Length . . . 32' 4" Beam . . . 10' 10" Draft (Hull) . . . 23" Deadrise

Total Page:16

File Type:pdf, Size:1020Kb

Length . . . 32' 4 XP ProLineBoats.com • 800.344.1281 Mercury Twin 250 Verado *D Twin 300 Verado *D Suzuki Twin 250 4-Stroke *D Twin 300 4-Stroke *D All 30" Shafts Shift & Throttle - *M = Mechanical, *D = Digital Length . 32' 4" Beam . 10' 10" Draft (Hull) . 23" Deadrise . 22 deg Fuel . 289 gal Weight - Hull . 11,500 lbs Weight - Trailer . 15,400 lbs Cockpit Area . 61 sq ft Cockpit Depth . 29" Bridge Clearance . 9' 10" Max HP . 600 Baitwell . 20 gal Fishbox (2) . 125 gal Fresh Water . 39 gal Headroom - Cabin . 6' 7" Headroom - Helm . 6' 8" Ice Maker (Per Day) . 23 lbs Water Heater . 6 gal While we endeavor to be as accurate as possible, certain changes in standard and optional equipment may occur. Also, specifications and performance figures are estimated and may vary with each vessel, application and conditions. XP ProLineBoats.com • 800.344.1281 • 10 Year Hull Structure Warranty • Cockpit Lights - LED • NMMA Certified • 110v Outlets - GFI Protected • Compass • Rod Holders - 2 Pair • 12-Volt Receptacle • Composite Construction - Floors • Rod Holders - 4 Transom & Transom Mounted • ABYC Color Coded Wiring w/ • Rod Racks - Cockpit (4) Shrink Connections • Dive Platform - Integrated w/Ladder Horizontal • Anchor Roller • Drink Holders - Stainless Steel • Rope Locker Storage • Baitwell w/Raw Water • Electrical Distribution Panel • Safety Engine Kill Switch w/ Washdown & Light Motor • Fiberglass Stringer System • Base Vinyl - Off White • Seating - Command Seat (Foam Filled) w/Baseball Glove Leather • Seating - Folding Rear Bench Accents • Fish Boxes w/Macerator • Seating - Lounge w/Bolster & • Battery Charger • Fresh Water w/Pull Out Shower - Storage (Port) Hot & Cold • Battery Switch for Dual Batteries • Shore Power w/Cord (30 Amp) • Full Galley - Refrigerator, • Steering - Hydraulic • Battery(s) w/ Engine Selection Microwave & Alcohol/Electric • Bilge Pumps (2) - Auto-Manual Stove • Steering - Tilt Upgrade w/ Engine Selection • Bonding System • Galvanic Isolator • Storage - Tackle • Gunnel Trim - Rigid Vinyl w/ SS • Bow Handrail - Stainless Steel Insert • Striping - Waterline • Cabin Cushion(s) • Hand Laid Knitted Fiberglass • Switch and Breaker Panel • Cabin Door - Acrylic Fabric (Hull Structure) • Top - Hard Top w/Lighting, Hatches, Rod Holders (4 • Cabin Hatches (2) • Head - Hot & Cold Shower & Vertical) & Curtain Wall (Aft) Sink (w/Storage) • Cabin Lights • Transom Door • Head - Vacuum Flush • Cabin Portholes w/Overboard & Dockside • Trim Tabs w/ Indicator • Cabin Table w/Filler Cushion Discharge • Water Heater • City Water Hook-Up • Horn - Electric • Windlass w/Rope & Chain • Cleats - 7 • Light LED - Navigation • Windshield - Tempered Glass • Mid-Cabin Berth w/Privacy • Windshield Wiper - Starboard & • Cockpit Bolsters Curtain Port While we endeavor to be as accurate as possible, certain changes in standard and optional equipment may occur. Also, specifications and performance figures are estimated and may vary with each vessel, application and conditions. XP ProLineBoats.com • 800.344.1281 • Air Conditioner (16k BTU) - Cabin Unit Color Package - Hull Bottom Gel to Chine • Air Conditioner (16k BTU) - Cabin Unit (220 Volt) Black • Fighting Lady Yellow • Ice Blue • Navy • Air Conditioner (18k BTU) w/Heater & Windshield Pro-Line Blue • Sand • Seafoam Green Defroster - Cockpit Color Package - Hull Sides • Air Conditioner (18k BTU) w/Heater & Windshield Gel to Chine Defroster (220 Volt) - Cockpit Black • Fighting Lady Yellow • Ice Blue • Navy • Baitwell & Light , Port Side (In Lieu of Sink) Pro-Line Blue • Sand • Seafoam Green • Bow Thruster Electronics Package 2 • Cabin Floor & Steps - Teak & Holly Garmin Striker 5 • CE Certification Garmin GPS echoMAP 54DV VHF Radio - Garmin 200 w/ Antenna • Curtain - Aft Enclosure • Dive Ladder Electronics Package 3 Garmin GPSMap 7608 • Generator (Gas) 4.0 kw w/Carbon Monoxide VHF Radio - Garmin 200 w/ Antenna Detector & Auto Shut Off (220 Volt) * Optional XM Weather • Generator (Gas) 5.0 kw w/Carbon Monoxide * Optional 1kw In-Hull Transducer Detector & Auto Shut Off (110 Volt) Electronics Package 4 • Ice Maker Garmin GPSMap 7608 • Light - Remote Spot VHF Radio - Garmin 200 w/ Antenna XM Weather • Lights LED - Spreader * Optional 1kw In-Hull