Vale of Local Plan

Regulation 19 Draft

- Infrastructure Delivery Plan

- Appendix A: Infrastructure Delivery Schedule September

0 | P a g e 2017

Table of Contents 1. Physical Infrastructure ...... 2 1.1 Transport and Highways; Short Term (2013-2018) ...... 2 1.2 Transport and Highways; Medium Term (2018-2023) ...... 4 2. Social Infrastructure – Education ...... 14 2.1 Primary Short Term (2013-2018) ...... 14 2.2 Primary Long Term (2018-2033) ...... 15 2.3 Secondary Short Term (2013-2018) ...... 17 2.4 Secondary Long Term (2018-2033) ...... 18 3. Health ...... 21 3.1 Primary Care Facilities ...... 21 3.1.1 Short Term (2018-2033) ...... 21 3.1.2 Medium Term (2018-2023) ...... 21 3.2 Housing for the Elderly ...... 26 3.2.1 Medium to Long Term (2018-2023) ...... 26 3.2.2 Long Term (2023 -2033) ...... 28 3.2.3. Medium to Long Term (2018-2013) ...... Error! Bookmark not defined. 3.2.4 Long Term (2023-2033) ...... Error! Bookmark not defined. 4. Waste Disposal ...... 30 4.1 Medium Term ...... 30 5. Flood Defences ...... 33 5.1 Medium Term (2018-2023) ...... 33

0 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

6. Emergency Services ...... 35 6.1 Police ...... 35 6.1.1 Short Term (2013-2018) ...... 35 6.1.2 Medium Term (2018-2023) ...... 36 7. Utilities ...... 359 8. Green Infrastructure ...... 40 9. Open Space, Recreation and Community Facilities...... 435

1 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

1. Physical Infrastructure

1.1 Transport and Highways; Short Term (2013-2018) Infrastructure Evidence Required Delivery Indicative Delivery Anticipated Additional Comments/ Status Type Base Works Partner Cost Mechanism Date Delivery notes /Funding /timescales Aylesbury Aylesbury - ATS Grand Union BCC, £7.3m S106, Heritage Phase 1 to be Upgrade of Grand Necessary Cycle ways Triangle AVDC, Lottery funding delivered in Union Canal Towpath /Footpaths ‘Greenways developers (TBC) 2017-2018 connecting Aylesbury to Growth’ Tring and , Future phases with a land-based route dependent on completing the link. timing of s106 Initial works between agreements Aylesbury and Arla Aylesbury – ATS Aylesbury BCC, £1m DfT 2017-2019 Funding to be secured Necessary Cycle ways Vale HS2 National /Footpaths Parkway to Estate, Cycleway; Waddesdon Greenways Waddesdon Cycleway and Cycle Estate Routes Ltd. Buckingham Buckingham Buckingham BCC, £1.3m Developer Incremental Will be implemented Necessary – Transport Town-wide AVDC, contributions implementation gradually as Cycle Strategy. cycle Sustrans developments progress Network network for the following: improvement London Road Riverside Walk/Bourton Rd Railway Walk A421 Stowe Avenue (NCN 50) A413 Moreton Road

2 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

A422 Stratford Road Hollow Way (Bridleway) CP Circular Walk (Chandos Park) DA Dark Alley / Brookfield Lane MH A422 Market Hill CR Chandos Road A421 West TR Road/Railway Walk A413 / A421 East BIE Buckingham Industrial Estate (based on 4.5km of cycle route) Cycle Buckingham Buckingham BCC, £3m Developer s106 Proposed transport Necessary Network Transport to AVDC, contributions obligation to be infrastructure Strategy. Silverstone Sustrans met – must be associated with MEPC Park completed Silverstone outline cycle route Stage 1 65,000 application includes sq m cycling routes. The occupation route to Buckingham All – by via Rd is 158,000 sq m assumed to be on-road; occupation however, BCC’s preference is for an off- road alignment.

3 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

1.2 Transport and Highways; Medium Term (2018-2023) Infrastructure Evidence Required Delivery Indicative Delivery Anticipated Additional Comments/ Status Type Base Works Partner Cost Mechanism Date Delivery notes /Funding /timescales Aylesbury Highways Kingsbrook Stocklake BCC, AVDC £11-19m Developer Being built as Being delivered by Critical Masterplan Improvement contribution part of s38 – BCC through s38 s (rural likely to be agreement section) completed by 2021 Highways Kingsbrook Aylesbury, Bucks Approx. Developer Completed 5 Tied to the Woodlands Critical Masterplan remainder of Advantage £38m contribution/B years after development and Eastern Link CC Capital work Kingsbrook Road (S) Fund/LGF commences of development 1st home (by £20,280,000 budget left 2021) Highways Southern BCC, Approx. Developer 2021 Tied to the Land East Critical Link Road AVDC, £17+m contributions of Aylesbury (between developers development A41 and (Hampden Fields) A413) Highways Stoke HS2 2021 To support outer link Critical Mandeville roads around Aylesbury A4010 to facilitate orbital Realignment movement. Linked to delivery of Aylesbury South east Link Road (A413 to B4443 Lower Road)). Highways Aylesbury BCC £23,550,0 Developer 2021 To be aligned with Critical South east Developer 00 contributions/H scheme above (Stoke Link Road S2/LGF Mandeville (A413 to realignment) B4443 Lower Road)

