Planning Report

Total Page:16

File Type:pdf, Size:1020Kb

Planning Report TOWN OF DAVIE PLANNING & ZONING DIVISION 6591 ORANGE DRIVE DAVIE, FLORIDA 33314-3399 Phone: 954.797.1103 www.davie-fl.gov PLANNING REPORT Project Type, Number and Name Site Plan, SP18-314 Sierra Ranch Application Petitioner/Representative Lennar Homes, LLC / Greenspoon Marder LLP Owner AMZAK International Inc Project Planner Matthew Coyle Date of Report 05/10/2019 Date of Public Participation 02/07/2019 and 02/28/2019 Date of Public Notification N/A Date of Board Review 05/21/2019 Date of Town Council Review 06/05/2019 Location/Site Folio/Identification Number 50-41-18-17-0010 Address (General Location) 1950 Hiatus Road Nearest North/South Road Hiatus Road Nearest East/West Road State Road 84 Size (Approx. Acres) 89 acres Existing Use Vacant Future Land Use Residential 1 DU/Acre Zoning R-1 and R-2 Council District 3 Redevelopment Area N/A Overlay District Rural lifestyle Design Regulation Anti-monotony Flexibility Zone 100 Planning Area 2 Right-of-way Acquisition No Utilities Provider Sunrise Utilities Drainage District Central Broward Water Control District (CBWCD) Nearby Equestrian Trail Peaceful Ridge Nearby Recreational Trail Peaceful Ridge Nearby Park Math Igler Park Nearby Bus Route N/A Key Points This request is to amend a previously approved Site Plan (SP16-326) consisting of a new residential community with 79 single-family dwellings. Site Plan SP16-326 was approved by Town Council on September 27, 2017 with 10 conditions. The 10 conditions have been restated in the staff recommendations and include the status of each one. On SP16-326, the R-2 lots were assigned more restrictive setbacks consistent with the R-1 SP18-314_PZ_Rpt Pg. 1 of 4 district. The proposed plan revises the setbacks of the R-2 lots to match the R-2 setback standard. The remaining changes include: addition of a temporary sales trailer and parking lot, addition of a security gate and call box and addition of model homes and landscape plans. The applicant has completed the public participation process (see attached report). Note that the following issues are unresolved at this time: o Request to build a fence along the northern property line to protect the existing Harmony Lakes fence from damage by horses. The applicant indicated they would be willing to construct an additional chain link fence if the Town Council determined it was necessary. Staff is not requesting installation of an additional fence as it would reduce the width of the horse trail. o Request to preserve some of the existing oak trees in the eastern portion of the preserve area. Prior to any clearing or grubbing permits or tree/relocation permits being issued the applicant will need to submit a revised tree mitigation plan. The existing trees will be further evaluated as part of the tree removal/relocation permit; however, it does not appear that there is sufficient upland to support new or relocated canopy trees. o Request to install exterior landscaping, fencing and the preserve first in order to minimize visual and noise impacts on the surrounding neighbors. History 1. Related Zoning Information: a. Rezoning (ZB) 03-05-03 – At the November 19, 2003 Town Council meeting, this request to rezone the property from Agricultural (AG) District to Agricultural (A-1) District was approved. 2. Previous Request(s): a. Site Plan (SP) 03-04-03 – At the December 17, 2003, the site plan was approved with conditions. b. Plat (P) – At the September 18, 2002 Town Council meeting, the plat known as Sierra Estates was approved. c. Delegation (DG) 08-02-07 – At the October 17, 2007 Town Council meeting, this request to amend the recorded finding of adequacy date on the plat known as Sierra Estates was approved through Resolution R-2007-299. d. Site Plan (SP) 03-01-06 – This request was to remove the roundabout from the originally approved site plan. e. Variance (V) 13-006 – This request would have allowed lots as small as 20,016 square feet was withdrawn. f. Rezoning (ZB) 13-022 – To allow the zoning of the subject site to be changed to Estates Dwelling (R-1) District and Low Density Dwelling (R-2) District. g. Site Plan (SP) 13-005 – To allow the subject site to be developed as a single-family residential community with 79 dwelling units. h. Delegation (DG) 13-004 – To amend the non-vehicular access line opening along the western boundary line. i. Site Plan (SP) 16-326 – To allow the subject site to be developed as a single-family residential community with 79 dwelling units. 3. Concurrent Request(s): N/A SP18-314_PZ_Rpt Pg. 2 of 4 TOWN OF DAVIE PLANNING & ZONING DIVISION 6591 ORANGE DRIVE DAVIE, FLORIDA 33314-3399 Phone: 954.797.1103 www.davie-fl.gov Analysis 1. Site: The subject site is generally located on the east side of Hiatus, between State Road 84 and Southwest 26th Street. A canal, equestrian trail, right-of-way (Hiatus Road) and landscape buffer provides a separation from the existing adjacent residential communities. 