Community Engagement Drives Progress in the Spicket River Revitalization Project
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
MMI 53 River Street Dam.Pdf
TOWN OF ACTON JUNE 7, 2019 | ACTON, MA PROPOSAL Studies Related to the Dam Located at 53 River Street June 7, 2019 Mr. John Mangiaratti, Town Manager Town of Acton Town Manager’s Office 472 Main Street Acton, MA 01720 RE: River Street Dam Removal and Fort Pond Brook Restoration Acton, Massachusetts MMI #4458-02 Dear Mr. Mangiaratti: The Milone & MacBroom team of structural engineers, bridge scour experts, geotechnical engineers, and hydraulic engineers are uniquely qualified to design the dam removal, and evaluate the potential upstream and downstream infrastructure impacts associated with the removal of the Dam at River Street to improve ecological functions of the Fort Pond Brook. When reviewing our proposal, we ask that you consider the following: Our team brings expertise and a proven track record of success in dam removal projects throughout New England. Milone & MacBroom professionals have backgrounds in hydrology and hydraulics, engineering design, fisheries expertise, and wetland biology. Our staff also includes invasive species experts, fisheries biologists, and permitting specialists. We also integrate the creative innovation of our extensive in-house team of landscape architects and frequently include passive recreational park features at our dam removal sites. We have the ability to integrate dam removal with the natural site opportunities through careful analysis and planning so that your project is technically sound, environmentally sensitive, and aesthetically pleasing. Our team of experts has performed many dam removal projects throughout New England and the Northeast. Milone and MacBroom are pioneers in the field, having completed our first dam removals in the 1990s. With over 40 constructed dam removal projects, we have completed more than any other design firm in the Northeast. -
Flood Study of the Suncook River in Epsom, Pembroke, and Allenstown, New Hampshire, 2009
Prepared in cooperation with the Federal Emergency Management Agency Flood Study of the Suncook River in Epsom, Pembroke, and Allenstown, New Hampshire, 2009 Scientific Investigations Report 2010–5127 U.S. Department of the Interior U.S. Geological Survey Cover. Photograph looking downstream at area of Suncook River avulsion, Epsom, New Hampshire. (Photograph taken on June 18, 2008) Flood Study of the Suncook River in Epsom, Pembroke, and Allenstown, New Hampshire, 2009 By Robert H. Flynn Prepared in cooperation with the Federal Emergency Management Agency Scientific Investigations Report 2010–5127 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior KEN SALAZAR, Secretary U.S. Geological Survey Marcia K. McNutt, Director U.S. Geological Survey, Reston, Virginia: 2010 For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment, visit http://www.usgs.gov or call 1-888-ASK-USGS For an overview of USGS information products, including maps, imagery, and publications, visit http://www.usgs.gov/pubprod To order this and other USGS information products, visit http://store.usgs.gov Any use of trade, product, or firm names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Although this report is in the public domain, permission must be secured from the individual copyright owners to reproduce any copyrighted materials contained within this report. Suggested citation: Flynn, R.H., 2010, Flood study of the Suncook River in Epsom, Pembroke, and Allenstown, New Hampshire, 2009: U.S. -
Methuen Report.Pdf
SUMMARY OF FINDINGS METHUEN MUNICIPAL VULNERABILITY PREPAREDNESS COMMUNITY RESILIENCE BUILDING JUNE 2019 CITY OF METHUEN With assistance from Merrimack Valley Planning Commission & Horsley Witten Group 1 Table of Contents Executive Order 569 and the Massachusetts Municipal Vulnerability Preparedness Program ......................................................................................................................3 Planning Project Vision Statement ..............................................................................5 Climate Data for Methuen and the Shawsheen Basin .................................................7 Methuen Demographics .............................................................................................9 Top Hazards for Methuen ......................................................................................... 11 Concerns & Challenges Presented by Hazards and Climate Change ........................... 14 Methuen Infrastructure & Critical Facilities – Vulnerabilities Identified .................... 14 Methuen Societal Features – Vulnerabilities Identified ............................................. 17 Methuen Environmental Features – Vulnerabilities Identified .................................. 19 Community Strengths & Assets ................................................................................. 21 Top Recommendations for a More Resilient Methuen .............................................. 24 Appendices .............................................................................................................. -
