Vernon/Enola School buildings. (See proj. 001.)This proj. is District Mt.Vernon-Enola High Shool science lab and computer lab. 0607 Partnership $25,000.00 $15,765.00 Completed Mount Vernon/Enola School District Mt. Vernon-Enola High School Build new agri. Facility 0607 Partnership $1,197,466.00 $755,141.93 Completed 0303 - Mountain Home High HS expansion of all academic areas Mountain Home School District School due to growth 0911 Partnership $2,190,198.40 $55,472.57 Completed

Mountain Home School District NEW EL SCHOOL BUILD TWO GRADE ES 0709 Partnership $12,546,570.14 $508,010.63 Completed Mountain Pine School District Mountain Pine High School Replace Fire Alarm System 0709 Partnership $19,166.66 $8,919.38 Completed Mountain Pine School District Mountain Pine Elementary Replace Fire Alarm System 0709 Partnership $19,166.67 $8,919.39 Completed Mountain Pine School District Mountain Pine High School Upgrade fire alarm system. 0709 Partnership $19,166.67 $8,919.39 Completed Mountain Pine School District Mountain Pine Elementary Resurface Roof 0709 Partnership $549,945.00 $157,646.28 Completed 2607 - Mountain Pine High Mountain Pine School District School Roof system improvement 0911 Partnership $377,008.54 $180,564.77 Completed 6901 - Rural Special Elem. Mountain View School District School Rural Special ES Roof -- Metal Retrofit 1315 Partnership $138,415.00 $60,291.00 Completed New Vocational Building, Addition Mountain View School District 6901 - Mountain View HS and Conversion of PE Space 1113 Partnership $2,065,234.38 $955,493.20 Completed Mountain View School District Mountain View High School Classroom Addition to HS 0709 Partnership $2,667,180.16 $1,017,347.90 Completed 1703 - Mountainburg Mountainburg School District Elementary School Elementary Roofing Renovation 1315 Partnership $330,622.18 $76,701.28 Completed 1703 - Mountainburg High Mountainburg School District School New High School HVAC Renovation 1315 Partnership $829,738.14 $171,594.33 Completed 1703 - Mountainburg Mountainburg School District Elementary School Elementary HVAC Renovation 1315 Partnership $1,210,052.10 $220,785.64 Completed 1703 - Mountainburg Elementary School Electrical Mountainburg School District Elementary School Renovation 1315 Partnership $432,191.32 $255,392.04 Completed High School/Middle School Plumbing Mountainburg School District --District Wide-- Project 1315 Partnership $489,909.75 $314,316.24 Completed 1703 - Mountainburg Middle Mountainburg School District School Middle School Electrical Upgrade 1315 Partnership $527,774.28 $338,456.37 Completed High School/Middle School Roof Mountainburg School District --District Wide-- Project 1315 Partnership $1,090,960.38 $538,276.81 Completed Mulberry/Pleasant View Bi- Battery Pack Emergency Lights / Exit County School District Pleasant View HS Signs 0607 Partnership $567.00 $227.95 Completed Mulberry/Pleasant View Bi- Battery Pack Emergency Lights / Exit County School District Marvin Elementary Signs 0607 Partnership $567.00 $273.95 Completed Mulberry/Pleasant View Bi- Battery Pack Emergency Lights / Exit County School District Mulberry HS Signs 0607 Partnership $567.00 $273.95 Completed Mulberry/Pleasant View Bi- Battery Pack Emergency Lights / Exit County School District Pleasant View Elementary Signs 0607 Partnership $2,268.00 $483.15 Completed Mulberry/Pleasant View Bi- Battery Pack Emergency Lights / Exit County School District Pleasant View HS Signs 0607 Partnership $1,705.00 $483.16 Completed Mulberry/Pleasant View Bi- Battery Pack Emergency Lights / Exit County School District Pleasant View HS Signs 0607 Partnership $2,850.00 $724.73 Completed Mulberry/Pleasant View Bi- Battery Pack Emergency Lights / Exit County School District Pleasant View HS Signs 0607 Partnership $3,000.00 $724.73 Completed Mulberry/Pleasant View Bi- Battery Pack Emergency Lights / Exit County School District Marvin Elementary Signs 0607 Partnership $1,762.00 $851.32 Completed

Page 25 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Mulberry/Pleasant View Bi- Battery Pack Emergency Lights / Exit County School District Marvin Elementary Signs 0607 Partnership $1,762.00 $851.32 Completed Mulberry/Pleasant View Bi- Install Fire Alarm (combined for County School District Marvin Elementary Marvin Elementary) 0709 Partnership $48,006.00 $14,508.99 Completed Mulberry/Pleasant View Bi- Install Fire Alarm (Combined for County School District Pleasant View HS PVHS) 0709 Partnership $54,561.00 $17,953.62 Completed Mulberry/Pleasant View Bi- Construct Classroom/Shop Vocational County School District Mulberry HS AGRI 0607 Partnership $606,780.00 $293,167.47 Completed

Nashville School District 3105 - Nashville Primary School primary addition 1315 Partnership $274,921.92 $149,551.28 Committed 3105 - Nashville Junior High Nashville School District School Roof Upgrade - Junior High 1315 Partnership $519,544.80 $252,055.12 Completed Construct Physical Education room and class space. Art Room and classes Nashville School District Nashville Primary School under one area 0709 Partnership $1,703,474.19 $615,568.71 Completed Nashville School District High School Renovation of High School Building 1113 Partnership $1,910,205.00 $837,728.26 Completed HS Addition, HS Gymnasium Addition, Nashville School District 3105 - Nashville HS JHS New Cafetorium 1113 Partnership $7,741,115.58 $4,137,504.58 Completed Construction of K-5 building to Nemo Vista School District Nemo Vista Elementary include cafeteria and library 0607 Partnership $4,596,720.00 $3,274,244.00 Completed High School Addition & Renovations Nettleton School District 1611 - Nettleton High School (Part 13-15) 1315 Partnership $450,868.00 $68,259.19 Committed Fox Meadow Intermediate Fox Meadow Inter. Addition (Part 11- Nettleton School District School 13) 1113 Partnership $679,748.55 $117,553.20 Completed Addition of 12 classrooms & Nettleton School District University Heights Elementary Expansion of relevant spaces 0709 Partnership $4,278,016.60 $611,831.99 Completed Newport School District 3403 - Newport High School High School HVAC/Fire Upgrades 1315 Partnership $2,841,517.52 $1,079,476.51 Completed Construct a new k-5 school (year 1 of Newport School District Newport Elementary 2) 0709 Partnership $13,022,609.31 $4,295,447.75 Completed Norfork School District Arrie Goforth Asphalt 1/3 of Parking Lots 0607 Partnership $1,800.00 $425.74 Completed Norfork School District Norfork HS Asphalt 1/3 of Parking Lots 0607 Partnership $1,800.00 $425.74 Completed 2 Additional Classrooms and 1 multi- Norfork School District Elementary School purpose PE Room 0709 Partnership $814,351.32 $152,782.88 Completed 2 Additional Classrooms and 1 Library Norfork School District High School media center 0709 Partnership $921,439.96 $167,898.93 Completed Meadow Park Elementary North Little Rock School District School Fire and Safety Improvement 0911 Partnership $40,799.70 $16,935.33 Completed 6002 - Indian Hills Elementary North Little Rock School District School Indian Hills Fire Alarm Upgrade 1315 Partnership $56,432.80 $24,993.90 Completed

North Little Rock School District Boone Park Elementary School Fire And Safety Improvement 0911 Partnership $64,948.32 $26,959.04 Completed

North Little Rock School District Lynch Drive Elementary School Fire and Safety Improvement 0911 Partnership $70,239.24 $29,155.22 Completed Seventh Street Fine Arts Elem. North Little Rock School District School Fire and Safety Improvement 0911 Partnership $74,399.94 $30,882.27 Completed 6002 - Ridgeroad Middle Charter Ridgeroad Middle School Fire Alarm North Little Rock School District School Upgrade 1315 Partnership $78,295.45 $34,676.80 Committed

North Little Rock School District Lakewood Middle School Electrical Improvement 0911 Partnership $452,255.04 $35,559.93 Completed

North Little Rock School District Lynch Drive Elementary School Roof System 0911 Partnership $107,421.60 $44,589.05 Completed

North Little Rock School District West Campus Roofing Improvement - Gym 0709 Partnership $177,558.00 $71,480.45 Completed North Little Rock HS-West North Little Rock School District Campus Fire and Safety Improvement 0911 Partnership $188,167.14 $78,105.27 Completed North Little Rock HS-East North Little Rock School District Campus Main Electrical Improvement 0911 Partnership $724,288.40 $85,135.01 Completed North Little Rock HS-West North Little Rock School District Campus Main Plumbing Improvements 0911 Partnership $219,883.00 $91,270.04 Completed New Seventh Street ES North Little Rock School District 6002 - Seventh Street ES Renovation/Addition 1315 Partnership $213,466.26 $94,543.50 Committed

North Little Rock School District Boone Park Elementary Roofing Improvement 0709 Partnership $251,160.00 $101,110.79 Completed Meadow Park Elementary North Little Rock School District School Roof System 0911 Partnership $277,615.35 $115,233.84 Completed Meadow Park Elementary North Little Rock School District School HVAC Improvement 0911 Partnership $742,968.45 $188,484.92 Completed

Page 26 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status 6002 - Seventh Street Fine Arts Seventh Street Electrical System North Little Rock School District Elem. School Upgrade 1315 Partnership $491,630.10 $217,741.34 Committed 6002 - Indian Hills Elementary North Little Rock School District School Indian Hills Electrical Upgrade 1315 Partnership $525,070.40 $232,551.94 Completed Seventh Street Fine Arts Elem. North Little Rock School District School HVAC Improvement 0911 Partnership $1,100,694.00 $292,250.66 Completed

North Little Rock School District Boone Park Elementary HVAC Improvement 0709 Partnership $760,932.20 $306,332.44 Completed 6002 - Ridgeroad Middle Charter Ridgeroad Middle School Electrical North Little Rock School District School Upgrade 1315 Partnership $728,488.10 $322,644.97 Committed

North Little Rock School District Lynch Drive Elementary School HVAC Improvement 0911 Partnership $824,610.80 $342,283.21 Completed

North Little Rock School District 6002 - Indian Hills ES Indian Hills ES Renovation/Addition 1315 Partnership $1,045,007.04 $462,830.16 Completed

North Little Rock School District Lakewood Middle HVAC Improvement 0607 Partnership $1,180,000.00 $477,404.10 Completed 6002 - Indian Hills Elementary North Little Rock School District School Indian Hills HVAC Upgrade 1315 Partnership $1,342,322.76 $594,510.31 Completed

North Little Rock School District Lakewood Middle Addition & Renovation 0607 Partnership $1,477,410.00 $597,730.16 Completed 6002 - Amboy Elementary North Little Rock School District School New Amboy Elementary School 1315 Partnership $1,451,800.00 $642,997.41 Completed 6002 - Boone Park Elementary North Little Rock School District School New Boone Park Elementary School 1315 Partnership $1,451,800.00 $642,997.41 Completed 6002 - Meadow Park Elementary New Meadow Park Elementary North Little Rock School District School School 1315 Partnership $1,451,800.00 $642,997.41 Completed 6002 - Lakewood Elementary North Little Rock School District School New Lakewood Elementary School 1315 Partnership $1,451,800.00 $642,997.41 Completed 6002 - Glenview Elementary North Little Rock School District School New Glenview Elementary School 1315 Partnership $1,451,800.00 $642,997.41 Completed

North Little Rock School District Crestwood Elementary Addition 0607 Partnership $1,957,793.50 $792,083.60 Completed

North Little Rock School District East Campus HVAC Improvement 0607 Partnership $2,014,000.00 $814,823.61 Completed 6002 - Ridgeroad Middle Charter Ridgeroad Middle School HVAC North Little Rock School District School Upgrade 1315 Partnership $2,937,781.45 $1,301,133.68 Committed 6002 - Crestwood Elementary New Addition and Renovation North Little Rock School District School Crestwood Elementary School 1315 Partnership $2,958,073.58 $1,310,120.99 Committed North Little Rock HS-West North Little Rock School District Campus HVAC Improvement 0911 Partnership $3,426,550.89 $1,422,308.36 Completed 6002 - New West Campus - NLR North Little Rock School District HS New West Campus - NLR HS 1315 Partnership $42,286,217.96 $18,728,425.92 Committed Omaha School District Not Specified Fine Arts Renovation Phase II 1113 Partnership $437,361.30 $161,451.50 Completed Secondary media center, Library, and Omaha School District 0504 High School Home Economics Facility 0607 Partnership $694,788.00 $387,340.49 Completed Omaha School District 0504 - Omaha ES Renovation of Middle School 1113 Partnership $1,190,160.00 $630,347.40 Completed Osceola Public Schools Kindergarten Playground Equipment 0607 Partnership $44,100.00 $28,681.39 Completed

Osceola Public Schools Jr. High Install New Fire/Safety Alarm System 0709 Partnership $64,602.00 $42,015.31 Completed K bldg. Parking lot, driveways, Osceola Public Schools Kindergarten drainage expansions 0607 Partnership $141,240.00 $55,758.58 Completed Osceola Public Schools Jr. High Replace Steel Doors & Frames 0607 Partnership $108,682.00 $64,787.89 Completed Osceola Public Schools Jr. High Replace Window System 0709 Partnership $123,983.00 $80,635.03 Completed 9th grade bldg. pk lot, drainage, walks Osceola Public Schools High School canopy drives 0607 Partnership $176,550.00 $100,912.09 Completed K bldg. parking lot, walks, canopy, Osceola Public Schools Kindergarten drainage structure 0607 Partnership $181,044.00 $115,945.01 Completed Expand Lobby, metal roof, courtyard Osceola Public Schools High School concrete 0607 Partnership $214,000.00 $139,179.54 Completed Remove Asbestos floor, Install Rubber Osceola Public Schools Jr. High floor 0607 Partnership $547,500.00 $146,085.54 Completed Osceola Public Schools 4713 - Osceola High School Replace SPF Roof 0911 Partnership $236,772.90 $150,116.67 Completed Install standing seam metal roof Osceola Public Schools Jr. High system 0607 Partnership $525,000.00 $279,961.55 Completed Osceola Public Schools ACE Library Building 0709 Partnership $494,927.40 $321,886.77 Completed Osceola North ES HVAC Renovations Osceola Public Schools 4713 North Elementary School (Part 13-15) 1315 Partnership $794,080.77 $430,458.68 Completed

Page 27 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Osceola ACE HVAC Renovations (Part Osceola Public Schools 4713 - Osceola Academic Center 13-15) 1315 Partnership $809,357.64 $438,740.03 Completed Osceola MS HVAC Renovations (Part Osceola Public Schools 4713 - Osceola Middle School 13-15) 1315 Partnership $1,588,778.52 $861,251.82 Completed Osceola Public Schools ACE Additional Classrooms 0709 Partnership $1,396,282.47 $908,102.59 Completed Osceola Public Schools Kindergarten Kindergarten classroom building 0607 Partnership $1,436,428.00 $934,212.11 Completed Osceola HS HVAC Renovations (Part Osceola Public Schools 4713 - Osceola High School 13-15) 1315 Partnership $1,830,614.28 $992,347.18 Completed Begin New const(combine E & W Osceola Public Schools Elementary Elem) 0709 Partnership $9,053,182.80 $5,887,933.79 Completed Replace Electrical Lighting at High Ouachita Public Schools 3005 - Ouachita High School School/Elementary 1315 Partnership $30,870.36 $21,486.04 Committed Ouachita Public Schools --District Wide-- Upgrade Fire Alarm System 1315 Partnership $84,895.47 $22,361.91 Completed Ouachita Public Schools 3005 - Ouachita High School Replace Gymnasuim Roof 1315 Partnership $95,287.36 $66,320.84 Completed 3005 - Ouachita Elementary Structural Window Wall & Electrical Ouachita Public Schools School Replacement 1517 Partnership $205,492.00 $143,333.62 Completed Ouachita Public Schools 3005 - Ouachita High School New Green House 1517 Partnership $252,198.00 $175,911.72 Committed Ouachita Public Schools 3005 - Ouachita HS High School RE-Roof 1113 Partnership $305,327.00 $209,911.00 Completed 3005 - Ouachita Elementary Ouachita Public Schools School Roof System 0911 Partnership $446,796.00 $299,218.33 Completed 3005 - Ouachita Elementary Ouachita Public Schools School Classrooms/Saferoom 1315 Partnership $541,000.80 $376,541.31 Completed Ouachita Public Schools District Wide Metal P.E. Building 1113 Partnership $827,803.35 $569,111.25 Completed New Art & Music & Distance Learning Ouachita Public Schools 3005 - Ouachita High School & Classrooms 1517 Partnership $957,553.25 $667,907.12 Committed Ouachita Public Schools 3005 - Ouachita High School Career Tech Building 0911 Partnership $1,251,087.10 $837,850.36 Completed Ouachita Public Schools --District Wide-- HVAC Replacement 1315 Partnership $1,627,176.32 $1,132,529.00 Committed Ouachita River School District Old Oden High School Install Emergency Lighting 0709 Partnership $500.00 $293.15 Completed Ouachita River School District Old Acorn Elementary School Install Emergency Lighting 0709 Partnership $700.00 $410.41 Completed Ouachita River School District Old Acorn Elementary School Insulate Ceiling 0607 Partnership $15,600.00 $5,464.89 Completed Remodel restrooms to meet ADA Ouachita River School District Old Acorn Elementary School codes 0607 Partnership $20,000.00 $11,725.86 Completed 5706 - Old Ode Maddox Ouachita River School District Elementary School HVAC replacement In Oden ES 0911 Partnership $65,100.00 $35,356.35 Completed Ouachita River School District 5706 - Old Oden High School Upgrade Roof Oden H.S. 1315 Partnership $155,015.00 $39,477.27 Completed 5706 - Old Ode Maddox Ouachita River School District Elementary School Roof replacement in Oden ES 0911 Partnership $147,136.85 $86,691.74 Completed Replace/ upgrade Roof Top Units with Ouachita River School District Old Acorn High School Ground Mounted Units 0607 Partnership $163,000.00 $95,565.73 Completed Replace Builtup Roof with Standing Ouachita River School District Old Acorn High School Seam Roof 0607 Partnership $200,000.00 $117,258.57 Completed

Ozark Mountain School District 6505 - Bruno-Pyatt ES & HS EOL - Sanitory Sewer 1113 Partnership $729,579.84 $29,028.23 Completed

Ozark Mountain School District 6505 - St. Joe High School Replace Roof System 0911 Partnership $164,824.00 $88,713.67 Completed 6505 - Western Grove High Ozark Mountain School District School Replace HVAC 0911 Partnership $399,796.95 $125,419.05 Completed

Ozark Mountain School District 6505 - St. Joe HS Replace HVAC at St. Joe 1113 Partnership $1,268,511.32 $251,331.67 Completed 6505 - Western Grove High Build new building at Western Grove Ozark Mountain School District School campus 0911 Partnership $869,386.80 $444,683.97 Completed 6505 - Western Grove High Classroom Addition to Western Grove Ozark Mountain School District School & ES Campus 1315 Partnership $1,061,182.08 $483,649.71 Completed Ozark School District Altus-Denning Elementary Install Backflow Preventer 0607 Partnership $1,000.00 $180.39 Completed Ozark School District Altus-Denning Elementary Install Backflow Preventer 0607 Partnership $1,000.00 $180.39 Completed Ozark School District Altus-Denning High School Install Backflow Preventer 0607 Partnership $1,000.00 $180.39 Completed Ozark School District Altus-Denning High School Install Backflow Preventer 0607 Partnership $1,000.00 $180.39 Completed Ozark School District Elgin B. Milton Elementary Install Backflow Preventer 0607 Partnership $1,000.00 $180.39 Completed Ozark School District Elgin B. Milton Elementary Install Backflow Preventer 0607 Partnership $1,000.00 $180.39 Completed Ozark School District Ozark High School Install Backflow Preventer 0607 Partnership $1,000.00 $180.39 Completed Ozark School District Ozark High School Install Backflow Preventer 0607 Partnership $1,000.00 $180.39 Completed Ozark School District Ozark Junior High School Install Backflow Preventer 0607 Partnership $1,000.00 $180.39 Completed Ozark School District Ozark Junior High School Install Backflow Preventer 0607 Partnership $1,000.00 $180.39 Completed Ozark School District Altus-Denning Elementary Install Surveillance System 0607 Partnership $10,000.00 $3,650.93 Completed Ozark School District Altus-Denning High School Install Surveillance System 0607 Partnership $10,000.00 $3,879.43 Completed Ozark School District Elgin B. Milton Elementary Install Surveillance System 0607 Partnership $10,000.00 $3,879.43 Completed Ozark School District Ozark Junior High School Install Surveillance System 0607 Partnership $10,000.00 $3,879.43 Completed

Page 28 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Ozark School District Altus-Denning High School Replace Exterior Doors 0709 Partnership $12,894.86 $4,895.46 Completed Ozark School District Ozark Junior High School Replace exterior doors 0709 Partnership $13,370.45 $5,076.01 Completed Ozark School District Elgin B. Milton Elementary Install Surveillance System 0607 Partnership $15,000.00 $5,819.14 Completed Ozark School District Ozark High School Install Surveillance System 0607 Partnership $15,000.00 $5,819.14 Completed Roof Renovation at Ozark Upper Ozark School District 2404 - Ozark Upper Elementary Elementary 1315 Partnership $267,345.40 $116,592.56 Completed Ozark School District --District Wide-- Fire Alarm Upgrades 1315 Partnership $304,148.52 $138,026.97 Completed Band Room/Storm Shelter at Ozark Ozark School District 2404 - Ozark Middle School Middle School 1315 Partnership $495,127.36 $232,468.41 Completed HVAC Renovation at Ozark Upper Ozark School District 2404 - Ozark Upper Elementary Elementary 1315 Partnership $706,284.04 $300,190.72 Completed

