Changes between the Draft and Final 2006-2008 STIP 1

Change Summary Between the Draft and Final 2006-2008 STIP

Need ID Program Place Highway Project Description Change Borough/Census District

Aleutians East Borough 2179 CTP AKUTAN Akutan Access Road Project funding deferred due to project development delay. 19265 CTP AKUTAN Akutan Access SAFETEA-LU earmark project added.

18344 CTP FALSE PASS False Pass Landfill Access Road Project funding deferred due to project development delay. 11700 CTP KING COVE Community Road Rehabilitation and Paving SAFETEA-LU earmark project added.

Aleutians West 16723 CTP ST. PAUL Landfill Access Road Improvements and Project accelerated or program increase Extension because of bridge earmark revision.

2685 CTP UNALASKA Unalaska: East Point/Ballyhoo Road Project accelerated or program increase Rehabilitation Phase I because of bridge earmark revision.

6398 CTP UNALASKA Unalaska South Channel Bridge #1386 Project funding increased due to increased estimate. 6701 CTP UNALASKA/ Captains Bay Road Rehabilitation Project accelerated or program increase DUTCH because of bridge earmark revision. HARBOR

Municipality of Anchorage 2189 NHS AMATS Glenn Highway Gambell Street to McCarrey Street Project accelerated. Reconstruction 14079 NHS AMATS Seward Highway New Seward Highway: Potter to Rabbit Creek Project funding deferred due to project development delay.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 2

Need ID Program Place Highway Project Description Change Borough/Census District

2202 NHS AMATS Seward Highway New Seward Highway: Rabbit Creek to 36th Project accelerated. Avenue 9299 CTP AMATS AMATS CMAQ Allocation Program extended because EPA uncertainty about Air Quality Non- Attainment Declaration in rural areas.

6460 CTP AMATS AMATS Program Allocation Project accelerated or program increase because of bridge earmark revision.

6461 TRAAK AMATS AMATS Program Allocation Project accelerated or program increase because of bridge earmark revision.

7373 NHS AMATS International Airport Road at New Seward Hwy Project deleted because funds were Grade Separation reassigned to 2202 Seward Hwy: Rabbit Creek to 36th Reconstruction

16543 NHS ANCHORAGE Knik Arm Crossing Project funding amended to reflect bridge earmark revision. 19261 CTP GIRDWOOD Olympic Circle Road paving SAFETEA-LU earmark project added.

19202 NHS Seward Highway Anchorage to Girdwood ITS Project Project added because of recent traffic accidents. 19266 CTP Anchorage Glacier/ Winner Creek SAFETEA-LU earmark project added. Development 2693 TRAAK US Forest Service Portage Valley Blue Ice Project accelerated to satisfy mitigation Trail System Construction required for Whittier Access project.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 3

Need ID Program Place Highway Project Description Change Borough/Census District

Bethel 6475 AHS BETHEL Chief Eddie Hoffman Hwy Rehabilitation Project advanced due to public comment and score. 19267 CTP BETHEL Dust Control Mitigation for Rural Roads SAFETEA-LU earmark project added.

2227 CTP BETHEL Ptarmigan Street Improvements Second phase of project added because of program increase. 2417 CTP KIPNUK Community Boardwalks Rehab & Water Construction scope of work added due Treatment Plant Boardwalk Construction to bridge height requirement. 15979 CTP KIPNUK Phase 2 Piped Transportation Improvements Project accelerated or program increase because of bridge earmark revision.

2518 CTP NAPAKIAK Sanitation Road Project accelerated or program increase because of bridge earmark revision.

15984 CTP NAPASKIAK Sanitation Boardwalk Improvements Project accelerated or program increase because of bridge earmark revision.

Bristol Bay Borough 6239 AHS NAKNEK Naknek River Bridge Project funding deferred due to project development delay.

