2019 Annual Report Contents

Total Page:16

File Type:pdf, Size:1020Kb

2019 Annual Report Contents 2019 Annual Report Contents 3 Management Report on Responsibility for Financial Reporting 3 Audit, Legal and Finance Committee Chair’s Letter 4 Independent Auditor’s Report 6 Energy Northwest Management’s Discussion and Analysis (Required Supplementary Information) 16 Current Debt Ratings 17 Statement of Net Position 19 Statements of Revenues, Expenses and Changes in Net Position 20 Statements of Cash Flows 22 Notes to Financial Statements 44 Schedules of Required Supplementary Information Energy Northwest Facts Headquarters www.energy-northwest.com Richland, Wash. and our blog: Employment Figures www.northwestcleanenergy.com Approximately 1,100 full-time employees Projects and Services • Four power generation projects • Environmental and analytical services • Operations and maintenance services • Equipment calibration services • Power system solutions • Project development • Demand-side management services To learn more visit our website: Management Report On Responsibility For Financial Reporting Energy Northwest management is responsible for preparing the accompanying financial statements and for their integrity. They were prepared in accordance with Generally Accepted Accounting Principles (GAAP) (applied on a consistent basis, and include amounts that are based on management’s best estimates and judgments). The financial statements have been audited by Baker Tilly Virchow Krause, LLP, Energy Northwest’s independent auditors. Management has made available to Baker Tilly Virchow Krause, LLP all financial records and related data, and believes that all representations made to Baker Tilly Virchow Krause, LLP during its audit were valid and appropriate. Management has established and maintains internal control procedures that provide reasonable assurance as to the integrity and reliability of the financial statements, the protection of assets from unauthorized use or disposition, and the prevention and detection of fraudulent financial reporting. These control procedures provide appropriate division of responsibility and are documented by written policies and procedures. Energy Northwest maintains an ongoing internal auditing program that provides for independent assessment of the effectiveness of internal controls, and for recommendations of possible improvements thereto. In addition, Baker Tilly Virchow Krause, LLP has considered the internal control structure in order to determine their auditing procedures for the purpose of expressing an opinion on the financial statements. Management has considered recommendations made by the internal auditor and Baker Tilly Virchow Krause, LLP concerning the control procedures and has taken appropriate action to respond to the recommendations. Management believes that, as of June 30, 2019, internal control procedures are adequate. Bradley J. Sawatzke Brent J. Ridge Chief Executive Officer Vice President for Corporate Services/Chief Financial Officer Audit, Legal And Finance Committee Chair’s Letter The executive board’s Audit, Legal and Finance Committee (committee) is composed of 11 independent directors. Members of the committee are: July 1, 2018 - Dec. 31, 2018 8: Chair John Saven, Terry Brewer, Arie Callahan, Marc Daudon, Linda Gott, Jack Janda, Sid Morrison, Jim Moss, Skip Orser, Will Purser and Tim Sheldon. Jan. 1, 2019 - Jan. 22, 2019: Chair John Saven, Arie Callaghan, Marc Daudon, Linda Gott, Jack Janda, Sid Morrison, Jim Moss, Skip Orser, Will Purser and Tim Sheldon. Jan. 23, 2019 - June 30, 2019: Chair John Saven, Arie Callaghan, Marc Daudon, Linda Gott, Jack Janda, Jim Malinowski, Sid Morrison, Jim Moss, Skip Orser, Will Purser and Tim Sheldon. The committee held eight meetings during the fiscal year ended June 30, 2019. The committee oversees Energy Northwest’s financial reporting process on behalf of the executive board. In fulfilling its responsibilities, the committee discussed with the performance auditors and the independent auditors the overall scope and specific plans for their respective audits, and reviewed Energy Northwest’s financial statements and the adequacy of Energy Northwest’s internal controls. The committee met regularly with Energy Northwest’s performance auditors and convened periodic meetings with the independent auditors to discuss the results of their audit, their evaluations of Energy Northwest’s internal controls, and the overall quality of Energy Northwest’s financial reporting. The meetings were designed to facilitate any private communications with the committee desired by the performance auditors or independent auditors. John Saven Chair, Audit, Legal and Finance Committee 2019 Annual Report | 3 INDEPENDENT AUDITORS' REPORT To the Executive Board INDEPENDENT AUDITORS' REPORT Energy Northwest Richland, Washington To the Executive Board ReportEnergy on theNorthwest Financial Statements Richland, Washington We have audited the accompanying financial statements of the business-type activities of Energy Northwest, as of andReport for the on y earthe endedFinancial June Statements 30, 2019, and the related notes to the financial statements, which collectively comprise Energy Northwest's basic financial statements as listed in the table of contents. We have audited the accompanying financial statements of the business-type activities of Energy Northwest, as Management’sof and for the Responsibility year