The Royal Borough of Kensington & Chelsea Key Decision Report Dated

Total Page:16

File Type:pdf, Size:1020Kb

The Royal Borough of Kensington & Chelsea Key Decision Report Dated The Royal Borough of Kensington & Chelsea Key Decision Report dated 17 June 2008 For Decision by Councillor Ritchie, Cabinet Member for Family and Children’s Services Report by the Director for Community Learning PLAY PATHFINDER - APPROVAL TO DRAW DOWN FUNDING 1 Introduction 1.1 I am writing to seek your approval to draw down the Play Pathfinder Capital and Revenue Grants 2008-11. 2 Background 2.1 In February 2008, the Royal Borough of Kensington and Chelsea was invited by the DCSF to bid for ‘Play Pathfinder Status’. As set out in the Children’s Plan, there is to be an investment of £265 million in play facilities in England. Approximately £2.5 million will be allocated to each of 30 local authorities awarded ‘Play Pathfinder Status’, whilst all remaining local authorities will receive £1.14 million each to develop play facilities as ‘Playbuilder’ local authorities. 2.2 The Play Pathfinder programme has the following requirements; The creation of at least one new adventure playground at a cost of £800,000. The refurbishment or creation of a minimum of 26 smaller playgrounds at an average cost of £50,000. To promote adventurous ‘risky’ play within a secure environment. A focus on the 8-15 age range. Link the Play Pathfinder investment to planning, transport, leisure, and other related council strategies. Engage young people in positive activities. Ensure that play provision is of high quality and is sustainable. 2.3 A bid was submitted to the DCSF in March 2008 setting out how the Royal Borough can meet the priorities of the Play Pathfinder programme by building on the Royal Borough’s highly acclaimed Play Strategy and the existing investment in play facilities and services. 2.4 The Royal Borough was informed that it had been successful in securing Play Pathfinder status in April 2008. The capital and revenue 1 grant allocation letter, with attached guidance, was received on Thursday June 5th 2008. 2.5 The capital allocation is £2,153,170 and is to be spent by March 2010. The outline plans for the expenditure of the capital resources in 2008-9, and for the adventure playgrounds, are attached as Appendix 1. The revenue allocation is £498,011 and has to be spent by March 2011. 2.6 The original time limit placed on the capital expenditure was March 2011. The March 2010 date indicated in the DCFS guidance will create difficulties for the effective planning of this investment, including the identification of appropriate sites for the new adventure playground in Chelsea. Despite this, council officers will endeavour to secure the most appropriate and cost effective projects with the capital resources available. 3 Need 3.1 The RBKC Play Strategy sets out the benefits of good quality and accessible play for children and young people. It recognises play as fundamental for the social, physical and emotional development of children and young people. 3.2 The Play Pathfinder provides an opportunity to go further in meeting the aspirations of the RBKC Play Strategy. In particular, investment will enable the council to invest in the following priorities in the Play Strategy; Enabling Improved Child Development Providing Safe Play Opportunities Enhancing the Quality of Play Facilities Increasing Accessibility and Choice Promoting Social Inclusion Through Supervised Play Ensuring Children’s Participation in the Design and Maintenance of Play Facilities Promoting Healthy Lifestyles Through Play and Sport Ensuring All Children Can Access Good Quality Play. 3.3 In January 2007 the Play Service undertook an analysis of all play and open spaces in the Royal Borough. The analysis highlighted the areas of the borough with less play space and also assessed the quality of equipment in playgrounds, safety factors, and how accessible play was for children with disabilities. The play spaces analysis will help to inform the prioritisation of capital investment in the borough. 3.4 The Play Service works closely with colleagues in Parks, Housing, Planning, social landlords, the TMO, and the voluntary sector play 2 providers. There is a wealth of information held by these organisations that relates to the quality and maintenance of play areas in parks, housing estates and community amenity spaces. All of these partners will contribute to the prioritisation and delivery of play capital projects, ensuring that the Play Pathfinder maximises benefits to the borough’s children and families. A Play Pathfinder Team reflecting these agencies has been created to drive forward the Pathfinder project. 4 Project Management 4.1 A Project Board will oversee the effective development and delivery of the overall project, whilst a Project Team inclusive of key partners will ensure the delivery of individual projects. 