APPLICATION (FORM-1)

ENVIRONMENTAL CLEARANCE FOR METAL STONE QUARRY (MINING LEASE AREA 1.00 Ha)

AT Khasra No- 177/25/1(Part), Village- Bhajiyapaar, Tehsil- , District- , State-

Project Proponent: M/s. Sourabh Construction, Proporiter Shri Sourabh Peecha, Resi.-Ward No.- 14, Bus Stand Katangi, Tehsil- Katangi, District- Balaghat(MP)

February 2019 Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

APPENDIX-I FORM-1

(I) Basic Information

Sr. No. Item Details 1 Name of the project Bhajiyapaar Stone Quarry of M/s. Sourabh Construction, Proporiter Shri. Sourabh Peecha 2 Sl.No. in the schedule 1 (a) as per MoEF notification dt. 14.09.2006 as per OM dt. 18.05.2012 3 Proposed capacity/ area/ length/ Production– 6055 M3 per year, tonnage to be handled/ command area/ Mine Lease Area – 1.00 Ha lease area/ number of wells to be drilled 4 New/Expansion/Modernization New 5 Existing Capacity/ Area etc. Mine Lease Area – 1.00 Ha 6 Category of Project i.e. ‘A’ or ‘B’ B – 2 7 Does it attract the general condition? If No yes, please specify. 8 Does it attract the specific condition? If No yes, please specify. 9 Location The Area falls in SOI, Topo-sheet No. 64 A/7 The geographical location of the mine with respect to the boundary pillar of lease area are given below :- BP. Latitude Longitude No. A 21°49'44.57"N 79°50'35.39"E B 21°49'47.92"N 79°50'35.19"E C 23°18'40.14"N 80°24'01.52"E

Plot/Survey/Khasra No. Khasra No. 177/25/1 Part Village Bhajiyapaar Tehsil Katangi District Balaghat State Madhya Pradesh 10 Nearest railway station/airport along Nearest railway station: with distance in kms. Katangi ~ 8.00 Km SW Nearest Airport: Airport ~ 109.00 Km, SW 11 Nearest Town, city, District Nearest village: Bhajiyapaar Mal.: 1.11 km NE Headquarters along with distance in Nearest City: Balaghat ~36.50 Km SE kms. Nearest Town: Katangi ~ 7.00 Km SW District HQ: Balaghat ~ 36.50 Km, SE 12 Village Panchayats, Zilla Parishad, Village Panchayat: Gram Panchayat – Village: Municipal Corporation, Local body Bhajiyapaar, Tehsil: Katangi, District: Balaghat,

Page 2

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

Sr. No. Item Details (complete postal addresses with Madhya Pradesh telephone nos. to be given) Zilla Parishad: Collector Office Campus, Balaghat, Madhya Pradesh. 481011 Tel: 07632-240150 E Mail: [email protected] 13 Name of the applicant M/s. Sourabh Construction, Proponent Shri. Sourabh Peecha 14 Registered Address M/s. Sourabh Construction, Proponent Shri. Sourabh Peecha Resi.- Ward No.-14, BusStand Katangi, Tehsil- Katangi, Dist.- Balaghat (M.P.) 15 Address for correspondence Resi.- Ward No.-14, BusStand Katangi, Tehsil- Katangi, Dist.- Balaghat (M.P.) Name M/s. Sourabh Construction, Proponent Shri. Sourabh Peecha Designation Owner/Partner/CEO) Owner Address M/s. Sourabh Construction, Proponent Shri. Sourabh Peecha Resi.- Ward No.-14, BusStand Katangi, Tehsil- Katangi, Dist.- Balaghat (M.P.) Pin Code 481445 E-mail [email protected] Telephone No. +919039239148 Fax No. Not Available 16 Details of Alternative Sites examined, if Not applicable. Mining is site specific project. Mine any. Location of these sites should be lease area is falling in Toposheet No. 64 A/7 shown on a toposheet. 17 Inter-linked Projects No 18 Whether separate application of Not Applicable interlinked project has been submitted 19 It yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves Not Applicable. approval/clearance under: (a) The Forest (Conservation) Act, No forest land involved. 1980 No wildlife sanctuary/National park in 5 km radius. (b) The Wildlife (Protection) Act, 1972 Area does not fall in CRZ. (c) The C.R.Z Notification, 1991 22 Whether there is any Government No Order/Policy relevant/relating to the site 23 Forest land involved (hectares) None 24 Whether there is any litigation pending No litigation is pending in any court of law.

