Download Document
Total Page:16
File Type:pdf, Size:1020Kb
Agenda for 114th SEAC-3 meeting scheduled on 3rd, 4th and 5th February, 2021 (10.30 am onwards) at Dalamal House, Nariman Point, Point Sr Proposal No. Proposal Name 03.02.2021 1. MIS/117936/2019 Prayeja City - Plot 2 at S.No. 71(Pt) & 72/20a To 27a, Plot No.2, Wadgaon(Bk), Sinhgad Road,Taluka:-Haveli, District:- Pune, Pincode:- 411041. by Prayejacity A Jv Bhandari Gelada Associates LLP & Prayeja Developers LLP 2. MIS/134411/2019 “AADHAR NAGARI” Proposed Affordable Housing Project Under AHP Vertical PPP Model Under PMAY by M/s. Madhav Infra. 3. MIS/134425/2019 Environmental clearance for Proposed Residential and Commercial Project “41 Evoke” at S.No 74(P), Ravet, Pune by M/s. Krisala Associates 4. MIS/139066/2020 Menlo Homes Hinjewadi at S No 288, P.No3(Part), Mann, Next to Honeywell Turbo Technologies, Hinjewadi Phase II, Pune by MENLO HOMES LLP 5. MIS/135567/2020 Gagan Adira at S. No.-569, Wagholi, Tal: Haveli, Pune by TOPAZ HOMES LLP 6. MIS/180409/2020 Applied for amendment in EC Proposed project ''Gagan Signet'' at S. No. 66, H. No. 11/1 (P) Village Kondhwa, Budruk, Pune by M/s Gagan Realtors LLP. 7. MIS/172910/2020 Residential and Commercial Project Elina Living plot C, S. No. 43(P) + 44+46(P), Mohammadwadi, Pune by RAMKRISHNA CINE EXHIBITORS 8. MIS/59083/2020 Proposed Development of Residential Headquarter Quarters Building on plot bearing S. No. 532,533, 534, 557, 874, 876,877, 878, 879 at Shivaji Nagar, Pune by Police Commissioner, Pune. 9. NCP/58932/2020 Construction of Eastern part of Pune Ring Road from Solu (Km 38.000) to Varve (Km 104.275) around Pune city in Maharashtra State by MSRDC. 10. NCP/59168/2020 Proposed Construction of Pune Ring Road – 39.0 km, starts at Urse (Mumbai Pune Expressway) and ends at Solu, District – Pune by MSRDC. 04.02.2021 11. MIS/139388/2020 Proposed Project SILICONBAY Siliconbay, Sr.no 9/4 and 10/10 Opp Jade global, Wadgaonsheri, New Kalyaninagar, Pune by KARAN JANHAVI DEVELOPMENT CORPORATION 12. MIS/139684/2020 Proposed Residential Development project at old S. no. 11, H.no. 09+14A/2+1A/1, 1A/10, 11/12 & 11/13 new S. no. 11/14A/2, 11/1B/1A, 11/1B/10, 11/12 & 11/13, Kondhwa Khurd, Tal. Haveli, Pune by M/s. REPTON PROPERTIES PVT LTD 13. MIS/143686/2020 Proposed Revised Residential Group Housing Scheme at Gat No. 1242 (New), 384 (Old), Village Pirangut, Tal. Mulshi, Pune by M/s. Sai Associates 14. MIS/149427/2020 Kalyani Centre for Technology & Innovation at Survey No. 15, H. No. 1A, 1B, 1C, 1D, 5A/1, 5A/2, 2, 3, Mundhwa, Tal. Haveli, Dist. Pune by BHARAT FORGE LTD. (KCTI) 15. MIS/149621/2020 Residential and Commercial Development by M/s.Venkatesh Landmark through Mr.Rahul Kondiba Satav 16. MIS/150412/2020 “MAXX GLORRY” Proposed Group Housing Scheme at Kh. No. 56/4, P. H. No. 38, Mouza – Beltarodi, Tah. Nagpur (Gramin), Dist. Nagpur, Maharashtra, by M/s. Maxx Builder & Developers. 