4 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Highways South West Developer £14m- Developer 2018–2023 Linking from the new Critical link (between £31m contributions A4010 realignment. A4010 realignment and A418) Public Aylesbury Priority Public BCC £8m Developer 2021 To be implemented Necessary Transport Transport Transport contributions once relevant link roads Strategy. Corridor A41 are in place therefore Tring Road more capacity Public Aylesbury Aylesbury BCC, AVDC £12m- Developer In phases The town centre Necessary Realm Transport town centre £84m contributions / throughout amenities have Strategy/Ayl improvement grants Local Plan expanded across the esbury s to the period inner ring road; Garden pedestrian therefore improved Town network and access is required to public realm: enable  Cambridge pedestrians/cyclists to Street travel easier to all town  Exchange centre destinations (i.e. Street Cambridge Street –  Friarage access to Aylesbury Road Retail Park). These  Vale Park improvements cannot Drive fully be realised until  Upper traffic within the town Hundreds centre is reduced (once Way the link roads are in  Walton place to intercept Street traffic). Some works  Canal Basin could however be brought forward with  Town Centre the town centre cycle redevelopment. parking

5 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Highways Aylesbury Improvem’ts BCC £2m-£16m Developer 2018-2023 General improvements Necessary Transport to the Royal contributions to assist with road Strategy Bucks safety, traffic flows and Hospital pedestrian / cyclist roundabout movements. (A418, A413, A41 junction) Highways Aylesbury Accessibility Developer <£5m Developer Initial cycle link To ensure that relevant Necessary Area improvement contributions by 2021 new developments are Transport s to Stoke adequately linked to Study Mandeville their nearest/most railway appropriate rail station station. via sustainable modes (walking, cycling and bus) in order to minimise car use to the stations. Public Aylesbury Remodelling Developers £5m BCC/CIL Some initial Current bus station has Critical Transport Transport the bus capacity no capacity for growth Hub – bus, Strategy station and improvement in new services. rail, cycle reconfiguring by 2021 of the pedestrian access between the railway station/bus station and town centre. To include demolition and redevelopme nt of

6 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

immediate areas. Cycle Aylesbury Aylesbury BCC, £1.6m Developer Incremental Will be implemented Necessary Network Transport town-wide AVDC, contributions implementatio gradually as Strategy cycle network Sustrans n throughout developments improvement plan period progress. s - Link Road TBC TBC TBC TBC Highways from Bierton to new link road between A413 and A418 Buckingham Highways Buckingha Buckingham Developers £1.0m- Developer 2018-2023 Part funded Necessary m Transport Left turn slip £1.5m contributions Strategy at A422/A413/S tratford Road roundabout Highways Widen Lee S106 £30k 2017-18 Necessary Rd NDP Footpath Highways Ivinghoe N/A N/A N/A Uncertain No funding identified to Desirable Traffic NDP date Calming Solution Study Highways Extension Ivinghoe N/A N/A Uncertain No funding identified to Desirable to footpath NDP date spanning entire village Winslow Winslow - Infrastructure BCC, Bus <£5m Operators – 2022 Potential increase in Necessary

7 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Bus to facilitate operators, possible the frequency of the Services increase in EWR commercial bus connections to bus Alliance service Winslow to cater for frequency to increased demand (due Winslow to the opening of the Station East-West Rail station). Design for Winslow Station already allows for bus service running Highways Quainton Traffic BCC £50k est S106 2017-18 TBC Necessary NDP calming in village centre wide Aylesbury East West £5m EWR Scheme due to BCC/AVDC local Vale - Rail Rail – Winslow Consortium/Df be complete in contribution expected Bicester, to Station T/Network 2020/2021 to be confirmed Winslow, MK Rail/Local and authorities/CIL/ Aylesbury. Other Includes new station at Winslow.

8 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

1.3 Transport and Highways; Long Term (2023-2033) Infrastructu Evidence Required Works Delivery Indicative Delivery Anticipated Additional Status re Type Base Partner Cost Mechanism Date Comments/ Delivery /Funding /timescales notes Aylesbury Highways North East Link BCC, Approx. Through 2033 Was also linked to Necessary Road/ Aylesbury AVDC, £35m Oxford- recent planning LEP Cambridge application which Expressway was refused at appeal Highways Western link BCC, £11m-£23m Likely to 2033 Funding could be an Critical (between A418 AVDC, require issue with this link. and A41). LEP grants (i.e. Whilst it is an DfT). aspiration to complete the link road network around the town, there is no development in this area to help provide funding. Public Aylesbury Priority Public BCC £7m Developer Initial works To be implemented Necessary Transport Transport Transport contributions by 2020 once relevant link Strategy. Corridor A41 Long term roads are in place Bicester Road by 2033 therefore more capacity Public Aylesbury Public Transport BCC £4m Developer 2033 To be implemented Necessary Transport Transport Corridor A413 contributions once relevant link Strategy, Buckingham roads are in place Road capacity therefore more capacity Public Aylesbury - B4443 (based BCC, - £8m Developer 2027 PPTCs (depending Desirable Transport Transport on 3.8km of AVDC contributions on traffic levels, Strategy route) - £9m / grants demand etc.) to be - A413 Wendover implemented once Road (based on - £6m relevant link roads