2. The site design includes 79 single-family lots and is consistent with the design provisions of the rural lifestyle with a loop-pattern street system, a water body, preserve area, park and limited dead-end streets. The streets within the development are 50 foot wide right-of-ways with swales, street trees and sidewalks on both sides. 3. Architecture: The architecture of the one and two-story single-family detached homes reflects a contemporary design. The site plan includes 5 models with various color palettes, exterior accents and roof tiles. The roofs will consist of flat tile, while exterior walls are to be painted in an earth tone palette of colors. 4. Access and Parking: The access to the site will be located within the northwest corner of the site through a 50 foot opening off Hiatus Road. Each single-family home will comply with the minimum required parking spaces within driveways and garages. There will be a security gate and call box at the front entrance. The gated entry provides ample stacking and room for a single unit truck to safely turn out after passing the call box. 5. Lighting: The photometric design for the parking lot next to the mail kiosk complies with code but the proposed fixture is not consistent with Sec 12-262 – Night sky regulations (see condition below). 6. Signage: The plans include two ground mounted entry monument signs. The structures are compliant with code and the signage will be reviewed through a building permit. 7. Landscaping: The landscape design depicts 476 trees, 46 palms and 6,704 shrubs and groundcover plants. The design includes street trees, a landscaped entrance feature, the scenic corridor buffer along the western boundary and a landscape buffer along the southern boundary (not required by code). 8. Drainage: The proposed drainage design includes 20 foot swales between certain residential lots and a lake tract of 6.51 acres. Additionally, the site has been deemed to contain jurisdictional wetlands and the design also includes a 25 acre preservation area within the eastern portion of property. 9. Compatibility: The proposed residential use and overall design of the site is considered compatible with surrounding uses. SP18-314_PZ_Rpt Pg. 3 of 4 Recommendations Staff finds the application complete and suitable for transmittal for further consideration. If approved, staff recommends the following: 1. Prior to approval of the Site Plan, the applicant shall revise the photometric plan to show changes to the community entrance and show a fully cutoff light fixture in the park that is compliant with the Night sky regulations. 2. Prior to issuance of a building permit for a single family home, record the declaration of restrictions and other documents necessary to ensure proper maintenance and control of the common elements (documents shall be in a form acceptable to the Town Attorney). Conditions imposed on Site Plan SP16-326: 3. Revise plans to extend the channel in the preserve area to the outfall structure (Satisfied – See sheet C-4) 4. Revise photometric plan to show a fully cutoff, fully shielded light fixture compliant with Night sky regulations and a LED luminary compliant with street lighting regulations (Satisfied). 5. Prior to commencement of any land clearing, the applicant shall take reasonable steps to ensure that nuisance animal species disturbed by such land clearing do not pose an undue burden on neighboring properties 6. Provide five (5) foot wide sidewalks within the Hiatus Road right-of-way (Satisfied – See sheet C-5) 7. Landscaping contractor shall adhere to all notes including calling for a pre-planting inspection prior to planting 8. Lots 68, 79, 29, 48, 67, 9, 53, 73, 38 and 39 shall not be permitted to add a driveway within 50 feet of the edge of the closest intersection. On lots 8 and 35 the developer shall work with staff to locate the driveway as far away from the intersection as possible 9. Applicant shall ensure that during construction the applicant’s contractor will clean any debris, dirt or material from Hiatus Road on a daily basis 10. Applicant shall be responsible for any damage caused to Hiatus Road during construction and any repairs caused by such damage that are caused by applicant’s construction on the frontage road of their property shall be repaired 11. Prior to issuance of the 20th Certificate of Occupancy, developer shall complete construction of the northbound and southbound turn lanes on Hiatus Road 12. As a condition of approval for the Sierra Ranch project, Home Dynamics agrees to resolve the outstanding wetland mitigation agreement with the Town of Davie, approved via Resolution 2004-281 and amended via Resolution 2007-327.
