Offshore GE Renewable

© 2018 General Electric Company - All rights reserved Haliade 150-6MW installation at First US Offshore Wind ; picture courtesy Deepwater Wind GE Offshore Wind

© 2018 General Electric Company - All rights reserved Our Offshore Footprint Hamburg • Sales & tendering • Project execution Quonset (RI) • O&M (Block Island) • Support functions

Cherbourg • Blades site Foxborough (MA) • Sales and tendering Ostend Saint-Nazaire • O&M • Manufacturing site • Support functions

Le Carnet • Testing site

Barcelona Asian Hub Nantes • Engineering • Beijing offices • Offshore HQ office • R&D

© 2018 General Electric Company - All rights reserved Nantes (engineering center and headquarters)

• Opened 2013 • 250+ employees • Engineering: Mechanical components, electrical components, loads, control, design... • Project management: installation, commissioning, planning… • Operations & Maintenance: technical support, field service… • Global Supply chain: Sourcing, manufacturing,… • Support functions: HR, Finance, Marketing, Communication, Quality,…

4

© 2018 General Electric Company - All rights reserved Saint-Nazaire (manufacturing facilities)

• Components: Generators and nacelles • Capacity: 100 turbines/year • Area: 32 Acres • Constructed area: 5 Acres. • Opened December 2014 • 200+ employees • Dynamic production line • Quality processes designed by manufacturing experts from the automotive and aircraft industries • First European factory HEQ certified

5

© 2018 General Electric Company - All rights reserved Blade production: LM Wind

DENMARK Headquarters • In operation since 1978 Engineering Test Center CANADA FRANCE • Produced > 185,000 blades Production facilities: 1 Production facilities: 1 Production facilities: 1 • Corresponding to ~ 77 GW capacity Production facilities: 3 USA TURKEY Production • Saving > 147 MM tons of CO2/year Production SPAIN facilities: 2 Production facilities: 1 Production • 9,000+ employees facilities: 2 facilities: 2 • 13 manufacturing facilities in 8 countries Production • Supplier to 30 turbine OEMs facilities: 1

Vertical integration to accelerate LCOE  6

© 2018 General Electric Company - All rights reserved Global installations Merkur Merkur 396 MW

Osterlild 6 MW

Belwind 6 MW

Fuqing Xinghua Bay 18 MW Block Island 30 MW

Ocean Wind 1,100 MW Le Carnet 6 MW Skipjack 120 MW Saint-Nazaire 480 MW Installed (462 MW)

Ongoing Project

Preferred Turbine Supplier

Only Offshore OEM with installations in 3 continents 7

© 2018 General Electric Company - All rights reserved Haliade-X 12 MW

© 2018 General Electric Company - All rights reserved 12 MW capacity 660-feet rotor 350-feet long blades HALIADE-X 12 MW 814 feet high GE is developing Haliade-X 67 GWh gross AEP 12 MW, the biggest offshore wind turbine in the world, with 220-meter rotor, 107-meter 63% blade, leading capacity factor (63%), and digital capabilities, that will help our 2 38,000 m swept area customers find success in an increasingly competitive environment. Wind Class IEC: IB 1063 ft 1046 ft Generates double the energy 324 m 319 m as previous GE Haliade model

Generates almost 45% 814 ft more energy than most 248 m powerful wind turbine available on the market today

Will generate enough clean power for up to 16,000 European households per turbine, and up to 1 million European households in a 750 MW configuration windfarm Eiffel Tower Haliade-X 12 MW Chrysler Building

9

© 2018 General Electric Company - All rights reserved Product comparison

Ø = 2.7 m Onshore 3X Blades 67 m Benefits of design 1. Hybrid carbon technology reduces weight of blade Ø = 3.3 m 2. 107m blade length yields high Haliade turbine capacity factor 73 m

Airbus A380 80 m

Ø = 5.5 m Haliade-X 107 m (350 ft) 10

© 2018 General Electric Company - All rights reserved Marshalling Harbor -Logistic Hub

1 1 Layout of an Offshore Wind Logistic Hub

Section of Towers 2.000m² used as a storage area Storage Area (spares)

Blades storage area

Nacelle storage area Pre-assembly area

Load-In area Load-Out area 24h/7D

© 2018 General Electric Company - All rights reserved Marshalling Harbor Requirements Pre-Assembly Site

Quay Requirements: • Deep water access • Length: 1050ft minimum • Water Depth: 32.8ft LAT minimum • Dedicated quay for Load In and Load Out operations • Seabed adapted for Jack-up vessel following project basis • Load Bearing capacity: 98 kPa min for Load-In and 294 kPa for Load-Out/pre-assembly

Storage Area requirements: • Storage Area: approx. 0.74 acres/WTG (245 kPa) • Pre-Assembly Area: 4 acres • Load bearing capacity: 294 kPa • Site surface: 50 acres (storage of approx. 40WTG for 100WTG project) • Horizontal and Vertical clearance: no restrictions

Others: • Security Level ISPS Level 1 • Power & Water Supply • Local Supply chain Operations - Onshore

WTG main components Transportation Marshalling Hub main functions • Road and Sea transport from factory to marshaling hub • Storage of components and preservation • Handling and Lifting at quay of components • Full tower or split tower pre-assembly at quayside before loadout. • Contracting full geared vessel for round trips • Pre-commissioning of main components

We need:

➢ Port /Terminal: Storage area + quay ➢ Manpower: Mech & Elec tech, Eng, CC, Quality, log… ➢ Lifting equipment & Tools (Cranes, forklift,…) ➢ Service providers (Marine, , Water…) ➢ Transport vessels ➢ Training/ facilities/ IT/ consumables…

14

© 2018 General Electric Company - All rights reserved Operations - Offshore Load-out and Installation Commissioning + O&M • Continuity tests, Energization and Hot Commissioning • 3 days average installation incl. Load-out, transit and installation • Dynamic tests incl. Spin Test and Production Test up to 1st kWh • Mechanical and Electrical completion works prior energization • Remote Commissioning, Troubleshooting & Stabilization of WTG

We need:

➢ Manpower: Inst & Com tech, quality, EHS… ➢ SOV, CTV, Heli, Marine Coordination, … ➢ Equipment & Tools (Blade Rack, forklift, Cherry picker, …) ➢ PPE, Tools and equipment, Aux-Gen, … ➢ Rigging, certification, Torque, … ➢ Training, facilities, Fuel, Consumables, IT, Water, …

15

© 2018 General Electric Company - All rights reserved Thank You!