Page 3

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

Sr. No. Item Details against the project and/ or land in which the project is propose to be set up (a) Name of the Court (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. [II] Activity Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data Permanent or temporary Mining activity will cause permanent change in the change in landuse, land topography and land use of mining area. After cover or topography completion of mining, the lower part of mined out pit 1.1 including increase in Yes will be converted into water reservoir and thick intensity of land use (with plantation will be developed on the upper benches of respect to local landuse mined out area and on the safety zone area. plan) This is proposed new mine hence there is existing vegetation in the form of bushes and shrubs which will Clearance of existing land, 1.2 Yes be cleared before starting the mining activity. vegetation and building? The land is devoid of any other structures, there will not be clearance of any building/structures. After completion of mining, the lower part of mined out pit will be converted into water reservoir and thick 1.3 Creation of new land uses Yes plantation will be developed on the upper benches of mined out area and on the safety zone area. Pre-construction Mineral reserves have been proved during existing 1.4 investigations e.g. bore Yes mining in the nearby area. As, per available reserve houses, soil testing ? the life of mine is 11 Years. Proposed infrastructure will consist of Mine Office, 1.5 Construction works? Yes First Aid Centre, Drinking Facility, Rest Shelter and Approach Road. The mining lease area is devoid any structure as this is a proposed new mine, hence no demolition work is involved during implementation and operation phase of 1.6 Demolition Works ? No the project. Demolition of any structure shall be done at the end of mine life as per the Mine Closure plan. Temporary sites used for Temporary sheds will be provided with basic facilities construction works or 1.7 Yes of drinking water, sanitation, etc. for construction housing of construction workers. workers?

Page 4

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data Above ground buildings, Proposed infrastructure will consist of Mine office, first structures or earthworks aid centre, drinking water facility, rest shelter and 1.8 Yes including linear structures, approach road will be created during the life of mine cut and fill or excavations i.e.e 10 year plan period. Underground works There will be no underground mining activity. 1.9 including mining or No Open cast Manual method of mining will be used for tunneling? mining operation. After completion of mining, the lower part will be 1.10 Reclamation works? Yes converted into water body, with plantation on the upper benches and along the safety zone. 1.11 Dredging? No Not applicable. 1.12 Offshore structures? No Not Applicable It is proposed to produce 6055 m3 stone for the ten Production and year period as per mine plan. The mining will be done 1.13 Yes manufacturing Process? by open cast Manual method with the help of excavators and tippers and associated equipment’s. The excavated stone will be directly transported to the Facilities for storage of 1.14 Yes crusher within lease area for sizing and sale. The goods or materials? blasting will be done by licensed contractor. Murum cover is present in the area. Murum cover will be completely removed during the first three year of mining. 3324 m3 murum will be generated which will be sold out. About 1600 m3 OB/Waste will be generated from mining will be dumped and stacked separately within lease area at specific location. Facilities for treatment or No process effluent will be generated from the mining 1.15 disposal of solid waste or Yes activities. But during rainy season water will be liquid effluents? accumulated in the mine pit which will be stored and used for dust suppression and plantation. Excess water if any, will be pumped to settling tank on surface and will be allowed to flow outside mine only after ensuring proper settling. Domestic effluent from mines office will be discharged in septic tank followed by soak pit. Facilities for long term Not Applicable as most of the workers will be from the 1.16 housing of operational No nearby villages. workers? New road, rail or sea traffic About 10 tonne capacity trucks and tractors are 1.17 during construction and Yes required for transportation of stone. operation? New road, rail, air Existing road network is sufficient to cater the