Ozark School District 2404 - Elgin B. Milton ES ES safe room/multi purpose addition. 1113 Partnership $781,476.52 $335,344.22 Completed Junior High moves to High School Ozark School District 2404 - Ozark High School Campus 1517 Partnership $3,142,829.17 $1,486,510.13 Committed 2404 - Elgin B. Milton Ozark School District Elementary School Primary moves to Upper Elementary 1517 Partnership $3,754,258.56 $1,775,706.88 Committed Palestine-Wheatley School District Elementary Install A.D.A. Lavatory & Toilet. 0607 Partnership $5,000.00 $2,969.85 Completed Palestine-Wheatley School District Senior High Install A.D.A. Lavatory & Toilet. 0607 Partnership $5,000.00 $2,969.85 Completed Palestine-Wheatley School District Elementary Upgrade Exterior Doors 0607 Partnership $12,707.94 $7,548.15 Completed Palestine-Wheatley School District Senior High Upgrade Exterior Doors 0607 Partnership $16,943.92 $10,064.20 Completed Construct new metal pitched roof for Senior High. Structural elements and Palestine-Wheatley School seemed mtl. Roof system over flat District Senior High roof. 0709 Partnership $97,702.92 $58,015.00 Completed Palestine-Wheatley School Wheatley MS Roof Replacement (Part District 6205 - Palestine-Wheatley JHS 11-13) 1113 Partnership $311,960.54 $205,250.02 Completed Palestine-Wheatley School 6205 - Palestine-Wheatley Elem. District Sch. New Elementary School 0911 Partnership $1,763,559.65 $1,090,492.43 Completed Pangburn School District --District Wide-- Fire Safety Upgrades 0911 Partnership $183,869.28 $127,369.69 Completed Classroom and special education Pangburn School District --District Wide-- additions 0911 Partnership $1,509,376.00 $1,045,572.98 Completed Addition (replacement) 9-12 High Pangburn School District 7309 - Pangburn HS School 1113 Partnership $3,875,011.20 $1,950,317.24 Completed Pangburn School District Middle School New building for grades 5-8 0607 Partnership $3,214,655.00 $2,558,424.63 Completed 1500 seat auditorium with music, Pangburn School District High School band and theater facilities 0607 Partnership $4,390,892.00 $3,002,215.00 Completed Paragould School District Woodrow Wilson Surveillance System 0607 Partnership $3,250.00 $1,240.63 Completed Paragould School District HS Surveillance System 0607 Partnership $6,500.00 $2,481.26 Completed Paragould School District Oak Groves Surveillance System 0607 Partnership $6,500.00 $2,481.26 Completed Paragould School District JHS Surveillance System 0607 Partnership $7,800.00 $2,977.51 Completed Paragould School District PARAGOULD HS REPLACE FLAT ROOF 0709 Partnership $45,240.00 $17,269.47 Completed Paragould School District JUNIOR HIGH REPLACE FLAT ROOF 0709 Partnership $666,771.00 $254,526.49 Completed

Paragould School District 2808 - Oak Grove Middle School Oak Grove MS-Addition (Planned) 0911 Partnership $4,190,867.59 $1,898,944.06 Completed Paragould School District New K-1 School (Planned) 0911 Partnership $8,868,429.12 $4,018,416.33 Completed Paris School District High School Additional Classrooms 0607 Partnership $263,172.00 $142,317.32 Completed Paris School District Paris HS Gyn Air Condition Existing Gym 0709 Partnership $318,119.41 $168,377.42 Completed Add a PE facility to current gym to Paris School District High School meet required PE standard 0607 Partnership $2,399,105.00 $1,297,380.41 Completed Replace chalkboards w/dry erase Parkers Chapel School District PCHS boards 0607 Partnership $1,525.00 $729.80 Completed Replace chalkboards w/dry erase Parkers Chapel School District PCES boards 0607 Partnership $2,287.00 $1,094.45 Completed Windows in office wing of H.S.. need Parkers Chapel School District PCHS replacing 0607 Partnership $5,866.00 $2,807.20 Completed Parkers Chapel School District PCES Add playground equipment 0607 Partnership $10,000.00 $4,785.54 Completed Parkers Chapel School District PCHS Replace windows in old gym 0607 Partnership $10,000.00 $4,785.55 Completed Parkers Chapel School District PCES Roof replacement/upgrade 0607 Partnership $31,817.00 $15,226.17 Completed Replace/Upgrade HVAC, furnace and Parkers Chapel School District PCHS controls 0607 Partnership $43,018.00 $20,586.46 Completed Replace/Upgrade HVAC, furnace and Parkers Chapel School District PCHS controls 0607 Partnership $53,773.00 $25,733.32 Completed

Page 29 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status 7007 - Parkers Chapel Elem & Cafetorium (Bldg. #7) Parkers Chapel School District High School HVAC/Electrical/Plumbing Project 1315 Partnership $334,104.93 $38,681.39 Completed Parkers Chapel School District PCHS Replace roof of old gym 0709 Partnership $90,666.25 $42,055.09 Completed Parkers Chapel School District 7007 - Parkers Chapel ES & HS Parkers Chapel Roof Upgrade 1113 Partnership $465,802.50 $66,616.95 Completed 7007 - Parkers Chapel Elem & Parkers Chapel School District High School Sanitation System 1315 Partnership $250,000.00 $77,510.77 Completed 7007 - Parkers Chapel Elem & Parkers Chapel School District High School Classroom Addition 0911 Partnership $974,270.60 $459,002.69 Completed 7007 - Parkers Chapel Elem & Parkers Chapel School District High School Addition to ES (Part. 15-17) 1517 Partnership $1,601,497.92 $706,762.65 Committed Pea Ridge School District JHS Asphalt Bus lane Parking at JHS 0607 Partnership $177,879.00 $109,274.54 Completed

Pea Ridge School District 0407 - Pea Ridge Middle School Middle School Classroom Addition 1315 Partnership $346,444.86 $232,222.13 Completed Six Classroom addtion to NEW JHS Pea Ridge School District Junior High School currently under contruction 0607 Partnership $778,752.00 $424,634.00 Completed Pea Ridge School District 0407 - Pea Ridge MS Intermediate School Project 1113 Partnership $711,354.80 $426,232.93 Completed Pea Ridge School District Six Classroom Addtion 0607 Partnership $793,664.00 $487,563.29 Completed High School Classroom Pea Ridge School District 0407 - Pea Ridge High School Addition/Performing Arts/CAD 1315 Partnership $1,318,397.52 $883,722.37 Completed Pea Ridge School District Pea Ridge Elementary Construct Elementary School 0709 Partnership $9,350,883.45 $5,700,392.06 Completed Fire Alarm System -Elementary 5303 - Perryville Elementary Buildings K-1, Elementary Classes, Perryville School District School and Old Elementary 0911 Partnership $37,330.84 $25,664.82 Completed Perryville School District Perryville Elementary School Additional Classrooms 0709 Partnership $1,050,656.01 $688,276.10 Completed Classroom Addition: Science lab and Piggott School District Piggott High School 4 classrooms 0709 Partnership $757,800.00 $399,603.10 Completed Southeast 300 Building/Roof (Part 11- Pine Bluff School District 3505 - Southeast MS 13) 1113 Partnership $118,182.50 $40,392.22 Completed Pine Bluff School District 3505 - Pine Bluff HS Pine Bluff Arts /HVAC (Part 11-13) 1113 Partnership $637,160.65 $221,346.75 Completed Pine Bluff School District Belair Remodel existing buildings 0607 Partnership $548,722.50 $252,102.74 Completed Pine Bluff School District W.T. Cheney New addition and remodeling 0607 Partnership $945,600.17 $434,442.53 Completed

Pine Bluff School District 3505 - Southeast Middle School Southeast School/HVAC (Part 13-15) 1315 Partnership $1,741,509.00 $487,486.63 Completed 3505 - Oak Park Elementary Pine Bluff School District School Oak Park/HVAC (Part. 13-15) 1315 Partnership $1,088,441.43 $487,486.63 Completed New addition and remodeling. Bldg. Pine Bluff School District Oak Park 600 0607 Partnership $1,339,220.00 $615,285.56 Completed Pine Bluff School District Southeast New addition and remodeling 0607 Partnership $1,375,600.17 $631,999.91 Completed Pine Bluff School District Pine Bluff High School HVAC Upgrade 0911 Partnership $1,345,388.50 $670,605.70 Completed Pine Bluff School District Pine Bluff High School New Facility (Academy) 0607 Partnership $1,586,038.74 $728,682.92 Completed New addition and remodeling. Bldg Pine Bluff School District Southwood 200 0607 Partnership $3,852,669.60 $1,751,131.42 Completed Pine Bluff School District Greenville New addition and remodeling 0607 Partnership $3,874,904.00 $1,780,269.47 Completed Pine Bluff School District Thirty-Fourth Ave New Facility 0607 Partnership $7,234,237.50 $3,323,667.41 Completed Pine Bluff School District Broadmoor New Facility 0607 Partnership $7,280,910.00 $3,345,110.43 Completed Upgrade the existing ten-(10) window Pocahontas School District Pocahontas High School air units to central air units. 0709 Partnership $177,094.00 $92,664.44 Completed Pocahontas Upper Elementary Pocahontas School District School New Cafeteria 0607 Partnership $796,680.00 $416,861.58 Completed The constructon of three-(4) new classrooms and a science lab to handle the enrollment growth within the adjoining building. These classrooms would be contructed at either the intermediate building or Pocahontas School District Pocahontas Junior High School the junior high school. 0709 Partnership $1,128,933.17 $459,304.14 Completed 6103 - Pocahontas Junior High Pocahontas School District School Jr. High Multi-purpose PE Facility 1315 Partnership $1,844,930.75 $1,037,332.15 Completed Pottsville School District Pottsville Middle Grades Construct six room addition 0607 Partnership $1,091,066.00 $737,533.35 Completed Pottsville School District Pottsville Elementary School Construct 8 room addition 0607 Partnership $1,219,713.00 $824,495.51 Completed

Construct new media center, science Pottsville School District Pottsville High School room, and four classrooms . 0607 Partnership $2,288,594.00 $1,282,093.03 Completed 2703 - Building 16 - Poyen High Poyen Public Schools School Library-Fire Alarm System 1517 Partnership $6,001.96 $3,879.60 Completed 2703 - Building 16 - Poyen High Poyen Public Schools School Cafeteria-Fire Alarm System Upgrade 1517 Partnership $10,916.11 $4,310.67 Completed

Page 30 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status 2703 - Building 16 - Poyen High Poyen Public Schools School New Multipurpose Gym 1517 Partnership $4,198,492.48 $3,619,659.06 Committed Poyen Public Schools Poyen ES & HS Construct K-6 addition 0709 Partnership $5,979,823.69 $3,779,141.96 Completed Install three (3) battery pack emergency lights, Priority One, Prairie Grove Public Schools Prairie Grove Middle School Deficiency list. 0607 Partnership $900.00 $153.40 Completed Install three (3) battery pack emergency lights, Priority One, Prairie Grove Public Schools Prairie Grove Middle School Deficiency list. 0607 Partnership $900.00 $153.40 Completed Install three (3) battery pack emergency lights, Priority One, Prairie Grove Public Schools Prairie Grove Middle School Deficiency list. 0607 Partnership $900.00 $153.40 Completed Install four (4) battery pack emergency lights, Priority One, Prairie Grove Public Schools Prairie Grove Middle School Deficiency list. 0607 Partnership $1,200.00 $204.48 Completed Install eight (8) battery pack emergency lights, Priority One, Prairie Grove Public Schools Prairie Grove Middle School Deficiency list. 0607 Partnership $2,400.00 $409.08 Completed Install ten (10) battery pack emergency lights, Priority One, Prairie Grove Public Schools Prairie Grove Elementary School Deficiency list. 0607 Partnership $3,000.00 $511.35 Completed Install ten (10) battery pack emergency lights, Priority One, Prairie Grove Public Schools Prairie Grove Elementary School Deficiency list. 0607 Partnership $3,000.00 $511.35 Completed Install HVAC system in Primary Prairie Grove Public Schools Prairie Grove Elementary School kitchen 0607 Partnership $15,000.00 $8,139.73 Completed Add four (4) additonal classrooms to Prairie Grove Public Schools Prairie Grove High School existing High School building. 0607 Partnership $558,045.00 $340,587.30 Completed 7206 - Prairie Grove Elem. Prairie Grove Public Schools School FEMA Safe Room/PE Facility 1315 Partnership $848,700.20 $464,751.59 Completed Add six (6) new classrooms, two (2) restrooms, and custodial area to existing Elementary Intermediate Prairie Grove Public Schools Prairie Grove Elementary School building. 0607 Partnership $962,141.26 $560,320.85 Completed Add six (6) new classrooms, two (2) restrooms, custodial area, and administrative offices to existing Prairie Grove Public Schools Prairie Grove Middle School Middle School 5/6 . 0607 Partnership $1,463,080.00 $852,051.84 Completed Multipurpose Facility/Auxiliary Gym/Classroom Addition at High Prairie Grove Public Schools 7206 - New High School School 1113 Partnership $2,669,889.54 $1,292,666.60 Completed 7206 - Prairie Grove Elem. Prairie Grove Public Schools School Construct New Primary Building 1315 Partnership $3,539,692.87 $1,938,349.82 Completed Replace/ Upgrade Roof at Prescott School District McRae Middle Band/Sci/FACS Building 0607 Partnership $22,500.00 $10,756.08 Completed Remodeling Agri Building with roofing, fire alarm, ADA, technology Prescott School District High School upgrades, storage, tackboards, etc 0709 Partnership $55,785.60 $25,616.89 Completed Remodeling boys and girls restrooms Prescott School District Prescott Elementary to meet ADA 0607 Partnership $106,500.00 $29,039.74 Completed Installing a campus wide fire alarm Prescott School District McRae Middle system 0709 Partnership $99,087.00 $58,883.29 Completed Replace/ Upgrade Roofing at Prescott School District Prescott High School health/Physical Education facility 0607 Partnership $167,000.00 $82,078.47 Completed Re-roofing of Old Junior High Prescott School District 5006 - Prescott High School Building.Part of Science Bld. 0911 Partnership $141,871.52 $86,973.87 Completed Prescott School District 5006 - Prescott High School Re-roofing of Annex building 0911 Partnership $223,315.26 $136,902.68 Completed Prescott School District 5006 - Prescott ES ES Roof 1113 Partnership $469,653.48 $308,649.47 Completed

Prescott School District 5006 - Prescott High School New Agriculture Buildling (Part 15-16) 1517 Partnership $876,983.76 $600,910.57 Committed Prescott School District 5006 - Prescott High School Addition to the HS Campus 1315 Partnership $4,747,561.19 $3,269,462.35 Completed Pulaski County Special School Improve the roofing system for CRs at District Oakbrooke ES this facility. 0709 Partnership $115,391.00 $14,490.28 Completed

Pulaski County Special School Improve the roofing system for main District Oakbrooke ES classroom building at this facility. 0607 Partnership $190,000.00 $18,679.24 Completed

Page 31 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Pulaski County Special School District Chenal Upper Elem. School Construct new elementary 0607 Partnership $9,251,187.00 $1,673,095.60 Completed Pulaski County Special School District Sylvan Hills Middle New Middle School 0709 Partnership $31,187,552.77 $3,947,148.43 Completed Pulaski County Special School New High School - Maumelle High District Oak Grove HS School 0709 Partnership $39,481,650.00 $4,996,863.14 Completed Quitman Public Schools Quitman High Surveillance System 0607 Partnership $1,300.00 $451.98 Completed Quitman Public Schools Quitman High Surveillance System 0607 Partnership $1,300.00 $451.98 Completed Quitman Public Schools Quitman High Surveillance System 0607 Partnership $1,950.00 $677.97 Completed Quitman Public Schools Quitman High Surveillance System 0607 Partnership $2,600.00 $903.96 Completed Quitman Public Schools Quitman High Surveillance System 0607 Partnership $3,250.00 $1,129.95 Completed Quitman Public Schools Quitman High Surveillance System 0607 Partnership $5,200.00 $1,808.85 Completed Quitman Public Schools Quitman High Surveillance System 0607 Partnership $5,850.00 $2,034.84 Completed Quitman Public Schools Quitman Elementary Surveillance System 0607 Partnership $12,650.00 $4,398.90 Completed Quitman Public Schools Quitman High Surveillance System 0607 Partnership $15,250.00 $5,303.79 Completed

Safety system to include emergency Quitman Elementary/High lights,exit signs,strobes/horns,smoke Quitman Public Schools School detectors,and control panels 0709 Partnership $19,423.79 $7,237.92 Completed Construct new high school facilities Quitman Public Schools Quitman High 18085 SF. & remodel 5074 SF. 0709 Partnership $4,890,844.20 $1,170,888.00 Completed

Rivercrest School District Rivercrest Jr. High Repair sidewalks for ADA accessibility 0607 Partnership $2,500.00 $1,655.48 Completed Sidewalks to provide ADA accessibility Rivercrest School District Wilson Elementary between Bldgs. 0607 Partnership $2,500.00 $1,655.48 Completed Replace/ upgrade exterior doors to Rivercrest School District Rivercrest High School increase security 0607 Partnership $4,000.00 $2,648.77 Completed Replace/ upgrade exterior doors to Rivercrest School District Rivercrest Jr. High increase security 0607 Partnership $4,800.00 $3,178.52 Completed Rivercrest School District Luxora Elementary Extend building canopies. 0607 Partnership $5,000.00 $3,310.96 Completed Improve ADA accessibility to and Rivercrest School District Rivercrest High School between buildings 0607 Partnership $5,000.00 $3,310.96 Completed Sidewalks for ADA accessibility to Rivercrest School District Keiser Elementary bldgs & playground 0607 Partnership $6,000.00 $3,973.15 Completed Sidewalks for ADA accessibility to Rivercrest School District Luxora Elementary bldgs & playground 0607 Partnership $6,000.00 $3,973.15 Completed Install public address and intercom Rivercrest School District Keiser Elementary system 0607 Partnership $13,282.00 $4,733.03 Completed Replace/ upgrade exterior doors to Rivercrest School District Luxora Elementary increase security 0607 Partnership $7,500.00 $4,966.43 Completed Replace/ upgrade exterior doors to Rivercrest School District Luxora Elementary increase security 0607 Partnership $7,500.00 $4,966.43 Completed Install public address and intercom Rivercrest School District Rivercrest Jr. High-New Bldg. system 0607 Partnership $40,000.00 $5,234.62 Completed Install a surveillance and security Rivercrest School District Keiser Elementary system 0607 Partnership $17,460.00 $5,940.89 Completed Install a surveillance and security Rivercrest School District Keiser Elementary system 0607 Partnership $18,778.00 $5,940.89 Completed Replace and extend the canopies Rivercrest School District Wilson Elementary between the buildings 0607 Partnership $10,000.00 $6,621.91 Completed Replace/ upgrade exterior doors to Rivercrest School District Keiser Elementary increase security 0607 Partnership $10,083.00 $6,953.01 Completed Rivercrest School District Rivercrest High School Upgrade and install HVAC 0607 Partnership $54,000.00 $11,085.08 Completed Install a surveillance and security Rivercrest School District Rivercrest Jr. High-New Bldg. system 0607 Partnership $18,833.00 $12,471.05 Completed Rivercrest School District Rivercrest Jr. High-New Bldg. Install technology infrastructure. 0607 Partnership $20,276.50 $13,426.92 Completed Pave the parking area for the school Rivercrest School District Rivercrest High School site 0607 Partnership $290,368.00 $192,279.15 Completed Rivercrest School District 4706 - Rivercrest High School Install HVAC systems 0911 Partnership $1,362,762.75 $235,891.92 Completed So. Miss. County Elementary Rivercrest School District School New SMC K-6 (Part 11-13) 1113 Partnership $12,949,193.70 $8,364,425.36 Completed 1613 - Riverside East Elem. Riverside School District School New East Elementary (Part 13-15) 1315 Partnership $4,563,700.15 $3,091,649.37 Committed Combine High School and Jr. High on Riverside School District High/Jr. High one site 0709 Partnership $12,777,182.18 $7,446,376.69 Completed Two Gyms/2 Elemenary requires fire alarm system/renovate Riverview School District Buildings dressing rooms 0709 Partnership $19,740.00 $11,228.68 Completed

