Llywodraeth Cymru / Welsh Government A487 New Dyfi Bridge Environmental Statement - Volume 3: Appendix 8.2
Total Page:16
File Type:pdf, Size:1020Kb
Llywodraeth Cymru / Welsh Government A487 New Dyfi Bridge Environmental Statement - Volume 3: Appendix 8.2 Visual Assessment Tables Final Issue | September 2017 Llywodraeth Cymru / Welsh Government A487 New Dyfi Bridge Visual Assessment Table - Construction Key Dist. = Distance to nearest part of the Scheme Receptor category = [R] – Representative, [S] – Specific, [I] – Illustrative Grid Ref = Accurate grid reference for the viewpoint Sensitivity = (High, Moderate, Low) Refer to criteria tables in Chapter 8 Nature of Change = Magnitude (Major, Moderate, Minor, Negligible, No Change), Permanent/Temporary (short-term: 5yrs, medium term: 5-15 yrs, long term: >15yrs), Reversible/ Irreversible. Refer to criteria tables in Chapter 8 N.B. For the construction phase in accordance GLVIA3 para 4.21, inbuilt standard construction mitigation measures have been developed as part of the iterative design and accounted for in the assessment process. These are described at paragraph 8.5.6 of Chapter 8 in Volume 1 of the ES. Due to the short-term and temporary nature of the construction effects identified, it is not considered feasible to include any (secondary) mitigation to further reduce the construction phase effects. Table 1 Assessment of visual effects arising from the construction phase View- Receptors Description of Existing View Receptor Sensitivity Nature of Changes to View Effect at point Represented During Construction Winter (receptor ID on during Figure 8.4) construction Year VP 1 This view is Open view looking east north-east. The recreational path Recreational route of national importance and high value. The route is well Construction activities including vegetation clearance, earthworks and Moderate representative of and surrounding fields occupy the foreground with the used by walkers, anglers and cyclists enjoying attractive views of the erecting of the piers, northern abutment and bridge deck would be adverse those available River Dyfi, visible through intervening vegetation, to the surrounding rural countryside. Views have a high susceptibility to change. dominant in the foreground and middle distance of views from this part [R] to pedestrians left of the view. The river provides a focal point as it These receptors have a high sensitivity to the proposed construction of the route. Whilst push launching the viaduct section of the and cyclists approaches the Millennium Bridge in the middle distance. works. development is intended to reduce potential impact on the surrounding Dist. using the To the north, the steep wooded northern riverbank and landscape, it is not possible to push launch the bridge section. Due to the footpath (P5) hillside beyond contain and foreshorten the view. To the weight and size of the elements required to construct the main spans over 40m and NCN 8 on south, more open, 180° views extend over the fields to the the river and the northern abutment, cranes and piling rigs are likely to the southern rising ground at Pen yr Allt. be prominent and dynamic features in this view. Changes arising from Grid Ref: bank of the the construction phase would be large scale, occupying a considerable River Dyfi. proportion of views but would be temporary, short term and reversible. SH 7479 The magnitude of change to views as a result of the construction phase 0194 over and above those assessed in table 2 below are judged to be moderate to minor. VP2 Pedestrians and Open and slightly elevated view partially filtered through Recreational route of national importance and high value. The route is well Construction activities including vegetation clearance, earthworks and Moderate cyclists using the tall feature railings to the bridge. The River Dyfi forms used by walkers and cyclists enjoying attractive views of the surrounding erecting of the piers, northern abutment and bridge deck would be adverse NCN 8. an attractive and dynamic focal point in the foreground rural countryside. Views have a high susceptibility to change. These dominant in the foreground and middle distance of this view. Due to the [S] Crossing the and middle distance of this view. To the north, the steep receptors have a high sensitivity to the proposed construction works. weight and size of the elements required to construct the main spans over Millennium wooded northern riverbank and hillside beyond contain the river and the northern abutment, cranes and piling rigs are likely to Dist. Bridge. and foreshorten the view. To the south, more open, 180° be prominent and dynamic features in this view. Changes arising from 30m views extend over the fields to the east of the site. Cars the construction phase would occupy a considerable proportion of the using the A487 are partially and fleetingly visible, filtered western and south-western part of this wide view, and would be at odds through the deciduous