Rc.No.589/2013/CE/DM/VUDA

SUBJECT NO.85

Sub: Works – Engg. – VUDA – Sanctioned works – Tenders accepted – Perusal– Reg.

***

Estimate Sl. Name of lowest Tendered Excess % Name of work Contract Remarks No. tenderer Amount (Rs.) Less% Value (Rs.) 01. Formation of Quarry The lowest Tender of Rubbish, GSB, WMM & Sri A,Kasi Visweswara SDBC layers Rao is accepted at 1.08% less than the construction of SW Sri A.Kasi Estimate Rates by the drains and CD works to 1,69,42,152/- 1,67,59,177/- 1.08% Less Visweswara Rao Vice Chairman, VUDA Chinamushidiwada on 31-01-2013 Layout. Rc.No.34/2005/EE- IV/VUDA 02 Providing 25W LED The lowest Tender of power consumption M/s. Kushima and high illumination at Luminaries is accepted M/s. Kushima at 9.80% less than the VUDA Park. 4,85,304/- 4,37,744/- 9.80% Less Luminaries Estimate Rates by the Rc.No.68/2012-13/EE-II/ Vice Chairman, VUDA VUDA on 12-04-2013 03 Providing special repairs The lowest Tender of to Kursura Submarine M/s. Srinivasa Museum at Beach road, Constructions is M/s. Srinivasa accepted at 3.39% less 1,12,000/- 3107839 3.39% Less Constructions than the Estimate Rc.No.66/2012-13/EE- Rates by the Vice II/VUDA Chairman, VUDA on 10-05-2013 04 Providing EPOXY The lowest Tender of painting to the bilges M/s. Sri Sai Engineering area of Kursura Company is accepted at 5.30% less than the Submarine Museum at M/s. Sri Sai Engineering 1,20,000/- 1,13,640/- 5.30% Less Estimate Rates by the Beach road, Company Vice Chairman, VUDA Visakhapatnam on 25-05-2013 Rc.No.70/2012- 13/EE/II/VUDA 05 Providing entrance The lowest Tender of ornamental gate at Sri K.Prasadu is Entrance of the New accepted at 3.39% less than the Estimate Scooter Parking at Sri K.Prasadu 1,84,693/- 1,78,432/- 3.39% Less Rates by the Vice Phase-III, VUDA Park Chairman, VUDA on Rc.No.67/2012-13/EE- Dt:25-05-2013 II/VUDA 06 Construction of Culvert The lowest Tender of at PM Palem approach M/s. Aruna Sai to NH-5 road Engineering Company M/s. Aruna Sai is accepted at 0.81% Rc.No.6/2013-14/EE- Engineering 7,86,844/- 7,80,471 0.81% less less than the Estimate I/VUDA Company Rates by the Vice Chairman, VUDA on 07-06-2013

07 Formation of BT road The lowest Tender of Sri P.V. Subba Raju 60,94,034/- 60,14,812/- 1.30% Less construction of CD Sri P.V. Subba Raju is

Estimate Sl. Name of lowest Tendered Excess % Name of work Contract Remarks No. tenderer Amount (Rs.) Less% Value (Rs.) works and SW drains to accepted at 1.30% less the Master Plan 60’-0” than the Estimate wide road from NH-5 Jn. Rates by the Vice Chairman, VUDA on to Shipyard Layout 08-06-2013. (Bindranagar Layout) Rc.No.2/2013-14/EE- I/VUDA

08 Construction of The lowest Tender of Shopping Complex at M/s. Ellarve Metals is Sector-VII of MVP quoted @ 2.79% excess over the Colony, M/s. Ellarve Metals 3,82,89,737/- 3,72,21,453/ 2.79% Less Estimate Rates by COT Visakhapatnam. and the same was Rc.No.36/2012-13/EE- approved by the Vice VI/VUDA Chairman VUDA on 10-06-2013. 09 Shifting of 11KV 33KV The lowest Tender of and LT electrical lines M/s. Mahalakshmi & along with transformers Co. is accepted at 4.00% excess over the for road widening work Estimate Rates by the at Ring Road work from M/s. Mahalakshmi 4.00% 32,80,636/- 34,11,861/- Vice Chairman, VUDA Balaji Jn. to Rythu & Co. Excess on bazaar, Vizianagaram. 22-06-2013