4.2 A Programme Manager will be recruited to oversee the project and will be accountable to the Head of Extended Services and the Project Board. 5 Capital Projects - Adventure Playgrounds 5.1 Adventure Playground at Little Wormwood Scrubs - The Royal Borough has recently secured a 20 year agreement to manage the Little Wormwood Scrubs site in North Kensington. The Family and Children’s Services Business Group will be responsible for the existing adventure playground area in the south-west corner of the park. 5.2 The existing Little Wormwood Scrubs Adventure Playground is small and has poor quality equipment. There is a play hut that requires repair and does not support the provision of a varied programme of play and learning activities. The KIDS organisation is currently funded by the Royal Borough to deliver adventure play for local children and specialist play for children with disabilities at the Little Wormwood Scrubs site. The usage of the facility is very limited and could be greatly increased with improved facilities and increased opening hours. 5.3 The Play Pathfinder Bid prioritised a capital allocation of £210,000 for the refurbishment and expansion of Little Wormwood Scrubs Adventure Playground. This allocation is match funded by £114,000 of Section 106 capital from a residential development in Barlby Road. An additional £120,000 of capital funding has been identified by the Project Team following a more favourable capital allocation from the DCFS than first indicated. 5.4 At present, this project has secured £444,000. There is also potential to secure funding from the TELS Business Group for investment in parks, and the Big Lottery My Space Capital Programme. Once the 3 total allocation is known a major redevelopment project will be advanced for the playground. 5.5 The Play Service has secured agreement from the Friend of Little Wormwood Scrubs to increase the size of the Little Wormwood Scrubs Adventure Playground by 250% and to create a new play hut building for the service. Final approval of the London Borough of Hammersmith and Fulham, as trustees of the land, is required and a planning application is also likely. 5.6 The new service at Little Wormwood Scrubs will have extended opening hours and will be targeted at local children and young people aged 5-15. The programme will be varied during evenings, weekends and holidays to engage children with disabilities, local children, and young people at risk of offending. The project will be developed in full consultation with the local community, children and young people, disability groups, parks, housing and social landlords, and the police. 5.7 In order to carry out the capital project the Little Wormwood Scrubs Adventure Playground site will be closed from November 2008 until April 2009. The new service will be delivered by a successful bidder following an exercise to tender the new service from April 2009. Revenue funding will be available through match funding of the Play Pathfinder capital and the council’s voluntary sector commissioning budget. 5.8 Adventure Playground in Chelsea – The brand new adventure playground highlighted in the Play Pathfinder bid is to be located in Chelsea. The bid allocated £590,000 of capital for this project. The potential site identified in the bid is in Hortensia Road. However, alternative sites are now being sought because it has transpired that this site will not be available until September 2010 as it will be the temporary location for the Chelsea Academy from September 2009. 5.9 Chelsea was identified as the priority location of a new adventure playground for several reasons; Worlds End is the only ward in the 20% most deprived in the Royal Borough without good access to an adventure playground. Local supervised play facilities have been lost to make way for the Chelsea Academy site. The Hortensia Road site has an existing building that can offer high quality activities for children and young people and a training facility for staff and volunteers. There are a significant number of children and young people in the area that are not engaged in local projects or activities. 5.10There are a number of alternative sites for an adventure playground in Chelsea. It is proposed that detailed consultation is carried out 4 with the local community to identify a preferred site. If the preferred site is Hortensia Road then the Royal Borough will need to use the evidence of the local consultation to request to the DCSF that Play Pathfinder capital for this project be carried forward into 2010-11. 5.11The Chelsea consultation will take place in the autumn of 2008. All local residents’ groups, service providers, elected members and children and young people will be approached for their views. 6 Small Capital Projects – Playgrounds 6.1 The Council is required to create or refurbish 26 play areas using Play Pathfinder capital. The average allocation should be in the region of £50,000 per project, a limited sum for the delivery of high quality play provision.