Recommended publications
  • Trends and Challenges in Brownfield Revitalization: a Gis Based Approach
    XVII International Scientific Conference on Industrial Systems (IS'17) Novi Sad, Serbia, October 4. – 6. 2017. University of Novi Sad, Faculty of Technical Sciences, Department for Industrial Engineering and Management Available online at http://www.iim.ftn.uns.ac.rs/is17 TRENDS AND CHALLENGES IN BROWNFIELD REVITALIZATION: A GIS BASED APPROACH Jelena Ignjatić (Urban and Spatial Planning Institute of Vojvodina, Železnička 6/III, Novi Sad, 21000 Serbia, [email protected]) Bojana Nikolić (University of Novi Sad, Faculty of Technical Sciences, Trg Dositeja Obradovića 6, 21000 Novi Sad, Serbia, [email protected]) Aeksandar Rikalović (University of Novi Sad, Faculty of Technical Sciences, Trg Dositeja Obradovića 6, 21000 Novi Sad, Serbia, [email protected]) Abstract Brownfield sites have negative effects on the spatial, economic, environmental and social aspects of community life. During the past decades, examples of good practice around the world showed that the revitalization of brownfields contributed to material and non-material prosperity, and the realization of a sustainable economic and social development. Once large corporations, who represented the foundation of economic development of Vojvodina, Serbia, are now mainly devastated and powerless to independently find a solution for revitalization. Investors are faced with the problem of non-defined, disorganized and unregulated locations, but primarily with the lack of associated database, which would shorten the process of selecting the most suitable location. To activate brownfield sites, it is necessary to pinpoint these locations, and conduct a detailed analysis. When it comes to trends in revitalization of brownfields in the practice of other countries, the use of geographic information systems (GIS) has proven to be one of the most effective tools for visualization of attributes of the brownfields in terms of socio-economic factors, the environment, and the immediate surrounding of the location.
    [Show full text]
  • Growing Smarter in Plymouth's Fifth Century; Master Plan 2004-2024
    i PLYMOUTH PLANNING BOARD LORING TRIPP, Chair PAUL MCALDUFF NICHOLAS FILLA, Vice Chair WENDY GARPOW, ALTERNATE LARRY ROSENBLUM MALCOLM MCGREGOR PLYMOUTH MASTER PLAN COMMITTEE (2004) ENZO MONTI, Chair JOHN MARTINI RUTH AOKI, Vice Chair LARRY ROSENBLUM AILEEN DROEGE IRA SMITH SASH ERSKINE LORING TRIPP ELAINE SCHWOTZER LUTZ CHARLES VANDINI PREVIOUS MEMBERS OF THE MASTER PLAN COMMITTEE THOMAS BOTT JAMES MASON TERRY DONOGHUE MARY MULCAHY WILLIAM FRANKS DON QUINN ROBERTA GRIMES ROBERT REIFEISS REBECCA HALL TOM WALLACE GERRE HOOKER BRIAN WHITFIELD LOUISE HOUSTON MARK WITHINGTON TOM MALONEY DIRECTOR OF PLANNING AND DEVELOPMENT LEE HARTMANN, AICP MASTER PLAN CONSULTANT MICHAEL PESSOLANO EDITING AND GRAPHIC DESIGN: GOODY, CLANCY & ASSOCIATES Photos: Larry Rosenblum Paul McAlduff Goody Clancy Thanks to everyone in Plymouth who helped create the Master Plan. GROWING SMARTER IN PLYMOUTH’S FIFTH CENTURY Town of Plymouth, Massachusetts Master Plan, 2004–2024 Plymouth Planning Board Master Plan Committee August 2006 Table of Contents VISION STATEMENT FOR PLYMOUTH, MASSACHUSETTS MASTER PLAN OVERVIEW 1. LAND USE 2. NATURAL RESOURCES 3. OPEN SPACE AND RECREATION 4. HISTORIC AND CULTURAL RESOURCES 5. ECONOMIC DEVELOPMENT 6. PUBLIC FACILITIES/SERVICES 7. TRANSPORTATION APPENDIX: MAPS vi Vision Statement for Plymouth, Massachusetts In 20 years, the Town of Plymouth will be a beautiful, maturing community with vibrant and pleasant village centers, a preserved and enhanced historic heritage, long stretches of accessible coastline, integrated areas of commerce and compact housing, and vast, connected areas of open space set aside for preservation, outdoor activities, and appreciation of nature. Plymouth will retain its outstanding visual character, de- fined by clean ponds, rivers, wetlands, coastline, and forests.
