Construction of Tehsil: Hauz Khas District: South Delhi “Motel Building” State: Delhi
Total Page:16
File Type:pdf, Size:1020Kb
FORM-I & IA, Conceptual Site Address Plan, Environment Khasra No.: Khasra No. 2 Min (1-1), 3 Min Management Plan (3-10), 4 Min (4-12), 5 Min (2-7), 3 Min (1-8) Village: Shahurpur Construction of Tehsil: Hauz Khas District: South Delhi “Motel Building” State: Delhi Project Proponent M/s Anant Raj Limited Registered Address- H-65 Connaught Circus, New Delhi Contact Person - Ajay Singh Pathania Designation - DGM Phone no.- 011-43034400, 9810585435 Email ID-Ajay.pathania@anantrajglobal.com Cost of Project - Rs. 115 Crore Category - 8(a) Environmental Consultant Total Plot Area - 10875.57 m2 Perfact Enviro Solutions Pvt Ltd Total Built-up Area : 48012.36 m2 (PESPL) Laboratory Assigned: M/s Perfact Researchers Pvt Ltd NABET Registered List of Accredited Consultant Organisations/ Rev 83/ January 2020/ S.no 120) Registered Address:- 5th Floor, Sector 3, Rohini, New Delhi- 110085 Email- info@perfactgroup.in Website- www.perfactgroup.com Phone- +91-11-49281360 Scanned by CamScanner Sections Particulars Page No. A FORM-1 A-1 TO A-21 B FORM-1A B-1 TO B-20 C CONCEPTUAL PLAN C-1 TO C-17 D ENVIRONMENT MANAGEMENT PLAN D-1 TO D-35 E RISK ASSESSMENT E-1 TO E-5 F ENCLOSURES 1 Accreditation of Consultant F-2 2 Consultant Authorization F-5 3 Land Papers F-7 4 Electricity Bill (Existing Building) F-220 5 Test Reports F-222 6 Layout Plan F-232 7 Landscape Plan F-234 8 Section and Elevation F-236 9 Parking Plan F-239 10 Topographical Map F-243 SECTION A: Form-1 Construction of “Motel Building” at Shahurpur, Tehsil- Hauz Khas, Delhi by Anant Raj Limited Form-1 I. Basic Information S. No. Item Details 1. Name of the project/s Construction of “Motel Building” 2. S. No. in the schedule 8 (a) 3. Proposed capacity/ area/length/ Total Plot Area- 10875.57 m2 tonnage to be handled/ command Net Plot Area- 10508.27 m2 area/ lease area/ number of wells to be Total Built up Area- 48012.36 m2 drilled 4. New/ Expansion/ Modernization New, Since, the Existing Motel building built-up area is less than 2 20,000 m , hence it was not in preview of EIA notification,2006. Now, the building will be demolished and a new motel complex has been proposed to be developed at the site. Hence, we are applying for construction of the motel building. 5. Existing Capacity/ Area etc. Total Plot Area- 10875.57 m2 Net Plot Area- 10508.27 m2 Existing Built-up area– 3229.05 m2 6. Category of Project i.e. ‘A’ or ‘B’ B 7. Does it attract the general condition? Not Applicable If yes, please specify. 8. Does it attract the specific condition? Not Applicable If yes, please specify. 9. Location Plot/ Survey/ Khasra No. Khasra No. 2 Min (1-1), 3 Min (3-10), 4 Min (4-12), 5 Min (2-7), 3 Min (1-8) Village Shahurpur Tehsil Hauz Khas Environmental Consultant : M/s Perfact Enviro Solutions Pvt. Ltd. A-2 Construction of “Motel Building” at Shahurpur, Tehsil- Hauz Khas, Delhi by Anant Raj Limited District South Delhi State Delhi- 110016 10. Nearest railway station/ airport along Nearest Railway Station: Tughlakabad Railway with distance in kms. Station-11.40 km NEE Nearest Highway: NH 236 -3.90 km NW Nearest Airport : Safdarjung Airport-12.53 km NNE 11. Nearest Town, city, District The project is in Delhi city itself Headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, South Delhi Municipal Corporation Municipal Corporation, Local body Address: South Zone KD Colony, Sector 9, Rama Krishna (complete postal addresses with Puram, New Delhi, Delhi 110022 telephone nos. to be given) Email Address: mcdonline.gov.in 13. Name of the applicant Ajay Singh Pathania 14. Registered Address H-65 Connaught Circus, New Delhi 15. Address for correspondence: Name Ajay Singh Pathania Designation (Owner/Partner/CEO) DGM Address H-65 Connaught Circus, New Delhi Pin Code 110001 E-mail Ajay.pathania@anantrajglobal.com Telephone No. 011-43034400, 9810585435 Fax no. - 16. Details of Alternative Sites examined, None if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? Environmental Consultant : M/s Perfact Enviro Solutions Pvt. Ltd. A-3 Construction of “Motel Building” at Shahurpur, Tehsil- Hauz Khas, Delhi by Anant Raj Limited 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. Not Applicable The Forest (Conservation) Act, 1980? The Wildlife (Protection) Act, 1972? Not Applicable The C.R.Z. Notification, 1991? Not Applicable 22. Whether there is any Government Not Applicable Order/ Policy relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation No pending against the project and/ or land in which the project is propose to be set up? Name of the Court Not applicable Case No. Not applicable Orders/ directions of the Court, if any and its relevance with the proposed Not applicable project. Environmental Consultant : M/s Perfact Enviro Solutions Pvt. Ltd. A-4 Construction of “Motel Building” at Shahurpur, Tehsil- Hauz Khas, Delhi by Anant Raj Limited II. Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/Checklist Yes Details thereof (with approximate quantities /rates, confirmation /No wherever possible) with source of information data 1.1 Permanent or temporary change No The land use of the site has already been changed to in land use, land cover or Commercial Use. topography including increase Presently, the project is a non operational Motel building in intensity of land use (with 2 with a total built-up area of 3229.05 m . The existing respect to local land use plan) building will be demolished and the proposed development will be done on the same land. Hence, there will be no further change in land use and land cover. 1.2 Clearance of existing land, Yes The entire existing structure with a built-up area of vegetation and buildings? 3229.05 m2 will be demolished for the proposed development. 1.3 Creation of new land uses? No No creation of new land use. 1.4 Pre-construction investigations Yes Pre-construction Geo-technical investigation has already e.g. bore houses, soil testing? been done. 1.5 Construction works? Yes Construction will be done as per approved building plans & applicable by-laws. 1.6 Demolition works? Yes Demolition of existing building of total built-up area 2 3229.05 m will be done. C&D wastes will be reused to the extent possible. Excess waste will be sent to the C & D facility. 1.7 Temporary sites used for No Workers during the construction phase will be hired from construction works or housing nearby areas and hence no housing provisions will be of construction workers? made. Only temporary shelters will be provided. 1.8 Above ground buildings, Yes The proposed building will be elevated up to 67.30 m and structures or earthworks excavation up to 3 levels of basement will be carried out. including linear structures, cut and fill or excavations Environmental Consultant : M/s Perfact Enviro Solutions Pvt. Ltd. A-5 Construction of “Motel Building” at Shahurpur, Tehsil- Hauz Khas, Delhi by Anant Raj Limited 1.9 Underground works including No Not applicable mining or tunneling? 1.10 Reclamation works? No No reclamation work will be done 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No The proposed project is construction of a motel building. processes? Therefore, no production or manufacturing processes will be carried out. 1.14 Facilities for storage of goods Yes During Construction Phase: or materials? ♦ Separate raw material yards will be made within the project site. ♦ Cement will be separately stored under cover in bales. ♦ Sand will be stacked nearby under tarpaulin cover. ♦ Bricks and steel will be laid in open. ♦ The raw material yard will be located within the project site. During Operation Phase: Since the project will be Motel Building, storage of products like eatables, towels, toiletries etc. will be done within the building. Environmental Consultant : M/s Perfact Enviro Solutions Pvt. Ltd. A-6 Construction of “Motel Building” at Shahurpur, Tehsil- Hauz Khas, Delhi by Anant Raj Limited 1.15 Facilities for treatment or Yes During Construction phase: disposal of solid waste or liquid Total 200 labourers will be employed during the effluents? construction phase and hence the solid waste generation will be 30 kg/day which will be disposed off at a nearby municipal solid waste site. Construction debris like concrete will be recycled and will be used in lean concrete, brick work wastage will be reused for waterproofing for terrace, toilets etc. and rest will be sent to the approved construction and demolition facility at site. Approx. 7 KLD of the waste water will be generated from laborers which will be discharged to septic tank that will be cleaned regularly. During Operation Phase: Approx. 652 kg/ day of solid waste will be generated from the motel during the operational phase. Out of which, 261 kg/day of biodegradable waste will be treated in Organic Waste Converter to get converted to manure. 196 kg/day of recyclable waste and 196 kg/day of plastic waste will be sent to authorised recycler. Waste water (Sewage- 217 KLD ; Laundry wastewater- 8 KLD) will be generated from the complex.