Dillingham 18326 CTP ALEKNAGIK Float Plane Road SAFETEA-LU earmark project added.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 4

Need ID Program Place Highway Project Description Change Borough/Census District

2186 AHS ALEKNAGIK Wood River Bridge 14,000.0 will be needed to complete this project in the years beyond FFY 08. Funds will be shown in future amendments. 16030 CTP DILLINGHAM Downtown Streets Reconstruction & Rehab Project accelerated or program increase because of bridge earmark revision.

9548 CTP DILLINGHAM Wood River Road Reconstruction Project accelerated or program increase because of bridge earmark revision.

Fairbanks North Star Borough 2107 NHS FAIRBANKS Steese Highway Steese Highway/3rd Street Intersection Project schedule updated and funding amounts corrected 17662 CTP FMATS FMATS Allocation Project accelerated or program increase because of bridge earmark revision.

17681 TRAAK FMATS FMATS TRAAK Allocation Project accelerated or program increase because of bridge earmark revision.

17663 CTP FMATS FMATS: CMAQ Allocation Program extended because EPA uncertainty about Air Quality Non- Attainment Declaration in rural areas.

15685 NHS FNSB Airport Way Intersection Improvements Project amended with minor phase increase. 4007 AHS FNSB Chena Hot Springs Road: MP 22 to 54 Project accelerated or program increase Rehabilitation because of bridge earmark revision.

16117 NHS NORTH POLE Richardson Highway MP 348 North Pole Interchange Funding adjusted to utilize remaining GARVEE bonds. 18376 NHS Elliott Highway Washington Creek Bridge Replacement State funded projects were removed from the STIP.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 5

Need ID Program Place Highway Project Description Change Borough/Census District

6098 NHS Parks Highway MP 351 to 356 Rehabilitation Project amended with minor phase increase. 18788 NHS Richardson Highway MP 287 Shaw Creek Bridge Replacement State funded projects were removed (#0525) from the STIP. 7371 NHS Richardson Highway MP 357 - Weigh Station Scales Right of way phase added to continue project development.

Haines Borough 13879 FERR HAINES MARINE HIGHWAY Terminal: Haines Modifications Federal agency funding source changed.

City and Borough of Juneau 18609 CTP JUNEAU Bridge Repair and Upgrade Project funding changed to reflect scheduled earmark funding. 16147 CTP JUNEAU Capital Transit Bus Replacement Project accelerated or program increase because of bridge earmark revision.

16146 CTP JUNEAU Capital Transit Paratransit Vans Project accelerated or program increase because of bridge earmark revision.

6028 NHS JUNEAU Egan: Sunny Point Intersection Improvements Project accelerated.

19074 CTP JUNEAU Juneau, - transit bus acquisition and Transit-funded projects were updated transit center and added to the STIP data base.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 6

Need ID Program Place Highway Project Description Change Borough/Census District

Kenai Peninsula Borough 2344 CTP HOMER Homer: East End Road MP 3.75 to 12.2 - Project accelerated or program increase Rehabilitation because of bridge earmark revision.

19230 CTP KENAI Arctic Winter Games Buses & Bus Facilities Transit-funded projects were updated and added to the STIP data base.

19226 CTP KENAI Central Kenai Peninsula Transportation Transit-funded projects were updated (CARTS) and added to the STIP data base.

2337 CTP NINILCHIK Sterling Highway Ninilchik: Ninilchik Village Bridge #427 Project accelerated or program increase Replacement because of bridge earmark revision.