Recommended publications
  • Annual 2017-2018
    T H E E H K E T N KENSINGTON S I N G T SOCIETY O N 2017 –2018 S O C I E T Y 2 0 1 7 – 2 0 1 8 £5 for non-members KENSINGTON & CHELSEA The Royal Borough of Kensington & Chelsea was created in 1965 with the merger of the two boroughs. Kensington, the area we watch over on your behalf, is north of Fulham Road and Walton Street, the frontier with Chelsea being marked with a red line on the map. Cover illustrations by Eileen Hogan, © the artist – for more about her see page 16 Editor: Michael Becket [email protected] Designer: Ian Hughes www.mousematdesign.com Printed by KJS Print Services Limited E H T KENSINGTON 23 St James’s Gardens, London W11 4RE www.kensingtonsociety.org SociETy 2017–2018 The objects of the society are to preserve and improve the amenities of Kensington for the public benefit by stimulating interest in its history and records, promoting good architecture and planning in its development, and by protecting, preserving and improving its buildings, open spaces and other features of beauty or historic interest. Patron His Royal Highness The Duke of Gloucester, KG, GcVo President Nick Ross Vice-President General, The Lord Ramsbotham of Kensington, GcB, cBE council Barnabus Brunner Peter De Vere Hunt Susan Lockhart Sir Angus Stirling trustees Amanda Frame, chairman Martin Frame, treasurer and membership secretary Michael Bach, chairman of the planning committee Michael Becket, annual report editor Thomas Blomberg, editor of newsletter and website, member of planning committee Sophia Lambert, member of the planning committee
    [Show full text]
  • Community Engagement Workshops
    Grenfell Investigation into Potential Land Contamination Impacts Technical Note 14: Collated Community Information Royal Borough of Kensington and Chelsea Project number: 60595731 30 August 2019 Grenfell Investigation into Potential Land Contamination Impacts Project number: 60595731 Quality information Prepared by Checked by Verified by Approved by Katie Bruce David Dyson Simon Cole Liz Philp Principal Consultant Associate Technical Director Technical Director Revision History Revision Revision date Details Authorized Name Position 0 13 June 2019 Draft Liz Philp Technical Director 1 30 Aug 2019 Final Liz Philp Technical Director Distribution List # Hard Copies PDF Required Association / Company Name Nil Pdf MHCLG for distribution Prepared for: Royal Borough of Kensington and Chelsea AECOM Grenfell Investigation into Potential Land Contamination Impacts Project number: 60595731 Prepared for: Royal Borough of Kensington and Chelsea Prepared by: AECOM Infrastructure & Environment UK Limited Sunley House 4 Bedford Park, Surrey Croydon CRO 2AP United Kingdom T: +44 20 8639 3500 aecom.com © 2019 AECOM Infrastructure & Environment UK Limited. All Rights Reserved. This document has been prepared by AECOM Infrastructure & Environment UK Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. Prepared for: Royal Borough of Kensington and Chelsea AECOM Grenfell Investigation into Potential Land Contamination Impacts Project number: 60595731 Table of Contents 1.
    [Show full text]
  • Kensington Memorial Park
    LITTLE WORMWOOD SCRUBS Management Plan Annually reviewed from 2009 Acknowledgements London Borough of Hammersmith and Fulham Friends of Little Wormwood Scrubs Groundwork Trust Directorate of Family and Children‟s Services Directorate of Planning and Conservation Directorate of Transport, Environment and Leisure Services Quadron Services Limited Regular users of the park St. Charles Ward Members William Sutton Housing Association LBHF and RBKC Parks Police Services Contents Page Number Foreword Page 3 1. Background Page 4 2. Introduction Page 5 3. Wider Policy Context Page 11 4. The Management Plan Page 18 4.1 A Welcoming Place Page 18 4.2 Healthy Safe and Secure Page 23 4.3 Clean and Well Maintained Page 30 4.4 Sustainability Page 35 4.5 Conservation and Heritage Page 40 4.6 Community Involvement Page 53 4.7 Marketing Page 56 4.8 Management Page 59 5. How will we know when we have arrived? Page 60 6. Indicative Works Plan Page 60 Appendices: Appendix one: The Public Consultation 2008 Page 66 Appendix two: Ecological Appraisals Page 74 Appendix three: Recommended species for Page102 habitat enhancements Appendix four: the Tree Survey 2008 Page 109 Appendix five: A Brief History of Little Page 110 Wormwood Scrubs Appendix six: William Sinclair Environmental Page114 Policy Appendix seven: Improvement Plan Page116 Appendix eight: Record of Achievement Page117 Appendix nine: Summary of Green Flag Key Page118 Criteria Appendix ten: Timberplay Design for Adventure Page121 Playground 2 PROPOSED Foreword The Royal Borough is one of the most densely populated Boroughs in the United Kingdom with possibly the least amount of public green open space.