ended June for 30, the 2019 Financial, and the Statements related notes to the financial statements, which collectively comprise Energy Northwest's basic financial statements as listed in the table of contents. Management is responsible for the preparation and fair presentation of these financial statements in accordance withManagement’s accounting principles Responsibility generally acceptedfor the Financial in the United Statements States of America; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statementsManagem thatent are is freeresponsible from material for the misstatement, preparation and whether fair presentation due to fraud of orthese error. financial statements in accordance with accounting principles generally accepted in the United States of America; this includes the design, Auditors’implem Responsibilityentation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error. Our responsibility is to express opinions on these financial statements based on our audit. We conducted our auditAuditors’ in accordance Responsibility with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statementsOur responsibility are free from is to material express misstatement. opinions on these financial statements based on our audit. We conducted our audit in accordance with auditing standards generally accepted in the United States of America. Those An auditstandards involves require performing that we procedures plan and perform to obtain the audit audit evidence to obtain about reasonable the amounts assurance and aboutdisclosures whether in thethe financial financialstatements statements. are free The from procedures material selectedmisstatement. depend on the auditors’ judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments,An audit involves the auditor performing considers procedures internal control to obtain relevant audit evidenceto Energy about Northwest the amounts's preparation and disclosures and fair in the presentationfinancial statements.of the financial The statements procedures in selected order to dependdesign audit on the procedures auditors’ judgment,that are appropriate including the in theassessment of circumstances,the risks of materialbut not for misstatement the purpose of of the expressing financial anstatements, opinion on whether the effectiveness due to fraud of orEnergy error. Northwest In making's those risk internalassessments, control. Accordingly the auditor, we considers express internal no such control opinion. relevant An audit to Energyalso includes Northwest evaluating's preparation the appropriateness and fair of accountingpresentation policies of the used financial and thestatements reasonableness in order toof designsignificant audit accounting procedures estimates that are madeappropriate by management, in the as wellcircumstances, as evaluating but the not overall for the presentation purpose of ofexpressing the financial an opinionstatements. on the effectiveness of Energy Northwest's internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness We ofbelieve accounting that the policies audit evidenceused and we the have reasonableness obtained is sufficient of significant and accountingappropriate estimatesto provide made a basis by for management, our audit opinionsas well. as evaluating the overall presentation of the financial statements. OpinionsWe believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinions. In our opinion, the financial statements referred to above present fairly, in all material respects, the financial positionOpinions of the business-type activities of Energy Northwest as of June 30, 2019, and the respective changes
Recommended publications
  • Management Handbook 2020
    MANAGEMENT HANDBOOK 2020 Energy Northwest may revise or discontinue policies, procedures, or benefits described in this handbook, and/or institute new policies, procedures, or benefits. This handbook nor any other Energy Northwest policies, procedures, or practices (whether verbal or written) or the acceptance or continuance of employment are to be construed as a contract of employment, a promise of continued employment, or as creating an implied or contractual duty between an employee and Energy Northwest. All employment may be terminated "at will” by Energy Northwest or the employee for lawful reasons. Management Handbook 2020 Introduction Congratulations and welcome to Energy Northwest’s leadership team! You are part of a group of highly skilled professionals focused each day on the relentless pursuit of excellence through continuous improvement. This ensures we provide our public power members and regional ratepayers with safe, reliable, cost-effective, responsible power generation and energy solutions. I want to personally thank you for stepping up to the challenge of leadership on our management team. It’s a very important position to our agency, and to the people you lead. This handbook gives you the guidelines and resources to manage and direct your staff to help them accomplish individual and agency goals. It contains much of the information you will need to be successful in your leadership role here at Energy Northwest; it describes the many important programs, processes and resources available to you. The handbook also lists key expectations for supervisors and managers. I encourage you to use this handbook often as you get started in management, and keep it as a reference throughout your career with the agency.