riverside trees in winter. with its character. However the changes would be temporary, short term Grid Ref: and reversible. The magnitude of change to views as a result of the SH 7492 construction phase over and above those assessed in table 2 below are 0198 judged to be moderate to minor. VP3 Road users on View available to southbound driver and cyclists. To the This route is a busy trunk road through the southern edge of Snowdonia Works to clear mature vegetation from the riverbank in the middle Slight to the A487 (R2). east the view extends beyond the roadside hedgerow over National Park (SNP). It is of National Importance and visual amenity is of distance of this view would be visible. Once cleared, views would be moderate fields laid to pasture to the hills around Bryn-Tudor. To medium value. Driver’s attention would be focussed on the task of driving available to the nearest and tallest element of the works to the bridge adverse [R] the south views are foreshortened in the middle distance along this fast section of road on a bend. Southbound travellers would over the River Dyfi. Cranes and piling rigs would be visible as would by the mature tree-lined north bank of the River Dyfi. notice views opening out over the landscape to the east, having emerged earthworks and road works to create the junction in the foreground of the Dist. 5m In winter the suspension structure of the Millennium from the heavy woodland cover, just to the north. Views to the south (in view. Bridge is just visible through leafless trees. The the direction of travel) and east are of medium susceptibility to change For the duration of the construction phase a construction compound foreground of the view is dominated by the existing A487 from construction activity. The sensitivity of these receptors is considered would be visible beyond the roadside hedgerow to the left of the view. to be moderate. Page 2 Llywodraeth Cymru / Welsh Government A487 New Dyfi Bridge View- Receptors Description of Existing View Receptor Sensitivity Nature of Changes to View Effect at point Represented During Construction Winter (receptor ID on during Figure 8.4) construction Year Grid Ref: Cyclists on Road and cycle path. The steep and partially wooded Cyclists would be using the traffic-free roadside section of NCN 8. This is Changes arising from the construction phase would occupy a Moderate SH 7453 NCN 8. hillside to the northwest foreshortens views west and a nationally important route with views of high value. Cyclists would be considerable proportion of this view, but only to the area within 300m of adverse 0199 north. travelling at slower speeds and with attention more likely to be focussed the viewpoint the visible construction works would be partially at odds on views of the surrounding countryside. Their susceptibility to changes in with the character of this view. However the changes would be visual amenity is medium to high. These receptors are considered to be temporary, short term and reversible. The magnitude of change to views highly sensitive. as a result of the construction phase over and above those assessed in table 2 below are judged to be moderate to minor. Single dwelling, This property has similar, but more oblique and partial The visual amenity of residents in the property are considered to be of Parts of the northern construction compound, some traffic management Slight at the Junction views focussed in an easterly direction over the Dyfi high value and of individual importance. The property faces east affording works and occasional congested traffic may be obliquely and partially adverse of A487 and valley. residents wide and attractive views over the Dyfi valley. The susceptibility visible and could impact the visual amenity of residents in the garden to B4404. of these receptors to changes in their views is high. The sensitivity of this the rear of this property, but would be barely noticeable. residential receptors is assessed as high. Notably this property has no windows facing south or west. The magnitude of change to views as a result of the operational phase is judged to be Negligible. VP4 Users of a short An open and elevated view looking southwest from the Views of road users of the minor rural road (B4404) (R1) are of local Road users would experience occasional glimpsed open views of the Slight length of the B4404 adjacent to Glan-fechan. This is one of few importance and high value, but their susceptibility to change is medium northern end of the site, which would contain a considerable area of road adverse B4404 (R1) glimpsed views through gaps in the roadside hedgerow. due to their attention being focussed on the task of driving and the works and a temporary construction compound which would be seen as a [R] outside SNP. The foreground of this view is dominated by the roofs of restricted nature of views out. Thus their sensitivity to changes in views is contrasting element occupying a small proportion of the wide views.