    [Show full text]
  • An Exploratory Study of Awareness and Perceived Relevance of Gis Among General Contractors in the Usa
    www.itcon.org - Journal of Information Technology in Construction - ISSN 1874-4753 AN EXPLORATORY STUDY OF AWARENESS AND PERCEIVED RELEVANCE OF GIS AMONG GENERAL CONTRACTORS IN THE USA SUBMITTED: November 2018 REVISED: June 2019 PUBLISHED: July 2019 at https://www.itcon.org/2019/18 EDITOR: Amor R. Anne Arendt, Associate Professor; Utah Valley University, Department of Technology Management [email protected] Armen Ilikchyan, Assistant Professor; Utah Valley University, Department of Technology Management [email protected] Robert Warcup, Associate Professor; Utah Valley University, Department of Construction Technologies [email protected] SUMMARY: This document analyzes the awareness and perceived relevance of geographic information systems and related technologies by construction industry general contractors via an exploratory survey of individuals in the field. A quantitative survey was developed based on an extensive literature review and meta-analysis. The survey was then administered at the Association of General Contractors (AGC) 2018 convention in New Orleans, LA. Eighty-eight construction industry related individuals participated. When asked if they were familiar with GIS, a tool for organizing data so it can be displayed and analyzed based on its geospatial characteristics, 32.95% (n=29) said they were not, 57.95% (n=51) said they were, and 9.09% (n=8) did not respond to the question. The researchers further assessed respondents who stated yes to familiarity with GIS or left it blank in depth. Within this group, the greatest perceived relevance was in property and site survey maps (4.37 average), digital mapping (4.22 average), engineering surveys (3.95 average), and topographic or planimetric mapping (3.95 average).
    [Show full text]
  • HAILEY WOODS Urban Planning Portfolio
    HAILEY WOODS Urban Planning Portfolio 1 Hailey Woods CONTACT INFORMATION EDUCATION JOB EXPERIENCE 1212 W. Rex Street Bachelors of Urban Planning Muncie, Indiana 47304 and Development Chillers Microcreamery [email protected] Ball State University May 2011-August 2016 - Shift Manager (502) 468-2030 Historic Preservation Minor Responsibilities include overseeing co-workers, customer service, handling complaints and solving problems, and training new employees SKILLS RELEVANT EXPERIENCE Emens Auditorium Software Floyd County Planning Office August 2014-Current - Ticket Sales Associate • ArcGIS May 2016-August 2016 Responsibilities included interacting with the • InDesign Planning Intern community, customer service, answering phones, and sales • Photoshop • Contributed demographic • Microsoft Office research and analysis for updated • Community Analyst by ESRI comprehensive plan REFERENCES • SketchUP • Designed document template using InDesign for the Comprehensive Don Lopp Plan Urban Planning Director of Planning and Operations • Developed alternative site plans for • Conducting site analysis a community center and baseball (812) 948-4110 • Researching and analyzing park [email protected] census data • Developing alternative Bachelors of Urban Planning and Trevor Young solutions Development Capstone Project Owner of Chillers Microcreamery August 2016-December 2016 (812) 987-1298 • Writing initiatives, memos, PLAN 401 Field Studio [email protected] and reports • Creating goals and • Served on a team of students to Lisa Dunaway, AICP, LEED AP objectives create an Urban Redevelopment Instructor of Urban Planning • Collaborating with Plan for the City of Portland, Indiana (765) 285-1906 • Conducted surveys and interviews [email protected] community members with residents • Public Participation • Participated in 4 community • Public Speaking meetings throughout the semester 2 3 CONTENTS 01. Urban Infill Project Phase 1: Analysis | 8 Phase 2: Alternatives | 10 Phase 3: Final Proposal | 12 02.
