GE Renewable Energy

GE Renewable Energy

Offshore Wind GE Renewable Energy © 2018 General Electric Company - All rights reserved Haliade 150-6MW installation at First US Offshore Wind Farm; picture courtesy Deepwater Wind GE Offshore Wind © 2018 General Electric Company - All rights reserved Our Offshore Footprint Hamburg • Sales & tendering • Project execution Quonset (RI) • O&M (Block Island) • Support functions Cherbourg • Blades site Foxborough (MA) • Sales and tendering Ostend Saint-Nazaire • O&M • Manufacturing site • Support functions Le Carnet • Testing site Barcelona Asian Hub Nantes • Engineering • Beijing offices • Offshore HQ office • R&D © 2018 General Electric Company - All rights reserved Nantes (engineering center and headquarters) • Opened 2013 • 250+ employees • Engineering: Mechanical components, electrical components, loads, control, design... • Project management: installation, commissioning, planning… • Operations & Maintenance: technical support, field service… • Global Supply chain: Sourcing, manufacturing,… • Support functions: HR, Finance, Marketing, Communication, Quality,… 4 © 2018 General Electric Company - All rights reserved Saint-Nazaire (manufacturing facilities) • Components: Generators and nacelles • Capacity: 100 turbines/year • Area: 32 Acres • Constructed area: 5 Acres. • Opened December 2014 • 200+ employees • Dynamic production line • Quality processes designed by manufacturing experts from the automotive and aircraft industries • First European factory HEQ certified 5 © 2018 General Electric Company - All rights reserved Blade production: LM Wind DENMARK Headquarters • In operation since 1978 Engineering Test Center CANADA FRANCE • Produced > 185,000 blades Production facilities: 1 POLAND Production facilities: 1 Production facilities: 1 CHINA • Corresponding to ~ 77 GW capacity Production facilities: 3 USA TURKEY Production • Saving > 147 MM tons of CO2/year Production SPAIN INDIA facilities: 2 Production facilities: 1 Production • 9,000+ employees facilities: 2 facilities: 2 • 13 manufacturing facilities in 8 countries BRAZIL Production • Supplier to 30 turbine OEMs facilities: 1 Vertical integration to accelerate LCOE 6 © 2018 General Electric Company - All rights reserved Global installations Merkur Merkur 396 MW Osterlild 6 MW Belwind 6 MW Fuqing Xinghua Bay 18 MW Block Island 30 MW Ocean Wind 1,100 MW Le Carnet 6 MW Skipjack 120 MW Saint-Nazaire 480 MW Installed (462 MW) Ongoing Project Preferred Turbine Supplier Only Offshore Wind Turbine OEM with installations in 3 continents 7 © 2018 General Electric Company - All rights reserved Haliade-X 12 MW © 2018 General Electric Company - All rights reserved 12 MW capacity 660-feet rotor 350-feet long blades HALIADE-X 12 MW 814 feet high GE Renewable Energy is developing Haliade-X 67 GWh gross AEP 12 MW, the biggest offshore wind turbine in the world, with 220-meter rotor, 107-meter 63% capacity factor blade, leading capacity factor (63%), and digital capabilities, that will help our 2 38,000 m swept area customers find success in an increasingly competitive environment. Wind Class IEC: IB 1063 ft 1046 ft Generates double the energy 324 m 319 m as previous GE Haliade model Generates almost 45% 814 ft more energy than most 248 m powerful wind turbine available on the market today Will generate enough clean power for up to 16,000 European households per turbine, and up to 1 million European households in a 750 MW configuration windfarm Eiffel Tower Haliade-X 12 MW Chrysler Building 9 © 2018 General Electric Company - All rights reserved Product comparison Ø = 2.7 m Onshore 3X Blades 67 m Benefits of design 1. Hybrid carbon technology reduces weight of blade Ø = 3.3 m 2. 107m blade length yields high Haliade turbine capacity factor 73 m Airbus A380 80 m Ø = 5.5 m Haliade-X 107 m (350 ft) 10 © 2018 General Electric Company - All rights reserved Marshalling Harbor -Logistic Hub 1 1 Layout of an Offshore Wind Logistic Hub Section of Towers 2.000m² used as a storage area Storage Area (spares) Blades storage area Nacelle storage area Pre-assembly area Load-In area Load-Out area 24h/7D © 2018 General Electric Company - All rights reserved Marshalling Harbor Requirements Pre-Assembly Site Quay Requirements: • Deep water access • Length: 1050ft minimum • Water Depth: 32.8ft LAT minimum • Dedicated quay for Load In and Load Out operations • Seabed adapted for Jack-up vessel following project basis • Load Bearing capacity: 98 kPa min for Load-In and 294 kPa for Load-Out/pre-assembly Storage Area requirements: • Storage Area: approx. 0.74 acres/WTG (245 kPa) • Pre-Assembly Area: 4 acres • Load bearing capacity: 294 kPa • Site surface: 50 acres (storage of approx. 40WTG for 100WTG project) • Horizontal and Vertical clearance: no restrictions Others: • Security Level ISPS Level 1 • Power & Water Supply • Local Supply chain Operations - Onshore WTG main components Transportation Marshalling Hub main functions • Road and Sea transport from factory to marshaling hub • Storage of components and preservation • Handling and Lifting at quay of components • Full tower or split tower pre-assembly at quayside before loadout. • Contracting full geared vessel for round trips • Pre-commissioning of main components We need: ➢ Port /Terminal: Storage area + quay ➢ Manpower: Mech & Elec tech, Eng, CC, Quality, log… ➢ Lifting equipment & Tools (Cranes, forklift,…) ➢ Service providers (Marine, Fuel, Water…) ➢ Transport vessels ➢ Training/ facilities/ IT/ consumables… 14 © 2018 General Electric Company - All rights reserved Operations - Offshore Load-out and Installation Commissioning + O&M • Continuity tests, Energization and Hot Commissioning • 3 days average installation incl. Load-out, transit and installation • Dynamic tests incl. Spin Test and Production Test up to 1st kWh • Mechanical and Electrical completion works prior energization • Remote Commissioning, Troubleshooting & Stabilization of WTG We need: ➢ Manpower: Inst & Com tech, quality, EHS… ➢ SOV, CTV, Heli, Marine Coordination, … ➢ Equipment & Tools (Blade Rack, forklift, Cherry picker, …) ➢ PPE, Tools and equipment, Aux-Gen, … ➢ Rigging, certification, Torque, … ➢ Training, facilities, Fuel, Consumables, IT, Water, … 15 © 2018 General Electric Company - All rights reserved Thank You! © 2018 General Electric Company - All rights reserved .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us