(R&B) Department, Kashmir

(R&B) Department, Kashmir

Financial details under State Sector Bridge Programme 2015-16 (R&B) Department, Kashmir (Rs in lakhs) Physical Progressive Revised Year of Target Expdt. cost of Date of progress of expenditure Pending cost if S.No Name of the project/works commenc date of during work sanction work in to the end payments any/date of ement completion the year percent of the year revision 1 2 3 4 5 6 7 8 9 10 11 District Kupwara Const of single lane 30 mtr 212 bridge at Marsari Zoon Reshi, 110.35 2009-10 2009-10 2016-17 87% 5.00 91.00 14.35 110.35 Kupwara Const of 1x15 mtr span steel decked bridge at Pazipora 213 158.77 2010-11 2010-11 2017-18 46% 21.00 52.50 85.27 158.77 Nirampora link road on nallah Vij Const of 03 minor bridges at 214 40.00 2012-13 2012-13 2018-19 48% 0.00 19.00 21.00 40.00 Keran Const of 84 mtr long (3 spans) 215 bridge at Old Vedpora 561.14 2007-08 2007-08 2017-18 74% 120.00 294.00 147.14 561.14 Handwara on Pahroo Nallah Const of 1x30 mtrspan steel decked bridge on Turkpora 216 150.00 2009-10 2009-10 com 100% 0.00 150.00 0.00 150.00 Khaipora Crumbhroo road Km 1st Const of 1x18 mtr span steel 217 decked bridge at Khanpora 152.83 2009-10 2009-10 2017-18 76% 10.00 106.00 36.83 152.83 over nallah Dangerwari Const of 1x28 mtr span steel 218 decked bridge at Dadikote 151.30 2009-10 2009-10 2017-18 69% 10.00 94.55 46.75 151.30 Kupwara Const of foot bridge at 219 Kulangam on Nallah Pohru 93.00 2007-08 2007-08 2017-18 48% 0.00 45.00 48.00 93.00 near stadium Const of 2x32 mtr span 220 composite foot bridge at 158.64 2007-08 2007-08 com 100% 8.64 150.00 0.00 158.64 Bongam, Langate Const of 1x38 mtr span trussed girder bridge over 221 213.19 2009-10 2009-10 2017-18 69% 34.00 114.00 65.19 213.19 nallah Mawar at Yaroo, Handwara Const of 4x25 mtr foot bridge 222 at Khan Tulwari, Langate 305.98 2011-12 2011-12 2019-20 25% 10.00 66.00 229.98 305.98 over nallah Mawar Const of 2x32mtr span composite decked foot bridge 223 158.64 2010-11 2010-11 2017-18 64% 5.00 96.00 57.64 158.64 over Nallah Pohru at Hangni Short on Younis Khuroo road Const of Batchatri Langate 224 86.00 2005-06 2005-06 com 100% 6.00 80.00 0.00 86.00 Kupwara with approaches Const of 1x25 mtr span steel 225 girder bridge in Km 1st of 135.00 2008-09 2008-09 2018-19 95% 18.00 110.50 6.50 135.00 Thayan Moorie road Const of 1x25 mtr span single 226 lane steel bridge at Batnar 107.00 2009-10 2009-10 com 100% 13.00 94.00 0.00 107.00 Khurhama, Kupwara Const of 1x33 mtr span single 227 lane steel trussed bridge in Km 105.00 2009-10 2009-10 2018-19 79% 10.00 73.00 22.00 105.00 1st of Kalarooch Lastiyal road Const of 20 mtr steel decked bridge on Trehgam 228 Bangergund road at washed 310.90 2011-12 2011-12 2019-20 23% 5.00 67.00 238.90 310.90 away causeway (damaged in floods) Const of 1x15 m span steel 229 decked bridge over nallah Hud 206.32 2010-11 2010-11 2018-19 34% 5.00 66.00 135.32 206.32 at Kralpora Bus Adda Const of bridge at Solina 230 127.71 2010-11 2010-11 2018-19 23% 5.00 25.00 97.71 127.71 Shomnag Const of 1x35 m span steel 231 decked bridge in Km 2nd of 119.00 2011-12 2011-12 2016-17 88% 10.00 94.50 14.50 119.00 Kuhmriyal Shumriyal road Single lane Steel