waterborne or other No transportation load from the mine. Existing roads will

transport infrastructure be further strengthened from time to time to maintain

Page 5

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data including new or altered the road in proper conditions. routes and stations, ports, airports etc.? Closure or diversion of existing transport routes or 1.19 infrastructure leading to No Not Applicable changes in traffic movements? New or diverted 1.20 transmission lines or No Not Applicable pipelines? Garland drains will be constructed around the mine Impoundment, damming, lease area to divert surface run-off from outside the culverting, realignment or mine lease area to enter the mine pit and the drains 1.44 other changes to the Yes will be connected to a settling pond. The water from hydrology of watercourses settling pond will be allowed to flow outside mine lease or aquifers? after ensuring proper settling. 1.22 Stream crossings? No Not Applicable The total water requirement of 8 KLD will be obtained Abstraction or transfers of though tankers from nearby village and rainwater when 1.23 water from ground or Yes accumulated in mine pit for dust suppression and surface waters? plantation. Water for domestic use will be supplied from ground water. Changes in water bodies or 1.24 the land surface affecting No Not Applicable drainage or run-off Excavated rock will be transported from mine to the Transport of personnel or nearby crusher and from crusher to the buyers location materials for construction, by 10 tonne capacity trucks. Manpower will come from 1.25 Yes operation or nearby villages. decommissioning? Construction materials will be transported to the mine site through the existing road network. Mine office and other infrastructure will be dismantled Long-term dismantling or during the final phase of mining. The worked out mine 1.26 decommissioning or Yes pit will be systematically reclaimed with lower portion restoration works? converted into water body and plantation done on upper benches and along the safety zone. Ongoing activity during decommissioning which Small level of dust and noise pollution because of 1.27 Yes could have an impact on the dismantling of mine office and other infrastructure. environment? Influx of people to an area in This project would provide direct employment to 1.28 No either temporarily or around 18 people and most of the employment will be

Page 6

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data permanently? to the local population. Introduction of alien 1.29 No Not Applicable species? Loss of native species or 1.30 No Not Applicable genetic diversity? 1.31 Any other actions? No Not Applicable

Use of Natural resources for construction or operation of Project (such as land, 2.0 water, materials or energy, especially any resources which are non-renewable or in short supply). Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data Land specially undeveloped Total 1.00 Ha is a non-forest private land owned by 2.1 Yes or agricultural land (ha) lessee is applied for mining lease. The total water requirement of 8 KLD will be obtained from tankers from nearby villages and rainwater that Water (expected source & 2.2 Yes will be accumulated in mine pit for dust suppression competing users) unit KLD and plantation. Water for domestic use will be supplied from ground water. 2.3 Minerals (MT) Yes Building stone (Basalt): 6055 m3 per yearproduction Construction material – Small quantity of construction material will be required 2.4 stone, aggregates, and/soil Yes for construction of mine office, first aid center, drinking (expected source-MT) water facility and rest shelter. Forests and timber (source- 2.5 No Not Applicable MT) Energy including electricity Electricity- 1-2 KWH from MPEB. and fuels (source, 2.6 Yes Diesel - 30-35 litre/day from nearby diesel filling competing users) Unit: fuel station. (MT), energy (MW) Any other natural resources 2.7 (use appropriate standard No Not Applicable units)

Use, storage, transport, handling or production of substances or materials, which 3.0 could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data

Page 7

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

No toxic material or hazardous material will be used Use of substances or except explosive as blasting material. materials, which are The explosive will be stored in portable explosive hazardous (as per MSIHC 3.1 Yes magazine located within the mine lease area and the rules) to human health or licensed person will supervise/ control the blasting the environment (flora, operations. DGMS & Controller of Explosive fauna, and water supplies) operational guidelines shall be followed. No such substances or material will be used which will Changes in occurrence of cause changes in occurrence of disease or disease disease or affect disease 3.2 No vectors. Proper housekeeping & sanitation will be vectors (e.g. insect or water maintained to keep the work places free from disease borne diseases) causing vectors. The mining will be having a positive impact on the locality by providing a source for direct and indirect Affect the welfare of people employment to the local people. After completion of 3.3 e.g. by changing living Yes mining, the mine pit will be converted into water conditions? reservoir and water will be made available to the nearby farmers for irrigation purpose. Vulnerable groups of people who could be affected by Bhajiyapaar Village occurs at a distance of 2.00 km SE 3.4 the project e.g. hospital Yes direction while Bhajiyapar Mal.i Occurs at 1.11 Km NE patients, children, the direction elderly etc. 3.5 Any other causes No Not applicable

Production of solid wastes during construction or operation or decommissioning 4.0 (MT/month) Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data During plan Period (2019-20 to 2023 - 24) Soil, Overburden or mine 4.1 Yes Murum – 3324 m3 wastes Waste Rock/rejects – 1600 m3 Municipal waste (domestic Domestic effluent from mine office and rest shelter will 4.2 Yes and or commercial wastes) be disposed in septic tank and soak pit system. Hazardous wastes (as per Explosives used for blasting will be consumed. No 4.3 hazardous waste No hazardous waste will be generated. management rules) Other industrial process 4.4 No Not envisaged. wastes 4.5 Surplus product No Not envisaged. Sewage sludge or other Domestic effluent will be discharged in Septic Tank 4.6 sludge from effluent No and Soak Pit. treatment

