47270-001: Initial Environmental Examination for Hardua To

Total Page:16

File Type:pdf, Size:1020Kb

47270-001: Initial Environmental Examination for Hardua To Initial Environmental Examination August 2014 IND: Madhya Pradesh District Connectivity Sector Project Hardua to Chakghat Road Prepared by Madhya Pradesh Road Development Corporation for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 24th August 2014) Currency unit = Indian rupee (INR) INR1.00 = $ 0.0164 $1.00 = INR 60.86 ABBREVIATIONS AAQ – ambient air quality AAQM – ambient air quality monitoring ADB – Asian Development Bank APHA – American Public Health Association BGL – below ground level BOD – biological oxygen demand BOQ – bill of quantity CO – carbon monoxide COD – chemical oxygen demand CPCB – Central Pollution Control Board CSC – construction supervision consultant MPRDC – Madhya Pradesh Road Development Corporation DG – diesel generating set DO – dissolved oxygen DPR – detailed project report E&S – environment and social EA – executing agency EAC – Expert Appraisal Committee EIA – environmental impact assessment EMP – environmental management plan EMOP – environmental monitoring plan GHG – greenhouse gas GIS – geographical information system GOM – Government of Madhya Pradesh GRC – grievance redress committee GRM – grievance redress mechanism HFL – highest flood level IEE – initial environmental examination IMD – Indian Meteorological Department IRC – Indian Road Congress LHS – left hand side LPG – liquefied petroleum gas Max – Maximum Min – Minimum MJB – major bridge MNB – minor bridge MORT&H – Ministry of Road Transport and Highways MOEF – Ministry of Environment and Forests MPRSD – Master Plan Road Sector Development Wind Directions ( North, South, East, West or N, S, E, W, – combination of two directions like South West, NE, SW, NW North West) HC Road – Hardua – Chakghat Road NGO – nongovernmental organization NH – National Highway NIC – National Information Centre NOC – No Objection Certificate NOx – oxides of nitrogen OBC – other backward classes PCC – Portland Cement Concrete PCU – Passenger Car Units PD – Project Director PFR – project feasibility report PIU – project implementation unit PPE – personal protective equipment PPT – parts per trillion PWD – Public Works Department RCC – reinforced cement concrete REA – rapid environmental assessment RHS – right hand side ROW – right of way RSPM – respiratory suspended particulate matter SH – state highway SOI – Survey of India SO2 – Sulphur Dioxide SPCB – State Pollution Control Board SPL – sound pressure level SPM – suspended particulate matter SPS – ADB Safeguard Policy Statement, 2009 TA – technical assistance UT – Union Territories WHC – Water holding capacity WEIGHTS AND MEASURES dB (A) A-weighted decibel– ha Hectare – km Kilometre – km2 square kilome– tre KWA kilowatt ampere– Leq equivalent continuous– noise level µg Microgram – m Meter – MW (megawatt) Megawatt – PM 2.5 or 10 Particulate Matter– of 2.5 micron or 10 micron Size NOTE In this report, "$" refers to US dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.. CONTENTS EXECUTIVE SUMMARY ............................................................................................................. i I. INTRODUCTION ................................................................................................................ 1 A. Project Background .................................................................................................. 1 B. Nature, Size and Location of the Project ................................................................... 2 C. Purpose and Scope of the Study .............................................................................. 2 D. Methodology ............................................................................................................. 3 E. Organizational Setting of Implementing Agency ........................................................ 5 II. POLICY AND LEGAL FRAMEWORK ................................................................................. 7 A. Country’s Legal Framework and Regulatory Requirements for the Project ............... 7 B. International Agreements .......................................................................................... 