9 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

4.4km of route) are in place - Stocklake Link (therefore more Road (based on capacity). Lower 3km of route) priority than main PPTCs. Highways Aylesbury Bridge BCC £40m Grant 2033 No mechanisms to Necessary Area improvements at Funding deliver currently but Transport junction of Old known pinch – point Study Stoke Road and B4443 Cycle Aylesbury Aylesbury town- BCC, £1.6m Developer Incremental Will be implemented Necessary Network Transport wide cycle AVDC, contributions implementa gradually as Strategy network Sustrans tion developments improvements throughout progress. plan period Cycle Buckingham Buckingham BCC, £4m Developer 2028 The potential route Desirable Network Transport to Milton Keynes AVDC, contributions to Milton Keynes is Strategy. cycle route Sustrans mainly on-road; however, there is a short off-road section near Buckingham adjacent to the A421. Cycle Aylesbury to BCC, £4m Developer 2028 Would greatly Desirable Ways Haddenham AVDC, contributions support growth in cycle route Sustrans, and external Haddenham by Developers funding grant providing a link to (i.e. DfT) amenities, education and employment in Aylesbury. 2 options currently being considered (one along the roadside to Stone and one

10 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

along an existing Right of Way). Park and ATS Aylesbury Park £11m Developer 2033 Will depend on Desirable Ride and Ride sites contributions viability of park and ride from main routes into town. Will require further investigation. Will need to tie in with the PPTCs as it will be essential for bus services to bypass congestion (also needs to be assessed against town centre parking charges).A Park & Ride facility has been proposed as part of the Hampden Fields Planning Application Buckingham Highways Buckingham £7m-£14m 2033 Linked to VALP Necessary Western Link residual housing Road requirement of 557 dwellings. Development Management team are looking to acquire S106 agreement from developers. Part of Buckingham Transport Strategy.

11 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Highways A413 TBC Developer 2033 Likely to support Buckingham contributio BTS objective to Road ns reduce congestion in Improvem’ts town centre if these improvements discourage town centre through- traffic. “Route upgrade” in this context may include dualling the road(s). Highways Buckingham Buckingham Developer £3m-£20m 2028–2033 Dependent on Desirable Transport route downgrade s Western link Road Strategy on High Street and other and West Street surrounding improvement Highways Buckingham Buckingham Developer £38m-£52m Developer 2033 Necessary and Rights Transport Route upgrades s contributio of Strategy on A421 and ns and A413 grant funding Highways Ivinghoe Ivinghoe NDP N/A N/A N/A Uncertain No funding identified Desirable Traffic to date Calming Solution Study Highways Extension to Ivinghoe NDP N/A N/A Uncertain No funding identified Desirable footpath to date spanning entire village Edge of MK Highways Bletchley-by-Pass MK, BCC, £21m-£47m Developer 2033 Land secured Necessary - New road linking developer contributio through SW MK A421 and A4146 s ns and governme

12 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

nt grants

13 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

2. Social Infrastructure – Education

2.1 Primary Short Term (2013-2018)

Infrastructure Evidence Required Works Delivery Indicative Delivery Anticipated Additional Comments/ Status Type Base Partner Cost Mechanism Date Delivery notes /Funding /timescales Aylesbury Aylesbury - Expand BCC £4m Developer 2018 Green Ridge Primary Critical Primary second school from contributions Academy School 2fe to 3fe primary S106 school. Bierton Bierton - Bierton Expansion of BCC £4m Developer 2018 Critical Primary existing school by contributions School half a form of entry S106 Haddenham Haddenham Haddenham BCC £2m Developer 2017 Critical - Primary Expansion of contributions School Haddenham St S106 Mary’s CE Quaniton Saye & Sele Quainton Reinstate pre-school BCC £152k BCC/s106 2017 Received s106 - £5k, Necessary Hall NDP other £51k – gap funding required - £96,000 Wendover Wendover - Wendover BCC £6m Developer 2018 Critical Primary Expansion of John contributions School Hampden/Wendover S106 CE