18240 CTP SEWARD Seward Road Improvements Project added due to Section 115 earmark. 12520 CTP SOLDOTNA Keystone Road Reconstruction Project funding deferred to reflect scheduled earmark funding. 18903 TRAAK Seward Highway Seward Highway Recreational Improvements Project reflects changed earmark funding schedule. 2618 NHS Seward Highway Seward Highway: MP 25.5 to 36 Additional design funds to continue Reconstruction - Trail River to Sterling Wye project development

2673 NHS Sterling Highway Sterling Highway: MP 45 to 60 - Sunrise to Additional design funds to continue Skilak Lake Road Construction project development

11921 NHS Sterling Highway Sterling Highway: MP 60 to 79 - Skilak Lake Additional design funds to continue Road to Sterling Rehabilitation and Passing project development Lanes 18210 CTP Funny River Bridge Crossing Project withdrawn due to local referendum vote 13579 CTP KPB: Kalifornski Beach Road MP 0.0-16.4 State-funded projects were removed Rehabilitation from the STIP.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 7

Need ID Program Place Highway Project Description Change Borough/Census District

Ketchikan Gateway Borough 18776 FERR KETCHIKAN Marine Highway Terminal: AMHS Headquarters Building & Project schedule updated. Grounds 9844 FERR KETCHIKAN Marine Highway Terminal: Ketchikan Lay-up Facility Federal agency funding source changed. 16150 CTP KETCHIKAN Buses and Bus Refurbishments Project accelerated or program increase because of bridge earmark revision.

8462 NHS KETCHIKAN Gravina Access Bridge Construction Project funding amended to reflect bridge earmark revision. 19095 CTP KETCHIKAN Ketchikan AK - Transit Needs SAFETEA-LU earmark project added.

6383 CTP KETCHIKAN Ketchikan Shipyard Marine Dry-Dock and Project schedule adjusted. Intermodal Facilities Improvements 18214 TRAAK KETCHIKAN Port of Ketchikan Facility Project added due to Section 115 earmark. 3055 AHS KETCHIKAN South Tongass Highway Widening Phase sequencing corrected. 9187 FERR SAXMAN Marine Highway Terminal: Saxman Construct New Terminal Federal agency funding source changed.

Kodiak Island Borough 2440 CTP KODIAK Rezanof 'Y' Intersection Project accelerated or program increase because of bridge earmark revision.

2427 AHS Chiniak Road Rehabilitation Project delayed to balance the program. 18783 CTP Kodiak Island Roads SAFETEA-LU earmark project added.

2436 CTP Kodiak: Otmeloi Way Rehabilitation State-funded projects were removed from the STIP. 13521 AHS Pasagshak Road Realignment/Upgrade Project accelerated.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 8

Need ID Program Place Highway Project Description Change Borough/Census District

Lake and Peninsula Borough 2262 CTP Access Road Rehabilitation Project accelerated or program increase because of bridge earmark revision.

2261 AHS CHIGNIK Chignik Area Inter-Village Road System Funding delayed due to project delivery Construction schedule. 2386 AHS ILIAMNA Iliamna to Nondalton Road Completion Project delayed pending reevaluation of environmental document.

16032 CTP PEDRO BAY Rushing Creek Bridge Replacement Project accelerated or program increase because of bridge earmark revision.

18346 CTP PORT HEIDEN Port Heiden Airport Road Upgrade Project accelerated or program increase because of bridge earmark revision.

16741 AHS Williamsport/Pile Bay Road Project funding adjusted to reflect expected project schedule.

Matanuska-Susitna Borough 6483 AHS BIG LAKE Big Lake Road/Burma Road Upgrade State-funded projects were removed from the STIP. 18749 CTP HATCHER PASS Hatcher Pass Nordic Ski Trail System SAFETEA-LU earmark funding scheduled as authorized. 9622 CTP PALMER Chugach Street Rehabilitation Project removed because FFY 2009 funding is no longer displayed.

11720 CTP WASILLA Parks Highway Crusey Street Improvements Project accelerated or program increase because of bridge earmark revision.

2481 CTP WASILLA Mat-Su: Seward Meridian Rd. Improvements Project schedule updated with GARVEE bonds.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 9

Need ID Program Place Highway Project Description Change Borough/Census District

2503 CTP WASILLA Mat-Su: Wasilla Fishhook Road / Main Street Funding delayed due to project development delay. 19114 CTP WASILLA Matsu-Alaska - Transit Needs Transit-funded projects were updated and added to the STIP data base.