Page 32 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Riverview School District 7307 - Kensett ES Kensett Library-upgrade 1113 Partnership $176,427.90 $94,778.60 Completed High School/Jr. High School Riverview School District 7307 - Riverview HS Alternative School 1113 Partnership $231,109.48 $124,154.02 Completed 7307 - Kensett Elementary Riverview-Kensett Elementary Roof Riverview School District School Bldg #008 1315 Partnership $262,248.30 $138,602.11 Completed Riverview School District 7307 - Riverview High School Auditorium/Fine Arts Center 1517 Partnership $1,413,688.86 $768,590.32 Committed Riverview School District Judsonia ES Riveview Elementary Addition 0709 Partnership $5,136,245.34 $2,921,645.17 Completed NEW ELEMENTARY TO OPEN AUG 09- Rogers Public Schools NEW ELEMENTARY 09 YEAR 2 OF 4 0709 Partnership $10,738,878.40 $2,238,841.37 Completed Remodel and Rebuild old campus for Rogers Public Schools RHS 2-08 second HS 0607 Partnership $36,867,328.00 $8,913,078.29 Completed Rose Bud School District Rose Bud Elem. School Combined HVAC at Elementary 0709 Partnership $283,657.75 $193,798.44 Completed Remodel existing cafeteria to serve as Rose Bud School District Rose Bud Elem. School an elem. P.E. facility 0607 Partnership $375,000.00 $231,707.28 Completed 7310 - Rose Bud Elementary Rose Bud School District School Elementary/High School Addition 1315 Partnership $1,027,759.90 $261,088.10 Completed Rose Bud School District --District Wide-- Sanitary Sewer 0911 Partnership $778,847.00 $534,253.21 Completed Replace two battery pack emergency Salem School District Salem High School lights 0607 Partnership $1,844.00 $144.23 Completed 8 exit signs require replacement, 2 Salem School District Salem High School are missing 0607 Partnership $1,125.00 $634.00 Completed Install damper system on south- Salem School District Salem High School central heating/cooling unit 0607 Partnership $10,000.00 $4,569.31 Completed Salem School District Salem Elementary Install a surveillance system 0607 Partnership $10,700.00 $5,119.90 Completed Salem School District Salem High School Install a surveillance system 0607 Partnership $19,150.00 $10,792.09 Completed Salem School District Salem High School Install a new fire alarm system 0709 Partnership $19,985.00 $11,262.75 Completed Replace Roof on Physical Salem School District 2502 - Salem HS Education/Gym Building 1113 Partnership $182,812.76 $111,764.80 Completed Band Classroom Salem School District 2502 - Salem High School Expansion/Renovation 1315 Partnership $230,963.72 $139,179.01 Completed Elementary School HVAC Salem School District 2502 - Salem Elementary School Replacement 1315 Partnership $1,156,054.40 $696,639.76 Committed Salem School District 2502 - Salem High School High School HVAC Replacement 1315 Partnership $1,908,349.28 $1,149,973.55 Committed Remove or dis-assemble present Scranton School District Scranton High School special education building 0607 Partnership $5,000.00 $2,117.51 Completed Scranton School District Scranton Elementary Upgrade Fire Alarm System 0607 Partnership $9,000.00 $3,739.44 Completed Scranton School District Scranton High School Upgrade fire alarm system 0607 Partnership $22,845.00 $8,336.21 Completed Replace or install emergency battery backup systems and exit signs and Scranton School District --District Wide-- lights. 0911 Partnership $35,382.81 $14,801.63 Completed Build covered walkways between Scranton School District Scranton High School buildings 0607 Partnership $65,000.00 $27,527.65 Completed Scranton School District Scranton High School Total Renovation 0607 Partnership $95,000.00 $40,232.72 Completed Build a new classroom for elementary Scranton School District Scranton High School growth 0607 Partnership $96,672.00 $40,940.82 Completed Scranton School District Scranton High School Replace/ Upgrade HVAC 0607 Partnership $268,804.00 $113,839.12 Completed Scranton School District --District Wide-- Multipurpose Facility 1315 Partnership $380,703.00 $169,427.08 Committed Construct new pre-fabricated metal Scranton School District Scranton High School building 0607 Partnership $637,750.00 $270,088.62 Completed Scranton School District Scranton High School Construct new senior high addition 0607 Partnership $792,918.00 $335,802.63 Completed

Searcy County School District 6502 - Leslie Elementary School ac leslie campus 1315 Partnership $1,162,350.00 $742,778.25 Committed Searcy County School District 6502 - Marshall High School HS fine arts 1315 Partnership $1,295,936.18 $828,144.02 Committed 6502 - Marshall Elementary Searcy County School District School Elem classrooms 1315 Partnership $1,885,235.04 $1,204,723.94 Committed 6502 - Marshall Elementary Searcy County School District School Renovate H building at Elem 1315 Partnership NULL NULL Committed Remove existing facility, replace Searcy School District Searcy High School w/new fine arts center 0607 Partnership $5,296,532.70 $1,297,158.83 Completed Sheridan Public Schools High School Update Fire Alarm System 0607 Partnership $1,516.00 $809.02 Completed Sheridan Public Schools High School Update Fire Alarm System 0607 Partnership $1,516.00 $809.02 Completed Sheridan Public Schools High School Update Fire Alarm System 0607 Partnership $1,516.00 $809.02 Completed Sheridan Public Schools Intermediate Update Fire Alarm System 0607 Partnership $1,516.00 $809.02 Completed Sheridan Public Schools Middle School Update Fire Alarm System 0607 Partnership $1,516.00 $809.02 Completed Sheridan Public Schools Middle School Update Fire Alarm System 0607 Partnership $1,516.00 $809.02 Completed Sheridan Public Schools Middle School Update Fire Alarm System 0607 Partnership $1,516.00 $809.02 Completed Sheridan Public Schools Middle School Install acoustical ceiling 0607 Partnership $26,000.00 $8,774.97 Completed

Page 33 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Sheridan Public Schools East End ES,IS,Sheridan IS install HVAC 0709 Partnership $291,793.22 $155,716.57 Completed 2705 - Sheridan Freshman Sheridan Public Schools Academy SFA Roof project (Part 13-15) 1315 Partnership $596,564.80 $333,917.02 Committed 2705 - Sheridan Intermediate SIS Gym Addition & Conversion (Part Sheridan Public Schools School 15-17) 1517 Partnership $682,043.20 $379,606.68 Committed 2705 - East End Elementary Sheridan Public Schools School New Media Center 0911 Partnership $921,660.80 $516,968.92 Completed Sheridan Public Schools East End Intermediate School Eight Additional Classrooms 0709 Partnership $1,592,672.79 $849,935.96 Completed Sheridan Public Schools 2705 - Sheridan High School SHS Roofing (Part 13-15) 1315 Partnership $1,641,756.74 $918,945.46 Committed Sheridan Middle School Fine Arts Sheridan Public Schools 2705 - Sheridan Middle School Auditorium 0911 Partnership $2,437,771.15 $1,367,370.63 Completed Sheridan Public Schools 2705 - Sheridan HS HS HVAC Renovations (Part. 11-13) 1113 Partnership $2,503,627.64 $1,406,538.90 Completed New East End Middle School (Part 15- Sheridan Public Schools --NEW SCHOOL-- 17) 1517 Partnership $6,392,575.00 $3,557,933.20 Committed SHS Addition & Renovations (Part 15- Sheridan Public Schools 2705 - Sheridan High School 17) 1517 Partnership $8,930,782.30 $4,970,630.28 Committed Siloam Springs School District 0406 - Siloam Springs HS Fine Arts roof replacement 1113 Partnership $395,737.37 $89,420.11 Completed Siloam Springs School District 0406 - Southside ES Southside West portion of roof 1113 Partnership $626,850.00 $133,467.49 Completed 0406 - Siloam Springs Middle Siloam Springs School District School Replace Roof System 0911 Partnership $473,323.13 $178,970.89 Completed Siloam Springs School District 0406 - Southside Elem. School Southside East roof end of life cycle 1315 Partnership $372,182.20 $187,671.96 Completed High School South replace roof end of Siloam Springs School District 0406 - Siloam Springs HS life cycle 1113 Partnership $514,824.94 $187,934.59 Completed High School North replace roof end of Siloam Springs School District 0406 - Siloam Springs HS life cycle 1113 Partnership $737,314.90 $291,300.17 Completed 0406 - Northside Elementary Siloam Springs School District School Replace Roof System 0911 Partnership $778,114.56 $294,217.30 Completed Southside east/west classroom HVAC Siloam Springs School District 0406 - Southside ES end of life cycle 1113 Partnership $2,430,640.00 $348,911.47 Completed Siloam Springs School District New Build new high school 0709 Partnership $27,810,144.00 $15,324,014.00 Completed 3806 - Sloan-Hendrix High Old Gym Roof renovations (Part 13- Sloan-Hendrix School District School 15) 1315 Partnership $248,945.10 $161,046.26 Completed New K-12 Facility (Old Twin Build new K-12 Facility to Replace Old Sloan-Hendrix School District Rivers) Facilities 0607 Partnership $797,839.90 $389,201.15 Completed Sloan-Hendrix School District Sloan-Hendrix Construct new Agri 0607 Partnership $1,465,810.20 $843,613.00 Completed High School Fine Arts and Classroom Sloan-Hendrix School District Sloan-Hendrix HS Addition 1113 Partnership $1,454,852.15 $997,120.34 Completed 3806 - Sloan-Hendrix Elem. Sloan-Hendrix School District School ES Addition Wing (Part 15-17) 1517 Partnership $2,105,723.29 $1,375,515.23 Committed INSTALL FIRE ALARM SYSTEM, H.S. MUSIC/BAND, DISTANCE LEARNING, Smackover School District Smackover High School AUDITORIUM 0911 Partnership $24,363.52 $9,617.46 Completed Roof replacement HS building and Smackover School District 7008 - Norphlet High School GT/Art building 1315 Partnership $248,375.22 $81,085.81 Committed 7008 - Norphlet Elementary Smackover School District School Roof Replacement. 0911 Partnership $158,981.13 $82,968.29 Completed 7008 - Smackover Elementary ES Roof at Building B and Main , Smackover School District School Kindergarten (part 15-17) 1517 Partnership $381,201.60 $113,242.97 Committed Roof on HS Main and HS West and JHS Mid and JHS AddLevel (Part 15- Smackover School District 7008 - Smackover High School 17) 1517 Partnership $411,164.40 $122,143.97 Committed Smackover School District Smackover High Add classrooms 0709 Partnership $501,680.72 $193,773.86 Completed Smackover School District Smackover Elementary Four classroom addition 0709 Partnership $789,680.37 $305,013.55 Completed NEW BUILDING - BAND, MULTI 7008 - Norphlet Elementary PURPOSE, LIBRARY, CHOIR, BAND Smackover School District School ROOM, CONVERSION OF SPACE 0911 Partnership $1,246,808.95 $509,846.48 Completed South Conway County School District Strobe light is missing and is needed 0607 Partnership $4,451.00 $73.46 Completed South Conway County School Battery pack emergency light is District Morrilton High School missing and is needed 0607 Partnership $2,228.00 $73.46 Completed South Conway County School District Morrilton High School Strobe is missing and is needed 0607 Partnership $5,934.00 $73.46 Completed South Conway County School Battery pack emergency light is District Morrilton High School missing and is needed 0607 Partnership $1,671.00 $73.46 Completed South Conway County School Battery pack emergency light is District Morrilton High School missing and is needed 0607 Partnership $3,898.00 $73.46 Completed

Page 34 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status South Conway County School District Morrilton High School Exit sign is missing and is needed 0607 Partnership $3,874.00 $73.46 Completed South Conway County School District Morrilton High School Strobe light is missing and is needed 0607 Partnership $2,225.00 $73.46 Completed South Conway County School Battery pack emergency light requires District Morrilton Jr. High School replacement 0607 Partnership $3,898.00 $73.46 Completed South Conway County School District Morrilton Jr. High School Exit sign is missing and is needed 0607 Partnership $1,828.00 $73.46 Completed South Conway County School District Morrilton Jr. High School Strobe light is missing and is needed 0607 Partnership $11,127.00 $73.46 Completed South Conway County School Upgrade enegry efficiency lighting District Morrilton Intermediate School and increase FAQ to new codes 0607 Partnership $127,200.00 $1,929.96 Completed South Conway County School District Morrilton High School Replace/ Upgrade Fire Alarmt 0607 Partnership $35,953.72 $13,387.15 Completed South Conway County School District Morrilton High School Replace/ Upgrade Fire Alarmt 0607 Partnership $35,953.72 $13,387.15 Completed South Conway County School District Morrilton High School Replace/ Upgrade Fire Alarmt 0607 Partnership $35,953.72 $13,387.15 Completed South Conway County School School's surveillance system is District Morrilton High School undersized 0607 Partnership $42,200.00 $15,712.92 Completed

South Conway County School End of Life: Roofing system 1 - District Primary / Reynolds asphalt shingles require replacement 0709 Partnership $197,111.60 $73,393.32 Completed South Conway County School Intermediate Roof- Phase District Morrilton IS 2Documents may indicate MS plm. 1113 Partnership $616,190.00 $242,899.04 Completed South Conway County School Construct new Elementary / Library / District Morrilton Primary Admin / Technology 0607 Partnership $1,849,657.60 $688,708.88 Completed South Pike County School District Delight High School Install 2 GFI receptacles 0607 Partnership $271.00 $164.13 Completed South Pike County School District Delight High School Install 2 GFI receptacles 0607 Partnership $271.00 $164.13 Completed South Pike County School District Delight High School Install 2 GFI receptacles 0607 Partnership $271.00 $164.13 Completed South Pike County School District Delight High School Install 6 GFI receptacles 0607 Partnership $813.00 $492.38 Completed South Pike County School District Delight High School Install 6 GFI receptacles 0607 Partnership $813.00 $492.38 Completed South Pike County School District Delight High School Install 6 GFI receptacles 0607 Partnership $814.00 $492.98 Completed South Pike County School District Delight High School Install 11 GFI receptacles 0607 Partnership $1,491.00 $903.00 Completed South Pike County School District Delight Elementary Install 14 GFI receptacles 0607 Partnership $1,898.00 $1,149.49 Completed South Pike County School District Delight Elementary Install 8 GFI receptacles 0607 Partnership $2,146.26 $1,299.84 Completed South Pike County School District Delight High School Install surveillance system 0607 Partnership $14,005.00 $8,481.87 Completed South Pike County School District Murfreesboro High School Surveillance System 0607 Partnership $19,800.00 $8,828.00 Completed South Pike County School District Delight Elementary Install surveillance system 0607 Partnership $18,208.00 $11,027.33 Completed South Pike County School District Murfreesboro High School Pave gravel parking 0607 Partnership $38,027.00 $17,082.29 Completed South Pike County School Murfreesboro Elementary Construct a new playground for District School Elementary grades K-6 0607 Partnership $51,172.00 $21,743.87 Completed South Pike County School 5504 - Murfreesboro High Update roof at the High District School School/Cafeteria 1315 Partnership $207,992.96 $78,209.02 Completed South Pike County School 5504 - Murfreesboro High Replace Cooling Units Senior High District School School Building 1315 Partnership $1,433,300.00 $285,228.97 Completed South Pike County School Murfreesboro Elementary District School Renovate Primary Building 0607 Partnership $1,098,000.00 $434,195.97 Completed South Pike County School District Murphreesboro ES 11 CR Addition 1113 Partnership $1,049,988.12 $560,280.59 Completed South Side School District - Bee Branch --District Wide-- Cafeteria addition 0911 Partnership $227,092.32 $102,454.62 Completed South Side School District - Bee Branch --District Wide-- New School Building for 5th thr 8th 0911 Partnership $2,200,238.64 $992,656.26 Completed

Page 35 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status

Southside School District - Re-roof Home Economics/Industrial Batesville 3209 - Southside High School Arts Building and Main 0911 Partnership $533,232.70 $400,928.20 Completed Southside School District - Batesville 3209 - Southside Middle School Middle School Roof Replacement 1315 Partnership $770,301.33 $581,566.27 Completed Southside School District - Eight Classroom Addition to HS to Batesville 3209 - SouthSide HS replace temporary buildings 1113 Partnership $956,480.00 $734,168.89 Completed Southside School District - Phase II - 16 Classroom Add. & Batesville 3209 - Southside High School Auditorium (Part 13-15) 1315 Partnership $3,012,675.05 $2,274,525.74 Committed Southside School District - Batesville Southside ES Replace Campus 0607 Partnership $8,344,526.30 $6,254,336.30 Completed Spring Hill School District K-12 K-12 Wastewater Treatment Plant 1113 Partnership $1,014,337.24 $453,988.22 Completed Spring Hill School District 2906 - Spring Hill High School New Cafeteria K-12 (Part 15-17) 1517 Partnership $1,869,486.00 $1,558,326.58 Committed Add additional elementary Spring Hill School District Spring Hill Elementary classrooms as necessary 0709 Partnership $4,023,860.20 $3,236,602.57 Completed Renovation of Springdale High School Springdale School District Springdale High School to house ROTC 0607 Partnership $265,000.00 $6,352.14 Completed Springdale School District Springdale High School Upgrade windows 0709 Partnership $195,256.00 $72,559.08 Completed 7207 - John Tyson Elementary Springdale School District School Upgrade electrical 1315 Partnership $385,819.20 $89,448.11 Completed Springdale School District Springdale High School Upgrade HVAC 0709 Partnership $3,202,000.00 $216,997.90 Completed 7207 - Walker Elementary Springdale School District School Upgrade HVAC 1315 Partnership $1,698,745.10 $301,463.12 Completed 7207 - Elmdale Elementary Construct Media Center & Computer Springdale School District School Lab 1315 Partnership $594,089.82 $303,446.79 Completed 7207 - Thurman G. Smith Elem. Construction of Media Center & Springdale School District School Computer Lab 1315 Partnership $660,657.06 $337,447.74 Completed

Springdale School District Parson Hills Elementary Computer Lab and Library Expansion 0709 Partnership $966,330.92 $359,098.23 Completed

Springdale School District Westwood Elementary Computer Lab and Library Expansion 0709 Partnership $966,330.92 $359,098.23 Completed 7207 - Walker Elementary Springdale School District School Media Center & Computer Lab 1517 Partnership $715,109.20 $386,024.21 Committed 7207 - Central Junior High Springdale School District School Central Jr. High-upgrade roof 1315 Partnership $1,006,200.00 $409,402.37 Completed 7207 - John Tyson Elementary Springdale School District School Media Center & Computer Lab 1517 Partnership $1,241,075.40 $669,946.84 Committed Cafeteria & PE Dressing Rooms Springdale School District Central Jr. High Renovation 0709 Partnership $1,962,726.16 $729,368.67 Completed Renovation/Addition of cafeteria, offices, science labs, spec ed and Springdale School District Springdale High School seminar space 0709 Partnership $8,613,907.00 $3,200,993.43 Completed construction for new elementary Springdale School District new elementary school 0709 Partnership $10,675,096.00 $3,966,812.00 Completed Springdale School District new middle school new construction for middle school 0709 Partnership $18,238,128.00 $6,777,470.75 Completed

Springdale School District --NEW SCHOOL-- New Elementary School to Open 2016 1517 Partnership $14,257,168.62 $7,696,184.33 Committed Springdale School District --NEW SCHOOL-- I School 1517 Partnership $16,718,800.00 $9,025,001.39 Committed new construction for junior high Springdale School District new junior high school 0709 Partnership $26,713,125.00 $9,926,864.38 Completed Install fire alarm and intercom Star City Public Schools systems 0607 Partnership $20,000.00 $2,432.36 Completed Star City Public Schools ALE Building Fire and Safety 0911 Partnership $4,531.52 $2,822.53 Completed Star City Public Schools HS-Vocational Fire and Safety 0911 Partnership $20,416.32 $12,716.62 Completed Star City Public Schools Middle School Fire and Safety 0911 Partnership $36,040.00 $22,448.07 Completed Star City Public Schools Brown Elementary Fire and Safety 0911 Partnership $85,000.00 $52,943.55 Completed Star City Public Schools 4003 - Star City Middle School Middle School Building 2 New Roof 1315 Partnership $192,320.00 $57,797.18 Completed Star City Public Schools 4003 - Star City Middle School Middle School Electrical Project 1517 Partnership $189,030.40 $122,915.40 Committed Star City Public Schools Star City Middle School Reconstruct/rebuild facility 0607 Partnership $320,000.00 $196,541.58 Completed Conversion of old cafeteria to Star City Public Schools 4003 - Brown ES media/classrooms 1113 Partnership $354,791.86 $227,508.71 Completed

Star City Public Schools 4003 - Brown Elementary School Brown Elementry Roof 1315 Partnership $983,990.15 $281,048.02 Completed

Star City Public Schools 4003 - Brown Elementary School Additional Classrooms 0911 Partnership $635,410.25 $393,386.01 Completed Vocational Building Roof, electrical, Star City Public Schools 4003 - Star City High School plumbing 1315 Partnership $635,608.08 $412,652.73 Completed

Page 36 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status

Star City Public Schools 4003 - Brown Elementary School Cafeteria addition 0911 Partnership $929,272.32 $578,811.50 Completed Star City Public Schools 4003 - Brown ES HVAC Brown ES 1113 Partnership $1,790,949.65 $766,013.02 Completed Stephens School District Stephens HS Battery Pack Emetgency Light 0607 Partnership $2,935.68 $1,573.82 Completed Emergency Lighting, Fire Alarm, Exit Stephens School District Stephens ES Signs, Strobe 0607 Partnership $16,582.37 $3,189.47 Completed Emergency Lighting, Fire Alarm, Exit Stephens School District Stephens ES Signs, Strobe 0607 Partnership $7,397.17 $3,189.47 Completed Emergency Lighting, Fire Alarm, Exit Stephens School District Stephens ES Signs, Strobe 0607 Partnership $16,582.37 $3,189.47 Completed Emergency Lighting, Fire Alarm, Exit Stephens School District Stephens HS Signs, Strobe 0607 Partnership $9,455.00 $3,189.47 Completed Emergency Lighting, Fire Alarm, Exit Stephens School District Stephens HS Signs, Strobe 0607 Partnership $14,526.87 $3,189.47 Completed Emergency Lighting, Fire Alarm, Exit Stephens School District Stephens HS Signs, Strobe 0607 Partnership $12,000.97 $3,189.47 Completed Projects 83, 84. Upgrade HVAC Stephens School District Stephens HS System 0709 Partnership $1,370,338.20 $605,080.07 Completed FIRE ALARM/EMERGENCY LIGHTING Strong-Huttig School District 7009 - Strong High School STRONG HS 1315 Partnership $25,972.20 $10,758.36 Committed 7009 - Gardner-Strong Elem. FIRE ALARM/EMERGENCY LIGHTING Strong-Huttig School District School GSES 1315 Partnership $49,619.31 $20,553.61 Committed HVAC ductwork, controls, and the cooling package units need Stuttgart School District OLD Meekins replacement 0709 Partnership $842,853.00 $266,375.30 Completed Demo existing roof @ Din./Kit 12,589 SF, Gym & N.Wing 21,015 SF, Off/Clsrm. 11,454 SF and install Texarkana School District Washington 4-A Mod.Bit. Roof. 1113 Partnership $118,205.28 $55,308.42 Completed Demo existing roof on North & South Shops, DECCA Bld. Install Mod. Bit Texarkana School District 4605 - TAVC (Vocational Center) Roof. 1113 Partnership $135,398.40 $63,435.58 Completed Demo existing roof @ HS Aux Gym & Texarkana School District 4605 - Arkansas HS TV Bld. InstallMod.Bit. roof 1113 Partnership $226,424.00 $106,082.04 Completed Remove Existing Roof. Install 21635 SF Asphalt Shingle & 15644 SF Mod Texarkana School District 4605 - Fairview ES Bit. 1113 Partnership $311,665.00 $146,018.35 Completed Demo Existing roof @ HS Razorback Gym & Band Hall Roof. Installl Mod. Texarkana School District 4605 - Arkansas HS Bit. roof. 1113 Partnership $360,120.67 $168,720.34 Completed 4605 - Washington 4-A Texarkana School District Academny HVAC System Replacement 1315 Partnership $393,744.03 $183,210.38 Completed Demo Existing Roof. Install 40,234 SF Texarkana School District 4605 - Edward D. Trice ES Mod Bit. 1113 Partnership $442,976.34 $207,539.10 Completed Demo Existing roof & install Mod. Bit. Texarkana School District Union ES roof 1113 Partnership $571,433.60 $267,722.68 Completed 4605 - Fairview Elementary Texarkana School District School Physical Education/Safe Room 1517 Partnership $638,590.40 $287,323.51 Committed 4605 - College Hill Elementary Texarkana School District School Physical Education/Safe Room 1517 Partnership $638,590.40 $287,323.51 Committed Texarkana School District 4605 - Vera Kilpatrick ES Kilpatrick ES Roof 1113 Partnership $643,462.26 $301,468.87 Completed 4605 - Fairview Elementary Texarkana School District School HVAC System Replacement 1315 Partnership $841,628.82 $349,185.06 Completed 4605 - Edward D. Trice Elem. Texarkana School District School HVAC System Replacement 1315 Partnership $985,800.26 $380,200.60 Completed 4605 - College Hill Elementary Texarkana School District School HVAC System Replaced 1315 Partnership $1,094,973.93 $387,461.29 Completed

