Visual Simulations Las Virgenes Solar Farm -Preliminary- Photo Simulations Interacta Inc
Total Page:16
File Type:pdf, Size:1020Kb
Visual Simulations Las Virgenes Solar Farm -Preliminary- Photo Simulations Interacta Inc. Ron Stevens 14 July 2018 © Copyright 2018, interacta inc. interacta inc. 805.962.1300 www.interacta3d.com SP1 SP3 SP2 North © Copyright 2018, interacta inc. Solar Farm Map Photo Simulation Locations interacta inc. 805.962.1300 www.interacta3d.com 2 SP3 SP2 North © Copyright 2018, interacta inc. Solar Farm Map Photo Simulation Locations interacta inc. 805.962.1300 Mound Location - East of Onsite Road - approx 5’5” www.interacta3d.com 3 SP3 SP2 North © Copyright 2018, interacta inc. Solar Farm Map Photo Simulation Locations interacta inc. 805.962.1300 Mound Location - West of Onsite Road - approx 5’5” www.interacta3d.com 4 © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP1 interacta inc. 805.962.1300 Current Conditions www.interacta3d.com 5 Preliminary © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP1 interacta inc. 805.962.1300 Proposed Solar Panels www.interacta3d.com 6 © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP2 interacta inc. 805.962.1300 Current Conditions www.interacta3d.com 7 Preliminary © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP2 interacta inc. 805.962.1300 Proposed Solar Panels www.interacta3d.com 8 Preliminary © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP2 interacta inc. 805.962.1300 Proposed Solar Panels - Mound West of Road www.interacta3d.com 9 Preliminary © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP2 interacta inc. 805.962.1300 Proposed Solar Panels - Mound East of Road www.interacta3d.com 10 © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP3 interacta inc. 805.962.1300 Current Conditions www.interacta3d.com !11 Preliminary © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP3 interacta inc. 805.962.1300 Proposed Solar Panels www.interacta3d.com 12 Preliminary © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP3 interacta inc. 805.962.1300 Proposed Solar Panels - - Mound West of Road www.interacta3d.com 13 Preliminary © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP3 interacta inc. 805.962.1300 Proposed Solar Panels - Mound East of Road www.interacta3d.com 14 Disclaimer • The photo simulations were developed using Interacta’s methodology process as described below. • Interacta’s methodology uses high end 3D software for generating simulated objects based on architectural CAD files and sketches, terrain surfaces based on topo data files and simulated camera locations based on actual photographs taken. • Every effort has been made to make these photo simulations as accurate as possible based on the data provided. interacta’s methodology integrates input from … Aerial Topographical Architectural Landscape On-site Photograph Survey Map Drawings Design Photographs 3D Terrain Model 3D Site Model 3D Site Rendering … to create an accurate and comprehensive representation © Copyright 2018, interacta inc. of your project. interacta inc. 805.962.1300 www.interacta3d.com 15 © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP2 interacta inc. 805.962.1300 Current Conditions www.interacta3d.com 7 Preliminary © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP2 interacta inc. 805.962.1300 Proposed Solar Panels www.interacta3d.com 8 Preliminary © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP2 interacta inc. 805.962.1300 Proposed Solar Panels - Bush Locations www.interacta3d.com 9 Preliminary Green - 30’ setback from road Orange - 60’ setback from road Blue - 130’ setback from road © Copyright 2018, interacta inc. Solar Farm Photo Simulation - SP2 interacta inc. 805.962.1300 Proposed Solar Panels - Bush Locations www.interacta3d.com 10 California Emissions Estimator Model Outputs CalEEMod Version: CalEEMod.2016.3.2 Page 1 of 27 Date: 7/12/2018 12:22 PM JPA 4-5 MW Solar Panel Installation - South Coast Air Basin, Winter JPA 4-5 MW Solar Panel Installation South Coast Air Basin, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population User Defined Industrial 0.00 User Defined Unit 20.00 0.