14 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

2.2 Primary Long Term (2023-2033) Infrastructure Evidence Required Works Delivery Indicative Delivery Anticipated Additional Comments/ Status Type Base Partner Cost Mechanism Date Delivery notes /Funding /timescales Aylesbury Primary Kingsbro Broughton Crossing BCC £20m Developer (to provide Critical School ok - Provision of 2 x 2fe contributions a serviced Masterpl primary schools S106 site for a an including school at contributions occupation of 1500 homes) Primary Hampde Hampden Fields – BCC £22m Developer Critical School n Fields provision of 2fe and contributions Masterpl 3fe primary school S106 an Primary Woodlan Woodlands – BCC £10m Developer Critical School ds Provision of 2fe contributions Masterpl school S106 an Primary South South West BCC Developer School West Aylesbury contributions Aylesbur S106 y Masterpl an Primary BCC Shortfall in BCC £10m Developer Critical School School Aylesbury housing contributions Expansio (1,325 homes) – S106 n expansion of Program existing schools by me 2fe (e.g. Haydon Abbey, Elmhurst) Stoke Mandeville

15 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Primary Stoke Mandeville BCC £8-12m Developer To accommodate Critical School provision of 2-3fe contributions development in the school S106 south within the SM Parish (approx. 2,000 homes). This is within the William Harding catchment but would require a suitable 2-3 hectare school site. Buckingham Primary Buckingham BCC £2.5m Developer Critical School Expansion of contributions existing school at S106 Primary Buckingham BCC £3m Developer Critical School expansion of contributions existing school at S106 Buckingham Primary Primary Buckingham BCC £1m Developer Critical School Expansion of contributions existing school at S106 Roundwood Primary Winslow Primary Winslow provision of BCC £6m Developer Critical School a new 1fte school or contributions 1fe expansion of S106 Winslow CE Primary school Stone Primary Stone provision of BCC £6m Developer Critical School 1fe school contributions S106 Wendover Primary Wendover provision BCC £6m Developer Assuming an allocation Critical School of a new 1-2fe contributions of 1000 homes at RAF

16 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

school or expansion S106 Halton of existing Halton school Primary Long Crendon BCC £0.5-1m Developer Critical School expansion of Brill contributions School S106 Edge of MK South West SWMK provision of BCC £12m Critical MK - Primary 3fe primary school School Milton Shenley Road, MK £13m Critical Keynes – provision of 3fe Primary primary school School

2.3 Secondary Short Term (2013-2018) Infrastructure Evidence Required Works Delivery Indicative Delivery Anticipated Additional Comments/ Status Type Base Partner Cost Mechanism Date Delivery notes /Funding /timescales Aylesbury Secondary Part of BCC £35m HIF/DfE Sept 2018 Currently subject to a Critical School agreeme Secondary School feasibility study nt linked annex, to provide with additional 6fe school Berryfiel places on site. ds

17 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

2.4 Secondary Long Term (2023-2033) Infrastructure Evidence Required Works Delivery Indicative Delivery Anticipated Additional Comments/ Status Type Base Partner Cost Mechanism Date Delivery notes /Funding /timescales Aylesbury Secondary Part of Reserve 10 hectare BCC £34+m Developer £6m already sourced Critical School Woodlan site on Broughton contributions through s106 ds Crossing School – S106 Masterpl for new secondary an school of up to 10fe

Secondary Kingsbro Kingsbrook BCC £38m S106 (to provide Would need to be Critical school ok development (25 (includes a serviced futureproofed up to Masterpl acre site has been £6m land sites for a 10FE. £12m sourced an reserved) 6fe costs) school at through s106 secondary school occupation of 1500 homes) plus a contribution Secondary BCC – Expansion of BCC £5m per Developer Secondary schools Critical School School existing schools form of contributions across Aylesbury Vale Expansio (e.g. John Colet, entry S106 are all at capacity and n Mandeville, close to the limits of Program Cottesloe, their sites. Estimated me Buckingham, pupil growth from over Waddesdon, 8000 dwellings with Grange) outstanding housing permission is

18 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

projected to put increased pressure on secondary schools. Any major scheme (of around 2000+ homes) would be required to make either on-site provision for a new school or else contribute towards the expansion of a new school. Other smaller scale schemes would be expected to contribute towards additional secondary school provision provided no more than five planning obligations are allocated towards a single scheme. Education to continue discussions with secondary school providers on possible expansion options Edge of MK South West SW Milton Keynes BCC £30m Developer SWMK planning Critical MK - 6fe new school contributions application for 1,885 – Secondary offering BCC a School reserved secondary school. 6fe to meet the total growth planned along the

19 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

border of Milton Keynes Special Schools Special BCC The need for Critical schools additional special school provision – will be informed by review currently being carried out by the SEND team - although BCC would look where possible to expand existing schools (i.e. Booker Park, Stocklake Park and Pebble Brook).