17. MIS/152525/2020 Proposed Residential & Commercial Project at Gat. no. 1331/6, Wagholi, Pune by M/s. Sagar Construction Company 18. MIS/152537/2020 Proposed commercial project "Suratwala Mark Plazzo" at Hinjewadi, Mulshi by Suratwwala Business Group Ltd. 19. MIS/155864/2020 Proposed Residential & Commercial project at Survey No. 10/2 Dhanori, Dist. Pune by M/s Nyati Construction Pvt. Ltd 20. MIS/156190/2020 Gandharv Samrudhi at Gat No. 120 (Old Gat No. 1240), Borhadewadi, Moshi, Tal. Haveli, Dist. Pune – 412105 by Yogesh Enterprises 21. MIS/156283/2020 Proposed Residential & Commercial Project S.No. 261/2, Village- Lohegaon, Tal- Haveli, Dist- Pune by M/s. Shriram Associates 22. MIS/53534/2020 Environment clearance for proposed residential & commercial township Project at CTS.No. 4510, 4510/1, 4513 Chinchwad, Pune by R Retail Ventures Private Limited.. 05.03.2021 23. MIS/155584/2020 Residentail construction project At S.no 74/1+2+3/2 (P) + 1/3 (P) + 1/2/1 (P) + 1/2/2 (P) + 1/2/3 (P) + 1/5/1 (P) + 1/6 (P) + 4/1B (P) + 2/24 (P) 1/5/4 at village Nande Taluka -Mulshi, Hinjewadi Pune by Urban Life Ventures LLP 24. MIS/161581/2020 Proposed Residential & Commercial Project at Sr. No. 223,224,225, Dudulgaon, Moshi Alandi Road, Taluka – Haveli, District – Pune by Metro Buildcon 25. MIS/162553/2020 Proposed Project at C.S.No.10568/A(P)(S.No.331/A/2/1) Plot No. 01, Taluka - Miraj, District – Sangli by M/s. Siddhivinayak Platinum 26. MIS/167186/2020 “Windsor County” at 39/17B, 39/18, 39/18/1, 39/19, 20, 21, 22, 23, 24, 25(P), Ambegaon Budruk, Taluka - Haveli, Dist.- Pune by Windsor Shelters 27. MIS/167524/2020 Commercial Project at Survey No. 439, 441/1, 441/2, 441/3, 441/4, 441/5, 441/6, 442/3, 442/4, 516/1 and 516/2 having a corresponding C.T.S. No. 2656, Kasarwadi, Taluka - Haveli, Dist.- Pune by Dai-Ichi Karkariya Limited 28. MIS/167572/2020 Proposed Service Apartment Hospitality / Commercial Building at C.T.S 4/1, F.P.NO 64A, Sangamwadi, T.P.S. Mumbai-Pune Road, Pune, Maharashtra by Apeejay Surrendra Park Hotels Ltd. 29. MIS/185925/2020 Citron at Gat No. 878, Kesnanad Road, Wagholi, Pune by M/s Cherry Construction Pvt. Ltd. 30. NCP/53957/2020 Proposed Residential and Commercial Development at Gat. no. 1321, Wagholi Pune by Goel Ganga India Pvt. Ltd. 31. SEIAA - Proposed amendment in Environment clearance obtained vide letter no. SEAC- STATEMENT- 2010/CR.669/TC.2 dated 20/01/2012 for proposed residential project 0000003293 “Windermere” located at Koregaon Park, Pune. ***** Important Note: 1. The project proponents are requested remain present with copy of duly signed Form-1, Form-IA and conceptual/approved plan as uploaded on the portal. 2. Further, it is requested that the project proponent or his/her authorized representative should attend the presentation meeting of SEAC. They may also depute senior officer from the company who can make a presentation on their behalf on the salient features of the project, the related environmental issues, proposed Environmental Management Plan and also respond to the queries/suggestions of the Committee. Due care shall be taken to maintain social distancing. 3. No consultant is permitted into the meeting who has no accreditation with Quality Council of India (QCI)/National Accreditation Board of Education and Training (NABET). 