Texarkana School District 4605 - Union Elementary School HVAC System Replacement 1315 Partnership $924,828.18 $409,051.04 Completed 4605 - Vera Kilpatrick Elem. Texarkana School District School HVAC System Replacement 1315 Partnership $1,323,797.66 $462,863.02 Completed Texarkana School District 4605 - College Hill Middle HVAC System Replacement 1315 Partnership $3,297,415.00 $1,534,297.95 Completed Renovate current high school campus Trumann School District 5605 - for 5th-8th grade 0911 Partnership $460,275.20 $291,958.90 Completed TIS TOTAL GYMNASIUM ROOF Trumann School District 5605 - Tis 5-8 REPLACEMENT 1517 Partnership $486,687.36 $318,753.42 Committed Trumann School District Cedar Park Elementary build new kitchen 0709 Partnership $539,676.40 $333,891.71 Completed

Page 37 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status 5605 - Cedar Park Elementary Trumann School District School Trumann Elementary School K-4 1315 Partnership $7,615,758.29 $4,776,413.36 Committed

Trumann School District Trumann High School Construct new High School Complex 0607 Partnership $15,927,553.92 $9,996,071.15 Completed ADA - Door Hardware is not fully Two Rivers School District Old Ola Elementary School compliant 0607 Partnership $50.00 $29.57 Completed Old Fourche Valley Elementary ADA - Door Hardware is not fully Two Rivers School District School compliant 0607 Partnership $83.00 $49.08 Completed ADA - Door Hardware is not fully Two Rivers School District Old Ola High School compliant 0607 Partnership $176.00 $104.08 Completed ADA - Door Hardware is not fully Two Rivers School District Old Ola Elementary School compliant 0607 Partnership $194.00 $114.72 Completed Old Plainview-RoverElementary ADA - Door Hardware is not fully Two Rivers School District School compliant 0607 Partnership $264.00 $156.12 Completed Classroom door lacks appropriate Two Rivers School District Old Fourche Valley High School hardware (Combined Projects) 0607 Partnership $515.00 $304.54 Completed Battery Pack Emergency Light is Two Rivers School District Old Plainview-RoverHigh School missing and is needed 0607 Partnership $844.90 $499.63 Completed

Two Rivers School District Old Plainview-RoverHigh School Exit Sign is missing and is needed 0607 Partnership $844.90 $499.63 Completed Battery Pack Emergency Light Two Rivers School District Old Plainview-RoverHigh School requires replacement 0607 Partnership $844.91 $499.63 Completed Replace/Upgrade Emergency Lighting - Standby Battery Lighting System Two Rivers School District Old Plainview-RoverHigh School requires replacement 0607 Partnership $945.00 $558.82 Completed Battery Pack Emergency Light is Two Rivers School District Old Ola Elementary School missing and is needed 0607 Partnership $3,268.00 $946.02 Completed Classroom door lacks appropriate Two Rivers School District Old Ola Elementary School hardware (Combined Projects) 0607 Partnership $2,060.00 $1,218.17 Completed Co2 Fire Extinguishing requires Two Rivers School District Old Plainview-RoverHigh School replacement 0607 Partnership $2,196.00 $1,298.59 Completed

Two Rivers School District ES K-4 Addition New Elementary Construction Project 1113 Partnership $1,805,043.40 $1,006,560.06 Completed Two Rivers School District High School New High School 0709 Partnership $16,057,146.84 $9,481,130.76 Completed Valley Springs School District Elementary 6 New classrooms 0607 Partnership $980,617.00 $625,709.62 Completed Valley View Public Schools --District Wide-- New Multi-story High School 0911 Partnership $11,443,271.84 $5,911,295.79 Completed BJH Auditorium & PE Facility Roof Van Buren School District 1705 - Butterfield Trail JHS Replacement 1113 Partnership $172,862.64 $89,155.75 Completed Roofing System- Gymnasium Van Buren School District 1705 - Van Buren High School 170502701 0911 Partnership $212,290.00 $106,751.92 Completed 1705 - City Heights Elementary Van Buren School District School Roofing - System 1 & 2 - City Heights 0911 Partnership $214,505.20 $107,865.85 Completed Van Buren School District 1705 - Van Buren High School Roof North & South Wing 0911 Partnership $492,651.25 $247,734.07 Completed Van Buren School District 1705 - Van Buren High School HVAC - North & South Wing 0911 Partnership $765,625.05 $385,001.38 Completed 1705 - Coleman Junior High Van Buren School District School Roofing - Coleman 0911 Partnership $1,179,577.84 $593,161.22 Completed 1705 - Coleman Junior High Van Buren School District School HVAC 0911 Partnership $1,363,117.86 $685,455.96 Completed Construction of New Elementary for Van Buren School District King growth and eliminate high FCI 0709 Partnership $9,110,909.16 $4,762,275.99 Completed School's Surveillance system is Vilonia School District Vilonia Primary undersized per Deficiency Listing 0607 Partnership $6,800.00 $3,972.00 Completed School's Surveillance system is Vilonia School District Vilonia JHS undersized per Deficiency Listing 0607 Partnership $11,241.00 $7,911.76 Completed Fire and Safety-Strobe is missing and Vilonia School District Vilonia HS is needed 0607 Partnership $49,047.00 $34,145.98 Completed Vilonia School District Vilonia Elementary Sanitiary System needs replacment 0607 Partnership $88,000.00 $61,937.06 Completed

Vilonia School District District Wide Fire Alarm replacement District-wide 1113 Partnership $139,924.24 $89,263.42 Completed Vilonia School District Vilonia District High-efficiency lighting 0607 Partnership $182,250.00 $117,735.60 Completed Vilonia School District 2307 - New Auditorium 1517 Partnership $2,233,700.00 $1,519,148.66 Committed 2307 - Vilonia Intermediate New Vilonia Intermediate School for Vilonia School District School Grades 4-6 1113 Partnership $13,370,295.16 $9,062,858.49 Completed Viola School District Viola High School Install Metal Roof with pitch 0607 Partnership $25,000.00 $11,200.29 Completed Viola School District --District Wide-- Fire Alarm Project 0911 Partnership $82,450.00 $37,587.53 Completed Viola School District Viola High School Install Metal Roof with pitch 0607 Partnership $100,000.00 $37,720.23 Completed Viola School District Viola High School Build New High School 0709 Partnership $5,949,249.67 $2,045,713.54 Completed

Page 38 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status Improve exterior lighting for safety Waldron School District Middle and security 0607 Partnership $22,750.00 $10,575.42 Completed Waldron School District Elementary Fire Alarm Replacement 0607 Partnership $109,254.00 $30,847.93 Completed Construct outdoor physical activity Waldron School District Elementary stations and Playground Eqipment 0607 Partnership $60,000.00 $41,774.00 Completed Construct walkway/canopy system Waldron School District Elementary for unloading buses 0607 Partnership $70,000.00 $48,737.00 Completed Construct walkway/canopy system Waldron School District Middle for unloading buses 0607 Partnership $70,000.00 $48,737.00 Completed Construct outdoor physical activity Waldron School District High School (New) stations 0607 Partnership $75,000.00 $52,218.00 Completed Construct outdoor physical activity Waldron School District Middle stations and soccer field 0607 Partnership $75,000.00 $52,218.00 Completed Construct walkway/canopy system Waldron School District High School (New) for unloading buses 0607 Partnership $80,000.00 $55,699.00 Completed Waldron School District 6401 - Waldron Middle School Fire Alarm System - Middle Campus 0911 Partnership $81,016.00 $56,332.50 Completed Waldron School District 6401 - Waldron MS MS Renovation 1113 Partnership $90,317.10 $62,043.78 Completed Replace Roofing System - Multi- Waldron School District 6401 - Waldron Middle School purpose facility 0911 Partnership $503,102.16 $251,729.45 Completed Waldron School District 6401 - Waldron MS MS HVAC 1113 Partnership $778,322.16 $534,672.31 Completed renovate to accommodate ALE Waldron School District HS Program 0709 Partnership $983,874.87 $677,532.07 Completed COMPLETE Replace worn out HVAC Waldron School District 6401 - Waldron Middle School Systems Middle 0911 Partnership $1,169,746.40 $813,354.70 Completed Waldron School District Elementary Replace Worn Out HVAC Systems 0709 Partnership $1,240,012.50 $853,917.77 Completed Replace and bring to current standard Warren Public Schools Eastside Primary HVAC 0709 Partnership $147,340.00 $79,362.16 Completed Warren Public Schools 0602 - Eastside Primary School Roof Elementary K/1 Building 0911 Partnership $183,592.00 $112,634.29 Completed Warren Public Schools 0602 - Eastside Primary School Roof Elementary 2/3 Building 0911 Partnership $183,592.00 $112,634.29 Completed Warren Public Schools Eastside Primary Replace HVAC to current standard 0709 Partnership $235,928.68 $127,078.94 Completed Electrical distribution at K-1 and 2-3 Warren Public Schools 0602 - Eastside Primary School buildings 0911 Partnership $411,436.45 $146,320.52 Completed

Warren Public Schools 0602 - Eastside Primary School Plumbing and bathrooms at Eastside 1315 Partnership $768,351.26 $388,941.63 Completed Warren Public Schools 0602 - Warren High School Replace High School HVAC 1315 Partnership $2,118,821.76 $487,968.27 Completed High School Electrical Replacement Warren Public Schools 0602 - Warren High School Project 1517 Partnership $759,779.52 $508,320.24 Committed Roof @ Bldg. #060201401(Senior Warren Public Schools 0602 - Warren High School High School) 1315 Partnership $1,367,249.04 $876,155.91 Committed 3509 - Watson Chapel Jr. High Watson Chapel School District School Junior High Gym Roof Improvement 0911 Partnership $161,385.00 $122,792.36 Completed 3509 - Coleman Elementary Watson Chapel School District School Roof improvements 0911 Partnership $161,385.00 $122,792.36 Completed 3509 - Watson Chapel High Auto Mechanics & Vocational Watson Chapel School District School Addition 0911 Partnership $166,111.50 $126,388.59 Completed Replace Trocal with Pitched Duralast Watson Chapel School District Watson Chapel HS roof 0709 Partnership $865,090.72 $180,087.28 Completed Replace HVAC per deficiency listing noting inadequate ventilation, Watson Chapel School District Watson Chapel Junior High ductwork and controls replacement 0709 Partnership $667,243.91 $492,549.92 Completed 3509 - Watson Chapel High Watson Chapel School District School High School HVAC Renovation 0911 Partnership $1,380,163.49 $1,050,119.49 Completed 3509 - Watson Chapel High Watson Chapel School District School HS PE/Multipurpose (Part 13-15) 1315 Partnership $1,938,998.72 $1,475,872.32 Committed 3509 - Coleman Elementary Coleman ES HVAC Renovations (Part Watson Chapel School District School 13-15) 1315 Partnership $2,948,414.85 $2,065,097.25 Completed Watson Chapel School District New K-1 School New K-1 School 1113 Partnership $7,852,019.29 $5,991,624.39 Completed Install exhaust fan above stove and install code compliant fire West Fork School District West Fork Elementary School extinguisher stystem - in kitchen 0607 Partnership $4,500.00 $3,138.33 Completed Middle School Restrooms, Classroom West Fork School District 7208 - West Fork Middle School & Corridor 1315 Partnership $565,120.01 $395,610.25 Completed Add Four Classrooms, Hallway, Asphalt Parking, Sidewalk, Awning, West Fork School District West Fork High School Site-work and prep. 0709 Partnership $771,568.53 $538,099.61 Completed West Fork School District 7208 - West Fork ES New Elementary Cafeteria 1113 Partnership $1,130,919.10 $771,554.69 Completed

Page 39 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status New Middle School Physical West Fork School District 7208 - West Fork Middle School Education Facility 1315 Partnership $1,431,720.00 $1,002,270.48 Completed High School HVAC System West Fork School District 7208 - West Fork High School Replacement 1517 Partnership $2,568,106.55 $1,780,977.89 Committed West Memphis School District East Junior High Re-roof buildings 40 & 44 0709 Partnership $105,124.80 $68,093.58 Completed West Memphis School District Wonder Junior High Re-roof building 53 0709 Partnership $163,909.98 $106,171.11 Completed Install New Roofs on Junior high West Memphis School District 1803 - East Junior High School bkdgs 1 and 2 0911 Partnership $204,275.70 $132,898.23 Completed JHS HVAC Renovation buildings West Memphis School District 1803 - East Junior High School 302,303,304 0911 Partnership $328,053.04 $213,425.62 Completed West Memphis School District Weaver Elementary Addition of Four New Classrooms 0607 Partnership $587,437.38 $261,949.44 Completed West Memphis School District West Memphis High School Add 4 Classrooms 0607 Partnership $603,777.78 $278,626.17 Completed West Memphis School District Faulk Elementary Add 4 Classrooms 0607 Partnership $521,210.70 $337,609.21 Completed 1803 - Richland Elementary West Memphis School District School Classroom Addition 0911 Partnership $624,401.61 $406,224.85 Completed 1803 - Weaver Elementary West Memphis School District School Weaver ES Addition (Part 15-17) 1517 Partnership $1,747,212.75 $1,159,926.40 Committed 1803 - Maddux Elementary West Memphis School District School Maddux ES Addition (Part 15-17) 1517 Partnership $1,772,955.00 $1,177,015.97 Committed

West Memphis School District 1803 - Faulk Elementary School Faulk ES Addition (Part 15-17) 1517 Partnership $2,016,630.24 $1,338,785.25 Committed 1803 - Richland Elementary West Memphis School District School Richland ES Addition (Part 15-17) 1517 Partnership $2,767,447.65 $1,837,232.24 Committed District-wide Electrical Renovations West Memphis School District --Multiple Schools-- (Part 15-17) 1517 Partnership $3,324,261.20 $2,206,885.42 Committed

West Memphis School District 1803 - Bragg Elementary School New Bragg ES (Part 15-17) 1517 Partnership $10,406,900.00 $6,908,854.17 Committed Western Yell County School 7509 - Western Yell Co. Elem. District School New Elementary School Building 0911 Partnership $1,962,568.88 $789,639.37 Completed Western Yell County School District WYC High School New Senior High School Addition 0709 Partnership $4,654,768.84 $2,041,581.75 Completed Westside Consolidated School Addition of 3 science labs and 1 agri District Westside High lab 0607 Partnership $1,054,901.28 $588,622.66 Completed Westside Consolidated School Westside Consolidated High District School New HS Fine Arts Auditorium 1113 Partnership $1,016,918.70 $600,121.20 Completed Westside Consolidated School District 1602 - Westside ES Westside Elementary K-1 Facility 1113 Partnership $1,432,080.16 $845,123.28 Completed Install (chain link) fencing and gates. Westside School District Westside High School (Year 1-3) 0607 Partnership $11,849.00 $4,527.62 Completed Install (chain link) fencing and gates. Westside School District Westside High School (Year 1-3) 0607 Partnership $11,849.00 $7,615.97 Completed Install (chain link) fencing and gates. Westside School District Westside High School (Year 1-3) 0607 Partnership $11,849.00 $7,615.97 Completed Replace/ upgrade wiring and Westside School District Westside Elementary School electrical services (Year 1-3) 0607 Partnership $20,201.00 $12,984.23 Completed Replace/ upgrade wiring and Westside School District Westside Elementary School electrical services (Year 1-3) 0607 Partnership $21,552.00 $13,852.59 Completed Replace/ upgrade wiring and Westside School District Westside Elementary School electrical services (Year 1-3) 0607 Partnership $26,390.00 $16,962.22 Completed 3606 - Westside Elementary Westside School District School K-3 Addition at Hartman Campus 0911 Partnership $1,289,467.14 $844,088.40 Completed White County Central School District 7304 - White Co. Central ES Phase II of Roofing Project 1113 Partnership $329,482.22 $44,925.94 Completed White County Central School White County Central High District School New High School Addition 0607 Partnership $250,920.00 $179,468.61 Completed White County Central School 7304 - White Co. Central Elem. District School Roof System 0911 Partnership $273,458.57 $195,976.07 Completed White County Central School District District Wide P.E. Building/Saferoom building 1113 Partnership $650,106.75 $340,944.33 Completed White County Central School White County Central High District School New High School Addition 0607 Partnership $2,714,675.60 $1,871,724.78 Completed Classroom White Hall School District 3510 - White Hall High School Addition 0911 Partnership $3,040,948.68 $1,272,158.20 Completed

Wonderview School District Wonderview Elementary School 4-Exit signs and 16 battery pack lights 0709 Partnership $2,858.86 $1,702.49 Completed 1-Fire Alarm Panel, emergency Wonderview School District Wonderview High School lighting, exit signs 0709 Partnership $4,019.00 $2,393.29 Completed

Page 40 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program -State Plan List of Committed Projects

Qualifying Project State Financial District Name School Name Project Description Program Costs Participation Status 1505 - Wonderview Elementary Wonderview School District School Elementary Fire Alarm System 0911 Partnership $18,535.52 $7,343.95 Completed Fire Alarm Systems - High School, Wonderview School District 1505 - Wonderview High School Agri, & Music/Band Buildings 0911 Partnership $25,947.00 $10,206.85 Completed Replacement of collapsed building. Wonderview School District Wonderview High School Added classrooms & labs. 0607 Partnership $1,108,100.33 $661,743.17 Completed Construct New Cafetorium and Add Wonderview School District --District Wide-- Classrooms 0911 Partnership $2,597,307.93 $1,070,610.33 Completed

Woodlawn School District --District Wide-- District Wide Fire Alarm Replacement 0911 Partnership $48,916.48 $31,251.94 Completed Woodlawn School District Woodlawn High School Cafeteria/Admin Roof Replacement 1315 Partnership $86,245.92 $54,016.90 Completed Renovate restrooms to meet ADA Woodlawn School District Woodlawn Elementary School standards 0607 Partnership $111,000.00 $74,766.45 Completed Woodlawn School District 1304 - Woodlawn HS HVAC Life Cycle (WHS) 1304 1113 Partnership $487,225.34 $77,056.71 Completed 1304 - Woodlawn Elementary Woodlawn School District School Elementary Roof 0911 Partnership $129,500.35 $86,387.76 Completed Cafeteria/Admin Woodlawn School District --District Wide-- Foundation/Plumbing Repair 1315 Partnership $150,000.00 $90,118.13 Completed Woodlawn School District 1304 - Woodlawn High School Roof system 0911 Partnership $142,275.00 $94,909.54 Completed 2 kindergarten classroom addition with corridor enclosure and teacher Woodlawn School District Woodlawn Elementary restroom. 0709 Partnership $579,505.44 $387,173.38 Completed New Construction(Fine Arts, Muti- Woodlawn School District --District Wide-- Media, Technology Center 0911 Partnership $739,249.28 $493,142.20 Completed Woodlawn School District Woodlawn High School Additional Classrooms and Labs 0607 Partnership $2,989,261.60 $1,908,698.60 Completed Wynne Public Schools Intermediate Expand Parking Area 0607 Partnership $66,000.00 $39,469.90 Completed Wynne Public Schools Junior High Shelving and Storage 0607 Partnership $69,988.00 $41,854.84 Completed Wynne Public Schools Intermediate Cabinet Storage 0607 Partnership $99,125.00 $59,279.60 Completed HS Fire Alarm/Intercom System (Part Wynne Public Schools 1905 - 13-15) 1315 Partnership $271,080.60 $60,831.58 Completed Wynne Public Schools Primary School Enlarge Support Service Area 0607 Partnership $201,283.20 $120,373.15 Completed

Wynne Public Schools Intermediate Restroom Renovations to meet ADA 0607 Partnership $201,294.00 $120,379.61 Completed

Wynne Public Schools 1905 - Wynne High School HS HVAC & Renovations (Part 15-17) 1517 Partnership $309,445.40 $186,159.96 Committed Primary School Roof Replacement - Wynne Public Schools 1905 - Wynne Primary Main Building (Part 11-13) 1113 Partnership $896,395.22 $374,645.22 Completed Wynne Public Schools Intermediate 4 Classroom Addition 0607 Partnership $703,138.52 $420,497.09 Completed Wynne Public Schools Wynne HS 6-8 Classroom Addition 0607 Partnership $2,172,408.00 $1,299,162.55 Completed 6 Classroom Addition to Replace Yellville-Summit School District Yellville-Summit ES Temporary Buildings 0607 Partnership $812,140.00 $459,682.16 Completed 6 Classroom Addition, Library,P.E. Facility to Replace Temporary Yellville-Summit School District Yellville-Summit MS Buildings 0607 Partnership $4,112,792.00 $604,945.71 Completed 4 Classroom Addition to Replace Yellville-Summit School District Yellville-Summit HS Temporary Buildings 0607 Partnership $2,053,228.61 $1,162,155.00 Completed