2325 NHS Glenn Highway Glenn Highway: MP 80 to 92 Reconstruction - Additional design funds added to Long Lake to Cascade continue project development. 11959 NHS Glenn Highway Glenn Highway: MP 34 to 50 Reconstruction - Additional design funds added to Parks to Palmer Fishhook continue project development.

2320 NHS Glenn Highway MP 53 to 56 Reconstruction - Moose Creek Right of Way delayed to balance Canyon program. 2326 NHS Glenn Highway MP 92 to 97 Reconstruction - Cascade to Project accelerated. Hicks Creek 2556 NHS Parks Highway MP 42.1 to 44 Rehabilitation - Crusey Street Project cost estimate updated. to Lucus Road 7000 NHS Parks Highway MP 194 - Broad Pass RR Overcrossing Right of way & utilities phases added to continue project development

11961 NHS Parks Highway MP 44 to 52.3 Reconstruction - Lucus Road to Big Lake Cutoff Project delayed to balance program. 2563 NHS Parks Highway Parks Highway: MP 72 to 83 Rehabilitation - Additional design funds added to Willow Creek to Kashwitna River continue project development.

18954 CTP Bogard/Seldon Extension (West) SAFETEA-LU earmark project added.

9732 AHS Hatcher Pass Road MP 18 - 25 Recondition Project accelerated or program increase and Paving because of bridge earmark revision.

6206 CTP Mat-Su: Bogard Road Extension East State-funded projects were removed from the STIP.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 10

Need ID Program Place Highway Project Description Change Borough/Census District

2500 CTP Mat-Su: Trunk Road Reconstruction Project accelerated or program increase because of bridge earmark revision.

6203 AHS Old Glenn Highway Rehabilitation State-funded projects were removed from the STIP. 19262 CTP Point MacKenzie Road Design SAFETEA-LU earmark project restructured from ID2479 2479 AHS Point Mackenzie Road Upgrade and Paving: Project restructured as ID 19262 MP 7-19 18745 CTP West Mat-Su Access Project-Little Su Project added. Crossing

Nome 15439 CTP GAMBELL Gambell: Evacuation Road Repairs and Change reflects an increase in the Extension construction cost estimate. 18195 CTP NOME Nome Bypass Road Improvements Project accelerated or program increase because of bridge earmark revision.

19161 AHS NOME Nome-Teller Highway Permanent Repairs Project to conduct emergency repairs.

18638 CTP NOME Road Improvements Scheduled funding adjusted to reflect allocation of earmarks. 19176 CTP SHISHMAREF Relocation Road Project to conduct emergency repairs.

19160 CTP UNALAKLEET Beach Road Permanent Repairs Project to conduct emergency repairs.

9911 CTP UNALAKLEET Unalakleet: Landfill Access Road Project accelerated or program increase because of bridge earmark revision.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 11

Need ID Program Place Highway Project Description Change Borough/Census District

North Slope Borough 18902 CTP BARROW Access Road for the Barrow Arctic Research SAFETEA-LU earmark project added. Center 19115 CTP BARROW North Slope Borough, AK - Transit Purposes Transit-funded projects were updated and added to the STIP data base.

18637 CTP POINT HOPE Evacuation Road Schedule adjusted to reflect earmark distribution. 17128 NHS Dalton Highway Dalton Highway Culverts MP 260 to 321 Project accelerated.

Northwest Arctic Borough 18634 CTP KOTZEBUE Cape Blossom Road Project adjusted to reflect earmark funding allocation. 18901 CTP KOTZEBUE Municipal Road Paving SAFETEA-LU earmark project added.