    [Show full text]
  • Site Plan Instructions P1
    Planning Division Submittal Requirements PLAN INSTRUCTIONS PROJECT DRAWINGS: The following drawings and information must be included with your application submittal. Note that in the City of West Hollywood, drawings must be prepared and certified by licensed design professionals (Architect and Landscape Architect) and engineering professionals (Surveyor, Civil Engineer, Structural Engineer, Soils/Geotechnical Engineer, Seismic Engineer, etc.) In accordance with State Law, professionals are not permitted to stamp and sign documents or drawings that have not been prepared by them under their direct supervision. Please note that larger projects are subject to the Concurrent Plan Check Process. 1. ARCHITECTURAL DRAWING CONVENTIONS a. Provide north indication arrow, and orient plans with north toward the top (if possible); b. Plan must be drawn to scale, with scale indicated. Use Engineer’s or Architect’s scale: 1” = 10’, 1/4” = 1’, etc.; c. Indicate demolished walls with dashed lines, walls to remain as solid lines and new walls filled; d. Provide correct submittal date on all drawing sheets; e. Use line weights properly-(i.e. heaviest for elements that are cut through, lightest for transparent elements, door swings, etc.); f. Show stairs accurately with arrows indicating direction; g. Show all property lines. Do not use edge of paper for property lines. 2. PROJECT DATA (should be included on cover sheet or site plan sheet) a. Include Index Sheet with all plan sets; b. Address and legal description of subject property; c. Name, address and phone number of the applicant, owner and architect; d. Existing and proposed land use and number of stories; e. Building square footage ; f.
    [Show full text]
  • A History of Residential Development, Planning, and Zoning in Arlington County, Virginia
    A History of Residential Development, Planning, and Zoning in Arlington County, Virginia April 2020 Acknowledgements This report would not have been possible without the guidance and feedback from Arlington County staff, including Mr. Russell Danao-Schroeder, Ms. Kellie Brown, Mr. Timothy Murphy, and Mr. Richard Tucker. We appreciate your time and insights. Prepared by Dr. Shelley Mastran Jennifer Burch Melissa Cameron Randy Cole Maggie Cooper Andrew De Luca Jose Delcid Dinah Girma Owain James Lynda Ramirez-Blust Noah Solomon Alex Wilkerson Madeline Youngren Cover Image Source: https://www.flickr.com/photos/arlingtonva/29032004740/in/album-72157672142122411/ i Table of Contents Acknowledgements ............................................................................................................................................................................................ i Prepared by ......................................................................................................................................................................................................... i Table of Contents ............................................................................................................................................................................................. ii Executive Summary ......................................................................................................................................................................................... iii Key Findings ...............................................................................................................................................................................................