Page 41 - Committed Projects October 1, 2016 Academic Facilities Master Plan Program - State Plan Four-Year Rolling Forecast 2017-2021 Planned Academic Facilities Partnership Program Projects

District Name Project Number School Project Name Project Type Budget

Alpena 1718-0501-001 0501 - Alpena HS New HS Warm/Safe/Dry Space Replacement $11,576,250.00 Arkadelphia 1718-1002-002 --Not Specified-- AMS Classroom Addition Space $1,987,995.00 Arkadelphia 1718-1002-003 --Not Specified-- AES Classroom Addition Space $2,141,091.00 Arkadelphia 1819-1002-004 1002 - Arkadelphia HS Total Renov of AHS Gymnasium Warm/Safe/Dry Space Replacement $2,905,111.00 Arkadelphia 1819-1002-006 1002 - Arkadelphia HS Renov and Expansion AHS Band Hall Warm/Safe/Dry Space Replacement $1,785,240.00 Ashdown 1718-4101-100 4101 - Margaret Daniels PS Margaret Daniels Renov/Addition Space $10,000,000.00 Ashdown 1819-4101-005 4101 - C. D. Franks ES Gym Warm/Safe/Dry Space Replacement $10,442.00 Barton-Lexa 1718-5401-001 5401 - Barton ES K-12 Addition & Renov Warm/Safe/Dry Space Replacement $6,060,000.00 Barton-Lexa 1718-5401-002 5401 - Barton HS BL HS Gym HVAC Warm/Safe/Dry System Replacement $648,150.00 Barton-Lexa 1718-5401-003 5401 - Barton ES BL ES HVAC Warm/Safe/Dry System Replacement $1,136,270.00 Bauxite 1718-6301-002 6301 - Bauxite HS HS Additions Space $4,400,000.00 Bauxite 1718-6301-004 6301 - Pine Haven ES Pine Haven ES - Phase 4 Addition Space $1,900,000.00 Bearden 1718-5201-123 5201 - Bearden HS BHS Auditorium Construction Space $1,350,000.00 Bearden 1819-5201-131 --Not Specified-- Upgrade/remodel add'l classrooms/bathrooms Warm/Safe/Dry Space Replacement $35,000.00 Bearden 1920-5201-140 5201 - Bearden ES Upgrade/remodel add'l classrooms/bathrooms Warm/Safe/Dry System Replacement $250,000.00 Beebe 1718-7302-001 7302 - Beebe MS Space/MS Space $245,660.00 Beebe 1718-7302-003 7302 - Beebe JHS Addition/Renov to JHS Cafeteria and Library Space $783,000.00 Beebe 1718-7302-004 7302 - Beebe MS Roof Replacement at SPED @ McRae Warm/Safe/Dry System Replacement $144,912.00 Beebe 1819-7302-004 7302 - Beebe ES HVAC and Electrical at 4th Grade Building Warm/Safe/Dry System Replacement $2,344,467.00 Beebe 1819-7302-005 7302 - Beebe ES Beebe ES Renov/Addition Space $3,794,350.00 Benton 1718-6302-009 6302 - Benton JHS JHS Addition Space $2,100,000.00 Benton 1819-6302-003 6302 - Benton HS Cook Fieldhouse - Conversion Space $3,800,000.00 Benton 1819-6302-004 6302 - Benton JHS JHS Main Building Roof Replacement Warm/Safe/Dry System Replacement $900,000.00 Benton 1819-6302-006 6302 - Caldwell ES Caldwell ES Roof Warm/Safe/Dry System Replacement $720,000.00 Benton 1819-6302-008 6302 - Benton JHS 9th Grade Expansion Space $10,000,000.00 Benton 1920-6302-001 --NEW SCHOOL-- New 600 Student ES Space $9,647,190.00 Benton 1920-6302-003 6302 - Benton HS HS - CTE Addition Space Not Indicated Benton 1920-6302-005 --Multiple Schools-- ES HVAC - Perrin, Caldwell, Grant Warm/Safe/Dry System Replacement Not Indicated Bentonville 1718-0401-001 --NEW SCHOOL-- New ES (#12) Space $20,000,000.00 Bentonville 1718-0401-002 --NEW SCHOOL-- 5-6 MS (#6) Space $20,000,000.00 Bentonville 1819-0401-001 --NEW SCHOOL-- 7-8 JHS (#4) Space $28,000,000.00 Bergman 1718-0502-001 --Not Specified-- Wastewater Treatment Facility Expansion Warm/Safe/Dry System Replacement $300,000.00 Bergman 1920-0502-001 0502 - Bergman HS Classrooms Warm/Safe/Dry Space Replacement $639,088.00 Bergman 1920-0502-002 0502 - Bergman ES Addition of classrooms to ES Space $1,597,146.00 Bergman 1920-0502-008 --NEW SCHOOL-- New MS Space $12,834,576.00 Berryville 1718-0801-002 --NEW SCHOOL-- Grade 5-8 MS Space $17,000,000.00 Berryville 1718-0801-003 0801 - Berryville HS East Campus Fire Alarms Warm/Safe/Dry System Replacement $100,000.00 Berryville 1819-0801-001 --Multiple Schools-- Roof Replacements Warm/Safe/Dry System Replacement $1,000,000.00 Berryville 1819-0801-003 --Multiple Schools-- HS Additions - Phase I Warm/Safe/Dry Space Replacement $2,750,000.00 Bismarck 1819-3001-002 3001 - Bismarck HS HS Main Boiler/Chiller Replacement Warm/Safe/Dry System Replacement $400,000.00 Bismarck 2021-3001-001 3001 - Bismarck MS Water Infiltration Warm/Safe/Dry System Replacement $150,000.00 Blevins 1718-2901-003 2901 - Blevins HS ROOF-BHS-6 Warm/Safe/Dry System Replacement $168,000.00 Blevins 1819-2901-100 2901 - Blevins ES Replace HVAC Warm/Safe/Dry System Replacement Not Indicated Booneville 1718-4201-012 4201 - Booneville JHS Construct cover walkways & bus pick-up Warm/Safe/Dry Space Replacement $50,000.00 Booneville 1718-4201-013 4201 - Booneville HS Construct covered bus pick-up and drop-off Warm/Safe/Dry Space Replacement $20,000.00 Booneville 1718-4201-100 4201 - Booneville JHS Replace all exterior doors Warm/Safe/Dry Space Replacement $90,000.00 Booneville 1718-4201-500 4201 - Booneville HS HS Foundation Project Warm/Safe/Dry System Replacement $254,866.00 Booneville 1819-4201-004 4201 - Booneville HS HS HVAC Project Warm/Safe/Dry System Replacement $2,007,253.00 Booneville 1819-4201-005 4201 - Booneville JHS JHS Electrical Project Warm/Safe/Dry System Replacement $606,836.00 Booneville 1920-4201-050 4201 - Booneville JHS JSH Plumbing Renov Warm/Safe/Dry Space Replacement $215,000.00 Booneville 1920-4201-051 4201 - Booneville JHS Music/Band Roof Project Warm/Safe/Dry System Replacement $125,000.00 Bradford 1718-7303-001 7303 - Bradford HS Bradford HS (ADA) Warm/Safe/Dry Space Replacement $24,800.00 Bradford 1718-7303-002 7303 - Bradford ES Bradford ES (site and building ADA) Warm/Safe/Dry Space Replacement $26,800.00 Brinkley 1718-4801-001 4801 - C.B. Partee ES CB Partee ES Roof Renov Warm/Safe/Dry System Replacement $1,750,000.00 Brinkley 1718-4801-044 4801 - Brinkley HS HS Bldg. Roof Renov Warm/Safe/Dry System Replacement $2,500,000.00 Brookland 1819-1603-001 1603 - Brookland HS HS Roofs Renov Warm/Safe/Dry System Replacement $1,100,000.00 Brookland 1920-1603-001 1603 - Brookland ES New ES Addition Space $1,200,000.00 Bryant 1718-6303-256 6303 - Bryant HS HS Additions, Phase I Space $26,000,000.00 Bryant 1718-6303-279 --NEW SCHOOL-- New ES Space $14,500,000.00 Bryant 1718-6303-285 --NEW SCHOOL-- New JHS, Phase I Space $43,300,000.00 Bryant 2021-6303-290 --NEW SCHOOL-- New 700 Student ES Space $15,000,000.00 Buffalo Island 1920-1605-001 1605 - Buffalo Is. Central HS Buffalo Is. Central HS (main bldg. roof) Warm/Safe/Dry System Replacement $525,000.00 Buffalo Island 1920-1605-002 1605 - Buffalo Is. Central JHS JHS Gym Roof Warm/Safe/Dry Space Replacement $150,008.00 Buffalo Island 1920-1605-003 --Multiple Schools-- JHS/East ES HVAC Renov Warm/Safe/Dry System Replacement $1,500,000.00 Cabot 1718-4304-011 --Multiple Schools-- HVAC for Kitchens Warm/Safe/Dry System Replacement $8,000,000.00 Cabot 1718-4304-704 4304 - Cabot HS HS CTAT Roof (local) Warm/Safe/Dry System Replacement $160,000.00 Cabot 1819-4304-002 4304 - Westside ES Westside Renov Warm/Safe/Dry System Replacement $3,319,000.00 Cabot 1819-4304-003 4304 - Cabot MS South MS South Roof Warm/Safe/Dry System Replacement $1,921,740.00 Cabot 1819-4304-005 4304 - Eastside ES Eastside ES Renov Warm/Safe/Dry System Replacement $3,000,000.00 Cabot 1819-4304-006 4304 - Southside ES Southside ES Renov Warm/Safe/Dry System Replacement $2,800,000.00 Cabot 1819-4304-007 4304 - Cabot JHS South JHS South Renov Warm/Safe/Dry System Replacement $4,500,000.00 Cabot 1920-4304-002 4304 - Northside ES Northside ES Addition Space $700,000.00

October 1, 2016 Page 1 of 9 Academic Facilities Master Plan Program - State Plan Four-Year Rolling Forecast 2017-2021 Planned Academic Facilities Partnership Program Projects

District Name Project Number School Project Name Project Type Budget

Cabot 1920-4304-011 4304 - Northside ES Northside Roof Warm/Safe/Dry System Replacement $891,640.00 Cabot 2021-4304-003 --NEW SCHOOL-- Austin - New ES Space $6,303,636.00 Caddo Hills 1718-4901-007 --Multiple Schools-- Replacement of Campus Fire Alarm System Warm/Safe/Dry System Replacement $200,000.00 Caddo Hills 1819-4901-002 4901 - Caddo Hills HS Conversion Student Dining/PE/Perform Arts Space $400,000.00 Caddo Hills 1819-4901-003 --Multiple Schools-- Replace Roofing Systems Warm/Safe/Dry System Replacement $275,000.00 Camden Fairview 1819-5204-001 5204 - Camden Fairview IS IS Roof Replacement Warm/Safe/Dry System Replacement $600,000.00 Carlisle 1920-4303-001 4303 - Carlisle ES New ES Warm/Safe/Dry Space Replacement $6,741,515.00 Carlisle 1920-4303-004 4303 - Carlisle HS HS Auditorium Warm/Safe/Dry Space Replacement $400,000.00 Cedarville 1718-1702-101 --Multiple Schools-- HS/MS Roof Project Warm/Safe/Dry System Replacement $1,140,795.00 Cedarville 1819-1702-101 1702 - Cedarville HS HS MS Electrical Project Warm/Safe/Dry System Replacement $749,070.00 Cedarville 1920-1702-002 1702 - Cedarville MS MS Plumbing Renov Warm/Safe/Dry System Replacement $80,000.00 Cedarville 1920-1702-903 1702 - Cedarville HS Auditorium Space $2,800,000.00 Centerpoint 1718-5502-009 5502 - Centerpoint HS HS HVAC Replacement Warm/Safe/Dry System Replacement $1,300,000.00 Centerpoint 1718-5502-011 5502 - Centerpoint HS Fire & Safety Replacement at HS Warm/Safe/Dry System Replacement $240,000.00 Centerpoint 1819-5502-001 5502 - Centerpoint HS HS Agri-Building Roof Replacement Warm/Safe/Dry System Replacement $106,000.00 Centerpoint 1920-5502-002 5502 - Centerpoint HS HS Roof Replacement Warm/Safe/Dry System Replacement Not Indicated Charleston 1819-2402-002 2402 - Charleston ES Safety Warm/Safe/Dry System Replacement $916,281.00 Charleston 1819-2402-722 2402 - Charleston HS TECH BLDG CLASSROOM IMPROVEMENT Warm/Safe/Dry Space Replacement $1,165,009.00 Clarendon 1718-4802-001 4802 - Clarendon HS HS Addition (Phase II - Part 17-19) Warm/Safe/Dry Space Replacement $2,024,999.00 Clarendon 1920-4802-006 4802 - Clarendon HS HS HVAC Warm/Safe/Dry System Replacement $258,000.00 Clarksville 1718-3601-011 3601 - Clarksville HS HS Addition Space Not Indicated Cleveland Co. 1718-1305-001 1305 - Rison HS Replacement of portables 1 and 2 Space $375,000.00 Cleveland Co. 1819-1305-125 1305 - Rison HS K-12 P.E. facility construction 125P 500,000 Space $500,000.00 Clinton 1718-7102-003 7102 - Clinton HS Amended Life Cycle Plumbing PE/Walker Warm/Safe/Dry System Replacement $111,000.00 Clinton 1718-7102-004 7102 - Clinton HS Math/SPED Warm/Safe/Dry System Replacement $185,490.00 Clinton 1920-7102-001 7102 - Clinton IS HVAC - Intermediate School Warm/Safe/Dry Space Replacement $993,000.00 Concord 1920-1201-001 1201 - Concord HS Classrooms Space $510,000.00 Concord 2021-1201-001 1201 - Concord HS art Space $1,700,000.00 Conway 1819-2301-001 --NEW SCHOOL-- New ES #2 Space $15,000,000.00 Conway 1920-2301-041 --Not Specified-- District Assessment Facility Space $1,370,000.00 Corning 1920-1101-001 1101 - Central ES New HS Warm/Safe/Dry Space Replacement $10,000,000.00 Cossatot River 1718-5707-001 5707 - Cossatot River HS ES Space $12,000,000.00 Cossatot River 1920-5707-002 5707 - Cossatot River HS Safe room/2 classrooms Space Not Indicated Cotter 1920-0302-001 --NEW SCHOOL-- New PreK-4 at Gassville Space Not Indicated Cross Co. 1819-1901-001 HS A New Tech Sch HS Roof Renov Warm/Safe/Dry System Replacement $1,859,915.00 Cross Co. 1819-1901-002 HS A New Tech Sch HS HVAC Renov. Warm/Safe/Dry System Replacement $1,384,730.00 Cross Co. 1920-1901-001 ES Tech Academy K-12 Fine Arts & Classroom Addition Space $2,887,500.00 Cutter-Morning 1718-2601-001 2601 - Cutter-Morning Star ES Gym Roof Replacement Warm/Safe/Dry System Replacement $220,000.00 Cutter-Morning 1718-2601-002 2601 - Cutter-Morning Star HS Additional SF for New HS Space $2,800,000.00 Cutter-Morning 1819-2601-001 2601 - Cutter-Morning Star ES Alarm) Warm/Safe/Dry System Replacement $1,500,000.00 Cutter-Morning 1819-2601-002 2601 - Cutter-Morning Star ES Cafeteria HVAC Replacement Warm/Safe/Dry System Replacement $455,000.00 Cutter-Morning 1819-2601-004 2601 - Cutter-Morning Star ES Replace Warm/Safe/Dry System Replacement $227,000.00 Danville 1718-7503-001 7503 - Danville HS Construct Agri Business Lab Space $1,111.00 Dardanelle 1819-7504-001 7504 - Dardanelle HS HS South Wing - Replace Building Roof Warm/Safe/Dry System Replacement $489,000.00 De Queen 1718-6701-001 6701 - Dequeen HS New HS Space $15,000,000.00 De Queen 1718-6701-007 6701 - Dequeen MS Replace roof Warm/Safe/Dry System Replacement $378,000.00 De Queen 1819-6701-002 NULL Roofing - Replace Roofing System 1 Warm/Safe/Dry Space Replacement $209,406.00 De Queen 1819-6701-003 NULL Roofing - Replace Roofing System 1 Warm/Safe/Dry Space Replacement $41,320.00 De Queen 1819-6701-005 6701 - Dequeen PS PS Addition Space $1,800,000.00 Decatur 1718-0402-010 0402 - Decatur MS MS - PE Addition Space $1,250,000.00 Decatur 1819-0402-011 0402 - Decatur HS Alarm Warm/Safe/Dry System Replacement $1,600,000.00 Decatur 1819-0402-012 0402 - Decatur HS HS - New Student Dining/Commons Space $2,050,000.00 Dermott 1920-0901-003 0901 - Dermott HS Gym air conditioning project Warm/Safe/Dry Space Replacement $200,000.00 Dermott 2021-0901-002 0901 - Dermott ES ES PE facility Space $675,000.00 Des Arc 1718-5901-002 5901 - Des Arc HS Electrical Svc & Distrib w/Life Safety at HS Warm/Safe/Dry System Replacement $1,010,415.00 Des Arc 1718-5901-003 5901 - Des Arc ES Electrical Svc & Distrib w/Life Safety at ES Warm/Safe/Dry System Replacement $687,873.00 Des Arc 1819-5901-001 5901 - Des Arc HS Roof Replacement at HS Warm/Safe/Dry System Replacement $1,202,183.00 Des Arc 1819-5901-004 5901 - Des Arc HS Gym Renov Warm/Safe/Dry System Replacement $550,000.00 DeWitt 1819-0101-001 0101 - DeWitt HS Gym/PE/Classroom Facility Roof Sys Replace Warm/Safe/Dry System Replacement $311,441.00 DeWitt 1819-0101-002 0101 - DeWitt ES DeWitt ES Bldg Electrical Upgrade Warm/Safe/Dry System Replacement $323,492.00 DeWitt 1819-0101-003 0101 - DeWitt HS HS Cafeteria HVAC-Plumbing-Electrical Warm/Safe/Dry System Replacement $158,364.00 DeWitt 1819-0101-004 0101 - DeWitt HS Band Hall HVAC Warm/Safe/Dry System Replacement $162,786.00 DeWitt 1819-0101-005 0101 - DeWitt HS Classroom Building Systems Replacement Warm/Safe/Dry System Replacement $452,278.00 Dierks 1718-3102-076 3102 - Dierks HS Fine Arts Center Space $2,000,000.00 Dierks 1718-3102-196 3102 - Dierks HS Replace HVAC systems Warm/Safe/Dry Space Replacement $30,000.00 Dierks 1819-3102-057 3102 - Joann Walters ES Roof replacement (partial) Warm/Safe/Dry Space Replacement $72,000.00 Dierks 1819-3102-100 3102 - Joann Walters ES ES classrooms Space Not Indicated Dierks 1920-3102-089 3102 - Joann Walters ES Replace HVAC systems Warm/Safe/Dry Space Replacement $75,000.00 Dollarway 1718-3502-001 3502 - Robert F Morehead MS Morehead Roof Renov Warm/Safe/Dry System Replacement $503,307.00 Drew Central 1819-2202-004 --Multiple Schools-- MS & Auditorium HVAC Warm/Safe/Dry System Replacement $1,932,812.00 Drew Central 1819-2202-079 2202 - Drew Central HS Humanities/Math-Science HVAC Syst Replace Warm/Safe/Dry System Replacement $1,200,000.00 Drew Central 1920-2202-001 --Multiple Schools-- Adm/gym/cafeteria & Kindergarten roof replace Warm/Safe/Dry System Replacement $672,464.00

October 1, 2016 Page 2 of 9 Academic Facilities Master Plan Program - State Plan Four-Year Rolling Forecast 2017-2021 Planned Academic Facilities Partnership Program Projects