    [Show full text]
  • Final Environmental Assessment for the Energy Northwest WNP-1/4 Lease Renewal January 2017 I
    DOE/EA-2044 Assessment Energy Northwest WNP-1/4 Lease Renewal, Hanford Site, Washington January 2017 U.S. Department of Energy Richland Operations Office Richland, WA 99352 Approved for Public Release; Further Dissemination Unlimited U.S. Department of Energy DOE/EA-2044 Terms Used in this Document Area of Potential Effect (APE) – the geographic area within which an undertaking may cause changes in the character or use of historic properties, if such properties exist. The APE is influenced by the scale and nature of the undertaking. Best Management Practices (BMPs) – Standard activities, operating procedures, and practices that are used to prevent or reduce potential environmental impacts from project activities. Cultural Resources - A general term used to refer to a wide range of resources, including historic structures, archaeological sites, places of traditional, religious and cultural significance, sacred sites, Native American human remains, and associated objects that are entitled to special consideration under federal statute, regulations, and executive orders. Energy Northwest (EN) – the municipal corporation and joint operating agency that owns both the Industrial Development Complex (IDC) and the Columbia Generating Station (CGS) Federal Threatened or Endangered Species - Plant or animal species that are at risk of becoming endangered in the near future throughout all or a significant part of their range. Threatened or endangered status is formally designated by a listing process under the Endangered Species Act (16 USC 1531 et seq.). Industrial Development Complex (IDC) – the collective name applied to the area occupied by Washington Nuclear Projects Number 1 and Number 4 (WNP-1/4) that reflects the current industrial nature of the site.
    [Show full text]
  • TVA's Bad Nuclear
    TVA’s Bad Nuclear Bet: Gambling BILLIONS on Bellefonte Reactors Prepared by the Southern Alliance for Clean Energy August 2011 Executive Summary “The circumstances for Bellefonte Units 1 and 2 are unique; no other licensee has ever given up its construction permits, partially dismantled the plant and allowed the facility to degrade, then requested that the permits be reissued.” -Joseph F. Williams, NRC Senior Project Manager1 The history of the Tennessee Valley Authority’s (TVA) Bellefonte site in Jackson County, Alabama spans nearly 40 years. A total of four reactors have been proposed, and billions of dollars have been spent, but not a single kilowatt of electricity has ever been produced. After allowing the site to sit idle for more than 20 years and scrapping the facility for spare parts, TVA is now proposing to restart construction of the Bellefonte Unit 1 reactor, which may be one of the greatest gambles in the agency’s history. Southern Alliance for Clean Energy has serious concerns about TVA’s push to complete the mothballed, abandoned Bellefonte reactors. Bellefonte’s unique and complicated history is compounded by that fact that, in order to complete construction of the reactors, TVA faces unique and complicated problems—many worse than any other reactor project has previously faced. This report documents some of our concerns and makes it clear that finishing Bellefonte is not a gamble worth taking. Our concerns include Bellefonte's long, complicated history; multiple safety concerns that have not been addressed; the troubled history of the Babcock &Wilcox “Mark-C 205” design; the unnecessary and costly nature of Bellefonte; and additional obstacles.