20 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

3. Health

3.1 Primary Care Facilities

3.1.1 Short Term (2013-2018)

Infrastructur Evidenc Required Works Delivery Indicative Delivery Anticipated Additional Status e Type e Base Partner Cost Mechanism/Fu Date Comments/Delive nding ry Notes Primary Care CCG SW Milton Keynes MKCCG TBC Developer Dependent It is anticipated Critical Facilities submissi (Salden Chase) contributions upon site land will be put on/public developmen aside for a 6-GP informati t surgery. on on list growth

3.1.2 Medium Term (2018-2023) Infrastructur Evidenc Required Works Delivery Indicative Delivery Anticipated Additional Status e Type e Base Partner Cost Mechanism/ Date Comments/Delive Funding ry Notes Primary Care CCG Haddenham - Aylesbury TBC - Developer Medium Haddenham Necessar Facilities submissi Approx. 600 new Vale CCG Additional contributions/pr term but Medical Centre is y on homes - excluding facilities actice Dependent based in a large existing will be on phasing purpose built commitments. needed if of growth building with Modification to number of capacity to cater existing premises if new for increased housing growth homes patient numbers. limited to 600 new exceeds Short term - they homes as per Local 600. should be able to Plan provide care, within

21 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

current building, for up to 2000 additional patients, Primary Care CCG Consolidated Aylesbury TBC Developer 2018-2023 As the population Necessar Facilities submissi community facility to Vale contributions of Aylesbury y on and serve the population CCG/NHS grows, there will be national of Aylesbury and other a greater need to direction partners centralise services of travel and offer more hospital-based services in the community setting. Primary Care CCG Berryfields Medical Aylesbury Estimated Developer 2018-2020 To replace existing Necessar Facilities submissi Centre requires a Vale CCG £3.3m contributions/3P temporary y on new purpose built D (bids through portakabins with a /public primary care health NHS England new purpose build informati centre on the for ETTF on the Berryfields on on list Berryfields site to funding were site CCG and the growth replace existing successful) practice in temporary discussion with portakabins. CCG in AVDC regarding discussion with site and premises AVDC regarding site lease. Estimated and premises lease completion 2020 options. Primary Care CCG Meadowcroft Aylesbury Estimated Developer 2018-2023 To re build existing Necessar Facilities submissi Surgery Vale CCG £3.3m contributions/N surgery on a y on/public HSE phased programme informati improvement to accommodate on on grant/practice patient growth. The expected funding current building list commissioned in growth 1992 was built for a population of

22 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

10,500 and the list size is currently 14,500. Primary Care CCG Aylesbury - Aylesbury Estimated Developer 2018-2020 Delivered by 600th Necessar Facilities submissi Hampden Fields Vale CCG £2 - £2.5m contributions occupation y on/public New primary care Local Practice informati health centre on interested to on on list Hampden Fields site progress growth to also serve (discussions with Woodlands. developers and the Required to CCG. Clarification accommodate of S106 provision 14,000 new patients needed.

Primary Care CCG Aylesbury - Stoke Aylesbury Estimated Developer 2018-2020 Extension to Necessar Facilities submissi Mandeville Vale CCG £100k but contributions Mandeville Practice y on/public this will or refurb of other informati Require AVDC to need nearby premises on on list indicate the considerati growth proposed number of on once homes? total number of new dwellings are confirmed Primary Care CCG Aylesbury - Aylesbury Estimated Developer 2018-2023 Potential extension Necessar Facilities submissi Broughton Crossing Vale CCG £100k contributions to Poplar Grove y on/public potentially up to and neighbouring informati 2500 dwellings = practices. on on list 7,500 patients Development likely growth to cross over into 3 different GP boundaries, Poplar Grove,

23 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

and Oakfield. Current infrastructure would absorb the volume of patients in place of erecting a temporary facility but would put these practices at capacity. Propose putting in more consultation rooms as a result of list growth (subject to developer contribution) at Poplar Grove- the NHS has funded a new development which has not yet met its full potential - but will be so once existing Broughton developments completed. Developer contributions will allow this practice to expand to accommodate these increased patient numbers.

24 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Primary Care CCG Winslow - Approx. Aylesbury Estimated Developer 2018-2019 Current plans for a Necessar Facilities submissi 600 new homes - Vale CCG £3m for contributions new surgery in y on/public excluding existing new build /NHS England Winslow only factor informati commitments (1,043 on existing /practice in the current on on list cited in plan in total). health neighbourhood growth Current plans for a centre site plan new surgery in Norden House, the Winslow only factor only practice in in the current Winslow would neighbourhood plan also be within the proposal and would catchment area of need to be re- proposed new addressed if development south Winslow is chosen of Milton Keynes as the new which has not been settlement for 4500 factored in. dwellings. Medical services in Winslow are cited in the IDP dated August 2013 but no details provided. Primary Care CCG Buckingham - Aylesbury Estimated Developer 2018-2023 The Swan Practice Necessar Facilities submissi Approx. 1,200 new Vale CCG £3m for contributions is the only practice y on/public homes excluding new build /NHS England in Buckingham and informati existing commitment excluding /practice currently has a list on on list (2,571 cited in plan land costs of 28,000 patients. growth in total). The Swan The surgery is Practice is the only spread across a practice in number of sites. Buckingham and Practice suggests currently has a list of they have a site in 28,000 patients. mind and need to The surgery is move imminently in spread across a order to take on number of sites. any new patients.

25 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Practice suggests they have a site in mind and need to move imminently in order to take on any new patients.