Prince of Wales – Outer Ketchikan 17101 CTP COFFMAN Coffman Cove Road Paving SAFETEA-LU earmark project added. COVE 13681 CTP CRAIG Port Saint Nicholas Road Upgrade Due to public comment, project accelerated through use of advance construction funds. 17341 CTP HYDER Causeway Reconstruction and Trestle Due to public comment, project Replacement accelerated with funds from bridge earmark revision. 12560 CTP HYDER Salmon River Road Rehabilitation Project accelerated or program increase because of bridge earmark revision.

16961 FERR METLAKATLA Marine Highway Terminal: Metlakatla, Annette Bay Construct New Terminal Project delayed to balance the program.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 12

Need ID Program Place Highway Project Description Change Borough/Census District

City and Borough of Sitka 10064 CTP SITKA Sawmill Creek Road Upgrade Project funding changed to reflect updated project schedule. 10999 NHS SITKA Rocky Gutierrez Airport Access Improvements State funded projects were removed from the STIP. 11085 CTP SITKA Indian River Road Improvements SAFETEA-LU earmark project added.

19116 CTP Sitka, Alaska - Transit Needs Transit-funded projects were updated and added to the STIP data base.

19229 CTP Sitka Sawmill Creek Intermodal Facility Transit-funded projects were updated and added to the STIP data base.

Skagway – Hoonah – Angoon 13883 FERR SKAGWAY Marine Highway Terminal: Skagway Modifications Project cost estimate updated. 16421 FERR ANGOON Marine Highway Terminal: Angoon Improvements Project removed because FFY 2009 funding is no longer displayed.

16416 AHS GUSTAVUS Gustavus Dock Replacement SAFETEA-LU earmark project added.

19094 CTP HOONAH Hoonah, AK-Intermodal Ferry Dock SAFETEA-LU earmark project added.

15219 FERR PELICAN Marine Highway Terminal: Pelican Improvements Project delayed at request of AMHS. 19117 CTP SKAGWAY Skagway Intermodal Facility, Alaska Transit-funded projects were updated and added to the STIP data base.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 13

Need ID Program Place Highway Project Description Change Borough/Census District

Southeast Fairbanks 10547 NHS Alaska Highway MP 1222 to 1235 Rehabilitation Project accelerated. 7367 NHS Alaska Highway MP 1308 - Tok Weigh Station Utility costs identified. 3640 AHS Taylor Highway MP 82 to Border Funding of Right-of-way phase added to continue project on this time trap project.

Valdez – Cordova 6617 CTP CORDOVA Shepard Point Road Project accelerated or program increase because of bridge earmark revision.

3777 AHS MCCARTHY Resurfacing and General Improvements SAFETEA-LU earmark project added. ROAD 15684 CTP VALDEZ Mineral Creek Bridge and Approaches Project accelerated or program increase because of bridge earmark revision.

6382 NHS Glenn Highway MP 172 to 189 Rehabilitation - Tolsona River Utility costs identified. to Richardson Hwy. Jct. 2120 NHS Richardson Highway MP 173 to186 Reconstruction - Dick Lake to Right-of-way costs identified. Paxon

Various Boroughs 7174 REQD SOUTHEAST Southeast Region: Highway Safety Program continued. REGION Improvement Program/Safety Management

19240 CTP STATEWIDE Alaska Mental Health Trust Transit-funded projects were updated and added to the STIP data base.

19216 REQD STATEWIDE Disadvantage Business Enterprises Disparity Project added as required by USDOT. Study

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 14

Need ID Program Place Highway Project Description Change Borough/Census District

19256 CTP STATEWIDE Job Access and Reverse Commute Transit-funded projects were updated Apportionments and added to the STIP data base.

19257 CTP STATEWIDE New Freedom Apportionments Transit-funded projects were updated and added to the STIP data base.

18844 REQD STATEWIDE Safe Routes to Schools Project reflects identification of additional Safe Routes to School funds.

19119 CTP STATEWIDE Special Needs For Elderly Individuals and Transit-funded projects were updated Indiviuals With Disabilities and added to the STIP data base.