District Name Project Number School Project Name Project Type Budget

Drew Central 1920-2202-002 2202 - Drew Central MS MS Roof Replacement Warm/Safe/Dry System Replacement $500,000.00 Drew Central 1920-2202-080 2202 - Drew Central HS Domestic Water Sys Piping Faucets Fixtures Warm/Safe/Dry System Replacement $150,000.00 Dumas 1718-2104-001 2104 - Dumas JHS JHS Roof Warm/Safe/Dry Space Replacement $705,000.00 Dumas 1819-2104-001 2104 - Dumas JHS Technology rooms for JHS Space $562,750.00 Dumas 1819-2104-002 2104 - Central ES Central ES Building A HVAC replacement Warm/Safe/Dry System Replacement $1,654,141.00 Earle 1718-1802-101 1802 - Earle ES Earle New ES Warm/Safe/Dry Space Replacement $7,000,000.00 East Poinsett Co. 1718-5608-001 5608 - Tyronza ES EPC Tyronza Fire Alarm Warm/Safe/Dry System Replacement $1,240,000.00 East Poinsett Co. 1718-5608-010 5608 - East Poinsett Co. HS HS - JHS Gym Roof Warm/Safe/Dry System Replacement $750,000.00 East Poinsett Co. 1920-5608-001 5608 - Tyronza Elementary Tyronza ES HVAC Warm/Safe/Dry System Replacement $260,000.00 East Poinsett Co. 1920-5608-003 5608 - East Poinsett Co. HS JHS & Special Ed Addition Wing Warm/Safe/Dry Space Replacement $2,025,000.00 East Poinsett Co. 2021-5608-005 5608 - Lepanto ES Lepanto ES HVAC Warm/Safe/Dry System Replacement $260,000.00 El Dorado 1920-7001-002 7001 - Retta Brown ES Warm Safe & Dry-HVAC, Roof, & Electrical Warm/Safe/Dry System Replacement $900,000.00 El Dorado 2021-7001-001 --Not Specified-- New JHS Building Warm/Safe/Dry System Replacement $17,000,000.00 Elkins 1718-7201-001 7201 - Elkins ES Add 6 classrooms Space $1,615,540.00 Elkins 1718-7201-002 7201 - Elkins ES ES Window Replacement Warm/Safe/Dry System Replacement Not Indicated Elkins 1718-7201-005 7201 - Elkins MS MS Roof Warm/Safe/Dry System Replacement $400,000.00 Emerson-Taylor-Bradley 1718-1408-003 1408 - Bradley HS New Home Ec, Business, Music Bldg Warm/Safe/Dry Space Replacement $1,750,000.00 Emerson-Taylor-Bradley 1920-1408-002 1408 - Taylor HS Classroom addition Taylor HS Space Not Indicated England 1718-4302-001 4302 - England ES England ES Warm/Safe/Dry Space Replacement $9,290,529.00 England 1718-4302-003 4302 - England HS HS HVAC Upgrade Warm/Safe/Dry System Replacement $600,000.00 Farmington 1920-7202-001 7202 - Bob Folsom ES Folsom ES Expansion Space $1,050,000.00 Farmington 1920-7202-002 7202 - George R Ledbetter IS Expansion of Classrooms and Adding Cafeteria Space $1,700,000.00 Fordyce 1819-2002-002 2002 - Fordyce HS / JHS HS HVAC, Electrical, and FA Renov Warm/Safe/Dry System Replacement $2,250,000.00 Foreman 1718-4102-002 4102 - Foreman HS plumbingjhs Warm/Safe/Dry Space Replacement $60,000.00 Foreman 1718-4102-004 4102 - Foreman HS HS cafeteria Space $800,000.00 Foreman 1819-4102-008 4102 - Foreman HS Roof-Fine Arts Warm/Safe/Dry Space Replacement $78,000.00 Foreman 1920-4102-001 4102 - Foreman HS HS Warm/Safe/Dry Space Replacement Not Indicated Forrest City 1718-6201-219 6201 - Forrest City JHS Forrest City JHS Interior Renov Warm/Safe/Dry System Replacement $317,845.00 Forrest City 1819-6201-001 6201 - Forrest City HS HS Main Roof Warm/Safe/Dry System Replacement $3,000,000.00 Forrest City 1819-6201-002 6201 - Forrest City JHS JHS HVAC Renov Warm/Safe/Dry System Replacement $3,020,000.00 Forrest City 1920-6201-001 Lincoln Academy Of Excellence Lincoln North Roof Warm/Safe/Dry System Replacement $380,000.00 Fort Smith 1718-6601-001 6601 - Dora Kimmons JHS Kimmons JH Addition & Renov Space $8,300,000.00 Fort Smith 1718-6601-002 6601 - Trusty ES Trusty ES Addition & Renov Space $3,238,500.00 Fort Smith 1718-6601-003 6601 - Sutton ES Sutton ES Classroom Addition Space $1,400,000.00 Fort Smith 1718-6601-005 6601 - Northside HS Northside Tornado Shelters Space $3,200,000.00 Fort Smith 1718-6601-006 6601 - Southside HS Southside HS Tornado Shelters Space $3,200,000.00 Fort Smith 1718-6601-007 6601 - Administration Performing Arts Center Space $18,000,000.00 Fort Smith 1718-6601-014 6601 - Southside HS Southside HS Addition & Renov Space $10,500,000.00 Fort Smith 1718-6601-017 6601 - Ramsey JHS Ramsey JH Addition/Renov Space $13,000,000.00 Fort Smith 1718-6601-020 6601 - Dora Kimmons JHS Kimmons Fire Sprinkler Warm/Safe/Dry System Replacement $2,330,000.00 Fort Smith 1718-6601-024 6601 - Ballman ES Ballman HVAC Replacement Warm/Safe/Dry System Replacement $1,060,056.00 Fort Smith 1718-6601-028 6601 - Trusty ES Trusty HVAC Replacement Warm/Safe/Dry System Replacement $650,144.00 Fort Smith 1819-6601-001 6601 - Tilles ES Tilles ES Classroom Addition Space $800,000.00 Fort Smith 1920-6601-001 6601 - Cavanaugh ES Cavanaugh ES HVAC Renov Warm/Safe/Dry System Replacement $500,000.00 Fort Smith 1920-6601-012 6601 - Northside HS Northside HS Health CR Roof Repair Warm/Safe/Dry System Replacement $350,000.00 Fort Smith 1920-6601-016 6601 - Spradling ES Spradling Roof Replacement Warm/Safe/Dry System Replacement $750,000.00 Fort Smith 1920-6601-020 6601 - L. A. Chaffin JHS Chaffin Auditorium Space $3,325,000.00 Fort Smith 1920-6601-115 6601 - Bonneville ES Bonneville Classroom Addition Space $3,500,000.00 Fort Smith 1920-6601-158 6601 - Dora Kimmons JHS Kimmons Auditorium Addition Space $1,775,000.00 Fort Smith 2021-6601-002 6601 - Spradling ES Spradling ES Classroom Addition Space $1,000,000.00 Fouke 1718-4603-001 4603 - Fouke HS HS roof replacement Warm/Safe/Dry System Replacement $465,000.00 Fouke 1718-4603-002 4603 - Paulette Smith MS Cafeteria addition Space $2,000,000.00 Fouke 1819-4603-044 4603 - Fouke ES New pre-k and special needs complex Space $1,164,000.00 Genoa Central 1718-4602-105 4602 - Genoa Central ES ES cafeteria Space $2,500,000.00 Genoa Central 1819-4602-001 4602 - Genoa Central ES Replace roof on ES bldg & attached Cafeteria Warm/Safe/Dry Space Replacement $504,000.00 Genoa Central 1920-4602-002 4602 - Genoa Central ES Art and Music, P. E. facility Space $388,980.00 Genoa Central 1920-4602-003 4602 - Gary E. Cobb MS Art classroom and two additional classrooms Space $578,496.00 Gentry 1718-0403-010 0403 - Gentry IS New Roof Systems at IS Warm/Safe/Dry System Replacement $525,000.00 Gentry 1718-0403-103 0403 - Gentry IS Stand Alone IS Classroom Building Warm/Safe/Dry Space Replacement $5,999,700.00 Gentry 1819-0403-001 0403 - Gentry HS Replace Chiller/Boiler of HS Auditorium Warm/Safe/Dry Space Replacement $610,200.00 Gentry 1819-0403-004 0403 - Gentry HS System Renov in New Agri Building Warm/Safe/Dry System Replacement $262,304.00 Gentry 1819-0403-006 0403 - Gentry HS New Electrical Service/Distribution @ HS Warm/Safe/Dry System Replacement $768,448.00 Gentry 1819-0403-009 0403 - Gentry HS Lab Space $818,274.00 Gentry 2021-0403-011 0403 - Gentry MS Classroom addition to Gentry MS Space $1,800,000.00 Glen Rose 1819-3002-002 3002 - Glen Rose HS HS HVAC and Electric Upgrade Warm/Safe/Dry System Replacement $1,700,000.00 Glen Rose 1819-3002-004 3002 - Gifford ES Gifford PS- Roof Upgrade Warm/Safe/Dry System Replacement $170,000.00 Gosnell 1718-4708-001 4708 - Gosnell HS HS HVAC Warm/Safe/Dry System Replacement $2,525,000.00 Gosnell 1718-4708-017 4708 - Gosnell ES ES Hallway (Enclose Hallway / Project 3 ) Space $85,065.00 Gosnell 1718-4708-018 4708 - Gosnell ES ES Hallway (Enclose Hallway / Project 4) Space $19,421.00 Gosnell 1718-4708-021 4708 - Gosnell ES Expand ES Physical Education Parking Space $55,640.00 Gosnell 1920-4708-001 4708 - Gosnell HS 2019-2021 New JHS Cafeteria Space $1,156,250.00 Gosnell 1920-4708-103 4708 - Gosnell HS HS Fine Arts/Band/Choir Addition Space $3,500,000.00

October 1, 2016 Page 3 of 9 Academic Facilities Master Plan Program - State Plan Four-Year Rolling Forecast 2017-2021 Planned Academic Facilities Partnership Program Projects

District Name Project Number School Project Name Project Type Budget

Green Forest 2021-0803-701 0803 - Green Forest HS New Fine Arts Building/Auditorium Warm/Safe/Dry Space Replacement $5,200,000.00 Greenbrier 1718-2303-002 2303 - Greenbrier JHS SYSTEMS REPLACEMENT Warm/Safe/Dry System Replacement $1,342,200.00 Greenland 1819-7204-002 7204 - Greenland HS Performing Arts Facility Space $2,000,000.00 Greenland 2021-7204-001 7204 - Greenland ES ES Roof Warm/Safe/Dry Space Replacement $1,000,000.00 Greenwood 1718-6602-001 6602 - Greenwood HS Replace HVAC units at Science Building Warm/Safe/Dry Space Replacement $150,000.00 Greenwood 1819-6602-001 6602 - East Pointe ES East Pointe Safe Room Space $1,000,000.00 Greenwood 1819-6602-004 --NEW SCHOOL-- Greenwood JHS Safe Room Space $1,000,000.00 Hackett 1718-6603-103 6603 - Hartford ES Hartford ES Roof Renov Warm/Safe/Dry System Replacement $790,409.00 Hackett 1819-6603-001 6603 - Hartford HS HVAC Replace at Hartford Classroom Bldg Warm/Safe/Dry System Replacement $130,050.00 Hackett 1920-6603-010 6603 - Hackett HS Renov of JP Annex Warm/Safe/Dry Space Replacement $1,053,000.00 Hackett 2021-6603-001 --NEW SCHOOL-- K-4 ES Space $6,859,160.00 Hampton 1718-0701-001 0701 - Hampton ES Cafeteria Renov-HVAC Warm/Safe/Dry System Replacement $30,000.00 Hampton 1819-0701-001 0701 - Hampton ES East ES-New Roof Warm/Safe/Dry System Replacement $480,000.00 Harmony Grove (Benton) 1718-6304-001 --Multiple Schools-- Districtwide Fire Alarm Replacement Warm/Safe/Dry System Replacement $225,000.00 Harmony Grove (Benton) 1920-6304-002 6304 - Harmony Grove HS New HS Warm/Safe/Dry Space Replacement Not Indicated Harrisburg 1920-5602-001 5602 - Harrisburg HS New HS Warm/Safe/Dry Space Replacement $20,000,000.00 Harrisburg 1920-5602-002 5602 - Harrisburg HS New HS Multi-purpose Facility Warm/Safe/Dry Space Replacement $3,000,000.00 Harrison 1819-0503-001 0503 - Harrison JHS Multiple Roof Replacement at JHS Campus Warm/Safe/Dry System Replacement $631,774.00 Harrison 1920-0503-001 --NEW SCHOOL-- College and Career Center Space $14,000,000.00 Hazen 1819-5903-034 5903 - Hazen HS Old HS Gym roof Warm/Safe/Dry System Replacement $417,700.00 Hazen 1819-5903-035 5903 - Hazen ES Neel Roof Renov Warm/Safe/Dry System Replacement $785,394.00 Hazen 1920-5903-002 5903 - Hazen HS Hazen New HS Warm/Safe/Dry Space Replacement $10,600,000.00 Hazen 2021-5903-019 5903 - Hazen HS HS Gym HVAC Upgrades Warm/Safe/Dry System Replacement $500,000.00 Hector 1819-5803-001 5803 - Hector HS HS Roof Partial Replacement Warm/Safe/Dry System Replacement $465,000.00 Helena/West Helena 1718-5403-001 5403 - Central HS Central HS Addition Warm/Safe/Dry Space Replacement $16,225,000.00 Helena/West Helena 1718-5403-002 5403 - Central HS HS Gym HVAC Renov Warm/Safe/Dry System Replacement Not Indicated Hermitage 1920-0601-001 0601 - Hermitage ES Roofing Replacement - K-4 Warm/Safe/Dry Space Replacement $160,000.00 Hermitage 1920-0601-009 0601 - Hermitage HS Cafe/Agri/Admin Warm/Safe/Dry Space Replacement $15,000.00 Highland 1718-6804-009 --Not Specified-- ES Roof and Window Replacement Warm/Safe/Dry System Replacement $1,600,000.00 Highland 1819-6804-002 6804 - Highland HS HS Modernization Project Warm/Safe/Dry Space Replacement $6,000,000.00 Hope 1718-2903-001 2903 - Hope HS Agriculture Building Total Renov Warm/Safe/Dry Space Replacement $1,500,000.00 Hope 1718-2903-020 Wm. Jefferson Clinton PS CPS - Car Drive Warm/Safe/Dry Space Replacement $300,000.00 Hope 1819-2903-003 2903 - Hope HS Main, Annex, Business Lab, Agri, Science Roof Warm/Safe/Dry System Replacement $830,000.00 Horatio 1718-6703-100 Horatio ES (former HS) Reroof ES Warm/Safe/Dry System Replacement $554,000.00 Hoxie 1819-3804-001 3804 - Hoxie HS HS Roof Warm/Safe/Dry System Replacement $1,600,000.00 Huntsville 1718-4401-001 4401 - Watson PS Replace Watson PS Roof Warm/Safe/Dry System Replacement $265,500.00 Huntsville 1819-4401-001 4401 - Watson PS Replace Kindergarten Roof Warm/Safe/Dry System Replacement $108,682.00 Jackson Co. 1718-3405-001 3405 - Tuckerman HS Gymnasium HVAC Warm/Safe/Dry System Replacement $250,000.00 Jacksonville North Pulaski 1718-6004-001 6004 - Jacksonville HS New HS Warm/Safe/Dry Space Replacement $46,000,000.00 Jacksonville North Pulaski 1718-6004-002 --Multiple Schools-- New ES Warm/Safe/Dry Space Replacement $14,000,000.00 Jacksonville North Pulaski 1718-6004-003 6004 - Bayou Meto ES Bayou Meto ES Multi-purpose Addition Space $1,500,000.00 Jacksonville North Pulaski 1718-6004-004 6004 - Warren Dupree ES Dupree ES Multi-purpose Addition Space $1,500,000.00 Jacksonville North Pulaski 1718-6004-005 6004 - Pinewood ES Pinewood ES Multi-purpose Addition Space $1,700,000.00 Jacksonville North Pulaski 1718-6004-006 6004 - Murrell Taylor ES Taylor ES Multi-purpose Addition Space $1,500,000.00 Jasper 1718-5102-005 5102 - Jasper HS Security System-Jasper Campus (HS/ELem) Warm/Safe/Dry Space Replacement $35,000.00 Jasper 1718-5102-010 --Multiple Schools-- Electrical Distribution at Kingston Campus Warm/Safe/Dry System Replacement $426,594.00 Jasper 1718-5102-101 --Multiple Schools-- New Elec Distribution Kingston Campus Warm/Safe/Dry System Replacement Not Indicated Jonesboro 1718-1608-001 AInternational Studies Magnet Int'l Studies Addition Space $2,808,750.00 Jonesboro 1718-1608-002 Academies At Jonesboro HS HS Addition Space $2,300,000.00 Jonesboro 1718-1608-003 Jonesboro Success School Success #2 Renov Warm/Safe/Dry System Replacement $1,308,200.00 Jonesboro 1718-1608-004 Douglas Macarthur JHS MacArthur Roof @ Main Bldg Warm/Safe/Dry System Replacement $687,000.00 Junction City 1718-7003-001 7003 - Junction City HS New Gymnasium PE Space Warm/Safe/Dry Space Replacement $1,600,000.00 Junction City 1819-7003-001 --Multiple Schools-- ES Building 7(K-1) Roof/HS & 2-3 Bldg Renov Warm/Safe/Dry System Replacement $950,000.00 Lake Hamilton 1718-2605-001 --Multiple Schools-- Districtwide Fire Alarm Warm/Safe/Dry System Replacement $913,000.00 Lakeside (Hot Springs) 1718-2606-013 2606 - Lakeside HS Fac Space $5,000,000.00 Lakeside (Hot Springs) 2021-2606-001 2606 - Lakeside PS PS School Cafeteria Addition Space $2,750,000.00 Lakeside (Hot Springs) 2021-2606-002 2606 - Lakeside IS Intermediate School Cafeteria Addition Space $1,650,000.00 Lakeside (Lake Village) 1920-0903-001 0903 - Eudora ES HVAC project at Eudora ES Warm/Safe/Dry System Replacement $1,527,733.00 Lakeside (Lake Village) 1920-0903-002 0903 - Lakeside HS Plumbing and electrical upgrade at HS Warm/Safe/Dry Space Replacement $825,000.00 Lamar 1718-3604-086 --NEW SCHOOL-- New HS Space $23,356,375.00 Lavaca 1920-6605-001 6605 - Lavaca MS Fine Arts Building Renov Warm/Safe/Dry Space Replacement $413,676.00 Lawrence Co. 1718-3810-001 3810 - Walnut Ridge ES Classroom Addition to ES Building (Planned) Space $1,859,734.00 Lawrence Co. 1920-3810-003 3810 - Walnut Ridge HS Electrical System Upgrade (Planned) Warm/Safe/Dry Space Replacement $495,000.00 Lawrence Co. 1920-3810-004 3810 - Walnut Ridge HS New Family & Consumer Science Bldg Space $1,530,760.00 Lawrence Co. 1920-3810-005 3810 - Walnut Ridge HS PE Facility Expansion (Planned) Space $1,223,334.00 Lead Hill 1718-0506-001 0506 - Lead Hill HS Demolition and Classroom Addition Phase 1 Warm/Safe/Dry Space Replacement $600,000.00 Lead Hill 1920-0506-002 0506 - Lead Hill HS Renovate Building G Warm/Safe/Dry Space Replacement $300,000.00 Lee Co. 1819-3904-001 --Multiple Schools-- Lee Co New K-6 Warm/Safe/Dry Space Replacement $12,000,000.00 Little Rock 1718-6001-010 6001 - Pulaski Heights MS Pulaski Hgts MS EOL Systems Minor Renov Warm/Safe/Dry System Replacement $125,000.00 Little Rock 1718-6001-024 6001 - Forest Park ES Forest Park ES EOL Systems Minor Renov Warm/Safe/Dry System Replacement $110,000.00 Little Rock 1718-6001-046 6001 - Brady ES Brady ES EOL Systems Major Renov Warm/Safe/Dry System Replacement $2,722,500.00 Little Rock 1718-6001-052 6001 - Brady ES Brady ES EOL Sidewalk and HVAC Renov Warm/Safe/Dry System Replacement $105,400.00

October 1, 2016 Page 4 of 9 Academic Facilities Master Plan Program - State Plan Four-Year Rolling Forecast 2017-2021 Planned Academic Facilities Partnership Program Projects