bridge at 232 168.89 2012-13 2012-13 2018-90 7% 0.00 11.00 157.89 168.89 Farkin Awathkul Kralpora main in place of 233 167.28 2012-13 2012-13 2019-20 2% 0.00 4.00 163.28 167.28 timber/cement bridge 234 Wasarkoo Lonaharia Bridge 167.28 2012-13 2012-13 2018-19 8% 0.00 14.00 153.28 167.28 Single lane steel bridge at 235 168.38 2012-13 2012-13 2018-19 23% 15.00 24.00 129.38 168.38 Dobwan Kachama Page 1 of 2 Physical Progressive Revised Year of Target Expdt. cost of Date of progress of expenditure Pending cost if S.No Name of the project/works commenc date of during work sanction work in to the end payments any/date of ement completion the year percent of the year revision 1 2 3 4 5 6 7 8 9 10 11 Constt of 1x21.34 mtr span single lane steel trussed 236 86.75 2007-08 2007-08 com 100% 0.00 86.75 0.00 86.75 bridge at Km 1st of Machil Pushwari road Const of 260 mtr long 7 span 237 PSC bridge at Tumina 803.00 2000-01 2000-01 2020-21 58% 5.00 458.00 340.00 803.00 Chowkibal on Kohimal Nallah Const of 160 mtr long 4 span 238 PSC bridge at Manzgam 652.00 2000-01 2000-01 com 100% 79.00 573.00 0.00 652.00 Panzgam on Kahmil Nallah Const of 129 mtr bridge at 239 543.00 2009-10 2009-10 2019-20 54% 197.10 95.00 250.90 543.00 Kunan Kupwara Const of 16 mtr single lane 240 steel girder bridge over Fakrin 114.96 2009-10 2009-10 com 100% 19.96 95.00 0.00 114.96 Nallah at Meeliyal Kupwara Const of 3x30 mtr span truss girder tractor crossing/ foot 241 230.00 2009-10 2009-10 com 100% 141.00 89.00 0.00 230.00 bridge over Kahmil Nallah at Bohipora Kupwara Const of 204 mtr bridge at 242 684.00 2009-10 2009-10 2020-21 20% 5.00 128.50 550.50 684.00 Aloosa Kupwara Const of single lane 40 mtr plate girder bridge on 243 Kupwara Lolab bypass at 221.00 2010-11 2010-11 com 100% 21.00 200.00 0.00 221.00 Zangli over Lolab Nallah [HCM's commitment] Const of 24.3 mtr Kanthpora 244 411.00 2009-10 2009-10 2019-20 52% 5.00 209.00 197.00 411.00 bridge, Kupwara Const of 205 mtr in 6 span single lane in five span steel 245 858.00 2005-06 2005-06 2019-20 66% 5.00 561.81 291.19 858.00 girder bridge at Mugalpora Khumaryal 246 Const of Shatwari bridge 271.00 2010-11 2010-11 2019-20 19% 5.00 47.00 219.00 271.00 Foot bridge at Drungsoo- 247 718.28 2010-11 2010-11 2022-23 6% 5.00 38.50 674.78 718.28 Latch over Nallah Mawar 248 Const of bridge at Shaloora 881.42 2011-12 2011-12 2023-24 3% 5.00 24.00 852.42 881.42 Constt of foot bridge at 249 20.35 2011-12 2011-12 com 100% 8.35 12.00 0.00 20.35 Pazipora Langate Completion of 1x11 mtr span RCC Bridge at Shamaspora on 250 40.00 2011-12 2011-12 com 79% 10.00 21.59 8.41 40.00 Khurimaidan Tangdar (Completion cost) Constr of 120 mtr span steel 251 975.00 2015-16 2015-16 2022-23 1% 10.00 0.00 965.00 975.00 trussed Bridge at Puthwari Constr of 1x24 mtr span 252 Bridge at Sahipora NABARD 7.40 2015-16 2015-16 com 100% 7.40 0.00 0.00 7.40 RIDF-XV Constr of 110.75 mtr 3 spans single lane steel girder (plate girder type) Bridge at Checki 253 35.54 2015-16 2015-16 com 100% 35.54 0.00 0.00 35.54 Drugmulla, Hatimullah over Kahmil/Pahroo Nallah NABARD RIDF-XV TOTAL DISTRICT KUPWARA 11675.30 874.99 4580.20 6220.11 11675.30 Page 2 of 2.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us