18881 REQD STATEWIDE Statewide: Advance Construction Repayment Specific funds identified for advance construction. 18327 REQD STATEWIDE Statewide: School Zone Crossing Project accelerated or program increase Improvements because of bridge earmark revision.

19120 CTP STATEWIDE Transit Non-Urbanized Capital & Operating Transit-funded projects were updated and Rural Transit Assistance Program and added to the STIP data base.

18359 FERR Marine Highway Ferry: Construct/Lease/Purchase Ferryboats Project funding reflects cost update. & Terminals 18358 FERR Marine Highway Ferry: Ferry Refurbishment Federal agency funding source changed. 19215 FERR Marine Highway Juneau Access: Katzehin Terminal and Project restructured from Need ID Shuttle Ferries 11299. 18724 FERR Marine Highway Terminal: Haines/Skagway Sewage Utility Project funding reflects cost update.

19054 FERR Marine Highway Terminal: Syncrolift Controller Modifications Project delayed at AMHS request to balance the program. 19224 NHS Parks Highway Natural Gas Pipeline Corridor Feasibility Study SAFETEA-LU earmark project added.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 15

Need ID Program Place Highway Project Description Change Borough/Census District

17130 NHS Richardson Highway MP 265-341 (Delta Junction to Eielson AFB) State-funded projects removed from the Passing Lanes STIP. 19232 REQD Alaska Railroad Transit-funded projects were updated and added to the STIP data base.

19241 CTP Denali Commission Transit-funded projects were updated and added to the STIP data base.

19196 REQD Electronic Document Management System Continues project funding.

11299 NHS Juneau Access Improvements Project restructured to Need ID 19215.

19214 NHS Juneau Access: Glacier Highway MP 40.5- Project restructured from Need ID 91.1 11299. 18791 CTP Rural Dust Control Funding deferred pending non- attainment determination by EPA or other Federal action.

Wade – Hampton 19175 CTP Access Road Permanent Repairs SAFETEA-LU earmark project added.

18631 CTP EMMONAK Emmonak Street Lighting Project funding corrected per earmark allocation.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING) Changes between the Draft and Final 2006-2008 STIP 16

Need ID Program Place Highway Project Description Change Borough/Census District

Wrangell – Petersburg 17023 FERR KAKE Marine Highway Terminal: Kake Modifications Project delayed at AMHS request to balance the program. 16787 NHS PETERSBURG Marine Highway Terminal: Petersburg Modifications Project delayed at AMHS request to balance the program. 19154 CTP PETERSBURG Petersburg Road Improvements SAFETEA-LU earmark project added.

18354 AHS SOUTHEAST Mid-Region Access EIS Project accelerated. REGION 16037 CTP WRANGELL Wrangell Road Improvements SAFETEA-LU earmark project added.

Yukon – Koyukuk 18633 CTP GALENA Galena Road Resurfacing AK060 Earmark funding amount corrected. 17901 CTP STATEWIDE Congestion Mitigation and Air Quality Plan is deleted until new air quality Implementation Plan requirements are drafted. 18905 CTP TANANA Dust Control Mitigation SAFETEA-LU earmark project added.

2091 NHS Dalton Highway MP 37 to 49 Reconstruction - Hess Creek to Project was already funded.. Yukon River 3972 TRAAK Dalton Highway MP 57 - Yukon Crossing Intermodal Facility Project accelerated or program increase because of bridge earmark revision.

12625 NHS Dalton Highway MP 175 to 209 Reconstruction Construction accelerated due to program increase. 16207 NHS Dalton Highway MP 55.5 Yukon River Bridge #0271 Delayed because research needed on Redecking the best type of deck panels.

(PROJECTS UNCHANGED NOT LISTED IN THIS TABLE; SEE FINAL 2006 - 2008 STIP FOR COMPLETE LISTING)