Technical Memorandum 84-7 2004 Merrimack River Watershed Fish
Technical Memorandum 84-7 2004 Merrimack River Watershed Fish Population Assessment Robert J. Maietta Jane Ryder Watershed Planning Program Worcester, MA July 2008 CN 179.4 Commonwealth of Massachusetts Executive Office of Environmental Affairs Ian Bowles, Secretary Department of Environmental Protection Laurie Burt, Commissioner Bureau of Resource Protection Glenn Haas, Acting Assistant Commissioner Division of Watershed Management Glenn Haas, Director 1 Introduction Fish population surveys were conducted at sixteen stations in the Merrimack River Watershed in Massachusetts using techniques similar to Rapid Bioassessment Protocol V as described originally by Plafkin et al. (1989) and later by Barbour et al. (1999) (See Figure 1). Standard Operating Procedures are described in Fish Collection Procedures for Evaluation of Resident Fish Populations (MassDEP 2006 CN 75.1). Surveys also included a habitat assessment component modified from that described in Barbour et al (1999). Methods Fish populations in the Merrimack River watershed were sampled during August and September of 2004 by electrofishing using a Smith Root Model 12 battery powered backpack electrofisher. A reach of between 80m and 100m was sampled by passing a pole-mounted anode ring, side to side through the stream channel and in and around likely fish holding cover. All fish shocked were netted and held in buckets. Sampling proceeded from an obstruction or constriction, upstream to an endpoint at another obstruction or constriction such as a waterfall or shallow riffle. Following completion of a sampling run, all fish were identified to species, measured, and released. Results of the fish population surveys can be found in Table 1. It should be noted that young-of-the-year (yoy) fish from most species (with the exception of salmonids) are not targeted for collection. -
TWO RIVERS MASTER PLAN a Recreational Trail Through the City
BROCKTON TWO RIVERS MASTER PLAN A Recreational Trail through the City CITY OF BROCKTON | Mayor James E. Harrington | City Planner Nancy Stack Savoie Hubert Murray Architect + Planner | July 2008 2 Introduction 0 Program Goals / Common Issues 0 Strategies for Action 07 Area Analyses and Proposals 19 Study Area 01 20 Study Area 02 26 Study Area 0 4 Study Area 04 44 Study Area 05 46 Implementation 48 References 52 Appendix | Maps and Aerials 54 TABLE OF CONTENTS MASTER PLAN OVERVIEW For a quick understanding of the Two Rivers Master Plan, read the Introduction (p.1) and Program Goals / Common Issues (p.3). Strategies for Action (pp.7-17) gives an overview of what needs to be done. Area Analyses and Proposals (pp. 19-47) goes into more detail. Implementation (p.48) indicates next steps and funding possibilities. 20 miles radius from Brockton 5.44 miles E-W HOLBROOK ABINGTON AVON STOUGHTON WHITMAN 5.8 miles N-S EASTON EAST BRIDGEWATER WEST BRIDGEWATER William L. Douglas, shoe manufacturer and retailer, was elected governor of the Commonwealth for the term 905-906. INTRODUCTION Purpose On the other hand, city government has managed to urban parks have been created in the center of The purpose of this study is to provide an overview attract a number of government offices to provide the city as the beginnings of an urban open space of the recreational and environmental potential for local employment as well as attracting federal and system known as the Salisbury Greenway. Frederick restoring and enhancing the urban environment state investment programs in housing, education and Douglass Way (formerly High Street) has been through which Brockton’s Two Rivers run. -
Tm-81-4 Nashua River Watershed Dwm Year 2003
Technical Memorandum - TM-81-4 NASHUA RIVER WATERSHED DWM YEAR 2003 WATER QUALITY MONITORING DATA - RIVERS DWM Control Number: CN 107.2 Prepared By: Susan Connors December 2005 Commonwealth of Massachusetts Executive Office of Environmental Affairs Stephen R. Pritchard, Secretary Massachusetts Department Of Environmental Protection Robert W. Golledge, Jr., Commissioner Bureau of Resource Protection Glenn Haas, Acting Assistant Commissioner Division of Watershed Management Glenn Haas, Director Table of Contents Introduction.................................................................................................................................................... 3 Table 1. MassDEP DWM 2003 Nashua River Watershed Water Quality Station Locations and Parameters............................................................................................................................. 3 Figure 1. MassDEP DWM 2003 Nashua River Watershed Water Quality Station Locations............... 5 Objectives...................................................................................................................................................... 6 Methods......................................................................................................................................................... 6 Station Observations..................................................................................................................................... 7 Survey Conditions ...................................................................................................................................... -