    [Show full text]
  • EMS-01 Use Category: INFORMATION Major Rev: 014 Minor Rev: 001 Title: Environmental Management System Program Description Page: 1 of 81
    Initials Verify Revision Information Prior To Use Date Number: EMS-01 Use Category: INFORMATION Major Rev: 014 Minor Rev: 001 Title: Environmental Management System Program Description Page: 1 of 81 PCN#: ENVIRONMENTAL MANAGEMENT SYSTEM N/A *EMS-01* Effective Date: 6/30/16 EMS-01 Number: EMS-01 Use Category: INFORMATION Major Rev: 014 Minor Rev: 001 Title: Environmental Management System Program Description Page: 2 of 81 DESCRIPTION OF CHANGES Justification (required for major revision) Update is the result of the annual procedure review (AR 347279) and to address deficiency identified in CR 335161 and CR 335225. Page(s) Description (including summary, reason, initiating document, if applicable) All Updated reference to GBP-REC-02 and SWP-REC-02. All Minor spelling and grammar corrections. All Removed outdated reference to GBP-ENV-12 and replaced with RPI-29.0. 6 Section 5.0 - Updated management section. 11 Section 8.9 - Removed outdated reference to RPI-20.0 and referenced E&RP SharePoint for list of permits. 13 Section 9.2 - Removed revision dates of PSM-5.7. 15 Section 9.3 – Added reference to GBP-PUR-02. 28 Section 9.8 - Added reference to GBP-REC-03 to section on public record request. Added reference to the Regulatory Communication Database on SharePoint. 31-32 Section 9.10 - Added reference to GBP-PRO-01 to relevant procedure section for document control. Clarified document control requirements (CR 335161). 33-34 Section 9.11 – Updated records management requirements to address protection and storage of environmental records (CR 335225). 44 Section 9.16 – Removed third paragraph that discussed GBP-ENV-12 requires mangers are informed of environmental issues.
    [Show full text]
  • FEDERAL REGISTER INDEX January–October 2019
    FEDERAL REGISTER INDEX January–October 2019 Nuclear Regulatory Commission Ground Water Protection at Uranium In Situ Recovery Facilities – 574 RULES ( Jan 31); 6979 ( Mar 1) Access Authorization and Fitness-for-Duty Determinations – 43667 ( Aug 22) Harmonization of Transportation Safety Requirements with IAEA Adjustment of Civil Penalties for Inflation for Fiscal Year 2019 – 2433 ( Feb 7) Standards – 14898 ( Apr 12) Advanced Power Reactor 1400 (APR1400) Design Certification – 23439 List of Approved Spent Fuel Storage Casks: ( May 22) Holtec International HI-STORM 100 Cask System, Certificate of Compliance No. 1014, Amendment No. 13 – 6086 ( Feb 26) Advanced Power Reactor 1400 Design Certification – 41885 ( Aug 16) Holtec International HI-STORM 100 Multipurpose Canister Cask System, Clarification of Export Reporting Requirements for Nuclear Facilities, Certificate of Compliance No. 1014, Amendment No. 14 – 52815 Equipment, and Non-Nuclear Materials – 12483 ( Apr 2) ( Oct 3) Final State Agreement: Holtec International Storage, Transport and Repository 100 Storage Vermont: Discontinuance of Certain Commission Regulatory Authority System, Certificate of Compliance No. 1008, Amendment No. within the State – 51365 ( Sep 30) 3 – 43729 ( Aug 22) List of Approved Spent Fuel Storage Casks: NAC International NAC-UMS Universal Storage System, Certificate of Holtec International HI-STORM 100 Cask System, Certificate of Compliance Compliance No. 1015, Amendment No. 7 – 21728 ( May 15) No. 1014, Amendment No. 13 – 6055 ( Feb 26); 16201 ( Apr 18) Measurement Standards Used at U.S. Nuclear Power Plants – 21727 Holtec International HI-STORM 100 Multipurpose Canister Cask System, ( May 15) Certificate of Compliance No. 1014, Amendment No. 14 – 52747 Measurement Standards Used at U.S. Nuclear Power Plants; ( Oct 3) Correction – 33710 ( Jul 15) Holtec International HI-STORM 100 Multipurpose Canister Cask System, Certificate of Compliance No.
