Engg. – VUDA – Sanctioned Works – Tenders Accepted – Perusal– Reg

Engg. – VUDA – Sanctioned Works – Tenders Accepted – Perusal– Reg

Rc.No.589/2013/CE/DM/VUDA SUBJECT NO.85 Sub: Works – Engg. – VUDA – Sanctioned works – Tenders accepted – Perusal– Reg. *** Estimate Sl. Name of lowest Tendered Excess % Name of work Contract Remarks No. tenderer Amount (Rs.) Less% Value (Rs.) 01. Formation of Quarry The lowest Tender of Rubbish, GSB, WMM & Sri A,Kasi Visweswara SDBC layers Rao is accepted at 1.08% less than the construction of SW Sri A.Kasi Estimate Rates by the drains and CD works to 1,69,42,152/- 1,67,59,177/- 1.08% Less Visweswara Rao Vice Chairman, VUDA Chinamushidiwada on 31-01-2013 Layout. Rc.No.34/2005/EE- IV/VUDA 02 Providing 25W LED The lowest Tender of power consumption M/s. Kushima and high illumination at Luminaries is accepted M/s. Kushima at 9.80% less than the VUDA Park. 4,85,304/- 4,37,744/- 9.80% Less Luminaries Estimate Rates by the Rc.No.68/2012-13/EE-II/ Vice Chairman, VUDA VUDA on 12-04-2013 03 Providing special repairs The lowest Tender of to Kursura Submarine M/s. Srinivasa Museum at Beach road, Constructions is M/s. Srinivasa accepted at 3.39% less Visakhapatnam 1,12,000/- 3107839 3.39% Less Constructions than the Estimate Rc.No.66/2012-13/EE- Rates by the Vice II/VUDA Chairman, VUDA on 10-05-2013 04 Providing EPOXY The lowest Tender of painting to the bilges M/s. Sri Sai Engineering area of Kursura Company is accepted at 5.30% less than the Submarine Museum at M/s. Sri Sai Engineering 1,20,000/- 1,13,640/- 5.30% Less Estimate Rates by the Beach road, Company Vice Chairman, VUDA Visakhapatnam on 25-05-2013 Rc.No.70/2012- 13/EE/II/VUDA 05 Providing entrance The lowest Tender of ornamental gate at Sri K.Prasadu is Entrance of the New accepted at 3.39% less than the Estimate Scooter Parking at Sri K.Prasadu 1,84,693/- 1,78,432/- 3.39% Less Rates by the Vice Phase-III, VUDA Park Chairman, VUDA on Rc.No.67/2012-13/EE- Dt:25-05-2013 II/VUDA 06 Construction of Culvert The lowest Tender of at PM Palem approach M/s. Aruna Sai to NH-5 road Engineering Company M/s. Aruna Sai is accepted at 0.81% Rc.No.6/2013-14/EE- Engineering 7,86,844/- 7,80,471 0.81% less less than the Estimate I/VUDA Company Rates by the Vice Chairman, VUDA on 07-06-2013 07 Formation of BT road The lowest Tender of Sri P.V. Subba Raju 60,94,034/- 60,14,812/- 1.30% Less construction of CD Sri P.V. Subba Raju is Estimate Sl. Name of lowest Tendered Excess % Name of work Contract Remarks No. tenderer Amount (Rs.) Less% Value (Rs.) works and SW drains to accepted at 1.30% less the Master Plan 60’-0” than the Estimate wide road from NH-5 Jn. Rates by the Vice Chairman, VUDA on to Shipyard Layout 08-06-2013. (Bindranagar Layout) Rc.No.2/2013-14/EE- I/VUDA 08 Construction of The lowest Tender of Shopping Complex at M/s. Ellarve Metals is Sector-VII of MVP quoted @ 2.79% excess over the Colony, M/s. Ellarve Metals 3,82,89,737/- 3,72,21,453/ 2.79% Less Estimate Rates by COT Visakhapatnam. and the same was Rc.No.36/2012-13/EE- approved by the Vice VI/VUDA Chairman VUDA on 10-06-2013. 09 Shifting of 11KV 33KV The lowest Tender of and LT electrical lines M/s. Mahalakshmi & along with transformers Co. is accepted at 4.00% excess over the for road widening work Estimate Rates by the at Ring Road work from M/s. Mahalakshmi 4.00% 32,80,636/- 34,11,861/- Vice Chairman, VUDA Balaji Jn. to Rythu & Co. Excess on bazaar, Vizianagaram. 22-06-2013 Rc.No.14A/2011-12/EE- VI/ VUDA 10 Formation of internal The lowest Tender of roads (Sub Base) for M/s. KSR Constructions Harita Housing Project is accepted at 35.00% M/s. KSR 35.00% less than the Estimate at Madhurawada, 26,51,070/- 17,23,196/- Constructions Less Rates by the Vice Phase-I. Chairman, VUDA on 27-06-2013 Rc.No.226/EE-VII/VUDA 11 Construction of The lowest Tender of boundary pillars in Sri Y.Appala Raju is S.No.24/6 (Acs.8.85 Cts.) accepted at 2.07% less than the Estimate of Kummaripalem (V) of Sri Y.Appala Raju 1,53,700/- 1,56,774/- 2.07% Less Rates by the Vice Sports complex site at Chairman, VUDA on Bheemunipatnam. 