9 C. Asian Development Bank Safeguard Policies ..........................................................10 D. Category of the Project as per SPS .........................................................................10 III. PROJECT DESCRIPTION .................................................................................................11 A. Rational and Project Settings ...................................................................................11 B. Project Road Condition: ...........................................................................................12 C. Proposed Improvement ...........................................................................................14 IV. DESCRIPTION OF THE ENVIRONMENT .........................................................................20 A. Introduction ..............................................................................................................20 B. Physical Environment ..............................................................................................20 C. Madhya Pradesh Economy ......................................................................................50 V. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES ................57 A. Impact on Physical Environment Design Stage ........................................................57 B. Construction Stage ..................................................................................................58 C. Socio-Economic Impact ...........................................................................................65 VI. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE .......................................74 A. Methodology for Consultations ................................................................................74 B. Project Stakeholders ................................................................................................74 C. Results of Consultation with Local People ...............................................................77 D. Conclusion and Recommendation ...........................................................................77 VII. ENVIRONMENTAL MANAGEMENT PLAN AND GRIEVANCE REDRESS MECHANISM .79 A. Environmental Management Plan ............................................................................79 B. EMP Implementation Schedule ................................................................................79 C. Emergency Response Plan .....................................................................................79 D. Environmental Monitoring Plan (EMoP) ...................................................................79 E. Institutional Setting and Proposed Implementation Arrangement .............................81 F. Institutional Capacity Building ..................................................................................82 G. Grievance Redress Mechanism ...............................................................................82 H. Cost for Environmental Management Plan, Training and Environmental Monitoring 84 VIII. CONCLUSIONS AND RECOMMENDATIONS ..................................................................86 A. Environmental Gains Due to Proposed Work Justifying Implementation ..................86 B. Potential Impacts and Mitigation ..............................................................................86 C. Irreplaceable Resources ..........................................................................................86 D. Post IEE Surveillance and Monitoring ......................................................................87 E. Public Consultations ................................................................................................87 F. Recommendations ...................................................................................................87 APPENDIXES APPENDIX-1: RAPID ENVIRONMENTAL ASSESSMENT CHECKLIST ...................................88 APPENDIX-2: GUIDELINES FOR BORROW AREAS MANAGEMENT ....................................93 APPENDIX -3: ENVIRONMENTAL MANAGEMENT PLAN .......................................................96 APPENDIX 4: ENVIRONMENTAL MONITORING PROGRAMME .......................................... 126 APPENDIX-5: NATIONAL AMBIENT AIR QUALITY STANDARDS ......................................... 128 APPENDIX 6: INDIAN STANDARD DRINKING WATER SPECIFICATION-IS 10500:1991 .... 129 APPENDIX 7: AMBIENT AIR QUALITY STANDARDS IN RESPECT OF NOISE ................... 130 APPENDIX 8: MINUTES OF MEETING OF PUBLIC CONSULTATION AT HARDUA ........... 131 APPENDIX 9: GRM IN HINDI ................................................................................................. 151 i EXECUTIVE SUMMARY A. Introduction 1. The Madhya Pradesh District Connectivity Sector Project will improve transport connectivity in the state by rehabilitating and upgrading