3.2 Housing for the Elderly

3.2.1 Medium Term (2018-2023) Infrastructur Evidenc Required Delivery Indicative Delivery Anticipated Additional Status e Type e Works Partner Cost Mechanism Date Comments/Delive Base /Funding ry Notes Housing Housing Aylesbury – 150 unit Developers, Developers Hampden Fields to Necessar LIN mixed tenure BCC contributions/ deliver 60 bed care y report retirement village BCC home/extra care scheme 50 facility. The CCG rental/100 leasehold asks the council and planners to bear in mind the additional workload care homes place on local GP services and requests Primary Care services are consulted at every opportunity. Housing Housing Aylesbury Vale – Developers, Developers The CCG asks the Necessar LIN Housing with care housing contributions/ council and y report dementia units association, BCC planners to bear in BCC mind the additional

26 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

workload Dementia care place on local GP services and requests Primary Care services are consulted at every opportunity. Housing Housing Wendover/Haddenh Developers, Developers – Leasehold Necessar LIN am BCC contributions/ housing with care y report BCC schemes, one high capital value, one downsizer model, in the Wendover/Hadden ham localities Housing Housing Wendover, Developers, Developers Enhanced Necessar LIN Buckingham, housing contributions/ sheltered schemes y report Haddenham – association, BCC BCC Housing Housing Buckingham and Developers, Developers 2-3 nursing homes Necessar LIN Winslow BCC contributions/ required of approx. y report BCC 200 beds. The CCG asks the council and planners to bear in mind the additional workload care homes place on local GP services and requests Primary Care services are consulted at every opportunity.

27 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

3.2.2 Long Term (2023 -2033) Infrastructur Evidenc Required Delivery Indicative Delivery Anticipated Additional Status e Type e Works Partner Cost Mechanism Date Comments/Delive Base /Funding ry Notes Housing Housing Developers, Developer Dependant on Necessar LIN housing contributions/ achieving targets y report association BCC for medium term s, BCC targets: At least 1 mixed tenure housing with care retirement village: Housing with care dementia units Continuing need for private sector leasehold retirement housing and private sector housing with care schemes; Additional nursing home capacity, estimated between 2 – 3 homes. The CCG asks the council and planners to bear in mind the additional workload care homes place on local GP services and requests

28 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Primary Care services are consulted at every opportunity.

29 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

4. Waste Disposal

4.1 Medium Term (2018-2023) Infrastructur Evidenc Required Delivery Indicative Delivery Anticipated Additional Status e Type e Works Partner Cost Mechanism Date Comments/Delive Base /Funding ry Notes Household Land to be allocated £5.0-£5.5 Private Towards Major development Necessar Recycling and delivery of a million contractor/BCC end of 2023 and housing y Centre new Household growth numbers Recycling Centre will generate (HWRC) additional waste/ recyclable/ compostable materials and the existing HRC site at Rabans Lane has limited development capacity to keep pace with increasing household numbers.

The requirement would therefore be for a plot of land of approximately 1-2 hectares, ideally in a non-residential location that could be developed to provide long-term

30 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

capacity. Part of the Hampden Fields Planning Application makes on site providing for a household waste recycling centre Waste TBC £5.0-5.5 Private Late 2020s Linked to need for Necessar Transfer million contractor/BCC redeveloped HRC, y Station (today’s there is a need for prices) additional waste transfer capacity to deal with materials generated within the AVDC area. As the Waste Disposal Authority, BCC must provide outlets for food waste and garden. Currently there are direct delivery options for food waste (Westcott), and some capacity at for garden waste. However neither of these options can be guaranteed long term. Area required is a building of around 50 x 40 metres in

31 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

covered area with external vehicle turning space circa 50x 60 M. Additionally AVDC require bulking/ storage capacity for dry recyclable materials (paper, card, cans, plastics, glass) of similar scale to above. Bin storage Ongoing during Minimal Private Housing Necessar capacity housing cost, but developers to build y development some land in adequate waste/ take recycling/ compost implication bin storage for each capacity. Space developm should be allocated ent for 1 x 140 litre bin (residual waste), 1 x 240 litre bin (co- mingled dry recyclables), 1 x 40 litre bin (food waste caddy) and 1x 240 litre garden waste bin (for households with gardens).

32 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

5. Flood Defences

5.1 Medium Term (2018-2023) Infrastructur Evidenc Required Delivery Indicative Delivery Anticipated Additional Status e Type e Works Partner Cost Mechanism Date Comments/Delive Base /Funding ry Notes All major Developer/S106 2018-2023 New flood storage Critical development sites: option on Stoke Brook (potential linkages with EA- led HS2 mitigation scheme on Stoke Brook – see specific entry below) A new flood storage option on Wendover Brook (Currently being taken forward as part of the Hampden Fields development) An increase to the dam of the current flood alleviation scheme on the Bear Brook; A flood diversion scheme from the Bear Brook and associated storage option between the

33 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

and the old disused railway embankment crossing Burcott Brook Flood Aylesbury East £475k Developer/S106 2017-2021 S106 funding Necessar Management Flood Management secured and paid y system and now awaiting EA instruction to use. Flood Willows Aylesbury Developer/S106 2017-2021 HS2 mitigation - Critical Management Diversion of Stoke Brook to enhance and provide flood mitigation, provision of surface water storage into existing channel, attenuation and slowing of flow upstream to mitigate flooding Flood Woodlands Developer/S106 2017-2021 Potential Management opportunities via link road design – additional storage? Scheme to be delivered prior to first occupation Flood Hampden Fields Developer/S106 2017-2021 Wendover Brook Critical Management Flood Alleviation Scheme – being delivered as part of Hampden Fields development.