Transducer • Lights LED - Underwater (1 Pair) Blue or Green * Optional 2nd Garmin GPSMap 7608 • Outriggers - GS-280 w/ 18 ft Poles & Rigging Kit Electronics Package 5 • Seating - Helm Bench Garmin GMR 24XHD Radar Garmin GPSMap 7612 • Shore Power w/Cord - 220 Volt Upgrade VHF Radio - Garmin 200 w/ Antenna • Shrink Wrap XM Weather * Optional 1kw In-Hull Transducer • Stereo - AM/FM w/ iPod, Bluetooth, 4 Speakers & * Optional 2nd Garmin GPSMap 7612 Remote • Television (Flatscreen) w/DVD Player Powdercoat Package Helm Seat & Top • Top - Full Aft Wall (Hard) w/Swing Open Door & * Black Sliding Windows * White • Windlass - Foot Switch While we endeavor to be as accurate as possible, certain changes in standard and optional equipment may occur. Also, specifications and performance figures are estimated and may vary with each vessel, application and conditions..
Recommended publications
  • Inclining Test and Lightweight Survey V2.1
    GL Leaflet for Inclining test and Lightweight survey V2.1 Leaflet for Inclining test and Lightweight Survey Version 2.1 dated 2011-08-24 1 GL Leaflet for Inclining test and Lightweight survey V2.1 Version information Version Date Editor Items treated Approved 1.0 2005-05 Fim, TBo, Pei initial version HB 2.0 2011-04 Pei, GLe, SKl, MBst draft readings, status of vessel, FSM, tank fillings AFl 2.1 2011-08 Pei, Jasch BW shifting tanks, amount of additional masses, AFl shifting weights, editorial changes 2 GL Leaflet for Inclining test and Lightweight survey V2.1 Table of contents: 1 Inclining Test........................................................................................................................ 4 1.1 Purpose and objective..................................................................................................................... 4 1.2 Acceptance of the test..................................................................................................................... 4 1.3 Procedure of the inclining test ......................................................................................................... 5 1.3.1 Notification of the inclining test/lightweight survey.................................................................. 5 1.3.2 Condition of the vessel ........................................................................................................... 5 1.3.3 Mooring Arrangement.............................................................................................................5
    [Show full text]
  • Panamax - Wikipedia 4/20/20, 1018 AM
    Panamax - Wikipedia 4/20/20, 1018 AM Panamax Panamax and New Panamax (or Neopanamax) are terms for the size limits for ships travelling through the Panama Canal. General characteristics The limits and requirements are published by the Panama Canal Panamax Authority (ACP) in a publication titled "Vessel Requirements".[1] Tonnage: 52,500 DWT These requirements also describe topics like exceptional dry Length: 289.56 m (950 ft) seasonal limits, propulsion, communications, and detailed ship design. Beam: 32.31 m (106 ft) Height: 57.91 m (190 ft) The allowable size is limited by the width and length of the available lock chambers, by the depth of water in the canal, and Draft: 12.04 m (39.5 ft) by the height of the Bridge of the Americas since that bridge's Capacity: 5,000 TEU construction. These dimensions give clear parameters for ships Notes: Opened 1914 destined to traverse the Panama Canal and have influenced the design of cargo ships, naval vessels, and passenger ships. General characteristics New Panamax specifications have been in effect since the opening of Panamax the canal in 1914. In 2009 the ACP published the New Panamax Tonnage: 120,000 DWT specification[2] which came into effect when the canal's third set of locks, larger than the original two, opened on 26 June 2016. Length: 366 m (1,201 ft) Ships that do not fall within the Panamax-sizes are called post- Beam: 51.25 m (168 ft) Panamax or super-Panamax. Height: 57.91 m (190 ft) The increasing prevalence of vessels of the maximum size is a Draft: 15.2 m (50 ft) problem for the canal, as a Panamax ship is a tight fit that Capacity: 13,000 TEU requires precise control of the vessel in the locks, possibly resulting in longer lock time, and requiring that these ships Notes: Opened 2016 transit in daylight.