Recommended publications
  • 1- M.P. State Legal Services Authority Jabalpur
    Annex-A 1- M.P. State Legal Services Authority Jabalpur S.No Nodal Officer Post Email ID Contact No. Legal Aid Officer, 1 Ms. Poonam Tiwari M.P. State Legal Services Authority [email protected] 9425898051 Jabalpur Annex-B 2- District Legal Services Authority, All- M.P. Nodal Officer Resource Persons Name of the S.No. Telephone Telephone DLSA Name E-mail ID S.No. Name E-mail ID No. No. Shri Shrikant 1 9893522897 - Baheti (Advocate) Shri Rajesh 2 Rathore 9685910184 - (Advocate) Shri Mukesh 1 Alirajpur 9425414088 Shri Ramansingh Kaushal, DLAO 3 9981793042 - Solanki (Advocate) Shri M.S. Vasunia 4 7587603117 - (ADPO) Shri Keshrimal 5 7587603114 - Kanash (ADPO) Hanuman Sharan 1 8719909831 - Tiwari Shri Rakesh Singh 2 8966068838 [email protected] Mr. Jeetendra Gond 2 Anuppur Mohan Dhurve, 9424681888 Shri Mahesh 3 9893092175 [email protected] DLAO Prashad Napit Shri Vidyanand 4 9926450523 [email protected] Shukla 5 Ms. Gayatri Napit 7049601208 - Shri Rajendra 1 9425039066 [email protected] Singh Thakur 2 Shri A.N. Mishra 9009024009 [email protected] Shri Virendra Shri Manendra 3 Ashok Nagar Kumar Chadar, 9425091587 [email protected] 3 9752591916 [email protected] Singh Yadav DLAO, Shri Manish 4 8827852200 [email protected] Raghuwanshi 5 Shri Raju Pardi 9893337823 [email protected] Shri Sachin Shri Vijay kumar 1 9407052265 Mesharam 4 Balaghat khobra gade 9424937480 - Shri Devendra DLAO 2 9424613832 Ramteke Shri Bharat 3 9752882431 Meshram Shri Jay prakash 4 8393858527 Ganveer 5 Shri
    [Show full text]
  • Alka Singh A.P.Singh ABSTRACT KEYWORDS INTERNATIONAL JOURNAL of SCIENTIFIC RESEARCH
    ORIGINAL RESEARCH PAPER Volume-7 | Issue-7 | July-2018 | PRINT ISSN No 2277 - 8179 INTERNATIONAL JOURNAL OF SCIENTIFIC RESEARCH MEDICINAL PLANTS IN MUKUNDPUR FOREST OF SATNA DIVISION MADHYA PRADESH Botany Alka singh Department of Botany, Govt. Model Science College Rewa M.P. A.P.singh Department of Botany, Govt. Model Science College Rewa M.P. ABSTRACT This paper deals with ethno medicinal plants documentation and information which are used by the tribals of Amrpatan tehsil of Satna district on M.P. India. The present study focused to assess the medicinal plant diversity of Mukundpur forest. The plant diversity of this area is quit rich. These plant species are enumerated alphabetically with their botanical name, vernacular name, family, plant parts, used and the way of using them medicinally. A total of medicinal plant 34 species belonging to 28 families are recorded. These tribal people still depend on the medicinal plants were mostly used to cure their diseases and disorders in Amarpatan forest region. The documented ethno medicinal plants were mostly used to cure wound infections, skin infections, stomachache, fever, cough, diabetes diuretics, diarrhea, eye infections and general weakness. KEYWORDS Ethno medicine , medicinal plant, Satna, Mukundpur forest Introduction rich diversity in the tribal communities which may be seen in the Medicinal plants play an important role in human life to face diseases lifestyle and cultural traditions, social and economic structure, since time immemorial. religious beliefs, language and speech, customs etc. Total tribal population of Satna District of the state is above 2.68 lakh as per 2001 Traditional medicine widely used the home of tribals and forest census data.
    [Show full text]
  • No. 18 of 2020 (Compliance Audit Observations)