City of Lawrence 2004 Open Space Plan
CITY OF LAWRENCE 2004 OPEN SPACE PLAN Michael J. Sullivan, Mayor Prepared by the City of Lawrence Office of Planning and Development and Groundwork Lawrence City of Lawrence 2004 Open Space Plan CITY OF LAWRENCE 2004 OPEN SPACE PLAN Table of Contents Section 1: Executive Summary 5 Section 2: Introduction 9 A. Statement of Purpose B. Planning Process and Public Participation Section 3: Community Setting 11 A. Regional Context B. History of the Community C. Population Characteristics D. Growth and Development Patterns Section 4: Environmental Inventory and Analysis 17 A. Geology, Soil and Topology B. Landscape Character C. Water Resources D. Vegetation E. Fisheries and Wildlife F. Scenic Resources and Unique Environments G. Environmental Challenges Section 5: Inventory of Lands of Conservation and Recreation Interest 25 A. Private Parcels B. Public and Non-Profit Parcels Section 6: Community Vision 29 A. Description of Process B. Statement of Open Space and Recreation Goals Section 7: Analysis of Needs 31 1 City of Lawrence 2004 Open Space Plan A. Summary of Resource Protection Needs B. Summary of Community’s Needs C. Management Needs, Potential Changes of Use Section 8: Goals and Objectives 39 Section 9: Five-Year Action Plan 42 Section 10: Public Comments 48 Section 11: References 49 Attachment A: Maps Open Space Improvements Since 1997 Regional Context Land Use Lawrence Census Tracts Lawrence Voting Wards Zoning Districts Recreational and Conservation Areas Population Density Density of Children Ages 0-5 Density of Children Ages 6-15 -
Water Quality
LAWRENCE HYDROELECTRIC PROJECT LIHI APPLICATION ATTACHMENT B WATER QUALITY 314 CMR 4.00: DIVISION OF WATER POLLUTION CONTROL 4.06: continued 314 CMR 4.00 : DIVISION OF WATER POLLUTION CONTROL 4.06: continued TABLE 20 MERRIMACK RIVER BASIN BOUNDARY MILE POINT CLASS QUALIFIERS Merrimack River State line to Pawtucket Dam 49.8 - 40.6 B Warm Water Treated Water Supply CSO Pawtucket Dam to Essex Dam, 40.6 - 29.0 B Warm Water Lawrence Treated Water Supply CSO Essex Dam, Lawrence to 29.0 - 21.9 B Warm Water Little River, Haverhill CSO Little River, Haverhill to 21.9 - 0.0 SB Shellfishing Atlantic Ocean CSO The Basin in the Merrimack River - SA Shellfishing Estuary, Newbury and Newburyport Stony Brook Entire Length 10.3 - 0.0 B Warm Water Beaver Brook State line to confluence 4.2 - 0.0 B Cold Water with Merrimack River Spicket River State line to confluence 6.4 -0.0 B Warm Water with Merrimack River Little River State line to confluence with 4.3 - 0.0 B Warm Water Merrimack River Cobbler Brook Entire Length 3.7 - 0.0 B Cold Water Powwow River Outlet Lake Gardner to tidal 6.4 - 1.3 B Warm Water portion Tidal portion 1.3 - 0.0 SB Shellfishing Plum Island River North of High Sandy sand bar SA Shellfishing Outstanding Resource Water 1 Water quality standards for Class B and Class SB waters Designated Use/Standard Parameter Support ≥ 5.0 mg/l Inland waters, Class B, Dissolved Oxygen ≥ 60% saturation unless background conditions warm water fishery lower Massachusetts waters, MADEP Temperature ≤ 28.3ºC (83ºF) pH 6.0 to 8.3 S.U. -
CITY of LAWRENCE 2009 OPEN SPACE and RECREATION PLAN
CITY OF LAWRENCE 2009 OPEN SPACE and RECREATION PLAN Prepared by Groundwork Lawrence for The City of Lawrence Community Development Department Table of Contents Section 1: Executive Summary ........................................................................................................... 1 Section 2: Introduction ....................................................................................................................... 2 Section 3: Community Setting ............................................................................................................ 3 Section 4: Environmental Inventory and Analysis ............................................................................ 11 Section 5: Inventory of Lands of Conservation and Recreation Interest ......................................... 24 Section 6: Community Vision............................................................................................................ 33 Section 7: Analysis of Need .............................................................................................................. 35 Section 8: Goals and Objectives ....................................................................................................... 42 Section 9: Seven Year Action Plan .................................................................................................... 43 List of Appendices Appendix A: Maps Appendix B: Meeting Notes Appendix C: Survey Results Appendix D: Outreach Appendix E: Regional and Local Trail Initiatives Appendix F: Natural -
Bulletin of the Massachusetts Archaeological Society, Vol. 57, No. 2 Massachusetts Archaeological Society