    [Show full text]
  • 13.012 Hydrodynamics for Ocean Engineers Reading #3
    13.012 Hydrodynamics for Ocean Engineers Reading #3 13.012 Hydrodynamics for Ocean Engineers Prof. A.H. Techet Fall 2004 Archimedes’s Principle and Static Stability “Any object, wholly or partly immersed in a fluid, is buoyed up by a force equal to the weight of the fluid displaced by the object.” “The apparent loss in weight of a body immersed in a fluid is equal to the weight of the displaced fluid.” I. Archimedes’s Principle: The force on a body due to pressure alone (in the absence of viscous forces) K F = ∫∫ p nˆ ds (3.1) S where pressure is a function of depth below the free surface: p(z) = −ρgz . (3.2) K F = ∫∫ p nˆ ds = − ρg ∫∫ z nˆ ds (3.3) S S By Calculus the surface integral can be converted into a volume integral (Gauss’s Theorem/Divergence Theorem): K K ∫∫G ⋅ nˆ ds = ∫∫∫∇ ⋅G dV (3.4) SV Thus equation becomes: K FpndsgzndsgdVgVk==−=∫∫ˆˆρρρ ∫∫ ∫∫∫ =ˆ (3.5) SSV version 3.0 updated 9/8/2004 -1- ©2003, 2004 aht 13.012 Hydrodynamics for Ocean Engineers Reading #3 We can see now that the buoyancy force acts to counterbalance the displaced volume of fluid. For a half submerged body the area of the water plane must be accounted for in the integration. II. Moment on a body (Ideal Fluid) The moment on a submerged body follows directly from structural mechanics or dynamics methodologies. K K M = p(x × nˆ) ds ≡ (M ,M ,M ) = (M ,M ,M ) (3.6) ∫∫ 1 2 3 x y z S Figure 1: x, y, z coordinate reference frame.
    [Show full text]
  • Course Objectives Chapter 2 2. Hull Form and Geometry
    COURSE OBJECTIVES CHAPTER 2 2. HULL FORM AND GEOMETRY 1. Be familiar with ship classifications 2. Explain the difference between aerostatic, hydrostatic, and hydrodynamic support 3. Be familiar with the following types of marine vehicles: displacement ships, catamarans, planing vessels, hydrofoil, hovercraft, SWATH, and submarines 4. Learn Archimedes’ Principle in qualitative and mathematical form 5. Calculate problems using Archimedes’ Principle 6. Read, interpret, and relate the Body Plan, Half-Breadth Plan, and Sheer Plan and identify the lines for each plan 7. Relate the information in a ship's lines plan to a Table of Offsets 8. Be familiar with the following hull form terminology: a. After Perpendicular (AP), Forward Perpendiculars (FP), and midships, b. Length Between Perpendiculars (LPP or LBP) and Length Overall (LOA) c. Keel (K), Depth (D), Draft (T), Mean Draft (Tm), Freeboard and Beam (B) d. Flare, Tumble home and Camber e. Centerline, Baseline and Offset 9. Define and compare the relationship between “centroid” and “center of mass” 10. State the significance and physical location of the center of buoyancy (B) and center of flotation (F); locate these points using LCB, VCB, TCB, TCF, and LCF st 11. Use Simpson’s 1 Rule to calculate the following (given a Table of Offsets): a. Waterplane Area (Awp or WPA) b. Sectional Area (Asect) c. Submerged Volume (∇S) d. Longitudinal Center of Flotation (LCF) 12. Read and use a ship's Curves of Form to find hydrostatic properties and be knowledgeable about each of the properties on the Curves of Form 13. Calculate trim given Taft and Tfwd and understand its physical meaning i 2.1 Introduction to Ships and Naval Engineering Ships are the single most expensive product a nation produces for defense, commerce, research, or nearly any other function.