    Report of the Comptroller and Auditor General of India for the year ended 31 March 2019 Union Government (Commercial) No. 18 of 2020 (Compliance Audit Observations) CONTENTS CHAPTER/ SUBJECT CPSE PAGE PARAGRAPH NO. PREFACE v EXECUTIVE SUMMARY vii Chapter I MINISTRY OF CHEMICALS AND FERTILIZERS 1.1 Non-Compliance of DPE Rashtriya Chemicals 1 Guidelines on payment of and Fertilizers Limited Performance Related Pay Chapter II MINISTRY OF CIVIL AVIATION 2.1 Payment of Performance Airports Authority of 3 Related Pay due to non- India adherence of conditions of ‘Bell Curve Approach’ 2.2 Short recovery of liquidated Airports Authority of 4 damages from a contractor India 2.3 Irregular absorption by Air Air India Limited 6 India Limited towards ground handling services charged by Air India SATS Airport Services Private Limited 2.4 Undue favour to M/s Ballarpur Air India Limited 8 Industries Limited by withdrawal of recovery proceedings pending final payment of dues Chapter III MINISTRY OF COAL 3.1 Excess payment to the Mahanadi Coalfields 10 contractor under mining Limited contract 3.2 Avoidable expenditure on NLC India Limited 11 excavation outsourcing in South West Area of Mine II 3.3 Avoidable payment of NLC Tamilnadu Power 13 demurrage charges Limited Chapter IV MINISTRY OF COMMERCE AND INDUSTRY 4.1 Information Systems Audit of Government 15 Government E-Marketplace E-Marketplace i Chapter V MINISTRY OF FINANCE (DEPARTMENT OF FINANCIAL SERVICES) 5.1 Review of Loans to Road India Infrastructure 49 Projects Finance Company Limited 5.2 Avoidable
    [Show full text]
  • Social Safeguards Due Diligence Report IND: Madhya Pradesh
    Social Safeguards Due Diligence Report November 2017 IND: Madhya Pradesh District Roads II Sector Project Prepared by Madhya Pradesh Roads Development Corporation, Government of India for the Asian Development Bank. CURRENCY EQUIVALENTS (As of 17 October 2017) Currency unit – Indian Rupee (Rs) INR 1.00 = $ 0.01545 $ 1.00 = 64.71 ABBREVIATION ADB Asian Development Bank AP Project Affected Persons CSC Construction Supervision Consultant DPR Detailed project report EA Executing agency FGD Focus Group Discussion GOI Government of India GoMP Government of Madhya Pradesh GRC Grievance redress committee GRM Grievance redress mechanism IA Implementing Agency IP Indigenous People IPPF Indigenous People’s Planning Framework IR Involuntary Resettlement MDR Major District Road MPRDC Madhya Pradesh Roads Development Corporation PIU Project Implementation Unit PWD Public Works Departments R&R Resettlement and Rehabilitation RF Resettlement Framework RoW Right of Way SDDR Social Safeguard Due Diligence Report SPS Safeguard Policy Statement 2009 TCS Typical Cross Section This social safeguards due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. TABLE OF CONTENTS A. PROJECT BACKGROUND ................................................................................................. 1 B.
    [Show full text]
  • Of Madhya Pradesh on "Operate and Maintain Basis"
    Request for Proposal (RFP) RFP No: UAD/Transport/2017/11742 Selection of Bus Operators for Bus Transport System in 20 Cities (on cluster basis) of Madhya Pradesh on "Operate and Maintain Basis" Directorate Urban Administration and Development, Bhopal 6 No. Bus Stop, Shivaji Nagar, Bhopal 0755-2558282 “Selection of Bus Operators on Operate and Maintain Basis” Notice Inviting Tender (NIT) DIRECTORATE, URBAN ADMINISTRATION AND DEVELOPMENT (PALIKA BHAWAN, SHIVAJI NAGAR, BHOPAL, MADHYA PRADESH) Email – [email protected] Website- www.mpurban.gov.in, Tel No. – 0755-2558282 Notice Inviting Tender (NIT) Invitation for Services of Bus Operator “Selection of Bus Operators for Bus Transport System in 20 Cities (on cluster basis) of Madhya Pradesh on Operate and Maintain Basis” Urban Development and Housing Department has envisaged to improve and facelift the scenario of Intra and Inter City Public Transport in the state of Madhya Pradesh. The Recipient hereby invites proposals from reputed and eligible firms through the Request for Proposal (RFP) issued by the Commissioner, Urban Administration and Development titled “Selection of Bus Operator for Bus Transport System in 20 Cities (on cluster basis) of Madhya Pradesh namely Bhopal, Indore, Jabalpur, Gwalior, Ujjain, Sagar, Dewas, Katni, Rewa, Satna, Burhanpur, Khandwa, Chhindwara, Guna, Shivpuri, Bhind, Morena, Vidisha, Ratlam and Singrauli, on Operate and Maintain Basis”. Interested bidders may submit their duly filled proposals in the prescribed format available on e- procurement website no later than 12.07.2017 16:00 Hrs. Further details of the services can be referred from the RFP/Terms of Reference which can be downloaded from e-procurement website: www.mpeproc.gov.in of Government of Madhya Pradesh Amendments to NIT/RFP, if any, would be published on e-procurement website only, and not in newspaper.
