(R&B) Department, Kashmir
Total Page:16
File Type:pdf, Size:1020Kb
Financial details under State Sector Bridge Programme 2015-16 (R&B) Department, Kashmir (Rs in lakhs) Physical Progressive Revised Year of Target Expdt. cost of Date of progress of expenditure Pending cost if S.No Name of the project/works commenc date of during work sanction work in to the end payments any/date of ement completion the year percent of the year revision 1 2 3 4 5 6 7 8 9 10 11 District Kupwara Const of single lane 30 mtr 212 bridge at Marsari Zoon Reshi, 110.35 2009-10 2009-10 2016-17 87% 5.00 91.00 14.35 110.35 Kupwara Const of 1x15 mtr span steel decked bridge at Pazipora 213 158.77 2010-11 2010-11 2017-18 46% 21.00 52.50 85.27 158.77 Nirampora link road on nallah Vij Const of 03 minor bridges at 214 40.00 2012-13 2012-13 2018-19 48% 0.00 19.00 21.00 40.00 Keran Const of 84 mtr long (3 spans) 215 bridge at Old Vedpora 561.14 2007-08 2007-08 2017-18 74% 120.00 294.00 147.14 561.14 Handwara on Pahroo Nallah Const of 1x30 mtrspan steel decked bridge on Turkpora 216 150.00 2009-10 2009-10 com 100% 0.00 150.00 0.00 150.00 Khaipora Crumbhroo road Km 1st Const of 1x18 mtr span steel 217 decked bridge at Khanpora 152.83 2009-10 2009-10 2017-18 76% 10.00 106.00 36.83 152.83 over nallah Dangerwari Const of 1x28 mtr span steel 218 decked bridge at Dadikote 151.30 2009-10 2009-10 2017-18 69% 10.00 94.55 46.75 151.30 Kupwara Const of foot bridge at 219 Kulangam on Nallah Pohru 93.00 2007-08 2007-08 2017-18 48% 0.00 45.00 48.00 93.00 near stadium Const of 2x32 mtr span 220 composite foot bridge at 158.64 2007-08 2007-08 com 100% 8.64 150.00 0.00 158.64 Bongam, Langate Const of 1x38 mtr span trussed girder bridge over 221 213.19 2009-10 2009-10 2017-18 69% 34.00 114.00 65.19 213.19 nallah Mawar at Yaroo, Handwara Const of 4x25 mtr foot bridge 222 at Khan Tulwari, Langate 305.98 2011-12 2011-12 2019-20 25% 10.00 66.00 229.98 305.98 over nallah Mawar Const of 2x32mtr span composite decked foot bridge 223 158.64 2010-11 2010-11 2017-18 64% 5.00 96.00 57.64 158.64 over Nallah Pohru at Hangni Short on Younis Khuroo road Const of Batchatri Langate 224 86.00 2005-06 2005-06 com 100% 6.00 80.00 0.00 86.00 Kupwara with approaches Const of 1x25 mtr span steel 225 girder bridge in Km 1st of 135.00 2008-09 2008-09 2018-19 95% 18.00 110.50 6.50 135.00 Thayan Moorie road Const of 1x25 mtr span single 226 lane steel bridge at Batnar 107.00 2009-10 2009-10 com 100% 13.00 94.00 0.00 107.00 Khurhama, Kupwara Const of 1x33 mtr span single 227 lane steel trussed bridge in Km 105.00 2009-10 2009-10 2018-19 79% 10.00 73.00 22.00 105.00 1st of Kalarooch Lastiyal road Const of 20 mtr steel decked bridge on Trehgam 228 Bangergund road at washed 310.90 2011-12 2011-12 2019-20 23% 5.00 67.00 238.90 310.90 away causeway (damaged in floods) Const of 1x15 m span steel 229 decked bridge over nallah Hud 206.32 2010-11 2010-11 2018-19 34% 5.00 66.00 135.32 206.32 at Kralpora Bus Adda Const of bridge at Solina 230 127.71 2010-11 2010-11 2018-19 23% 5.00 25.00 97.71 127.71 Shomnag Const of 1x35 m span steel 231 decked bridge in Km 2nd of 119.00 2011-12 2011-12 2016-17 88% 10.00 94.50 14.50 119.00 Kuhmriyal