34 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

6. Emergency Services

6.1 Police

6.1.1 Short Term (2013-2018) Infrastructur Evidenc Required Delivery Indicative Delivery Anticipated Additional Status e Type e Works Partner Cost Mechanism Date Comments/Delive Base /Funding ry Notes Police Bletchley PS £975,000. Joint delivery 2018 Impact of proposed Necessar Station replacement £800,000 with Bucks growth on y in current F&RS/Develope MK/AVDC budget r contributions boundary may allocation. necessitate Developer increased contributio provision. Current n required: costings based on £175,000 policing existing population. Increased demand from new growth may require enhancements and/or adaptations to provide additional space.

35 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

6.1.2 Medium Term (2018-2023) Infrastructur Evidenc Required Delivery Indicative Delivery Anticipated Additional Status e Type e Works Partner Cost Mechanism Date Comments/Delive Base /Funding ry Notes Police Adaptations and Thames £800,000 Joint delivery 2018 Required to Joint Station alterations at Valley with Bucks accommodate delivery Aylesbury PS Police F&RS/Develope additional with r contributions resources linked Bucks to/generated by F&RS/De growth veloper contributi ons Office East Aylesbury Thames Developer 2020+ 2-desk Touch Necessar Accommodat Touch down Office Valley contribution down facility to be y ion Police secured though delivered to current s106 provide visibility and presence in new housing area Office Silverstone Thames Developer 2020+ 2-desk touch down Necessar Accommodat Touchdown office Valley contribution facility to be y ion Police secured though delivered to current s106 provide visibility and presence at new development

6.1.3. Long Term (2023-2033)

Infrastructur Evidenc Required Delivery Indicative Delivery Anticipated Additional Status e Type e Works Partner Cost Mechanism Date Comments/Delive Base /Funding ry Notes ANPR District Wide Thames £198,000 Developer Timescales Anticipat Cameras Valley contribution dependent upon e that an Police delivery of new additional development in the 18 ANPR

36 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

district. cameras would be required througho ut the district at £11,000 per camera Fleet District Wide Thames Bicycles - Developer Fleet is Vehicles Valley 6 contribution generally Police (£4800) delivered by way of PCSO three vehicle - 3 options, (£77,800) with costings Patrol based on vehicles – a 5 year 4 life term. (£172,600) Bicycles £ (£800) PCSO/N Total:£255, eighbour 200 hood Vehicles (£25,900) Patrol/Re sponse Vehicles (£43,150) ICT Computer Thames £42,500 Developer Timescales Units Equipment Valley contribution dependent upon (including Police delivery of new start up development in the costs)

37 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

district. cost £4250 each. It is estimate d that the planned growth will lead to an increase in requirem ents for 10 additional units

38 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

3.2 Utilities

Infrastructur Evidenc Required Delivery Indicative Delivery Anticipated Additional Status e Type e Works Partner Cost Mechanism Date Comments/Delive Base /Funding ry Notes Ultra-fast Develop Broadband to be BT or other Unknown - Funded direct 2013 - 2033 Improvements will Necessar broadband ers to provided at all sites providers, funded by developers in be delivered as y ensure Developers direct by consultation with developments that developer/ broadband come forward there is utility providers sufficient companie broadba s nd capacity to accomm odate the new develop ment High speed Quainton High Speed BT/Develop £60,000 Match funding 2017 Necessar broadband NDP Broadband for er (£30k required) y Station Road

39 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

3.3 Green Infrastructure

Infrastructur Evidenc Required Delivery Indicative Delivery Anticipated Additional Status e Type e Works Partner Cost Mechanism Date Comments/Delive Base /Funding ry Notes Green Buckingh Aylesbury Linear Developers Est.£1.85 Principally Plan Period Linked in with Necessar Infrastructure amshire Park - Links to River million Developers development y Green Thame and Strategic (source phasing Infrastruc GI network and links Draft IDP ture to Quarrendon Leas 2013) Delivery Plan Woodland Buckingh Settlement edge Forestry £20,000- English EWGS Necessar Planting amshire woodland Enterprise, 25,000 per Woodland Grant agreements y Green connectivity landowners, Hectare. Scheme from Infrastruc BBOWT (EWGS) 2013. ture Delivery Plan Wetland Buckingh Wetland landscape Canal & Included Principally During life Necessar Planting amshire enhancement to link River Trust; in Linear Developers of Delivery y Green Regional Wetland Wildlife Park Plan Infrastruc Park, Trusts, above ture college lake and RSPB, Delivery canal developers Plan network Urban Buckingh Urban areas – AVDC Example Principally During life Necessar Planting amshire ‘Greening the town’ Landowners costs for Developers of Delivery y Green through discrete Plan Infrastruc developmen elements: ture t schemes Sedum/tur Delivery as f roof: Plan they come £1700/sq. forward m

40 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Street tree (assume 20- 25 grade advanced nursery stock tree, with undergrou nd guying) £550 per tree.