    [Show full text]
  • Economic Impacts of the Columbia Generating Station an Analysis by the Nuclear Energy Institute
    ECONOMIC IMPACTS OF THE COLUMBIA GENERATING STATION AN ANALYSIS BY THE NUCLEAR ENERGY INSTITUTE JANUARY 2018 1 Economic Impacts of the Analysis by the January 2018 Columbia Generating Station Nuclear Energy Institute TABLE OF CONTENTS Executive Summary ................................................................................................... 2 Historical Background ............................................................................................... 4 National, State and Regional Benefits ................................................................. 5 Community Leadership and Environmental Protection .................................. 7 Economic Impact Analysis Methodology ......................................................... 10 Conclusion ................................................................................................................... 11 © 2018 Nuclear Energy Institute, Inc., Economic Impacts of the Columbia Generating Station all rights reserved. No part of this report may be reproduced, transmitted or modified without written permission of the Nuclear Energy Institute, Inc. 2 Economic Impacts of the Analysis by the January 2018 Columbia Generating Station Nuclear Energy Institute Columbia’s operations Columbia provides over support over $690 million 3,930 jobs, in economic output, including more than including more than 2,830 jobs $475 million in Washington. in Washington. EXECUTIVE SUMMARY The Columbia Generating Station (Columbia), located To quantify the economic impacts of this facility,
    [Show full text]
  • The Risks of Reviving TVA's Bellefonte Project Report Prepared
    The Risks of Reviving TVA's Bellefonte Project Report Prepared for Southern Alliance for Clean Energy (SACE) Fairewinds Associates, Inc Arnie Gundersen, Chief Engineer August 3, 2011 Table of Contents Introduction and Background....................................................................................3 Bellefonte’s Unique Design.........................................................................................3 Quality Assurance (QA) Breakdown..........................................................................9 Cannibalization ........................................................................................................12 Containment Issues...................................................................................................14 Historical Precedent .................................................................................................20 Post Fukushima Lessons Learned ............................................................................22 Conclusion ................................................................................................................22 Attachments..............................................................................................................24 Page 2 of 24 Introduction and Background The Tennessee Valley Authority (TVA) has requested permission from the NRC to complete construction and begin operation of the previously terminated TVA Bellefonte Nuclear Unit 1 located in Hollywood, Alabama. At this point in time, TVA believes it may be
    [Show full text]
  • Energy Northwest No 1. (WNP): Environmental Assessment And
    August 31, 2006 Mr. J. V. Parrish Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968 SUBJECT: ENERGY NORTHWEST NUCLEAR PROJECT NO. 1: ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT FOR TERMINATION OF CONSTRUCTION PERMIT CPPR-134 (TAC NO. MC9245) Dear Mr. Parrish: Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your request dated August 9, 2005, and supplemented by letter dated July 7, 2006, that Construction Permit No. CPPR-134 be terminated. The environmental assessment is being forwarded to the Office of the Federal Register for publication. Sincerely, /RA/ Brian J. Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-460 Enclosure: As stated cc w/encl: See next page August 31, 2006 Mr. J. V. Parrish Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968 SUBJECT: ENERGY NORTHWEST NUCLEAR PROJECT NO. 1: ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT FOR TERMINATION OF CONSTRUCTION PERMIT CPPR-134 (TAC NO. MC9245) Dear Mr. Parrish: Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your request dated August 9, 2005, and supplemented by letter dated July 7, 2006, that Construction Permit No. CPPR-134 be terminated. The environmental assessment is being forwarded to the Office of the Federal Register for publication. Sincerely, /RA/ Brian J. Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.
    [Show full text]
  • Energy Northwest
    BONNEVILLE POWER ADMINISTRATION Fact Sheet May 2018 Energy Northwest: Delivering value to BPA and the Northwest The relationship between BPA and Energy Northwest is unique among “Energy Northwest’s Columbia Generating the Bonneville Power Administration’s Station is a valuable, around-the-clock energy suppliers. Energy Northwest generating resource that supports BPA’s mission of delivering reliable, clean and and BPA have a shared responsibility affordable power to our utility customers for the Columbia Generating Station throughout the Northwest.” that runs much deeper than a power purchase agreement. — Elliot Mainzer, administrator and chief executive officer, BPA The simplest statement of the relationship is that Energy Northwest owns and operates the Columbia Generating Station, the Northwest’s only commercial nuclear power plant, while BPA funds the nuclear plant and markets its power. Bonneville and Energy Northwest both seek excellent plant performance as defined through measurements of safety, power generation, reliability and efficiency. Energy Northwest, a joint action agency of the state of Washington, currently made up of 27 of public utilities, also has helped BPA refinance and manage debt, resulting in hundreds of millions of dollars in savings to BPA ratepayers. Power benefits Columbia is an integral part of BPA’s energy portfolio. BPA provides about 30 percent of the electricity consumed in the Northwest. Of that, Columbia provides about 1,200 megawatts, or approximately 13 percent of BPA’s firm energy resource, making it the region’s third largest power resource behind Grand Coulee and Chief Columbia Generating Station Joseph dams. That’s enough energy for about one million homes or 4 percent of the region’s power.