Shumriyal road Single lane Steel bridge at 232 168.89 2012-13 2012-13 2018-90 7% 0.00 11.00 157.89 168.89 Farkin Awathkul Kralpora main in place of 233 167.28 2012-13 2012-13 2019-20 2% 0.00 4.00 163.28 167.28 timber/cement bridge 234 Wasarkoo Lonaharia Bridge 167.28 2012-13 2012-13 2018-19 8% 0.00 14.00 153.28 167.28 Single lane steel bridge at 235 168.38 2012-13 2012-13 2018-19 23% 15.00 24.00 129.38 168.38 Dobwan Kachama Page 1 of 2 Physical Progressive Revised Year of Target Expdt. cost of Date of progress of expenditure Pending cost if S.No Name of the project/works commenc date of during work sanction work in to the end payments any/date of ement completion the year percent of the year revision 1 2 3 4 5 6 7 8 9 10 11 Constt of 1x21.34 mtr span single lane steel trussed 236 86.75 2007-08 2007-08 com 100% 0.00 86.75 0.00 86.75 bridge at Km 1st of Machil Pushwari road Const of 260 mtr long 7 span 237 PSC bridge at Tumina 803.00 2000-01 2000-01 2020-21 58% 5.00 458.00 340.00 803.00 Chowkibal on Kohimal Nallah Const of 160 mtr long 4 span 238 PSC bridge at Manzgam 652.00 2000-01 2000-01 com 100% 79.00 573.00 0.00 652.00 Panzgam on Kahmil Nallah Const of 129 mtr bridge at 239 543.00 2009-10 2009-10 2019-20 54% 197.10 95.00 250.90 543.00 Kunan Kupwara Const of 16 mtr single lane 240 steel girder bridge over Fakrin 114.96 2009-10 2009-10 com 100% 19.96 95.00 0.00 114.96 Nallah at Meeliyal Kupwara Const of 3x30 mtr span truss girder tractor crossing/ foot 241 230.00 2009-10 2009-10 com 100% 141.00 89.00 0.00 230.00 bridge over Kahmil Nallah at Bohipora Kupwara Const of 204 mtr bridge at 242 684.00 2009-10 2009-10 2020-21 20% 5.00 128.50 550.50 684.00 Aloosa Kupwara Const of single lane 40 mtr plate girder bridge on 243 Kupwara Lolab bypass at 221.00 2010-11 2010-11 com 100% 21.00 200.00 0.00 221.00 Zangli over Lolab Nallah [HCM's commitment] Const of 24.3 mtr Kanthpora 244 411.00 2009-10 2009-10 2019-20 52% 5.00 209.00 197.00 411.00 bridge, Kupwara Const of 205 mtr in 6 span single lane in five span steel 245 858.00 2005-06 2005-06 2019-20 66% 5.00 561.81 291.19 858.00 girder bridge at Mugalpora Khumaryal 246 Const of Shatwari bridge 271.00 2010-11 2010-11 2019-20 19% 5.00 47.00 219.00 271.00 Foot bridge at Drungsoo- 247 718.28 2010-11 2010-11 2022-23 6% 5.00 38.50 674.78 718.28 Latch over Nallah Mawar 248 Const of bridge at Shaloora 881.42 2011-12 2011-12 2023-24 3% 5.00 24.00 852.42 881.42 Constt of foot bridge at 249 20.35 2011-12 2011-12 com 100% 8.35 12.00 0.00 20.35 Pazipora Langate Completion of 1x11 mtr span RCC Bridge at Shamaspora on 250 40.00 2011-12 2011-12 com 79% 10.00 21.59 8.41 40.00 Khurimaidan Tangdar (Completion cost) Constr of 120 mtr span steel 251 975.00 2015-16 2015-16 2022-23 1% 10.00 0.00 965.00 975.00 trussed Bridge at Puthwari Constr of 1x24 mtr span 252 Bridge at Sahipora NABARD 7.40 2015-16 2015-16 com 100% 7.40 0.00 0.00 7.40 RIDF-XV Constr of 110.75 mtr 3 spans single lane steel girder (plate girder type) Bridge at Checki 253 35.54 2015-16 2015-16 com 100% 35.54 0.00 0.00 35.54 Drugmulla, Hatimullah over Kahmil/Pahroo Nallah NABARD RIDF-XV TOTAL DISTRICT KUPWARA 11675.30 874.99 4580.20 6220.11 11675.30 Page 2 of 2.