Page 8

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

During construction of basic infrastructure facilities, small quantity of construction waste will be generated, Construction or demolition which will be used for land filling and development of 4.7 Yes wastes roads. Whereas during the last phase of mining demolition waste of small magnitude will be generated this will be used in the backfilling process. Redundant machinery or 4.8 No Not Applicable. All machinery will be on hire basis. equipment Contaminated soils or other 4.9 No Not Applicable materials 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No Not Applicable

5.0 Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr) Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data Insignificant quantity of emissions (SO & NOx) will Emissions from combustion 2 take place due to exhaust from tipper, mobile water 5.1 of fossil fuels from stationary Yes sprinkler, compressor and excavator deployed during or mobile sources mining and transportation activities. Dust will be generated from various processes like drilling, blasting, transportation etc. To reduce the dust generated during these processes, necessary control Emission from production 5.2 Yes measures like water sprinkling on haul road, plantation processes around mine lease area, covered transportation, plantation of grasses on OB to reduce wind erosion etc. will be taken.

Fugitive dust and SO2, NOx will be generated during Emissions from materials mining operations like drilling, blasting, loading, 5.3 handling including storage or Yes unloading, handling and transportation. Fugitive transport emission will be restricted by water sprinkling on haul road and covered transportation. Insignificant quantity of dust and SO , NOx will be Emissions from construction 2 generated during construction of basic facilities in mine 5.4 activities including plant and Yes lease area, due to transportation of material required equipment for construction. Dust or odours from handling Dust will be generated during drilling, blasting, loading, of materials including unloading, handling and transportation of mined out 5.5 Yes construction materials, materials. sewage and waste There is no possibility of any odour generation. Emissions from incineration 5.6 No Not Applicable of waste

Page 9

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

Emissions from burning of waste in open air (e.g. slash 5.7 No Not Applicable materials, construction debris) Emissions from any other 5.8 No Not Applicable sources

6.0 Generation of Noise and vibration, and emissions of Light and heat Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data Noise will be generated during mining operations and vehicular activities. The effect of increased level of noise will be insignificant as the noise will dissipated From operation of 6.1 Yes over short distance from source. Also proposed equipment’s. plantation around mine lease boundary will help in attenuating noise. Small amount of ground vibrations will be generated during blasting. From industrial or similar 6.2 No Not Applicable processes From construction or 6.3 No Not applicable demolition Noise generated during blasting process is instantaneous and proper steps like appropriate technique, proper hole pattern and size and use of low 6.4 From blasting or piling Yes intensity blasting material will be taken to keep the noise level as low as possible. Small amount of ground vibrations will be generated during blasting. From construction or There will be noise generation due to movement of 6.5 Yes operational traffic mining machineries and transportation vehicles. From lighting or cooling 6.6 No Not Applicable systems 6.7 From any other sources No Not Applicable

Risks of contamination of land or water from releases of pollutants into the ground or 7.0 into sewers, surface waters, groundwater, coastal wasters or the sea Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data Not Applicable since no hazardous material will be involved during mining process except the explosive From handling, storage, use which will be stored and handled as per the permission 7.1 or spillage of hazardous No letter of controller of explosive and will not contaminate materials the land or water bodies. This explosive will be handled by the licensed person.

Page 10

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

No process effluent will be generated by mining activity. The ground water from pit will be pumped out From discharge of sewage in a settling tank, after proper settling it will be utilized or other effluents to water or for dust separation and plantation and excess water 7.2 Yes the land (expected mode will be allowed to flow outside only after ensuring and place of discharge) proper settling. Domestic effluent from mine office and rest shelter will be discharged in septic tank and soak pit. Not Applicable because insignificant quantity of dust,

SO2 and NOx will be released into air due to mining in By deposition of pollutants very small area and low production on daily basis. 7.3 emitted to air into the land No Moreover release of these pollutants into the air will be or into water. controlled by regular dust suppression, plantation along road and regular maintenance of mining machinery. 7.4 From any other sources No Not Applicable Is there a risk of long term buildup of pollutants in the 7.5 No Not envisaged. environment from these sources

Risk of accidents during construction or operation of the project, which could affect 8.0 human health or the environment Details thereof (with approximate quantities/ Sr. Information/Checklist Yes/ rates, wherever possible) with source of No. Confirmation No information data From explosions, spillages, No Blasting will be done by licensed contractor hence fires etc. from storage, magazine is not required in lease area. DGMS & 8.1 handling, use or production of Controller of Explosive operational guidelines shall hazardous substances be followed. 8.2 From any other causes No Not Applicable Could the project be affected by natural disasters causing The project site falls in zone-II as per IS 1893 (Part- 8.3 environmental damage (e.g. No I): 2002. Hence, seismically it is a stable zone. floods, earthquakes, landslides, cloud burst etc.)