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 31 Climate Zone 9 Operational Year 2020 Utility Company Southern California Edison CO2 Intensity 702.44 CH4 Intensity 0.029 N2O Intensity 0.006 (lb/MWhr) (lb/MWhr) (lb/MWhr) 1.3 User Entered Comments & Non-Default Data Project Characteristics - Land Use - 20 acre solar install site Construction Phase - 3 months grading, 6 months install. No demo, stump removal, paving, or painting. Off-road Equipment - 3 forklifts, 3 loader/backhoe, 1 bore rig. Off-road Equipment - 2 grader, 2 dozer, 1 loader, 1 excavator, 1 water trucks Off-road Equipment - No stump removal Off-road Equipment - No demo Construction Off-road Equipment Mitigation - CalEEMod Version: CalEEMod.2016.3.2 Page 2 of 27 Date: 7/12/2018 12:22 PM JPA 4-5 MW Solar Panel Installation - South Coast Air Basin, Winter Table Name Column Name Default Value New Value tblConstructionPhase NumDays 20.00 0.00 tblConstructionPhase NumDays 300.00 135.00 tblConstructionPhase NumDays 20.00 0.00 tblConstructionPhase NumDays 30.00 65.00 tblConstructionPhase NumDays 20.00 0.00 tblConstructionPhase NumDays 10.00 0.00 tblConstructionPhase PhaseEndDate 9/11/2020 8/14/2020 tblConstructionPhase PhaseEndDate 7/17/2020 1/17/2020 tblConstructionPhase PhaseEndDate 3/29/2019 3/3/2019 tblConstructionPhase PhaseEndDate 5/24/2019 7/12/2019 tblConstructionPhase PhaseEndDate 8/14/2020 7/17/2020 tblConstructionPhase PhaseEndDate 4/12/2019 3/29/2019 tblConstructionPhase PhaseStartDate 5/25/2019 7/15/2019 tblGrading AcresOfGrading 65.00 75.00 tblLandUse LotAcreage 0.00 20.00 tblOffRoadEquipment LoadFactor 0.50 0.50 tblOffRoadEquipment OffRoadEquipmentType Bore/Drill Rigs tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Loaders tblOffRoadEquipment OffRoadEquipmentType Off-Highway Trucks tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 CalEEMod Version: CalEEMod.2016.3.2 Page 3 of 27 Date: 7/12/2018 12:22 PM JPA 4-5 MW Solar Panel Installation - South Coast Air Basin, Winter tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblTripsAndVMT WorkerTripNumber 18.00 35.00 2.0 Emissions Summary CalEEMod Version: CalEEMod.2016.3.2 Page 4 of 27 Date: 7/12/2018 12:22 PM JPA 4-5 MW Solar Panel Installation - South Coast Air Basin, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e PM10 PM10 Total PM2.5 PM2.5 Total Year lb/day lb/day 2019 4.7986 52.1365 22.6075 0.0589 13.6591 2.1555 15.8145 6.8563 1.9830 8.8394 0.0000 5,831.282 5,831.282 1.7345 0.0000 5,874.645 5 5 0 2020 1.2609 12.9584 11.6162 0.0222 0.0000 0.8650 0.7414 0.0000 0.8047 0.6821 0.0000 2,147.965 2,147.965 0.6947 0.0000 2,165.333 7 7 1 Maximum 4.7986 52.1365 22.6075 0.0589 13.6591 2.1555 15.8145 6.8563 1.9830 8.8394 0.0000 5,831.282 5,831.282 1.7345 0.0000 5,874.645 5 5 0 Mitigated Construction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e PM10 PM10 Total PM2.5 PM2.5 Total Year lb/day lb/day 2019 4.7986 52.1365 22.6075 0.0589 5.5657 2.1555 7.7211 2.7373 1.9830 4.7203 0.0000 5,831.282 5,831.282 1.7345 0.0000 5,874.645 5 5 0 2020 1.2609 12.9584 11.6162 0.0222 0.0000 0.8650 0.7414 0.0000 0.8047 0.6821 0.0000 2,147.965 2,147.965 0.6947 0.0000 2,165.333 7 7 1 Maximum 4.7986 52.1365 22.6075 0.0589 5.5657 2.1555 7.7211 2.7373 1.9830 4.7203 0.0000 5,831.282 5,831.282 1.7345 0.0000 5,874.645 5 5 0 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 59.25 0.00 48.89 60.08 0.00 43.26 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CalEEMod Version: CalEEMod.2016.3.2 Page 5 of 27 Date: 7/12/2018 12:22 PM JPA 4-5 MW Solar Panel Installation - South Coast Air Basin, Winter 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e PM10 PM10 Total PM2.5 PM2.5 Total Category lb/day lb/day Area 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Operational ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e PM10 PM10 Total PM2.5 PM2.5 Total Category lb/day lb/day Area 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000