    [Show full text]
  • NAME DESIGNATION DEPARTMENT EMAIL ADDRESS Mdez Jbp
    NAME DESIGNATION DEPARTMENT EMAIL ADDRESS mdez jbp Managing Director MD EZ Office [email protected] CHIEF GENERAL MANAGER ADB- Shiv Yadav DIRECTORTECHNICAL RGGVY [email protected] Prakash Kawade C.E. C.E. SAGAR REGION [email protected] Praveen Sinha C.E. C.E. JABALPUR REGION [email protected] Santosh Tandan C.E. C.E. REWA REGION [email protected] CHIEF GENERAL MANAGER FEEDER Abhay Bishnoi C.G.M SEPARATION [email protected] CHIEF GENERAL MANAGER ADB- Ashok Dhurway C.G.M RGGVY [email protected] Amar Bahadur Singh C.G.M. HR&A CHIEF GENERAL MANAGER HR&A [email protected] CEJR jabalpur CE mpez [email protected] CErr Rewa CE mpez [email protected] CEsr Sagar CE mpez [email protected] cfo mpez cfo mpez [email protected] cgm ddugjy CGM mpez [email protected] CHIEF GENERAL MANAGER Ajay Sharma CGM RAPDRP [email protected] cgm adb cgmADB mpez [email protected] ed comm cgmcomm mpez [email protected] cgm fs cgmfs mpez [email protected] cgm hr cgmhr mpez [email protected] ed purchase Cgmpurchase mpez [email protected] cgm rapdrp cgmrapdrp mpez [email protected] Vivek Chandra G.M.& Head-IT G.M Head IT [email protected] cgmenfo ENFORCEMENT edenfo mpez [email protected] gm works EDWORKS mpez [email protected] Vipin Dhagat Chief CS&A CHIEF C.S.&A.
    [Show full text]
  • Tehsil Wise Population of the District (As Per Census 2001)
    Tehsil Wise Population of the District (As per Census 2001):- Tehsil Name Total SC ST Gen Rural Urban RaghurajNagar 660665 114400 72361 473904 380123 280542 Rampur Baghelan 233232 34665 30639 167928 215059 18173 Nagod 200254 44228 16253 139773 180793 19461 Unchehra 160016 25244 31324 103448 143352 16664 Amarpatan 188005 25989 25312 136704 171634 16371 RamNagar 133393 16593 33900 82900 133393 0 Maihar 294539 43098 58615 193126 260197 34342 Total of The District 1870104 304217 268104 1297783 1484551 385553 (Source - District Statistical Book 2008-2009, Satna) Subdivisions/Tehsils/RI Circles/Patwari Circles:- No. of RI Name of SubDivision Name of Tehsils No. of Patwari Circles Circles Raghuraj Nagar RaghurajNagar 8 111 Rampur Baghelan Rampur Baghelan 4 68 Nagod 3 57 Nagod Unchehra 3 40 AmarPatan 3 50 AmarPatan RamNagar 3 47 Maihar Maihar 4 65 Total 28 438 (Source - District Statistical Book 2008-2009, Satna) Demography (Census 2001):- S.No. Particulars Unit India M.P. Satna 1 Population Density Per Sq.Km. 324 196 249 2 Decade Growth rate % 21.34 24.34 27.52 3 Sex Ratio Per 1000 Male 933 920 926 4 SC to total population % 16.48 14.54 16.26 5 ST to total population % 8.08 23.27 14.23 6 Rural population % 73 74.7 79.28 (Source - District Statistical Book 2002-2003, Satna) Literacy 2001:- S.No. Particulars Unit India M.P. Satna 1 Total % 65.38 64.11 65.12 2 Male % 75.85 76.8 77.82 3 Female % 54.16 50.28 49.1 4 Rural % 59.4 58.1 61.66 5 Urban % 80.3 79.67 78.30 (Source - District Statistical Book 2002-2003, Satna) Block wise details of the District:- Weekly Name of the Area in Inhabited Village Nagar Nagar Nagar S.No.