Rc.No.14A/2011-12/EE- VI/ VUDA 10 Formation of internal The lowest Tender of roads (Sub Base) for M/s. KSR Constructions Harita Housing Project is accepted at 35.00% M/s. KSR 35.00% less than the Estimate at , 26,51,070/- 17,23,196/- Constructions Less Rates by the Vice Phase-I. Chairman, VUDA on 27-06-2013 Rc.No.226/EE-VII/VUDA 11 Construction of The lowest Tender of boundary pillars in Sri Y.Appala Raju is S.No.24/6 (Acs.8.85 Cts.) accepted at 2.07% less than the Estimate of Kummaripalem (V) of Sri Y.Appala Raju 1,53,700/- 1,56,774/- 2.07% Less Rates by the Vice Sports complex site at Chairman, VUDA on . 02-07-2013 Rc.No.111/2010/EE- V/VUDA 12 Construction of MIG-IA The lowest Tender of Block-2 80 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates and Madhurawada Phase-I, 2.34% Sri K.Anantha Rao 8,71,75,562/- 8,92,15,470/- accepted by COT and Visakhapatnam Excess the same was (Balance works approved by the Vice Rc.No.225(C)/EE- Chairman VUDA on 10- V/VUDA 07-2013. 13 Construction of MIG-IB The lowest Tender of Block-1 60 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates and Madhurawada Phase-I, 2.34% accepted by COT and Sri K.Anantha Rao 6,70,55,658/- 6,86,24,760/- Visakhapatnam Excess the same was (Balance works approved by the Vice Rc.No.225 (D)/EE- Chairman VUDA on 10- V/VUDA 07-2013.

Estimate Sl. Name of lowest Tendered Excess % Name of work Contract Remarks No. tenderer Amount (Rs.) Less% Value (Rs.) 14 Construction of MIG-II The lowest Tender of Block-1 70 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates and Madhurawada Phase-I, 2.34% accepted by COT and Visakhapatnam Sri K.Anantha Rao 5,64,09,839/- 5,77,29,829/- Excess the same was (Balance works approved by the Vice Rc.No.225(F)/EE- Chairman VUDA on 10- V/VUDA 07-2013

15 Construction of MIG-II The lowest Tender of Block-2 70 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates and Madhurawada Phase-I, 2.34% accepted by COT and Visakhapatnam Sri K.Anantha Rao 7,32,14,535/- 7,49,27,755/- Excess the same was (Balance works approved by the Vice Rc.No.225(G)/EE- Chairman VUDA on 10- V/VUDA 07-2013

16 Construction of MIG-II The lowest Tender of Block-3 70 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates and Madhurawada Phase-I, 2.34% accepted by COT and Sri K.Anantha Rao 5,85,12,945/- 5,98,82,148/- Visakhapatnam Excess the same was (Balance works approved by the Vice Rc.No.225(H)/EE- Chairman VUDA on 10- V/VUDA 07-2013.

17 Providing ornamental The lowest Tender of hand railing (Bamboo Sri K.Prasadu is design) at damaged accepted at 7.38% less than the Estimate places and painting Rates by the Vice along the beach road Sri K.Prasadu 1,39,500/- 1,29,204/- 7.38% Chairman, VUDA on from ropeway Jn. to Dt:12-07-2013 Rc.No.04/2013-14/EE-II/ VUDA

18 Providing ornamental The lowest Tender of hand railing (Bamboo Sri K.Prasadu is design) from accepted at 11.22% less than the Estimate Dolphinorium turning Rates by the Vice (Zoo Park turning)to 11.22% Sri K.Prasadu 7,76,924/- 6,89,753/- Chairman, VUDA on Visalakshinagar Jn. Less Dt:12-07-2013 along beach road. Rc.No.11/2013-14/EE-II/ VUDA

19 Providing internal The lowest Tender of electrification to the M/s. Bhargavi Power Children Arena at Links is accepted at 9.10% less than the Siripuram Jn., M/s. Bhargavi 39,59,536/- 35,99,218/- 9.10% Less Estimate Rates by the Visakhapatnam Power Links Vice Chairman, VUDA Rc.No.02/2013-14/EE- on IV/VUDA Dt:12-07-2013

