THE GOLD STANDARD: Project Design Document for Gold Standard Voluntary Offset projects (GS-VER-PDD) For more information, please contact The Gold Standard: http://www.cdmgoldstandard.org
[email protected] phone +41 61 283 09 16 fax +41 61 271 10 10 April 2006 This document was developed by: The Gold Standard for VERs has received financial support from: Explanatory information on how to complete the PDD and how to obtain Gold Standard registration can be found in the project developer’s manual available on the Gold Standard website. This template of the PDD is applicable for micro-, small- and large-scale projects. Note that the shaded boxes present information on the Gold Standard VER project development procedures. Project developers should delete these shaded boxes when preparing their PDD. PROJECT DESIGN DOCUMENT FORM (GS-VER-PDD) Voluntary Offset Projects - Version 01 page 2 VOLUNTARY OFFSET PROJECTS PROJECT DESIGN DOCUMENT FORM (GS-VER-PDD) Version 01 - in effect as of: January 2006) Contents A. General description of project activity B. Application of a baseline methodology C. Duration of the project activity / Crediting period D. Application of a monitoring methodology and plan E. Estimation of GHG emissions by sources F. Environmental impacts G. Stakeholders’ comments Annexes Annex 1: Contact information on participants in the project activity Annex 2: Baseline information Annex 3: Monitoring plan Annex 4: Stakeholder Consultation Report Annex 5: Original feasibility Report Annex 6: Hydro Opportunities Assessment Annex 7: Financial assumptions Annex 8: Sakeji Village Load Estimates Annex 9: Energy Survey 2004 Annex 10: Estimates of demand by Work bank expert 2004 Annex 11: Kalene mission load survey 2003 Annex 12: Hillwood farm Load estimate PROJECT DESIGN DOCUMENT FORM (GS-VER-PDD) Voluntary Offset Projects - Version 01 page 3 SECTION A.