    [Show full text]
  • Service Electors Voter List
    FINAL ELECTORAL ROLL - 2021 STATE - (S12) MADHYA PRADESH No., Name and Reservation Status of Assembly Constituency: 78-SIHAWAL(GEN) Last Part No., Name and Reservation Status of Parliamentary Service Constituency in which the Assembly Constituency is located: 11-SIDHI(GEN) Electors 1. DETAILS OF REVISION Year of Revision : 2021 Type of Revision : Special Summary Revision Qualifying Date :01/01/2021 Date of Final Publication: 15/01/2021 2. SUMMARY OF SERVICE ELECTORS A) NUMBER OF ELECTORS 1. Classified by Type of Service Name of Service No. of Electors Members Wives Total A) Defence Services 319 10 329 B) Armed Police Force 0 0 0 C) Foreign Service 0 0 0 Total in Part (A+B+C) 319 10 329 2. Classified by Type of Roll Roll Type Roll Identification No. of Electors Members Wives Total I Original Mother roll Integrated Basic roll of revision 319 10 329 2021 II Additions Supplement 1 After Draft publication, 2021 0 0 0 List Sub Total: 0 0 0 III Deletions Supplement 1 After Draft publication, 2021 0 0 0 List Sub Total: 0 0 0 Net Electors in the Roll after (I + II - III) 319 10 329 B) NUMBER OF CORRECTIONS/MODIFICATION Roll Type Roll Identification No. of Electors Supplement 1 After Draft publication, 2021 0 Total: 0 Elector Type: M = Member, W = Wife Page 1 Final Electoral Roll, 2021 of Assembly Constituency 78-SIHAWAL (GEN), (S12) MADHYA PRADESH A . Defence Services Sl.No Name of Elector Elector Rank Husband's Address of Record House Address Type Sl.No. Officer/Commanding Officer for despatch of Ballot Paper (1) (2) (3) (4) (5) (6) (7) Assam
    [Show full text]
  • IEE: India: SH-45: Mihona-Lahar-Daboh-Bhander-Chirgaon Project Road, Madhya Pradesh State Roads Project
    Environmental Assessment Report Initial Environmental Examination for SH-45: Mihona–Lahar–Daboh–Bhander–Chirgaon Project Road Project Number: 43063 November 2010 IND: Madhya Pradesh State Roads Project III Prepared by Government of Madhya Pradesh for the Asian Development Bank (ADB). The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Table of Contents Executive Summary …………………………………………………………………………vii 1. INTRODUCTION 1 1.1. Project Background/Rationale .......................................................................... 1 1.2. Project Preparatory Technical Assistance (PPTA) and Environmental Assessment ................................................................................................................. 2 1.3. Purpose of the Study ....................................................................................... 2 1.4. Extent of IEE .................................................................................................... 3 1.5. IEE Content ..................................................................................................... 3 1.6. Team Composition and Acknowledgements .................................................... 3 1.7. Methodology .................................................................................................... 3 1.7.1. Information/ data Sources ...........................................................................