20 Construction of Fire The lowest Tender of fighting sump with 1.00 M/s. Giri Santosh Lakh Ltrs. And water Engineering works is accepted at 5.40% less supply sump with 0.50 than the Estimate Lakh Ltrs. Capacity and Rates by the Vice providing water supply Chairman, VUDA on & sanitary M/s. Giri Santosh Dt:12-07-2013 26,97,771/- 25,52,091/- 5.40% Less arrangements to the Engineering works vUDA Children Arena at Siripuram Jn., Visakhapatnam. Rc.No.09/2013-14/EE- IV/VUDA

21 Providing Central Air The lowest Tender of Conditioning at M/s. Meralec Ananda Gajapathi Engineering Company M/s. Meralec is accepted at 16.00% Auditorium, 16.00% Engineering 29,09,450/- 24,43,938/- less than the Estimate Less Vizianagaram. Company Rates by the Vice Rc.No.03/2013-14/EE- Chairman, VUDA on III/VUDA Dt:22-07-2013.

22 Construction of MIG-IA The lowest Tender of Block-1 80 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates by COT Madhurawada Phase-I, 2.34% Sri K.Anantha Rao 8,14,74,680/- 8,33,81,188/- and the same was Visakhapatnam Excess approved by the Vice (Balance works Chairman VUDA on 26- Rc.No.225(B)/EE- 07-2013. V/VUDA. 23 Providing SS hand railing The lowest Tender of at 2nd entrance GI hand M/s. SRK Logistics is railing on revetment accepted at 12.00% 12.00% less than the Estimate wall of VUDA Health M/s. SRK Logistics 5,33,048/- 4,86,682/- Less Rates by the Vice Arena. Chairman, VUDA on Rc.No.40/2012-13/EE- 30-07-2013. II/VUDA 24 Construction of certain The lowest Tender of civil structure for Silent Sri T.M. Kumar is Zone at Health Arena, accepted at 8.29% less than the Estimate Sri T.M. Kumar 27,08,785/- 24,84,227/- 8.29% Less Rates by the Vice Rc.No.22/2012-13/EE- Chairman, VUDA on II/VUDA 01-08-2013.

25 Construction of The lowest Tender of entrance arch at M/s. Sri Sampath Sai Hanumanthuwaka at Constructions is accepted at 4.59% VUDA Health Arena M/s. Sri Sampath 4.59% excess over the foot hill of Kailasa Hill. 6,10,000/- 6,38,000/- Sai Constructions Excess Estimate Rates by the Rc.No.35 (C)/EE-II/VUDA Vice Chairman, VUDA on Dt:04-08-2013

26 Drilling of bore wells and The lowest Tender of lowering of casing pipes M/s. Sravan Bore wells in Harita Housing Project is accepted at 2.00% excess over the Phase-I at M/s. Sravan Bore 2.00% 4,77,096/- 4,86,638/- Estimate Rates by the Madhurawada wells Excess Vice Chairman, VUDA on Rc.No.226(B)/EE- 06-08-2013 VII/VUDA

27 Construction of The lowest Tender of retaining walls alround Sri P.Srinivasa Rao is apartment blocks of all accepted at 25.04% less than the Estimate categories for Harita Rates by the Vice Housing Project Phase-I 24.05% Sri P.Srinivasa Rao 56,21,410/- 42,69,491/- Chairman, VUDA on at Madhurawada Less 18-08-2013.

Rc.No.226(A)/EE- VII/VUDA

28 Design and supply The lowest Tender of installation testing and M/s. Premier Solar commissioning 100Kwp Systems Pvt. Ltd. is accepted at 17.40% Solar Photo voltaic less than the Estimate power plant with 5 Rates by the Vice years of comprehensive Chairman, VUDA on M/s. Premier Solar maintenance contract 1,03,00,000/- 85,23,528/- 20-08-2013 Systems Pvt. Ltd. proposed to install on the roof top of Udyog Bhavan Complex. Rc.No.03-2013-14/EE- VI/VUDA