    [Show full text]
  • 7. Wormwood Scrubs Strategy
    7. WORMWOOD SCRUBS STRATEGY 107 WORMWOOD SCRUBS Key facts Approximate area: 68 hectares Designations: Metropolitan Open Land, Wormwood Scrubs Act, Commons Act, part covered by a Nature Conservation Area 7.1 Covering almost 68 hectares, responsibility of the Wormwood Scrubs (Boroughwide Grade 1 Importance). Wormwood Scrubs is the largest open space Charitable Trust. The Linford Christie Managed by the Wormwood Scrubs in the London Borough of Hammersmith Stadium provides changing facilities which Charitable Trust & Fulham and is green lung that provides are used by sports pitch users during people and wildlife with the opportunity match days. to enjoy green amenity space. The PRINCIPLE WS1: Wormwood Scrubs open space is managed 7.4 Over half of the Scrubs comprises a mix PROTECT & ENHANCE by the Wormwood Scrubs Charitable Trust of young and established woodland, scrub, and is protected by the Wormwood Scrubs grassland and tall herbaceous vegetation The Mayor will: Act 1879, the Commons Act 2006 and as which gives the Scrubs a sense of wildness a. Ensure the valuable ecology of Metropolitan Open Land in the London that is a unique characteristic, in particular Wormwood Scrubs is maintained and Plan, which affords the Scrubs the same given is proximity to central London. There where appropriate enhanced; level of protection as Metropolitan Green is a combination of diverse habitats across b. Maintain and where appropriate Belt. This protection will continue and the Wormwood Scrubs that support a diverse enhance Wormwood Scrubs as an Mayor of London will not seek to change range of native plants, breeding birds and area for exercise and recreation for the the Acts or its designation as Metropolitan insects, including species not usually found inhabitants of the metropolis; Open Land.
    [Show full text]
  • C254 OOC XSU10 Archaeological Works
    C254 Archaeological Works at Old Oak Common Depot, London NW10 XSU10 C254-OXF-T1-RGN-CRG03-50269Rev2 C O N T E N T S Page 1 Introduction ......................................................................................................................... 7 1.1 Scope of Work .......................................................................................................... 7 1.2 Planning Background .............................................................................................. 7 1.3 Location .................................................................................................................... 8 2 Geology and Topography ................................................................................................... 8 3 Archaeological and Historical Background ....................................................................... 9 3.1 Reports and Documentation ................................................................................... 9 3.2 Previous Work ........................................................................................................ 20 4 Research Aims and Objectives ........................................................................................ 21 5 Methodology ...................................................................................................................... 22 5.1 Methodological Standards .................................................................................... 22 5.2 Fieldwork Techniques ..........................................................................................
    [Show full text]
  • News for Carers
    May 2014 CARERS Kensington & Chelsea News for Carers Welcome to the May edition See page 5 for an update on local support groups and of News for Carers social activates for carers. Turn to pages 6-7 if you look We hope that you are all keeping well and enjoying the after someone with dementia or memory problems and warmer weather. Spring is in its full swing which can to pages 8-10 if you are a parent of a disabled child. If only mean that summer is on its way and the Carers you care for someone with mental health problems Week is just around the corner! As usual, Carers check pages 10-12 for information on the new Kensington & Chelsea will celebrate the occasion by Integrated Mental Health Service in Kensington and holding a series of events and activities for carers, so Chelsea and for other support available. If it is an keep the week between 9 and 15 June free. You can update on health and wellbeing services that you are read more about Carers Week below. To find out what looking for, then visit our Health and well-being corner will be happening in Kensington and Chelsea go to on pages 12-16. pages 2-3. Carers Week 2014 Carers Forum Kensington and Chelsea Carers Forum meets each quarter and gives carers a chance to have a say on local health and social care issues. It also enables carers to have a voice and the ability to shape the types of services available in RBKC. The forum is open to all carers in Kensington & Chelsea.