District Name Project Number School Project Name Project Type Budget

Little Rock 1718-6001-066 6001 - Mcdermott ES McDermott EOL Systems Minor Renov Warm/Safe/Dry System Replacement $260,000.00 Little Rock 1718-6001-074 6001 - Pulaski Heights ES EOL HVAC & Plumbing Systems Renov Warm/Safe/Dry System Replacement $600,000.00 Little Rock 1718-6001-075 Cloverdale Aerospace Tech Char Cloverdale MS EOL Systems Major Renov Warm/Safe/Dry Space Replacement $5,302,387.00 Little Rock 1718-6001-094 6001 - Parkview Magnet HS Parkview EOL Sidewalk & HVAC Renov Warm/Safe/Dry Space Replacement $600,700.00 Little Rock 1718-6001-096 6001 - Meadowcliff ES Meadowcliff EOL Systems Minor Renov Warm/Safe/Dry System Replacement $280,000.00 Little Rock 1718-6001-143 6001 - Otter Creek ES Otter Creek EOL HVAC & Plumbing Renov Warm/Safe/Dry System Replacement $456,000.00 Little Rock 1718-6001-157 WD Hamilton Learning Academy Hamilton EOL Systems Major Renov Warm/Safe/Dry System Replacement $4,150,000.00 Little Rock 1718-6001-166 6001 - Fulbright ES Fulbright EOL Systems Major Renov Warm/Safe/Dry System Replacement $3,350,000.00 Little Rock 1718-6001-185 6001 - Woodruff Pre-K Woodruff EOL Systems Minor Renov Warm/Safe/Dry System Replacement $571,098.00 Little Rock 1718-6001-196 6001 - Henderson MS Henderson EOL Systems Minor Renov Warm/Safe/Dry System Replacement $600,000.00 Little Rock 1718-6001-204 6001 - Henderson MS Henderson EOL Boiler Replacement Warm/Safe/Dry System Replacement $300,000.00 Little Rock 1718-6001-212 6001 - Mcclellan Magnet HS McClellan EOL Systems Minor Renov Warm/Safe/Dry System Replacement $600,000.00 Little Rock 1718-6001-234 6001 - Wilson ES Wilson EOL Systems Minor Renov Warm/Safe/Dry System Replacement $620,000.00 Little Rock 1718-6001-238 Forest Heights Stem Academy Forest Heights EOL Systems Renov Warm/Safe/Dry System Replacement $11,389,796.00 Little Rock 1718-6001-254 6001 - Chicot PS Chicot EOL Systems Minor Renov Warm/Safe/Dry System Replacement $2,985,000.00 Little Rock 1718-6001-269 6001 - Hall HS Hall EOL Systems Major Renov Warm/Safe/Dry System Replacement $6,250,000.00 Little Rock 1718-6001-294 6001 - Washington Magnet ES Washington EOL HVAC Renov Warm/Safe/Dry System Replacement $450,000.00 Little Rock 1718-6001-305 6001 - Jefferson ES Jefferson EOL Systems Renov Warm/Safe/Dry System Replacement $120,000.00 Little Rock 1718-6001-317 6001 - Watson IS Watson EOL Sidewalk Renov Warm/Safe/Dry Space Replacement $60,000.00 Little Rock 1718-6001-332 6001 - Central HS Central EOL Systems Renov Warm/Safe/Dry System Replacement $6,060,665.00 Little Rock 1718-6001-341 6001 - David O'Dodd ES David O. Dodd EOL HVAC Renov Warm/Safe/Dry System Replacement $500,000.00 Little Rock 1718-6001-361 6001 - Western Hills ES Renov Warm/Safe/Dry System Replacement $696,855.00 Little Rock 1718-6001-368 6001 - Rockefeller Incentive ES Rockefeller EOL Systems Minor Renov Warm/Safe/Dry System Replacement $629,133.00 Little Rock 1718-6001-383 6001 - Dunbar Magnet MS Dunbar MS EOL Systems Renov Warm/Safe/Dry System Replacement $1,500,000.00 Little Rock 1718-6001-390 6001 - Dunbar Magnet MS Dunbar EOL Systems Site & Exterior Renov Warm/Safe/Dry System Replacement $701,240.00 Little Rock 1718-6001-420 6001 - Mabelvale MS Mabelvale MS EOL Systems Renov Warm/Safe/Dry System Replacement $425,000.00 Little Rock 1718-6001-492 6001 - Bale ES Bale EOL Domestic Water Piping Replace Warm/Safe/Dry System Replacement $389,000.00 Little Rock 1718-6001-638 6001 - J.A. Fair HS J.A. Fair HS Classroom Addition Space $3,000,000.00 Little Rock 1718-6001-639 6001 - Parkview Magnet HS Parkview HS Classroom Addition Space $2,000,000.00 Little Rock 1718-6001-640 6001 - Dunbar Magnet MS Dunbar MS Classroom Addition Space $2,200,000.00 Little Rock 1819-6001-014 6001 - Forest Park ES Forest Park EOL HVAC Renov Warm/Safe/Dry System Replacement $198,000.00 Little Rock 1819-6001-058 6001 - Mcdermott ES McDermott Kitchen and Serving Line Update Warm/Safe/Dry System Replacement $75,000.00 Little Rock 1819-6001-059 6001 - Mcdermott ES McDermott Soundproofing Warm/Safe/Dry System Replacement $100,000.00 Little Rock 1819-6001-568 Metro VoTech/Accel Learn/Evening HS Metropolitan Partial HVAC Renov Warm/Safe/Dry System Replacement $300,000.00 Little Rock 1819-6001-662 6001 - Henderson MS Henderson MS Classroom Addition Space $1,800,000.00 Little Rock 1819-6001-663 6001 - Booker Arts Magnet ES Booker ES Classroom Addition Space $322,867.00 Little Rock 1819-6001-664 6001 - Carver Magnet ES Carver ES Classroom Addition Space $3,821,283.00 Little Rock 1920-6001-005 6001 - Pulaski Heights MS Pulaski Hgts. MS EOL Systems Minor Renov Warm/Safe/Dry System Replacement $300,000.00 Little Rock 1920-6001-248 Fair Park Early Childhood Dev Ctr Fair Park Cafeteria Expansion Space $275,000.00 Little Rock 1920-6001-263 6001 - Baseline ES Baseline EOL Boiler Replacement Warm/Safe/Dry System Replacement $79,500.00 Little Rock 1920-6001-584 6001 - Terry ES Terry Cafeteria Expansion Space $250,000.00 Little Rock 2021-6001-006 6001 - Pulaski Heights MS Pulaski Hgts. MS EOL Systems Minor Renov Warm/Safe/Dry System Replacement $2,600,000.00 Little Rock 2021-6001-018 6001 - Forest Park ES Forest Park ADA Project Warm/Safe/Dry System Replacement $100,000.00 Little Rock 2021-6001-019 6001 - Forest Park ES Forest Park EOL Systems Minor Renov Warm/Safe/Dry System Replacement $1,600,000.00 Little Rock 2021-6001-036 6001 - Carver Magnet ES Carver EOL Major Renov Warm/Safe/Dry System Replacement $3,085,000.00 Little Rock 2021-6001-049 6001 - Brady ES Brady EOL Lighting & Security Renov Warm/Safe/Dry System Replacement $265,000.00 Little Rock 2021-6001-061 6001 - Mcdermott ES McDermott EOL Systems Minor Renov Warm/Safe/Dry System Replacement $495,000.00 Little Rock 2021-6001-062 6001 - Mcdermott ES McDermott Addition Space $1,883,875.00 Little Rock 2021-6001-069 6001 - Pulaski Heights ES Pulaski Hgts ES EOL Systems Minor Renov Warm/Safe/Dry System Replacement $600,000.00 Little Rock 2021-6001-078 Cloverdale Aerospace Tech Char Cloverdale MS EOL Systems Minor Renov Warm/Safe/Dry System Replacement $350,000.00 Little Rock 2021-6001-089 6001 - Parkview Magnet HS Parkview EOL Systems Minor Renov Warm/Safe/Dry System Replacement $5,000,000.00 Little Rock 2021-6001-099 6001 - Meadowcliff ES Meadowcliff EOL Systems Minor Renov Warm/Safe/Dry System Replacement $155,000.00 Little Rock 2021-6001-109 6001 - Gibbs Magnet ES Gibbs EOL Systems Minor Renov Warm/Safe/Dry System Replacement $285,000.00 Little Rock 2021-6001-123 6001 - Terry ES Terry EOL Systems Minor Renov Warm/Safe/Dry System Replacement $818,100.00 Little Rock 2021-6001-138 6001 - Otter Creek ES Otter Creek EOL Safety & Security Renov Warm/Safe/Dry System Replacement $65,000.00 Little Rock 2021-6001-152 6001 - Booker Arts Magnet ES Replace Warm/Safe/Dry System Replacement $389,000.00 Little Rock 2021-6001-160 WD Hamilton Learning Academy Hamilton EOL Systems Minor Renov Warm/Safe/Dry System Replacement $200,000.00 Little Rock 2021-6001-161 WD Hamilton Learning Academy Hamilton Special Ed. Classrooms & Offices Space $200,000.00

Little Rock 2021-6001-168 6001 - Fulbright ES Fulbright EOL Electrical Service Replacement Warm/Safe/Dry System Replacement $225,000.00 Little Rock 2021-6001-179 6001 - Woodruff Pre-K Woodruff EOL Systems Minor Renov Warm/Safe/Dry System Replacement $250,000.00 Little Rock 2021-6001-191 6001 - Mabelvale ES Mabelvale ES EOL Systems Minor Renov Warm/Safe/Dry System Replacement $150,000.00 Little Rock 2021-6001-198 6001 - Henderson MS Replacement Warm/Safe/Dry System Replacement $350,000.00 Little Rock 2021-6001-199 6001 - Henderson MS Henderson Elevator Warm/Safe/Dry System Replacement $50,000.00 Little Rock 2021-6001-209 6001 - Mcclellan Magnet HS McClellan EOL Systems Minor Renov Warm/Safe/Dry System Replacement $600,000.00 Little Rock 2021-6001-216 Geyer Springs Gifted Talented Acad Geyer Springs EOL Systems Minor Renov Warm/Safe/Dry System Replacement $170,000.00 Little Rock 2021-6001-229 6001 - Wilson ES Wilson EOL Systems Minor Renov Warm/Safe/Dry System Replacement $375,000.00 Little Rock 2021-6001-249 Fair Park Early Childhood Dev Ctr EOL Safety & Security Systems Renov Warm/Safe/Dry System Replacement $60,000.00 Little Rock 2021-6001-256 6001 - Chicot PS Chicot EOL Minor Renov Warm/Safe/Dry System Replacement $325,000.00 Little Rock 2021-6001-264 6001 - Baseline ES Baseline EOL Systems Major Renov Warm/Safe/Dry System Replacement $3,200,500.00 Little Rock 2021-6001-290 6001 - Washington Magnet ES Washington EOL Systems Minor Renov Warm/Safe/Dry Space Replacement $2,624,375.00 Little Rock 2021-6001-298 6001 - Jefferson ES Jefferson EOL Systems Minor Renov Warm/Safe/Dry System Replacement $250,000.00

October 1, 2016 Page 5 of 9 Academic Facilities Master Plan Program - State Plan Four-Year Rolling Forecast 2017-2021 Planned Academic Facilities Partnership Program Projects

District Name Project Number School Project Name Project Type Budget

Little Rock 2021-6001-310 6001 - Watson IS Watson EOL Systems Minor Renov Warm/Safe/Dry System Replacement $680,000.00 Little Rock 2021-6001-325 6001 - Central HS Central EOL Systems Minor Renov Warm/Safe/Dry System Replacement $900,000.00 Little Rock 2021-6001-336 6001 - David O'Dodd ES David O. Dodd EOL Systems Minor Renov Warm/Safe/Dry System Replacement $840,000.00 Little Rock 2021-6001-337 6001 - David O'Dodd ES David O Dodd Addition Space $16,937,100.00 Little Rock 2021-6001-345 6001 - Franklin Incentive ES Franklin EOL Systems Minor Renov Warm/Safe/Dry Space Replacement $325,000.00 Little Rock 2021-6001-357 6001 - Western Hills ES Renov Warm/Safe/Dry System Replacement $250,000.00 Little Rock 2021-6001-364 6001 - Rockefeller Incentive ES Renov Warm/Safe/Dry System Replacement $360,000.00 Little Rock 2021-6001-373 6001 - Mann Magnet MS Mann MS EOL Systems Major Renov Warm/Safe/Dry System Replacement $4,255,442.00 Little Rock 2021-6001-386 6001 - Dunbar Magnet MS Dunbar MS EOL Systems Minor Renov Warm/Safe/Dry System Replacement $6,454,950.00 Little Rock 2021-6001-395 Metro VoTech/Accel Learn/Evening HS Metropolitan EOL Systems Minor Renov Warm/Safe/Dry System Replacement $400,000.00 Little Rock 2021-6001-403 6001 - M.L. King Magnet ES M.L King EOL Systems Minor Renov Warm/Safe/Dry System Replacement $180,000.00 Little Rock 2021-6001-408 6001 - Romine Interdist. ES Romine EOL Safety & Security Systems Renov Warm/Safe/Dry System Replacement $80,000.00 Little Rock 2021-6001-495 6001 - Bale ES Bale EOL Electrical and Safety Sys Replace Warm/Safe/Dry System Replacement $725,000.00 Lonoke 1920-4301-001 HS Career Ctr-Carver /Adult Ed HS Career Center Roof Warm/Safe/Dry System Replacement $250,000.00 Lonoke 1920-4301-002 4301 - Lonoke HS HS PE Gym Renov (19-21 Part) Warm/Safe/Dry System Replacement $1,525,000.00 Lonoke 1920-4301-003 HS Career Ctr-Carver /Adult Ed HS Career Center HVAC Warm/Safe/Dry System Replacement $507,048.00 Magazine 1920-4202-001 4202 - J.D. Leftwich HS Building 207 HVAC Project Warm/Safe/Dry System Replacement $171,338.00 Magazine 1920-4202-003 4202 - Magazine ES Upgrade Roof MOP Warm/Safe/Dry Space Replacement $45,776.00 Magazine 1920-4202-101 4202 - J.D. Leftwich HS Secondary School HVAC Upgrade Warm/Safe/Dry System Replacement Not Indicated

Magnet Cove 1819-3003-001 3003 - Magnet Cove MS MS - Convert old locker room into classrooms Space $310,000.00 Magnolia 1718-1402-006 1402 - Magnolia HS HS Addition Space $7,000,000.00 Magnolia 1819-1402-003 1402 - Magnolia JHS Science HVAC & Elec-Cafe/Band Roof/HVAC Warm/Safe/Dry System Replacement $750,000.00 Magnolia 1920-1402-001 1402 - Magnolia HS HVAC Upgrades to North End of Campus Warm/Safe/Dry Space Replacement $250,000.00 Magnolia 2021-1402-009 1402 - Magnolia HS HS HVAC replacement Warm/Safe/Dry System Replacement $300,000.00 Mammoth Spring 1718-2501-001 2501 - Mammoth Spring ES ES Addition Space Not Indicated Mammoth Spring 1718-2501-005 2501 - Mammoth Spring HS Remodel Cafeteria Warm/Safe/Dry Space Replacement Not Indicated Mansfield 1718-6606-004 6606 - Mansfield ES 3/4 Building System Renov Warm/Safe/Dry Space Replacement $3,941,610.00 Mansfield 1718-6606-020 6606 - Mansfield ES ES Electrical Upgrades Warm/Safe/Dry System Replacement $571,578.00 Mansfield 1819-6606-003 6606 - Mansfield MS MS Electrical Upgrades Warm/Safe/Dry System Replacement $703,487.00 Mansfield 2021-6606-010 6606 - Mansfield HS Addition to HS Space $811,493.00 Mansfield 2021-6606-701 6606 - Mansfield HS Construct auditorium Space $3,991,786.00 Marion 1920-1804-001 1804 - Marion HS Marion HS Roof Renov Warm/Safe/Dry System Replacement $650,000.00 Marked Tree 1718-5604-001 5604 - Marked Tree ES ES Space Replacment Warm/Safe/Dry Space Replacement $4,500,000.00 Marked Tree 1718-5604-002 5604 - Marked Tree HS HS Space Replacment Warm/Safe/Dry Space Replacement $6,025,000.00 Marked Tree 1920-5604-056 5604 - Marked Tree HS HS HVAC Renov Warm/Safe/Dry System Replacement $600,000.00 Marmaduke 1920-2803-001 2803 - Marmaduke K-12 Physical Education Building (Planned) Space $4,508,000.00 Marmaduke 1920-2803-002 2803 - Marmaduke K-12 ADA Upgrades (Planned) Warm/Safe/Dry System Replacement $485,000.00 Mayflower 1718-2305-002 2305 - Mayflower ES ES Safe Room Space $1,100,000.00 McGehee 1819-2105-004 2105 - Mcgehee HS Alternative Environment Building Space $325,000.00 Mena 1718-5703-005 5703 - Holly Harshman ES Renovate ES Warm/Safe/Dry Space Replacement $3,000,000.00 Mena 1718-5703-010 5703 - Mena MS Replace hvac units Warm/Safe/Dry Space Replacement $230,000.00 Midland 2021-3211-001 3211 - Midland HS Fine Arts/Gymnasium Warm/Safe/Dry Space Replacement $10,000,000.00 Midland 2021-3211-002 3211 - Midland HS HS Addition Phase 2 Warm/Safe/Dry Space Replacement $2,100,000.00 Monticello 2021-2203-001 2203 - Monticello HS ADA project for Monticello HS Warm/Safe/Dry Space Replacement $150,000.00 Monticello 2021-2203-002 2203 - Monticello MS HVAC replacement at the MS Warm/Safe/Dry Space Replacement $1,500,000.00 Monticello 2021-2203-003 2203 - Monticello HS HVAC replacement and upgrade at HS Warm/Safe/Dry Space Replacement $1,120,000.00 Monticello 2021-2203-004 2203 - Monticello ES HVAC Replacement at Monticello ES Warm/Safe/Dry Space Replacement $1,250,000.00

Monticello 2021-2203-005 2203 - Monticello IS HVAC replacement at Monticello Intermediate Warm/Safe/Dry Space Replacement $969,000.00 Mount Ida 1718-4902-703 4902 - Mount Ida HS HVAC Replacement at Senior HS Warm/Safe/Dry Space Replacement $463,075.00 Mount Ida 1819-4902-002 4902 - Mount Ida HS Comp Lab Warm/Safe/Dry Space Replacement $950,000.00 Mount Ida 1819-4902-701 4902 - Mount Ida ES Metal Roof Replacement at ES Warm/Safe/Dry Space Replacement $673,200.00 Mount Vernon/Enola 1819-2306-001 2306 - Mt. Vernon/Enola HS Life Cycle Roofing System - HS Campus Warm/Safe/Dry System Replacement $195,000.00 Mount Vernon/Enola 1819-2306-002 2306 - Mt. Vernon/Enola ES Life Cycle Roofing System - ES Campus Warm/Safe/Dry System Replacement $306,708.00 Mountain Pine 1718-2607-001 2607 - Mountain Pine HS Improvements Warm/Safe/Dry System Replacement $300,000.00 Mountainburg 1718-1703-003 --Not Specified-- ADA Compliance Issues - HS/ MS Warm/Safe/Dry Space Replacement $127,000.00 Mulberry/Pleasant View 1718-1704-202 1704 - Mulberry HS Physical Education Building Upgrades Warm/Safe/Dry System Replacement $783,107.00 Mulberry/Pleasant View 1718-1704-205 1704 - Marvin PS Marvin ES Roof Project Warm/Safe/Dry System Replacement $58,561.00 Mulberry/Pleasant View 1718-1704-210 --Multiple Schools-- Pleasant View Campus Projects Warm/Safe/Dry System Replacement $1,293,623.00 Nettleton 1920-1611-002 1611 - Fox Meadow ES Fox Meadow ES Roof Warm/Safe/Dry System Replacement $260,000.00 Nettleton 1920-1611-003 1611 - Fox Meadow ES Fox Meadow PE Space $1,250,000.00 North Little Rock 1819-6002-002 6002 - NLR MS NLR MS - SYSTEM Renov Warm/Safe/Dry System Replacement $6,200,000.00 North Little Rock 1819-6002-003 6002 - NLR MS NLR MS - CAFETERIA Renov/ADDITION Warm/Safe/Dry System Replacement $1,111.00 Omaha 1718-0504-003 0504 - Omaha HS Replace Roof on Classroom/Offices/Band Warm/Safe/Dry System Replacement $197,787.00 Omaha 1819-0504-004 0504 - Omaha ES New Roof on ES Four Plex and Wall Corridor Warm/Safe/Dry System Replacement $236,044.00 Osceola 1920-4713-001 4713 - Osceola HS HS Roof Renov Warm/Safe/Dry System Replacement $1,400,000.00 Ouachita 1718-3005-001 3005 - Ouachita HS HS Dining Addition Space $1,200,000.00 Ouachita 1819-3005-001 3005 - Ouachita HS HS Electrical Upgrade Warm/Safe/Dry System Replacement $310,000.00 Ouachita 1819-3005-002 --Multiple Schools-- ES Main & Cafeterium Roof Replacement Warm/Safe/Dry System Replacement $588,000.00 Ouachita 1819-3005-003 3005 - Ouachita ES Electrical Panel Replacement at ES Warm/Safe/Dry System Replacement $330,000.00 Ouachita River 1718-5706-003 5706 - Oden HS Replace Gym Roof at Oden Warm/Safe/Dry Space Replacement $280,000.00

October 1, 2016 Page 6 of 9 Academic Facilities Master Plan Program - State Plan Four-Year Rolling Forecast 2017-2021 Planned Academic Facilities Partnership Program Projects

District Name Project Number School Project Name Project Type Budget

Ouachita River 1718-5706-008 5706 - Oden HS Replace Floors, Carpet, and Paint in Oden HS Warm/Safe/Dry Space Replacement $178,000.00 Ouachita River 1718-5706-009 5706 - Oden HS Replace Interior Doors in Oden HS Warm/Safe/Dry Space Replacement $10,000.00 Ouachita River 1718-5706-010 5706 - Oden HS Replace Flooring & Interior Doors Oden Gym Warm/Safe/Dry Space Replacement $200,000.00 Ouachita River 1718-5706-011 5706 - Oden Maddox ES Replace Floors, Carpet, and Paint in Oden ES Warm/Safe/Dry Space Replacement $154,000.00 Ouachita River 1718-5706-012 5706 - Acorn ES ES Warm/Safe/Dry Space Replacement $230,000.00 Ouachita River 1718-5706-013 5706 - Acorn ES Gym Warm/Safe/Dry Space Replacement $181,000.00 Ouachita River 1718-5706-014 5706 - Oden HS Replace HVAC and Controls Oden HS Warm/Safe/Dry Space Replacement $340,000.00 Ouachita River 1718-5706-100 5706 - Acorn ES Acorn campus Cafetorium Warm/Safe/Dry Space Replacement $1,950,000.00 Ouachita River 1718-5706-101 5706 - Acorn HS Acorn Cafetorium Space $1,200,000.00 Ouachita River 1819-5706-002 5706 - Acorn HS Gym Warm/Safe/Dry Space Replacement $200,000.00