    [Show full text]
  • Recommended Drawing Numbering, Scales and Dimensioning 1 / 3
    Recommended Drawing Numbering, Scales and Dimensioning 1 / 3 Architectural Drawings: General: G101 Cover Sheet G102 General Information G201 Live Safety Plan Civil: C100 Site Topo Plan C200 Demolition Plan C300 Site Staking/Signing/Striping/Erosion Control Plan C400 Grading & Drainage Plan C500 Utility Plan Landscape: I‐1 Irrigation Plan I‐2 Irrigation Details L‐1 Landscape Plan L‐2 Landscape Details Architectural: AC01 Overall Architectural Site Plan AC02 Enlarged Architectural Site Plan AC03 Site Plan Details A001 Finish Schedule & Legend A002 Opening Schedule, Elevations A101 Floor Plan A102 Dimension Plan A103 Lower Roof Plan A104 Upper Roof Plan A105 Canopy Plan and Details A111 Enlarged Floor Plans A201 Exterior Elevations A201 Exterior Elevations A301 Building Sections A302 Building Sections A311 Wall Sections A312 Details – Curved Roof A313 Details – Curved Roof A316 Wall Partition Types A321 Plan Details A331 Section Details A332 Typical Details and Profiles A341 Roof Details A351 Interior Column Details A401 Interior Elevations A402 Interior Elevations A501 Reflected Ceiling Plan A601 Equipment Plan Recommended Drawing Numbering, Scales and Dimensioning 2 / 3 The recommendation scales* for key architectural drawings are as follows: Site plan – engineering scale 1:20 or similar, depend upon size of site Arch Floor Plan – 1/8” Arch Ceiling Plan – 1/8” Arch Roof Plan – 1/8” or 1/16” – (try to show roof as one drawing view) Interiors Floor Finish Plan – 1/8” Interiors Furniture Plan – 1/8” Enlarged Arch Floor Plans – ¼” or larger as needed (typically the toilet rooms) Arch Exterior Elevations – 1/8” Arch Building Section – ¼” or ½” if needed for a specialty area (ie lobby) Arch typical wall sections – ¾” Wall types (wall sections or plan views) – 1 ½” Details ‐ Plan and Section – 1 ½” or 3” Interior Elevations – ¼” or 3/8” as needed *Note: set up each drawing on a 42” x 30” page.
    [Show full text]
  • How to Create a Site Plan Site Plan: a Drawing of a Property As Seen from Above, Including, but Not Limited to a North Arrow, Grand Tree Locations, and Date
    How to create a Site Plan Site Plan: A drawing of a property as seen from above, including, but not limited to a north arrow, grand tree locations, and date. Show proposed improvements with exact size, shape and location of all existing and proposed buildings and structures, parking areas, driveways, walkways and patios. 1 Use a Scale Choose a standard scale, either an Architectural or Engineering Scale and note the numeric scale used on plan (i.e. 1 inch = 20 feet). Draw Property Lines 2 Label all dimensions in feet. A plat of the neighborhood may help you in determining the dimensions of the parcel. This may be available Show the property lines from the RMC office of the county in and note the dimensions. which the property is located. Draw all Buildings and Structures on the Plan 3 • Show existing buildings and structures as a solid line and all additions as a dashed line. • Be sure to show the precise footprint of all buildings or structures including, but not limited to steps, decks, porches, fences, bay windows and HVAC platforms. Draw Driveway and Parking on the Plan 4 Show all parking areas, driveways, walkways and patios in their precise locations in relation to your property lines and with their accurate foot- print. Show proposed paved areas with a dashed line. Locate Grand Trees 5 • A Grand Tree is a tree with a diameter at 4 1/2 feet above grade that is 24 inches or greater. • Use a dot to indicate the precise location of the center of the tree.