    [Show full text]
  • Little Wormwood Scrubs Ten-Year Management Plan 2010-2019
    Little Wormwood Scrubs Ten-year Management Plan 2010-2019 (Annually Reviewed) Acknowledgements London Borough of Hammersmith and Fulham Friends of Little Wormwood Scrubs Groundwork Trust Directorate of Family and Children‟s Services Directorate of Planning and Conservation Directorate of Transport, Environment and Leisure Services Quadron Services Limited Regular users of the park St. Charles Ward Members William Sutton Housing Association LBHF and RBKC Parks Police Services Think before you print Only print this document if necessary. It may only be necessary to print out pages of specific interest, rather than the full document. 2 Contents Page Number Foreword 4 1. Background 6 2. Introduction 7 3. Wider Policy Context 13 4. The Management Plan 19 4.1 A Welcoming Place 20 4.2 Healthy Safe and Secure 23 4.3 Clean and Well Maintained 27 4.4 Sustainability 33 4.5 Conservation and Heritage 37 4.6 Community Involvement 61 4.7 Marketing 64 4.8 Management 66 5. How will we know when we have arrived? 68 6. Indicative Works Plan 69 Appendices: Appendix one: 2008 consultation results 74 Appendix two: Ecological appraisals 80 Appendix three: Recommended species for habitat enhancement 99 Appendix four: Animal handling guidance 105 Appendix five: Little Wormwood Scrubs– A brief history 107 Appendix six: William Sinclair Environmental Policy 111 Appendix seven: Green Flag Award Criteria 112 Appendix eight: parks monitoring sheet 114 3 Foreword The Royal Borough is one of the most densely populated Boroughs in the United Kingdom with possibly the least amount of public green open space. It is, therefore, the Council‟s policy to maintain all its parks at an excellent standard, to renew the infrastructure and to ensure that our parks are something we can all be proud of.
    [Show full text]
  • No. 12 Spring 2005
    No. 12 Spring 2005 elcome to our latest newsletter. Our main theme Lots Road and Chelsea Creek in this edition is the theatres, variety halls, The Group, represented by the chairman, will be appearing Wcinemas and other ‘palaces of pleasure’ in the at the public inquiry into the Lots Road scheme, working borough. We may have lost the Granville and the King’s, closely with other resident and amenity associations. Our but we still have the Lyric and some interesting cinemas concerns include damage to the Sands End conservation and an historic dance hall. And of course we also have a area including a threat to the future of the Imperial Gas fairly new ‘palace of pleasure’ in the shape of the Works dock, encroachment into the creek, lack of open Riverside. Our other main feature is John Sheppard’s space, the effect on the river views of the two tall towers fascinating account of his pioneering survey of sculpture in (37 storeys and 25 storeys), which ‘outlandmark’ the Lot’s the borough. Completed in 2004 and comprising over 200 Road power station (memorably described by Gavin Stamp entries, this has added a whole new dimension to our work. as a ‘temple to power’), and the loss of the avenue of We also have articles by John Goodier on Fulham’s South mature horse chestnut trees in Chelsea Harbour. The river Park and Hammersmith’s Quaker meeting house, and by is a nature conservation area of metropolitan importance Charles Wagner on English Heritage’s high-profile and the riverside needs more 'greening’ to extend the green campaign to rid our streets of clutter.