Footpaths/Cy Buckingh Creation of NEP For new Principally During life Necessar cle Ways amshire enhanced BCC, surfacing, Developers of Delivery y Green strategic access link: AVDC, assume Plan Infrastruc Buckingham and landowners £75,000 ture Whaddon Chase per Delivery Way linear km Plan based on £30 rate per linear metre of crushed stone path and timber edge (assumes shared use route of 2.4 m width).

41 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Footpaths/Cy Buckingh Extension of NEP For new Principally During life Necessar cle Ways amshire access loops/links at BCC, surfacing, Developers of Delivery y Green College Wood, new AVDC, assume Plan Infrastruc green access links landowners £75,000 ture along tributary per Delivery stream linear km Plan in the Chase based on £30 rate per linear metre of crushed stone path and timber edge (assumes shared use route of 2.4 m width).

Wood Buckingh Restoration and NEP (with Woodland EWGS grant – During the Necessar pasture amshire recreation input from creation next phase y and parkland Green of wood pasture BCC/AVDC £20,000- of Infrastruc and parkland ) – liaison £25,000 EWGS ture with per agreements Delivery relevant hectare. from Plan landowners 2013. and Forestry Enterprise to facilitate enhanced take up.

42 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Woodland Buckingh New accessible NEP Woodland EWGS grant During the Necessar and amshire settlement edge AVDC, creation next phase y Orchards Green Woodlands and Forestry £20,000- of Infrastruc Orchards Enterprise, £25,000 EWGS ture landowners, per agreements Delivery BBOWT hectare. from Plan (advice and 2013. liaison role).

3.4 Open Space, Recreation and Community Facilities

Infrastructur Evidenc Required Delivery Indicative Delivery Anticipated Additional Status e Type e Works Partner Cost Mechanism Date Comments/Delive Base /Funding ry Notes Open Space Aylesbur 72ha of open space Developer S106 1st LEAP – Necessa and y East and children’s play prior to ry Children’s (Kingsbr area completion Play area ook) of 250 homes, 1st NEAP/MUG A, 2nd NEAP – prior to completion of 940 homes LEAP – prior to completion of 1250 homes Community Aylesbur Prior to Necessa

43 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Centre y East occupation ry (Kingsbr of 1500 ook) homes Woodlands Woodlan 3,500sqm leisure Developer S106 Necessa Aylesbury ds Site facility, ry South (North Allocatio informal/formal open of Stoke n space, parkland and Mandeville) recreational facilities, wildlife areas, water meadows, sports pitches and pavilions, children’s play areas, mixed use games area (MUGA) and allotments Aylesbury South Children’s play Developer S106 Necessa South West West space and informal ry Aylesbur Public Open Space y Site Allocatio n Aylesbury South Proposed public Developer S106 Necessa South East East open spaces, ry (Hampden Aylesbur parkland, sports Fields) y Site pitches and Allocatio pavilions, children’s n play areas, mixed use games areas (MUGA0 and allotments Aylesbury Aylesbur Public Open Space Developer S106 Necessa South y South including children’s ry Site play area

44 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

Allocatio n Quainton Quainton Purchase Upper St N/A £40k est 2020 Necessa NDP playground ry Quainton Quainton Extend Sports N/A £100k 2019/20 Necessa NDP Pavilion ry Quainton Quainton Purchase green N/A £60k 2018/19 Necessa NDP space (Station rd) ry Quainton Quainton MUGA site and Developer £45k S106 2018 Contribution Necessa NDP equipment agreed ry Marsh Marsh Improvements to Developer N/A Necessa Gibbon Gibbon and refurbishment of ry NDP sports and recreation facilities and equipment at the Recreation Ground, Summerstown, Marsh Marsh New swings for Developer Necessa Gibbon Gibbon younger children in ry NDP dedicated play area at the Village Hall Marsh Marsh Improvements to the Developer £25k S106 Necessa Gibbon Gibbon Village Hall, ry NDP including new storage for use by Scout Group. Aylesbury Library Develop service Developer £60k-£80k S106 Long-term strategy Necessa Services provision outside of ry Town Centre through small community venues or outreach provision delivered by a small and fit for

45 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule

purpose vehicle Buckingham Library Increase capacity by Developer £100k- S106 Necessa Services extending on to car £150k ry park area Wendover Library Extend capacity by Developer £100k- S106 Necessa Services creating additional £150k ry rooms on space between main library and meeting room Winslow Library Relocate to a High BCC £200k Capital Long-term strategy Desirabl Services St location e Haddenham Library Extend public space BCC £150k Capital Long-term strategy Necessa Services of the Community ry Library

46 | P a g e AVDC VALP – Regulation 19 Draft: Infrastructure Delivery Plan – Appendix A: Infrastructure Delivery Schedule