Page 11

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

Factors which should be considered (such as consequential development) which 9.0 could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Details thereof (with approximate quantities/ Sr. Information/Checklist Yes/ rates, wherever possible) with source of No. Confirmation No information data Lead to development of The stone mineral mining will lead to generation of supporting, facilities, ancillary direct and indirect employment opportunities. It will development or development also help in overall improvement in infrastructural stimulated by the project facility, road development etc., it will also help in which could have impact on upliftment of nearby population. the environment e.g.: Supporting infrastructure 9.1 Yes (roads, power supply, waste or waste water treatment, etc.)  Housing development  Extractive industries  Supply industries  Other A water reservoir will be developed in the lower part of the mine out pit. With plantation done on upper benches and along the safety 7.5 m safety zone. Lead to after use of the site, The water reservoir will help in ground water 9.2 which could have an impact Yes recharge that will improve the water table. It will be on the environment also helpful in rain water harvesting. The water from the pit can be used by the nearby farmers for irrigation purpose. Set a precedent for later No major development is envisaged due to small 9.3 No developments scale of project. Have cumulative effects due There are some other small stone quarries in the to proximity to other existing 9.4 Yes vicinity. However, cumulative effect because of or planned projects with existing nearby stone quarry will be insignificant. similar effects

(III) Environmental Sensitivity

Sr. Areas Name/ Aerial distance (within 5 No. Identity km radius) Proposed project location boundary 1 Areas protected under international conventions, None None within 5 km radius national or local legislation for their ecological,

Page 12

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

landscape, cultural or other related value 2 Areas which are important or Water Bodies sensitive of ecological Jamuniya Dam Dam- 1.85 Km W reasons – wetlands, water courses or other water bodies, coastal zone, Forests No Forest within 5 Km radius biospheres, mountains, None study Area forests

3 Areas used by protected, important or sensitive species of flora or fauna for None None within 5 km radius. breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or None None within 5 km radius underground waters 5 State, national boundaries None None within 5 km radius. 6 Routes or facilities used by Katangi-Lalbarra Road 1.20 kmSE the public for access to recreation or other tourist, pilgrim areas 7 Defense installations None None within 5km radius 8 Densely populated or built- Katangi 7.00 Km, SW up area 9 Areas occupied by sensitive Nearest Hospital at Katangi 7.00 Km, SW man made land uses (hospitals, schools, places of Nearest Schools worship, community Katangi H.S. School Katangi 7.00 Km, SW facilities) 10 Areas containing important, high quality or scarce resources(ground water None None within 5km radius. resource, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where None None within 5 km radius. existing legal environmental standards are exceeded) 12 Areas susceptible to natural None The area is not known for hazard which could cause these natural hazards. the project to present Seismically, this area is

Page 13

Bhajiyapaar Stone Quarry at Village- Bhajiyapaar, Tehsil- Katangi, Dist – Balaghat of FORM - I M/s. Sourabh Construction, Proporiter Shri.Sourabh Peecha (Area: 1.00 Ha)

environmental problems categorized under Zone-II as (earthquakes, subsidence, per IS-1893 (Part-1)- landslides, erosion, flooding 2002.Hence; seismically the or extreme or adverse site is in a stable zone. climatic conditions)

IV) Proposed Terms of Reference for EIA studies

It is hereby submitted that this minor mineral project may be considered under Category B-2 given in EIA Notification, 2006, and Environment Clearance (EC) may be issued on the basis of this Form-1 & enclosed PFR.

I, M/s Sourabh Construction, Prop. Shri Sourabh Peecha hereby give an undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any, to the project will be revoked at our risk and cost:

Date: 06.02.2019 Place: Balaghat, Madhya Pradesh

Lessee: M/s. Sourabh Construction, Proponent Shri. Sourabh Peecha Resi.- Ward No.-14, Bus Stand Katangi, Tehsil- Katangi, Dist.- Balaghat (M.P.)

Page 14