    [Show full text]
  • Active for Life 2017-2018 Your Guide to Low Cost and Free Activities in Kensington and Chelsea Active for Life 2017-2018 Contents
    active for life 2017-2018 Your guide to low cost and free activities in Kensington and Chelsea active for life 2017-2018 contents Benefits of physical activity 3 Activity Finder 4 Leisure Centres 5 Health Walks 6 Physical Activity in the north of the borough 7 – 13 Physical Activity in the south of the borough 14 – 17 Tennis 18 Healthy Hearts 19 MEND 19 Go Healthy with Go Golborne 20 Kick It 20 Health Trainers 21 Exercise Referral for Medical Conditions 21 Volunteering 22 Exercise at Home 22 Keep Fit Outdoors 23 2 active for life 2017-2018 The benefits of 30 minutes of physical activity each day • Meet new, likeminded people • Improved confidence and self-esteem • Improve your mobility and posture • Reduce stress and anxiety • Assist with weight loss and weight management • Lower your blood pressure • Keep your heart strong and healthy • Lower your risk of heart disease, obesity, type 2 diabetes and some cancers Things to consider: if you are not used to being active, start slow and build up in chunks of 10 minutes 3 active for life 2017-2018 find the right activity for you Type of activity Definition of activity Activity key The perfect activity for those Throughout the Low Level or monitored getting back into exercise, allowing programme these training you to track your personal goals sessions are labelled Throughout the Flexible and You decide the intensity of your programme these challenging workout sessions are labelled Throughout the Free and No payment needed, just turn up programme these accessible sessions are labelled Targeted sessions for specific groups: Throughout the Specific sessions Women only, men only, disability and programme these 50+ sessions are labelled 4 active for life 2017-2018 leisure centres Leisure Centre Membership Our centres are managed by GLL under the brand name Better.
    [Show full text]
  • WORMWOOD SCRUBS Protected Species Survey Report
    WORMWOOD SCRUBS Protected Species Survey Report November 2017 adult female viviparous lizard at the Scrubs Authors Mike Waller Grad CIEEM Huma Pearce MCIEEM Protecting London’s Wildlife for the future The London Wildlife Trust is a company limited by guarantee registered in England and Wales 1600379 and registered charity number 283895. Registered Office: Dean Bradley House, 52 Horseferry Road, London, SW1P 2AF This page is deliberately left blank Wormwood Scrubs Protected Species Surveys November 2017 Contents 1 Executive Summary ....................................................................................................... 3 2 Introduction .................................................................................................................... 5 2.1 HS2 Stamford Brook sewer realignment ................................................................. 5 2.2 Proposed ecological enhancements........................................................................ 6 2.3 Site Details.............................................................................................................. 6 2.3.1 Topography ..................................................................................................... 6 2.3.2 Hydrology and soils.......................................................................................... 6 2.3.3 Access and usage............................................................................................ 7 3 Protected species surveys ............................................................................................
    [Show full text]
  • Wormwood Scrubs Extended Phase 1 Habitat Survey October 2016
    Dean Bradley House 52 Horseferry Road London SW1P 2AF Tel: 020 7803 4284 [email protected] WORMWOOD SCRUBS Extended Phase I Habitat Survey October 2016 Author Mike Waller Grad CIEEM London Wildlife Trust Wormwood Scrubs Extended Phase I Habitat Survey October 2016 This page is deliberately left blank London Wildlife Trust Wormwood Scrubs Extended Phase I Habitat Survey October 2016 Contents 1 Executive Summary ....................................................................................................... 3 2 Additional Enhancements .............................................................................................. 4 3 Introduction .................................................................................................................... 5 3.1 Surveyed site details ............................................................................................... 6 3.2 Site Details ............................................................................................................. 6 3.2.1 Topography ..................................................................................................... 6 3.2.2 Hydrology and Soils ......................................................................................... 6 3.2.3 Access and Usage ........................................................................................... 7 3.3 Desktop Study ........................................................................................................ 7 4 Extended Phase I survey details .................................................................................
    [Show full text]
  • Central London Is the Greatest Challenge Within Rivers and the Sea
    Contents 1 Foreword and Introduction 2 Reverie 4 All London Green Grid Vision and Methodology 6 ALGG Framework Plan 6 ALGG Area Frameworks 7 ALGG Governance 8 Area Strategy 10 Area Description 14 Strategic Context 16 Vision 18 Objectives 20 Opportunities 22 Project Identification 24 Clusters 26 Projects Map 28 Key Prjojects 30 Project Details 82 Forward Strategy 84 Gap Analysis 86 Forward Strategy 88 Appendices 90 Baseline Description 92 ALGG SPG Chapter 5 GGA12 Links 94 Project Identification 112 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA12 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www.london.gov.uk/publication/all-london- green-grid-spg . Cover Image: River Thames from Wapping foreshore Foreword The All London Green Grid is this most visionary plan And what is the Green Grid? It is not just green, for for London in decades and could have a legacy as a start.
    [Show full text]