Bridgewater State University Virtual Commons - Bridgewater State University Bulletin of the Massachusetts Archaeological Journals and Campus Publications Society Fall 1996 Bulletin of the Massachusetts Archaeological Society, Vol. 57, No. 2 Massachusetts Archaeological Society Follow this and additional works at: http://vc.bridgew.edu/bmas Part of the Archaeological Anthropology Commons Copyright © 1996 Massachusetts Archaeological Society This item is available as part of Virtual Commons, the open-access institutional repository of Bridgewater State University, Bridgewater, Massachusetts. BULLETIN OF THE MASSACHUSETTS ARCHAEOLOGICAL SOCIETY VOLUME 57 (2) FALL 1996 CONTENTS: Maugua the Bear in Northeastern Indian Mythology and Archaeology . Michael A. Volmar 37 A Cache of Middle Archaic Ground Stone Tools from Lawrence, Massachusetts . James W. Bradley 46 Sunconewhew: "Phillip's Brother" ? . Terence G. Byrne and Kathryn Fairbanks 50 An Archaeological Landscape in Narragansett, Rhode Island: Point Judith Upper Pond . Alan Leveillee and Burr Harrison 58 Indigenous Peoples' Control over and Contribution to Archaeology in the United States of America: Some Issues Shirley Blancke and John Peters Slow Turtle 64 Assistant Editor's Note 68 Brief Note on Submissions 45 Contributors 68 THE MASSACHUSETTS ARCHAEOWGICAL SOCIETY, Inc. P.O.Box 700, Middleborough, Massachusetts 02346 MASSACHUSETTS ARCHAEOLOGICAL SOCIETY Officers: Curtiss Hoffman, 58 Hilldale Rd., Ashland, MA 01721 President Betsy McGrath, 89 Standish Ave., Plymouth, MA 02360 ...................... .. Vice President Thomas Doyle, P.O. Box 1708, North Eastham, MA 02651 Clerk Irma Blinderman, 31 Buckley Rd., Worcester, MA 01602 Treasurer Ruth Warfield, 13 Lee St., Worcester, MA 01602 Museum Coordinator, Past President Elizabeth Little, 37 Conant Rd., Lincoln, MA 01773 Bulletin Editor Lesley H. Sage, 33 West Rd., 2B, Orleans, MA 02653 .................. -
A Brief Concord River History
A Brief Concord River History Native Americans Lined by fertile lands and dotted with several good fishing sites, the lower stretch of the Concord River was at one time inhabited by large numbers of Native Americans, well before European settlers made their way across the Atlantic and inland from the coast. Seventeenth-century historian Daniel Goodkin claimed that before contact there were thousands of “Wamesit” making semi-permanent residence on the east side of the Concord, where it met the Merrimack. There they planted corn in the rich alluvial soil, fished “for salmon, shad, lamprey-eels, sturgeon, bass, and diverse others,” and hunted the reportedly abundant game in the surrounding woods. This group was one of two tribes in the area, with another, the “Pawtucket,” at Pawtucket Falls upstream on the Merrimack River. Both belonged to the Pennacook Middlesex Falls Confederacy, and their settlements swelled and shrank in size seasonally, as native visitors came and went with the migration cycles of the anadromous fish. In the 17th century, however, they were killed or run out of the river valley by fearful settlers. By 1726, native rights to the land along the Concord were nonexistent. East Chelmsford & Tewksbury Throughout the eighteenth century, the people of East Chelmsford, now downtown Lowell, were engaged primarily in farming and fishing. Joseph Fletcher and Jonathan Tyler owned the land abutting the Concord River on the west side, some of which they planted or managed as woodlot (see Map 1). On the east side, in Tewksbury, was the “Old Yellow House,” a tavern and hotel where the Wamesit village once stood and where Saints Memorial Medical Center stands today. -
Suncook River – Providing Resiliency Following a Channel-Changing Flood Event
Suncook River – Providing Resiliency Following a Channel-Changing Flood Event New Hampshire Water & Watersheds Conference March 18, 2016 Outline • Study area and avulsion • Project initiation and fundraising • Designs, construction, costs 2 Study Area – Epsom, NH Background HUCKINS MILLS LITTLE SUNCOOK Channel Avulsion RIVER Channel Abandonment LEIGHTON BROOK Migrating SUNCOOK RIVER Knickpoints Aggradation Infrastructure 1992 2011 Rt 4 Bridge Little Suncook River Suncook River Flows Dams Avulsion Site Leighton Brook 2006 – Day after Flood Suncook River Flow Avulsion Site Former Channel USACOE Sand Pit 2006 – Day after Flood Suncook River Flow Suncook River Flow USACOE 2006 – Day after Flood Suncook River Flow Leighton Brook USACOE 2006 – Day after Flood Downstream Deposition USACOE Current Conditions Glacial Lag Deposits Surrounded by Sand Incision and Widening on Leighton Brook Former Channel Elevation Infrastructure Black Hall Rd - Leighton Brook Rt 4 Bridge - Suncook River Buildings – Leighton Brook Project Goals • Protect bridge infrastructure –Rt 4 bridge over Suncook River –Black Hall Rd bridge over Leighton Brook • Control upstream migration of knickpoints on Suncook River and tributaries • Control channel widening Project Initiation and Fundraising 14 Project Initiation and Fundraising 15 Project Initiation and Fundraising 16 Project Initiation and Fundraising 17 2006 • NHDES Geological Survey conducts post-avulsion baseline survey • $8,000 2007 • NHDES and U.S. EPA Section 319 Grant - $24,000 • Non-federal match of $16,000 from