    [Show full text]
  • Feasibility Report Month: Oct 2018
    Project : Four laning of Kothi-Satna- Maihar Section of NH 135BG from km 55.000 to km 76.960 (Package-II) and km 80.800 to km 119.535 (Package-III) under Bharatmala Pariyojana in the State of Madhya Pradesh Document : Feasibility Report Month: Oct 2018 FEASIBILITY REPORT Four laning of Kothi-Satna- Maihar Section of NH 135BG from km 55.000 to km 76.960 (Package-II) and km 80.800 to km 119.535 (Package-III) under Bharatmala Pariyojana in the State of Madhya Pradesh 1.0 INTRODUCTION The National Highway Authority of India (NHAI) under the Ministry of Road Transport & Highways (MoRT&H), Government of India has been entrusted with the assignment of Development of Economic Corridors, Inter-Corridors, Feeder Routes and Coastal Roads under Bharatmala Pariyojana primarily to improve freight movement in Country. With a view to this, it has been proposed to conduct a “Consultancy Services for Preparation of Detailed Project Report for up-gradation of selected stretches as Feeder road comprising of SH-9, SH-10 and SH-11 of Madhya Pradesh and SH-275 of Maharashtra through BOT / Hybrid Annuity / EPC mode (Lot-I/Madhya Pradesh/ Package-6)”. MoRTH, Government of India has declared new National Highway (NH-135BG) vide Gazette Notification dated 5th December 2017. NH-135BG starts from its junction with NH-35 (old NH-76) near Chitrakoot in the State of Uttar Pradesh connecting Majhgawa, Satna and terminating at its junction with NH-30 (old NH-7) near Maihar in the State of Madhya Pradesh. Total length of the existing road is 121.350 km.
    [Show full text]
  • Final Population Totals, Series-24
    Census of India 2001 Series 24 : Madhya Pradesh FINAL POPULATION TOTALS (State, District, Tehsil and Town) Prabhal(ar Bansod Of the Indian Administrative Service Director of Census Operations, Madhya Pradesh Bhopal Websltl:: http://www.censlJsmdia.net/ © All rights reserved wIth Government of India Data Product Number 23-006-Cen-Book Preface The final population data presented in this publication IS based on the processing and tabulation of actual data captured from each and every 202 million household schedules. In the past censuses the final population totals and their basIc characteristics at the lowest geographical levels popularly known as the Village/town Primary Census Abstract was compiled manually. The generation of Primary Census Abstract for the Census 2001 is a fully computerized exercise starting from the automatic capture of data from the Household Schedule through scanning to the compilation of Primary Census Abstract. ThiS publication titled "Final Population Totals" is only a prelude to the Primary Census Abstract. The publication, which has only one table, presents data on the total population, the Scheduled Castes population and the Scheduled Tribes population by sex at the state, district, tehsll and town levels. The vitlage-wise data IS being made available In electronic format It is expected to be a useful ready reference document for data users who are only Interested to know the basic population totals. ThiS publrcatlon IS brought out by Office of the Registrar General, India (ORGI) centrally, I am happy to acknowledge the dedicated efforts of Mr Prabhakar Bansod, Director of Census Operations, Madhya Pradesh and his team and my colleagues in the ORG! in bringing out thiS publication.
    [Show full text]
  • District Disaster Management Plan Sidhi
    District Disaster Management Plan Sidhi By Nishant Maheshwari (MBA-IIT Kanpur) MP School of Good Governance & Policy analysis In Consultation with School of Good Governance & Policy Analysis, Bhopal Seeds Technical Services Government of Madhya Pradesh District Administration, Sidhi District Disaster Management Plan [DDMP] Template Preface Sidhi Disaster Management Plan is a part of multi-level planning advocated by the Madhya Pradesh State Disaster Management Authority (MPSDMA) under DM Act of 2005 to help the District administration for effective response during the disaster. Sidhi is prone to natural as well as man- made disasters. Earthquake, Drought, Epidemic (Malaria) are the major Natural Hazards and forest fire, rail/ road accidents etc. are the main man-made disaster of the district. The Disaster Management plan includes facts and figures those have been collected from various departments. This plan is first attempt of the district administration and is a comprehensive document which contains various chapters and each chapter has its own importance. The plan consist Hazard & Risk Assessment, Institutional Mechanism, Response Mechanism, Standard Operating Procedure, inventory of Resources etc. Hazard & Risk Assessment is done on the basis of past thirty year disaster data & is collected from all departments. It is suggested that the District level officials of different department will carefully go through the plan and if have any suggestions & comments be free to convey the same so that same can be included in the next edition. It is hoped that the plan would provide concrete guidelines towards preparedness and quick response in case of an emergency and help in realizing sustainable Disaster Risk Reduction & mitigate/minimizes the losses in the district in the long run.
    [Show full text]