02-07-2013 Rc.No.111/2010/EE- V/VUDA 12 Construction of MIG-IA The lowest Tender of Block-2 80 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates and Madhurawada Phase-I, 2.34% Sri K.Anantha Rao 8,71,75,562/- 8,92,15,470/- accepted by COT and Visakhapatnam Excess the same was (Balance works approved by the Vice Rc.No.225(C)/EE- Chairman VUDA on 10- V/VUDA 07-2013. 13 Construction of MIG-IB The lowest Tender of Block-1 60 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates and Madhurawada Phase-I, 2.34% accepted by COT and Sri K.Anantha Rao 6,70,55,658/- 6,86,24,760/- Visakhapatnam Excess the same was (Balance works approved by the Vice Rc.No.225 (D)/EE- Chairman VUDA on 10- V/VUDA 07-2013. Estimate Sl. Name of lowest Tendered Excess % Name of work Contract Remarks No. tenderer Amount (Rs.) Less% Value (Rs.) 14 Construction of MIG-II The lowest Tender of Block-1 70 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates and Madhurawada Phase-I, 2.34% accepted by COT and Visakhapatnam Sri K.Anantha Rao 5,64,09,839/- 5,77,29,829/- Excess the same was (Balance works approved by the Vice Rc.No.225(F)/EE- Chairman VUDA on 10- V/VUDA 07-2013 15 Construction of MIG-II The lowest Tender of Block-2 70 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates and Madhurawada Phase-I, 2.34% accepted by COT and Visakhapatnam Sri K.Anantha Rao 7,32,14,535/- 7,49,27,755/- Excess the same was (Balance works approved by the Vice Rc.No.225(G)/EE- Chairman VUDA on 10- V/VUDA 07-2013 16 Construction of MIG-II The lowest Tender of Block-3 70 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates and Madhurawada Phase-I, 2.34% accepted by COT and Sri K.Anantha Rao 5,85,12,945/- 5,98,82,148/- Visakhapatnam Excess the same was (Balance works approved by the Vice Rc.No.225(H)/EE- Chairman VUDA on 10- V/VUDA 07-2013. 17 Providing ornamental The lowest Tender of hand railing (Bamboo Sri K.Prasadu is design) at damaged accepted at 7.38% less than the Estimate places and painting Rates by the Vice along the beach road Sri K.Prasadu 1,39,500/- 1,29,204/- 7.38% Chairman, VUDA on from ropeway Jn. to Dt:12-07-2013 Jodugullapalem Rc.No.04/2013-14/EE-II/ VUDA 18 Providing ornamental The lowest Tender of hand railing (Bamboo Sri K.Prasadu is design) from accepted at 11.22% less than the Estimate Dolphinorium turning Rates by the Vice (Zoo Park turning)to 11.22% Sri K.Prasadu 7,76,924/- 6,89,753/- Chairman, VUDA on Visalakshinagar Jn. Less Dt:12-07-2013 along beach road. Rc.No.11/2013-14/EE-II/ VUDA 19 Providing internal The lowest Tender of electrification to the M/s. Bhargavi Power Children Arena at Links is accepted at 9.10% less than the Siripuram Jn., M/s. Bhargavi 39,59,536/- 35,99,218/- 9.10% Less Estimate Rates by the Visakhapatnam Power Links Vice Chairman, VUDA Rc.No.02/2013-14/EE- on IV/VUDA Dt:12-07-2013 20 Construction of Fire The lowest Tender of fighting sump with 1.00 M/s. Giri Santosh Lakh Ltrs. And water Engineering works is accepted at 5.40% less supply sump with 0.50 than the Estimate Lakh Ltrs. Capacity and Rates by the Vice providing water supply Chairman, VUDA on & sanitary M/s. Giri Santosh Dt:12-07-2013 26,97,771/- 25,52,091/- 5.40% Less arrangements to the Engineering works vUDA Children Arena at Siripuram Jn., Visakhapatnam. Rc.No.09/2013-14/EE- IV/VUDA 21 Providing Central Air The lowest Tender of Conditioning at M/s. Meralec Ananda Gajapathi Engineering Company M/s. Meralec is accepted at 16.00% Auditorium, 16.00% Engineering 29,09,450/- 24,43,938/- less than the Estimate Less Vizianagaram. Company Rates by the Vice Rc.No.03/2013-14/EE- Chairman, VUDA on III/VUDA Dt:22-07-2013. 22 Construction of MIG-IA The lowest Tender of Block-1 80 units in Harita Sri K.Anantha Rao @ Housing Project at 2.34% excess over the Estimate Rates by COT Madhurawada Phase-I, 2.34% Sri K.Anantha Rao 8,14,74,680/- 8,33,81,188/- and the same was Visakhapatnam Excess approved by the Vice (Balance works Chairman VUDA on 26- Rc.No.225(B)/EE- 07-2013.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us