    [Show full text]
  • Mailing List of U.S. Domestic Nuclear Utilities
    Mailing List of Domestic Nuclear Utilities ",Plant .. I Address Arkansas Nuclear One, Units 1 and 2 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Beaver Valley Power Station, Units 1 & 2 Eric A. Larson Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077 Browns Ferry Nuclear Plant, Units 1, 2 & 3 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Brunswick Steam Electric Plant Units 1 & 2 George T. Hamrick, Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461 Byron Station, Units 1 & 2/Braidwood Station, Michael J. Pacilio Units 1 & 2 Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon -Nuclear 4300 Winfield Road Warrenville, IL 60555 Callaway Plant, Unit 1 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company Ameren Missouri P.O. Box 620 -Fulton, MO 65251 Calvert Cliffs Nuclear Power Plant Units 1 & 2 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC. Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Catawba Nuclear Station, Units 1 & 2 Mr. Kelvin Henderson Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745 All -2- Plant Address Clinton Power Station, Unit No. 1 Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555 Columbia Generating Station Mr.
    [Show full text]
  • Official Program
    2017 Official Program June 11-15, 2017 Hyatt Regency San Francisco San Francisco, CA NNUUCCLL GG EEAA NN R R II TT P P A A O O V V W W O O E E N N R R N N I I Annual 2017 Innovating Nuclear Power Our most sincere thanks to our sponsors for their support of the 2017 Annual Meeting. PLATINUM SPONSOR SILVER SPONSORS BRONZE SPONSORS COPPER SPONSORS Table of Contents GENERAL MEETING INFORMATION Meeting Officials .................................................................................................. 2 Daily Schedule ..................................................................................................... 3-4 General Information ............................................................................................. 5-8 PLENARY, SPECIAL SESSIONS & EVENTS ANS President’s Opening Reception ...................................................................... 9 Opening Plenary Session ...................................................................................... 9 Embedded Topical NPIC&HMIT Opening Plenary . ................................................... 9 ANS President’s Special Session ........................................................................... 9 OPD Honors & Awards Dinner ............................................................................... 9 NPIC&HMIT Tuesday Plenary ................................................................................ 9 General Chair’s Special Session ............................................................................ 10 NPIC&HMIT Banquet
    [Show full text]
  • Gao-13-743, Nuclear Power
    United States Government Accountability Office Report to Congressional Requesters September 2013 NUCLEAR POWER Analysis of Regional Differences and Improved Access to Information Could Strengthen NRC Oversight GAO-13-743 September 2013 NUCLEAR POWER Analysis of Regional Differences and Improved Access to Information Could Strengthen NRC Oversight Highlights of GAO-13-743, a report to congressional requesters Why GAO Did This Study What GAO Found The 2011 disaster at Japan's The Nuclear Regulatory Commission (NRC) relies on its staff’s professional Fukushima Daiichi Nuclear Power judgment in implementing its processes for overseeing the safety of U.S. Plant demonstrated that unexpected commercial nuclear power reactors. In implementing this oversight, NRC nuclear accidents with extreme allocates specific roles and responsibilities to resident inspectors assigned to consequences can occur and, thus, each plant, regional officials at one of four regional offices responsible for most heightened concerns about NRC’s oversight activities, headquarters officials, and the nuclear power industry. NRC ability to oversee the safety of U.S. also builds into its processes incentives for plant managers to identify concerns commercial nuclear power reactors. about reactor safety, report those concerns to NRC, and take prompt actions to NRC oversees safety through multiple correct them. NRC’s processes for identifying and assessing findings and processes, such as physically violations are based on prescribed agency procedures and include several points inspecting reactors and also responding to signs of declining where NRC staff must exercise their professional judgment, such as determining performance (i.e., findings) or whether issues of concern identified during physical inspections constitute violations of its requirements.
    [Show full text]