4. PP is requested to submit information (as mentioned in the Form-I / Form-1A uploaded on the portal) during the meeting, duly signed by Project Proponent and Consultant in the Consolidated Statement format placed below. PP is also requested to make available soft copy of the same in MS-word format during the meeting. Consolidated Statement for <PROPOSAL NUMBER> 1. Proposal Number <PARIVESH / ecmpcb> 2. Name of Project 3. Project category <As per Schedule of EIA Notification, 2006> 4. Type of Institution <Private / Government / Semi-Government> 5. Project Proponent Name Regd. Office address Contact number e-mail 6. Consultant <Name, NABET Accreditation number and Validity.> 7. Applied for <New Greenfield Project / Modification / Expansion> 8. Details of previous EC <Number, Date, Granted by> 9. Location of the project <Survey / Gut number, Village, Taluka, District> 10. Latitude and Longitude 11. Total Plot Area (m2) 12. Deductions (m2) 13. Net Plot area (m2) 14. Proposed FSI area (m2) 15. Proposed non-FSI area (m2) 16. Proposed TBUA (m2) 17. TBUA (m2) approved by <m2, number and date of approval letter.> Planning Authority till date 18. Ground coverage (m2) & % 19. Total Project Cost (Rs.) 20. CER as per MoEF & CC circular Activity Location Cost (Rs.) Duration dated 01/05/2018 21. Details of Building Configuration : Reason for <Please use following legends: Floor = F , Parking = Pk, Podium = Po, Stilt =St, Modification / Lower Ground = LG, Upper Ground = UG, Basement = B, Shops = Sh> Change Previous EC / Existing Building Proposed Configuration Building Configuration Height Building Configuration Height Name (m) Name (m) 22. Total number of tenements (Existing + Proposed) 23. Water Budget Dry Season (CMD) Wet Season (CMD) Fresh Water Fresh Water Recycled Recycled Swimming Pool Swimming Pool Flushing Flushing Total Total Waste water Waste water generation generation 24. Water Storage Capacity for Firefighting / UGT 25. Source of water 26. Rainwater Level of the Ground water table: Pre-Monsoon: Harvesting Post Monsoon: (RWH) Size and no of RWH tank(s) and Quantity: Quantity and size of recharge pits: Details of UGT tanks if any: 27. Sewage and Sewage generation in CMD: Wastewater STP technology: Capacity of STP (CMD): 28. Solid Waste Type Quantity (kg/d) Treatment / disposal Management Dry waste: during Wet waste: Construction Construction waste Phase 29. Solid Waste Type Quantity (kg/d) Treatment / disposal Management Dry waste: during Wet waste: Operation Hazardous waste: Phase Biomedical waste E-Waste STP Sludge (dry) 30. Green Belt Total RG area (m2): Development Existing trees on plot: Number of trees to be planted: Number of trees to be cut: Number of trees to be transplanted: 31. Power Source of power supply: requirement: During Construction Phase (Demand Load): During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set: Fuel used: 32. Details of Energy saving 33. Environmental Type Details Cost Management Capital plan budget O&M during Construction phase 34. Environmental Component Details Capital (Rs.) O&M (Rs./Y) Management Storm Water plan Budget Sewage treatment during Water treatment Operation RWH phase Swimming Pool Solid Waste Hazardous waste e-waste Green belt development Energy saving Environmental Monitoring Disaster Management 35. Traffic Type Required as per DCR Actual Provided Area per parking (m2) Management 4-Wheeler 2-Wheeler Bicycles 36.