    [Show full text]
  • Maps and Meanings: Urban Cartography and Urban Design
    Maps and Meanings: Urban Cartography and Urban Design Julie Nichols A thesis submitted in fulfilment of the requirements of the degree of Doctor of Philosophy The University of Adelaide School of Architecture, Landscape Architecture and Urban Design Centre for Asian and Middle Eastern Architecture (CAMEA) Adelaide, 20 December 2012 1 CONTENTS CONTENTS.............................................................................................................................. 2 ABSTRACT .............................................................................................................................. 4 ACKNOWLEDGEMENT ....................................................................................................... 6 LIST OF FIGURES ................................................................................................................. 7 INTRODUCTION: AIMS AND METHOD ........................................................................ 11 Aims and Definitions ............................................................................................ 12 Research Parameters: Space and Time ................................................................. 17 Method .................................................................................................................. 21 Limitations and Contributions .............................................................................. 26 Thesis Layout ....................................................................................................... 28
    [Show full text]
  • Site Plan for Central Park and Field
    Response to Request for Proposals Glencoe Park District Site Plan for Central Park and Field in collaboration with: Primera Engineers, Ltd.; Nova Engineering and FRS Design April 1, 2015 McCaslin Park: West Chicago, Illinois April 1, 2015 Board of Commissioners c/o Lisa Sheppard, Executive Director Glencoe Park District 999 Green Bay Road Glencoe, Illinois 60031 RE: Central Park and Field Dear Lisa, The Central Park and Field initiative is an amazing opportunity to create local-pride, community nostalgia and a sports-legacy for many generations! Central Park is one of Glencoe Park District’s “beating-hearts” in your open-space system, and soon to be a renewed contributor to the quality of life in Glencoe! We want to help your leadership team achieve this important goal. Consequently, we hope you will find that, in close collaboration with our engineering partners, the Hitchcock Design Group team has a better approach, better resources and better experience necessary to accomplish your vision. Better Approach Our entire team is dedicated to Creating Better Places® to play for the Glencoe Park District. Now that your Comprehensive Master Plan is completed, we will maintain our team’s strong commitment to the implementation of your objectives and deliver a consistent look, feel, brand and quality level, in a community-driven fashion, to your high-priority capital improvements. Specifically, we want to help you create Central Park and Field improvements that are not only more 225 W. Jefferson Avenue attractive, but are genuinely sustainable – not just environmentally, but functionally, culturally and Naperville, Illinois 60540 economically, as well.
    [Show full text]
  • I. What Is a Site Plan Review? Site Plan Review Is a Process Where the Construction of New Buildings, New Additions, and Certain
    I. What is a Site Plan Review? Site Plan Review is a process where the construction of new buildings, new additions, and certain types of canopies and/or tax-exempt institutions are reviewed by the City Planning staff and the City Council. The City reviews the new site in order to improve the functionality or mitigate any potential adverse impacts of the proposed development on neighboring properties. The end result of the process is for the applicant to obtain a special use permit. II. What Type of Development Requires Site Plan Review? There are five situations where a site plan review is required: All New Developments This does not include single or two-family dwellings. Substantial Additions Additions to buildings, or new accessory buildings, when a) the addition or new accessory building is greater than 25% of the existing principal building; b) the addition or new accessory building exceeds 1,000 square feet in gross floor area; c) curb cuts are required; or d) when such new construction reduces existing parking or significantly modifies existing on-site circulation (this does not include single or two-family dwellings). Canopies Canopies constructed over existing walkways, loading docks, or pump islands, where such new construction reduces existing parking or significantly modifies existing on-site circulation. Tax Exemption Person, association, corporation, religious institution, charity or foundation that has been designated by any governmental entity as exempt from payment of any tax levied by the city seeking to purchase or occupy real property in University City per the Municipal Code. Amendments Amendments to any of the above.
    [Show full text]
  • Site Plan Checklist
    HOW TO PREPARE YOUR SITE PLAN The #1 reason for delays in approving permit applications is incomplete Site Plans. Please refer to checklist inside. A site plan is needed to review your development proposal for zoning, addressing, sanitation, and building requirements. Producing a complete site plan will take a little time, but time spent now will speed up your application process later. YOUR SITE PLAN MUST BE ON AN 11” X 17” SHEET OF PAPER. ALL OTHER SIZES WILL BE REJECTED. (No blue print stock) • Please, use the blank form provided in this guide • I Five Tips Before You Start N 1 Talk to a Planner Prior to submitting a development application, meet with a planner to discuss potential land use issues and required setbacks. F • Planners are available from 9:00 am to 4:00 pm Monday thru Friday, or you can call 682-3577. O 2 Check Your Records To help you create your site plan, get a copy of the Assessor’s tax map that shows your property configuration, as well as other sources of information such as aerial photos, deed and title records, an appraiser’s report, or surveys. 3 Tools You Will Need G Before beginning, you will need an engineer’s scale, for measuring distances, scaling your site plan and to serve as a straightedge. An engineer’s scale can be purchased at an office supply store. Use a pencil or pen. U 4 Draw to a Scale Divisible by 10 I A uniform drawing scale is important to accurately display how various elements of your development proposal fit together.
    [Show full text]