Ouachita River 1819-5706-003 5706 - Acorn HS Replace HVAC, Controls, Furnaces Voc Bldg Warm/Safe/Dry Space Replacement $155,000.00 Ouachita River 1819-5706-008 5706 - Oden HS Replace Roof on Oden Vocational Building Warm/Safe/Dry Space Replacement $156,000.00 Ouachita River 1920-5706-001 5706 - Acorn HS Construct Classroom Addition to the Acorn HS Space $630,000.00 Ozark 1718-2404-001 2404 - Ozark JHS Roof Rennovation at Ozark JHS Warm/Safe/Dry System Replacement $193,725.00 Ozark Mountain 1819-6505-001 --Not Specified-- Specialties and Technology Systems Warm/Safe/Dry Space Replacement $336,070.00 Palestine-Wheatley 1718-6205-001 --Multiple Schools-- New 7-12 HS Warm/Safe/Dry Space Replacement $14,050,000.00 Palestine-Wheatley 1718-6205-002 Palestine-Wheatley HS HS Vo-Ag Roof Warm/Safe/Dry System Replacement $150,000.00 Paragould 1920-2808-001 2808 - Paragould HS Physical Ed Facility (Planned) Space $4,700,000.00 Paragould 1920-2808-003 2808 - Paragould HS Student Dining Renov (Planned) Space $800,000.00 Paragould 1920-2808-004 2808 - Paragould HS Media Center (Planned) Space $3,875,800.00 Paragould 1920-2808-005 2808 - Paragould HS Agri Ed (Planned) Space $2,183,913.00 Paragould 1920-2808-006 2808 - Paragould HS ROTC (Planned) Space $1,467,813.00 Paragould 1920-2808-007 2808 - Paragould HS Music Building (Planned) Space $1,421,420.00 Paris 1718-4203-001 4203 - Paris HS roof Warm/Safe/Dry Space Replacement $918,000.00 Paris 1718-4203-003 --Not Specified-- Electrical Renov Warm/Safe/Dry Space Replacement $60,000.00 Paris 1718-4203-012 4203 - Paris HS Lighting and ADA doorways at HS Warm/Safe/Dry Space Replacement $50,000.00 Paris 1718-4203-024 4203 - Paris ES ES Roof Project Warm/Safe/Dry System Replacement $250,368.00 Paris 2021-4203-001 4203 - Paris MS New MS Space $15,000,000.00 Parkers Chapel 1718-7007-004 7007 - Parkers Chapel HS Roof at the HS Complex Warm/Safe/Dry System Replacement $550,000.00 Parkers Chapel 1718-7007-005 7007 - Parkers Chapel HS Cafeteria Conversion Project Space $1,100,000.00 Pea Ridge 1718-0407-001 --NEW SCHOOL-- 6-7 MS Space $13,000,000.00 Pea Ridge 1718-0407-002 0407 - Pea Ridge IS New Cafeteria Space $1,700,000.00 Pea Ridge 1819-0407-001 0407 - Pea Ridge HS HS Auditorium and Media Center Space $15,000,000.00 Perryville 1718-5303-002 5303 - Perryville HS Construct HS Cafeteria Warm/Safe/Dry Space Replacement $2,351,000.00 Perryville 1718-5303-004 5303 - Perryville ES ES - Safe Room Space $1,000,000.00 Perryville 1718-5303-005 5303 - Perryville HS HS - Safe Room Space $1,000,000.00 Perryville 1920-5303-001 5303 - Perryville ES Life Cycle Roof - ES Building Classes Warm/Safe/Dry Space Replacement $157,000.00 Perryville 1920-5303-002 5303 - Perryville HS Complete Renov - Band Warm/Safe/Dry Space Replacement $161,000.00 Piggott 1718-1104-001 1104 - Piggott ES Piggott ES Roofing Project Warm/Safe/Dry System Replacement $750,000.00 Piggott 1920-1104-001 1104 - Piggott HS Piggott HS - Safe Room (Planned) Space $1,000,000.00 Piggott 1920-1104-025 1104 - Piggott HS Domestic Water Piping System Field House Warm/Safe/Dry Space Replacement $15,724.00 Piggott 2021-1104-001 1104 - Piggott HS Band Room Warm/Safe/Dry Space Replacement $500,000.00 Pine Bluff 1718-3505-010 3505 - Pine Bluff HS PB HS Gym HVAC Warm/Safe/Dry System Replacement $1,362,060.00 Pine Bluff 1718-3505-011 3505 - Jack Robey JHS Jack Robey JHS Gym HVAC Warm/Safe/Dry System Replacement $1,175,000.00 Pine Bluff 1718-3505-012 3505 - Belair MS Bel Air Gym HVAC / Roof Warm/Safe/Dry System Replacement $1,225,000.00 Pocahontas 1819-6103-001 --NEW SCHOOL-- New K-4 School Space $18,000,000.00 Pottsville 1718-5804-004 --NEW SCHOOL-- NEW HS Space $20,000,000.00 Pottsville 1819-5804-002 5804 - Pottsville MS Life Cycle Electrical - MS Bldg 1502 Warm/Safe/Dry System Replacement $1,200,000.00 Pottsville 1819-5804-003 5804 - Pottsville HS HS - HVAC/ROOF REPLACEMENT Warm/Safe/Dry System Replacement $150,000.00 Prescott 1718-5006-004 5006 - Prescott HS HS GYM Renov Warm/Safe/Dry Space Replacement $350,000.00 Prescott 1819-5006-001 5006 - Prescott HS Electrical Renov at HS Campus Warm/Safe/Dry System Replacement $400,000.00 Prescott 1819-5006-002 5006 - Prescott HS Re-roofing of Main PHS building Warm/Safe/Dry System Replacement $525,000.00 Pulaski Co. 1718-6003-054 6003 - Sylvan Hills HS Sylvan Hills HS HVAC Upgrades Warm/Safe/Dry Space Replacement $1,472,000.00 Quitman 1718-1203-001 1203 - Quitman ES HVAC Life Cycle - ES/PS Warm/Safe/Dry System Replacement $150,000.00 Quitman 1718-1203-005 1203 - Quitman ES Renovate K-3 Wing of ES Complex Warm/Safe/Dry System Replacement $1,327,560.00 Rivercrest 1718-4706-001 4706 - Rivercrest HS HS Roofs Renov Warm/Safe/Dry System Replacement $350,000.00 Rivercrest 1920-4706-010 4706 - Rivercrest HS Construct 4 HS classrooms Space $871,200.00 Riverside 1920-1613-006 1613 - Riverside West ES HVAC replacement-West ES Warm/Safe/Dry System Replacement $300,000.00 Riverside 1920-1613-008 1613 - Riverside West ES Addition West ES Space $850,000.00 Riverside 2021-1613-004 1613 - Riverside West ES New roof at West ES Warm/Safe/Dry System Replacement $400,000.00 Riverview 1920-7307-014 7307 - Riverview HS Interior Plumbing Warm/Safe/Dry Space Replacement $200,000.00 Riverview 1920-7307-015 7307 - Riverview HS Riverview HS HVAC Warm/Safe/Dry System Replacement $900,000.00 Rose Bud 1920-7310-006 7310 - Rose Bud HS Auditorium an classrooms Space $5,676,000.00 Russellville 1819-5805-001 5805 - Center Valley ES New HVAC - Center Valley Warm/Safe/Dry Space Replacement $990,000.00 Russellville 1819-5805-003 5805 - Russellville HS Construct HS Multi Purpose Building Space $5,500,000.00 Russellville 1920-5805-002 --NEW SCHOOL-- New ES Campus Space $5,000,000.00 Russellville 1920-5805-701 5805 - Russellville MS Roofing Project - MS/Upper ES Warm/Safe/Dry System Replacement $1,000,000.00 Salem 1920-2502-001 --Not Specified-- New MS Space $7,000,000.00 Salem 1920-2502-002 2502 - Salem HS Construct 6 Additional Classrooms - HS Space $1,000,000.00 Salem 1920-2502-003 2502 - Salem ES Construct 6 Additional Classrooms - ES Space $1,000,000.00 Scranton 1718-4204-100 4204 - Scranton ES Multipurpose Facility Space $706,400.00

October 1, 2016 Page 7 of 9 Academic Facilities Master Plan Program - State Plan Four-Year Rolling Forecast 2017-2021 Planned Academic Facilities Partnership Program Projects

District Name Project Number School Project Name Project Type Budget

Scranton 1920-4204-001 4204 - Scranton HS HS Addition 2017 Space $376,712.00 Scranton 1920-4204-039 4204 - Scranton HS new gym Warm/Safe/Dry Space Replacement $201,736.00 Searcy Co. 1718-6502-009 6502 - Marshall HS Gym Renov Warm/Safe/Dry System Replacement $750,000.00 Sheridan 1718-2705-001 2705 - Sheridan JHS SMS/JHS Space Replacement Warm/Safe/Dry Space Replacement $6,125,000.00 Sheridan 1718-2705-002 2705 - ALE (formerly SFA) HS Addition Phase 2 Warm/Safe/Dry Space Replacement $6,500,000.00 Sheridan 1718-2705-003 2705 - Sheridan JHS EE MS Addition phase 2 Space $2,979,300.00 Sheridan 1718-2705-005 2705 - Sheridan HS HS Auditorium Renov Warm/Safe/Dry System Replacement $1,801,092.00 Sheridan 1819-2705-001 2705 - Sheridan IS SIS Roof Renov Warm/Safe/Dry System Replacement $1,870,694.00 Shirley 1718-7104-002 7104 - Shirley HS Life Cycle HVAC - Vocational Building Warm/Safe/Dry Space Replacement $14,000.00 Shirley 1819-7104-001 7104 - Shirley ES ES Renov - HVAC, Plumbing & Electrical Warm/Safe/Dry Space Replacement $640,000.00 Shirley 1920-7104-001 7104 - Shirley ES ES - New Construction Project Space $8,500,000.00 Siloam Springs 1718-0406-010 0406 - Siloam Springs IS Intermediate Warm/Safe/Dry System Replacement $291,613.00 Siloam Springs 1819-0406-010 0406 - Siloam Springs MS Panther Gym Roof Replacement Warm/Safe/Dry System Replacement $577,026.00 Siloam Springs 1920-0406-005 0406 - Northside ES Northside ES Library Addition and Renov Warm/Safe/Dry Space Replacement $1,200,000.00 Siloam Springs 2021-0406-003 --NEW SCHOOL-- New ES Space $8,000,000.00 Sloan-Hendrix 1819-3806-001 --Multiple Schools-- K-12 Additions WSD Space Repl Warm/Safe/Dry Space Replacement $5,850,000.00 Smackover 1718-7008-004 7008 - Norphlet ES Norphlet Campus HVAC Warm/Safe/Dry System Replacement $300,000.00 Smackover 1718-7008-005 --Multiple Schools-- HVAC Main ES, HS, and Gym Renov Warm/Safe/Dry System Replacement $2,500,000.00 South Conway Co. 1718-1507-003 1507 - Morrilton PS Construct PS Reynolds Cafeteria/CRs Warm/Safe/Dry Space Replacement $2,850,000.00 South Pike Co. 1718-5504-001 5504 - Murfreesboro ES New Roof at Upper ES Warm/Safe/Dry System Replacement $328,000.00 South Pike Co. 1718-5504-006 5504 - Murfreesboro HS HS Band Building - New Fire Alarm Warm/Safe/Dry System Replacement $5,952.00 South Pike Co. 1718-5504-007 5504 - Murfreesboro HS Roof - HS Main Building Warm/Safe/Dry System Replacement $1,010,000.00 Southside - Batesville 1718-3209-001 3209 - Southside HS HS PE FACILITY Space $6,000,000.00 Spring Hill 1819-2906-001 2906 - Spring Hill HS Gym Conversion/Addition Space $1,200,000.00 Spring Hill 1819-2906-002 2906 - Spring Hill HS New H.S. Academic Building #2 Warm/Safe/Dry Space Replacement $2,200,000.00 Spring Hill 1819-2906-003 2906 - Spring Hill HS Gymnasium Roof/HVAC Project Warm/Safe/Dry System Replacement $600,000.00 Springdale 1718-7207-001 7207 - School of Innovation I School Phase II - To Open 2019 Space $35,000,000.00 Springdale 1819-7207-002 --NEW SCHOOL-- New ES to Open 2020 Space $17,000,000.00 Star City 1819-4003-001 4003 - Star City HS Star City HS Roof Replacement Warm/Safe/Dry System Replacement $1,426,058.00 Star City 1920-4003-004 4003 - Brown ES Sports floor added to gym for stud safety Warm/Safe/Dry Space Replacement $75,000.00 Star City 1920-4003-005 4003 - Star City HS Gym Roof Replacement Warm/Safe/Dry System Replacement $300,905.00 Star City 1920-4003-084 4003 - Star City MS MS New Roof Warm/Safe/Dry Space Replacement $300,000.00 Strong-Huttig 1920-7009-003 7009 - Strong HS Science Warm/Safe/Dry Space Replacement $150,000.00 Stuttgart 1718-0104-001 0104 - Stuttgart HS SHS New Gym Add & Cafe Conv/Renov. Warm/Safe/Dry Space Replacement $2,800,000.00 Stuttgart 1920-0104-001 0104 - Meekins MS Meekins MS Replacement Warm/Safe/Dry Space Replacement $13,150,000.00 Stuttgart 1920-0104-005 0104 - Park Avenue ES Park Ave ES HVAC Renov Warm/Safe/Dry System Replacement $292,250.00 Stuttgart 1920-0104-013 0104 - Park Avenue ES New Roof on Old PAE Warm/Safe/Dry System Replacement $250,000.00 Stuttgart 2021-0104-015 0104 - Stuttgart HS HVAC at SHS Warm/Safe/Dry Space Replacement $900,000.00 Texarkana 1718-4605-002 --NEW SCHOOL-- New JHS Campus Space $20,000,000.00 Texarkana 1819-4605-001 Washington Academy/Charter Washington Academy 9-12 Roof Replacment Warm/Safe/Dry System Replacement $500,000.00 Texarkana 1819-4605-002 Texarkana Vocational Center HS Roof Replace Voc Shop & DECA Bldg Warm/Safe/Dry System Replacement $285,000.00 Trumann 1718-5605-001 5605 - Trumann IS5-8 TIS Gym Sys Replacement Warm/Safe/Dry System Replacement $1,787,434.00 Trumann 1819-5605-002 5605 - Trumann IS5-8 REPLACEMENT Warm/Safe/Dry System Replacement $491,280.00 Valley Springs 1718-0505-001 --Multiple Schools-- New HS Warm/Safe/Dry Space Replacement $5,369,000.00 Valley Springs 1819-0505-001 0505 - Valley Springs ES ES Roof Replacement Warm/Safe/Dry System Replacement $562,402.00 Valley View 1718-1612-002 1612 - Valley View JHS JHS HVAC/Roof Renov Warm/Safe/Dry System Replacement $3,800,000.00 Valley View 1718-1612-003 1612 - Valley View IS VV IS Electrical Renov Warm/Safe/Dry System Replacement $885,000.00 Valley View 1819-1612-706 1612 - Valley View IS Covered Drop Off Areas for Bus Drop Off Warm/Safe/Dry System Replacement $175,000.00 Valley View 1920-1612-003 1612 - Valley View IS Valley View New K-2 Space $4,000,000.00 Van Buren 1718-1705-001 --Multiple Schools-- New ES Warm/Safe/Dry Space Replacement $10,500,000.00 Van Buren 1718-1705-002 1705 - Central ES Central ES HVAC/Roof Renov. Warm/Safe/Dry System Replacement $12,000,000.00 Van Buren 1718-1705-003 1705 - Parkview ES Parkview HVAC/Roof Renov. Warm/Safe/Dry System Replacement $3,550,000.00 Van Buren 1718-1705-004 1705 - Rena ES Rena HVAC/Roof Renov. Warm/Safe/Dry System Replacement $3,550,000.00 Van Buren 1718-1705-005 1705 - James R. Tate ES Tate Plumbing Renov Warm/Safe/Dry System Replacement $1,500,000.00 Van Buren 1819-1705-005 1705 - James R. Tate ES Tate HVAC / Roof Renov Warm/Safe/Dry System Replacement $3,550,000.00 Van Buren 1819-1705-006 1705 - Butterfield Trail MS Butterfield MS HVAC / Roof Renov. Warm/Safe/Dry System Replacement $4,750,000.00 Van Buren 1819-1705-007 1705 - Northridge MS Northridge MS HVAC / Roof Renov. Warm/Safe/Dry System Replacement $3,600,000.00 Van Buren 1920-1705-001 1705 - Van Buren HS VB HS STEM Addition Space $1,000,000.00 Van Buren 1920-1705-002 1705 - James R. Tate ES Tate 4 CR addition Space $968,000.00 Van Buren 1920-1705-003 1705 - Butterfield Trail MS BJH Gym HVAC Warm/Safe/Dry System Replacement $240,000.00 Vilonia 1819-2307-001 --Multiple Schools-- Career and Technical Center Warm/Safe/Dry Space Replacement $12,800,000.00 Viola 1718-2503-002 2503 - Viola HS Jr High / Admin HVAC Warm/Safe/Dry System Replacement $100,000.00 Viola 1718-2503-004 2503 - Viola ES Original ES HVAC Warm/Safe/Dry System Replacement $110,000.00 Viola 1718-2503-005 2503 - Viola ES ES Art Roof & HVAC with ES Hallway HVAC Warm/Safe/Dry System Replacement $80,000.00 Viola 1819-2503-002 2503 - Viola ES ES Addition HVAC Warm/Safe/Dry System Replacement $100,000.00 Viola 1819-2503-003 --Multiple Schools-- Districtwide HVAC Warm/Safe/Dry System Replacement $150,000.00 Viola 1819-2503-006 2503 - Viola HS Gymnasium HVAC Warm/Safe/Dry System Replacement $80,000.00 Waldron 1718-6401-019 6401 - Waldron ES Construct Additional Classrooms ES Space $1,000,000.00 Warren 1920-0602-003 Eastside New Vision - Charter ADA compliance at Eastside PS Warm/Safe/Dry System Replacement $175,000.00 Warren 1920-0602-008 --NEW SCHOOL-- New Gym/PE Facility Space $9,000,000.00 Watson Chapel 1718-3509-001 3509 - L. L. Owen ES LL Owen HVAC Renov Warm/Safe/Dry System Replacement $2,438,125.00 Watson Chapel 1718-3509-010 3509 - L. L. Owen ES Owen roof improvement Warm/Safe/Dry Space Replacement $714,461.00

October 1, 2016 Page 8 of 9 Academic Facilities Master Plan Program - State Plan Four-Year Rolling Forecast 2017-2021 Planned Academic Facilities Partnership Program Projects

District Name Project Number School Project Name Project Type Budget

Watson Chapel 2021-3509-001 3509 - Coleman ES Coleman 4th Grade Roof Warm/Safe/Dry Space Replacement $500,000.00 West Fork 1718-7208-004 7208 - West Fork MS MS HVAC System Replacement Warm/Safe/Dry System Replacement $1,674,485.00 West Fork 1819-7208-002 7208 - West Fork ES ES HVAC System Replacement Warm/Safe/Dry System Replacement $1,999,118.00 West Fork 1920-7208-003 7208 - West Fork MS Tornado Safe Room Space $1,500,000.00 West Memphis 1718-1803-010 Academies of W Memphis Charter WM (HS) Academies Roof Renov Warm/Safe/Dry System Replacement $256,034.00 West Memphis 1718-1803-300 --Multiple Schools-- New Jackson/Wonder ES Warm/Safe/Dry Space Replacement $20,531,000.00 West Memphis 1718-1803-385 Academies of W Memphis Charter WMHS Vocational Renov Warm/Safe/Dry System Replacement $1,300,000.00 West Memphis 1920-1803-382 --Multiple Schools-- New East/Wonder JHS Warm/Safe/Dry Space Replacement $23,088,000.00 West Memphis 1920-1803-384 1803 - West JHS New West JHS Warm/Safe/Dry Space Replacement $24,588,000.00 Western Yell Co. 1920-7509-001 --Not Specified-- K-2 Building Addition Warm/Safe/Dry Space Replacement Not Indicated Westside 1718-3606-001 3606 - Westside HS HS HVAC Project Warm/Safe/Dry System Replacement $2,601,802.00 Westside 1718-3606-101 3606 - Westside HS HS Gym HVAC Warm/Safe/Dry System Replacement $695,035.00 Westside 1718-3606-201 3606 - Westside ES ES HVAC Project Warm/Safe/Dry System Replacement $188,373.00 Westside 1819-3606-004 3606 - Westside HS Agri Barn System Renov Warm/Safe/Dry Space Replacement $157,139.00 Westside 1920-3606-005 3606 - Westside HS New Roof at Multi-Purpose Warm/Safe/Dry Space Replacement $30,821.00 Westside 1920-3606-030 3606 - Westside HS Replace Roof at HS Warm/Safe/Dry Space Replacement $624,815.00 Westside 2021-3606-111 3606 - Westside ES ES Cafeteria Addition Space $525,000.00 White Co. Central 1718-7304-001 7304 - White Co. Central ES Multi-Purpose Roof Replacement Warm/Safe/Dry System Replacement $177,364.00 White Co. Central 1920-7304-001 7304 - White Co. Central HS HS Addition Warm/Safe/Dry Space Replacement $6,000,000.00 White Hall 1718-3510-701 3510 - White Hall HS WH HS Additions (local) Space $26,463,392.00 White Hall 1920-3510-001 3510 - White Hall HS WH HS Performing Arts Center Space $4,125,000.00 White Hall 1920-3510-003 3510 - White Hall HS Parking Lot Reconstruction Warm/Safe/Dry System Replacement $700,000.00 White Hall 1920-3510-010 3510 - White Hall MS White Hall MS HVAC Warm/Safe/Dry System Replacement $500,000.00 Woodlawn 1718-1304-002 1304 - Woodlawn HS Family & Consumer Science Classroom/Lab Space $700,000.00 Woodlawn 1718-1304-053 1304 - Woodlawn HS Health/P.E.Gymnasium (New Construction) Space $3,000,000.00 Woodlawn 1819-1304-049 1304 - Woodlawn HS Renov FCS Building for Parent Involvement Ctr Warm/Safe/Dry Space Replacement $150,000.00 Woodlawn 1819-1304-060 --Not Specified-- Rural Sanitary System Upgrade Warm/Safe/Dry Space Replacement $300,000.00 Wynne 1718-1905-002 1905 - Wynne HS Wynne HS Bldg. 3 CR Renov Warm/Safe/Dry System Replacement $1,050,000.00 Wynne 1718-1905-008 1905 - Wynne PS PS School Replace HVAC Warm/Safe/Dry Space Replacement $263,500.00 Wynne 1718-1905-009 1905 - Wynne IS Intermediate School Replace HVAC Warm/Safe/Dry Space Replacement $650,000.00 Wynne 1718-1905-011 1905 - Wynne PS PS School Asbestos Abatement Warm/Safe/Dry Space Replacement $120,000.00 Wynne 1718-1905-017 1905 - Wynne JHS Replace JHS HVAC Main Bldg Warm/Safe/Dry System Replacement $1,686,000.00 Wynne 1718-1905-021 1905 - Wynne IS Asbestos Abatement Warm/Safe/Dry Space Replacement $200,000.00 Wynne 1718-1905-714 1905 - Wynne JHS Resurface Parking Area (local) Warm/Safe/Dry System Replacement $100,000.00 Yellville-Summit 1718-4502-001 4502 - Yellville-Summit HS Roof Replacement at HS Building Warm/Safe/Dry System Replacement $718,907.00 Yellville-Summit 1819-4502-001 --Multiple Schools-- District Wide Fire Alarm Warm/Safe/Dry System Replacement $463,517.00 TOTAL $1,359,570,870.00

October 1, 2016 Page 9 of 9