29 Improvement of lighting The lowest Tender of arrangements to the M/s. Kiron Engineering Beach Park and Tenneti Corporation works is M/s. Kiron accepted at 20.10% Park. Engineering 11,13,740/- 8,89,878/- 20.10% less than the Estimate Rc.No.53/2012-13/EE- Corporation works Rates by the Vice II/VUDA Chairman, VUDA on 11-09-2013

30 Providing lighting The lowest Tender of proposals to new M/s. Kiron Engineering animal theme park on Corporation works is M/s. Kiron accepted at 10.30% top of kailasa hill. 10.32% Engineering 8,27,554/- 7,42,150/- less than the Estimate Less Rc.No.41/2012-13/EE- Corporation works Rates by the Vice II/VUDA Chairman, VUDA on 11-09-2013

31 Providing electrification The lowest Tender of and lighting to APVCC M/s. Kushima compound, Luminaries is accepted at 1.00% less than the Bakkannapalem, M/s. Kushima 5,04,668/- 4,99,627/- 1.00% Less Estimate Rates by the Luminaries Visakhapatnam Vice Chairman, VUDA Rc.No.136a/2013-14/EE- on I/VUDA 17-09-2013.

32 Providing RCC fencing The lowest Tender of poles with barbed wire Sri Y.Karunakar Reddy and providing caution is accepted at 5.49% less than the Estimate boards for protection of Rates by the Vice Government lands in Chairman, VUDA on S.No.17,18,20,21,27, Sri Y.Karunakar 26-09-2013. 11,52,754/- 10,89,468/- 5.49% 28,32 in Reddy Village, Mandal Rc.No.8/2013-14/EE- I/VUDA

33 Supply of underground The lowest Tender of cables in Dr.YSR VUDA M/s. Kiron Engineering Central Park at Old Corporation works is M/s. Kiron accepted at 20.40% central jail premises, 20.40% Engineering 25,59,200/- 20,37,123/- less than the Estimate Less Visakhapatnam. Corporation works Rates by the Vice Rc.No.400K(1)/2012- Chairman, VUDA on 13/EE-VI/VUDA 30-09-2013

34 Providing motors to The lowest Tender of bores, distribution M/s. Capital Steel Tube pipeline external is accepted at 3.06% less than the Estimate jogging track in Dr.YSR Rates by the Vice VUDA Central Park at M/s. Capital Steel Chairman, VUDA on Old central jail 10,20,325/- 9,89,103 3.06% Less Tube 03-10-2013 premises, Visakhapatnam. Rc.No.24/2013-14/EE- VI/VUDA

35 Construction of The lowest Tender of additional class room Sri P.Ananda Babu is and toilets for women’s accepted at 10.10% less than the Estimate students at 10.10% Sri P.Ananda Babu 8,39,119/- 7,53,469/- Rates by the Vice Dr.V.S.Krishna College. Less Chairman, VUDA on Rc.No.1/2013-14/EE-I/ 08-10-2013. VUDA

36 Construction of Daises The lowest Tender of in the earmarked lawns Sri P.Appala Raju is at Old MGM site, VUDA accepted at 14.50% 14.50% less than the Estimate Park Sri P.Appala Raju 16,03,139/- 13,70,684/- Less Rates by the Vice Rc.No.36/2013-14/EE- Chairman, VUDA on II/VUDA 08-10-2013.

37 Construction of The lowest Tender of compound wall for Sri P.Appala Raju is Burial Ground at 60’-0” accepted at 17.19% 17.19% less than the Estimate wide Sivashaktinagar Sri P.Appala Raju 3,55,220/- 3,02,439/- Less Rates by the Vice (Ganesh Nagar) Chairman, VUDA on Rc.No.10/2013-14/EE-I/ 15-10-2013. VUDA 38 Providing Marine The lowest Tender of painting to Kursura M/s. Gayatri Submarine Museum at Engineering Works is M/s. Gayatri accepted at 9.99% less Visakhapatnam. 11,48,300/- 10,33,585/- 9.99% Less Engineering Works than the Estimate Rc.No.43/2013-14/EE- Rates by the Vice II/VUDA Chairman, VUDA on 31-10-2013.

Hence the matter is placed before VUDA Board for perusal.