    [Show full text]
  • Tendency Toward Mega Containerships and the Constraints of Container Terminals
    Journal of Marine Science and Engineering Article Tendency toward Mega Containerships and the Constraints of Container Terminals Nam Kyu Park 1,* and Sang Cheol Suh 2 1 Department of International Logistics, Tongmyong University, Busan 48520, Korea 2 Institute of Port & Logistics Industry, Busan 48520, Korea; [email protected] * Correspondence: [email protected]; Tel.: +82-010-3575-1004 Received: 25 February 2019; Accepted: 17 April 2019; Published: 6 May 2019 Abstract: This paper focuses on the coping ability of the existing container terminals when mega containerships call at a port. The length of 30,000 TEU (Twenty Equivalent Unit) ships are predicted to be 453 m and occupy 498 m of a quay wall. As a result, the length of berth should be more than a minimum of 500 m. If a 25,000 TEU ship or 30,000 TEU ship call at a terminal, the outreach of QC (Quay Crane) should be a minimum 74.3 m or 81.0 m respectively. As mega ships are calling at the port, the ship waiting time, the available stacking area, and the number of handling equipment can be limited. The analysis reveals that larger ships wait for longer than the smaller ones because they have difficulty allocating the proper seat on berth. As a result of the survey in a terminal, the average occupancy is shown to be 60.4%, the minimum is 52.4%, and the maximum is 73.3%. Surveying the monthly equipment operation rate for 3 years, the average is 85.8%, the minimum is 80.1%, and the maximum is 90.1%.
    [Show full text]
  • Us Tonnage Regulations Application for Formal Measurement Services
    U.S. TONNAGE REGULATIONS MTN 01-98 APPLICATION FOR FORMAL MEASUREMENT SERVICES as amended I. APPLICABILITY A U.S. flag vessel is eligible to be measured under the Convention system (46 CFR 69 subpart B) if it is 79 feet or more in overall length. Also, any U.S. flag vessel, regardless of length, may be measured under the Standard system (46 CFR 69 subpart C) or Dual system (46 CFR 69 subpart D). Some vessels, including those that are less than 79 feet in overall length, are eligible to be measured under the Simplified system (46 CFR 69 subpart E), without the need for formal measurement. Refer to section 69.11 of 46 CFR 69 for complete measurement eligibility details. II. APPLICATION INFORMATION *1. REQUESTED SERVICE (see instructions on reverse) 12. OVERALL HULL DIMENSIONS Length = ________ ft Breadth = _______ ft Depth = ______ ft INITIAL MEASUREMENT (indicate measurement system(s)) Subpart B - Convention system ( GT ITC / NT ITC ) Subpart C - Standard system ( GRT / NRT ) Subpart D - Dual system ( GRT / NRT ) REMEASUREMENT (indicate reason(s)) Configuration changes Change in passengers or draft 13. ADDITIONAL VESSEL INFORMATION Correction of measurement errors a. PROPULSION: Self-Propelled Non-Self-Propelled Other (describe in remarks) b. NUMBER OF PASSENGERS: OTHER (describe in remarks) Total: _____ Accommodated in cabins for 8 or fewer: _____ *2. REQUESTED TONNAGE CERTIFICATE(S): US ITC69 c. NUMBER OF CARGO SPACES: ______ *3. VESSEL NAME ____________________________________ d. NUMBER OF PORTABLE ENCLOSED SPACES: ______ e. DRAFT RESTRICTIONS: Load Line Other *4. VESSEL NUMBER ___________________________________ Stability Letter 5. HAILING PORT _____________________________________ f. INTENDED VOYAGES: Domestic Great Lakes 6.
    [Show full text]
  • The Impact of Mega-Ships
    The Impact of Mega-Ships Case-Specific Policy Analysis The Impact of Mega-Ships Case-Specific Policy Analysis INTERNATIONAL TRANSPORT FORUM The International Transport Forum at the OECD is an intergovernmental organisation with 54 member countries. It acts as a strategic think tank with the objective of helping shape the transport policy agenda on a global level and ensuring that it contributes to economic growth, environmental protection, social inclusion and the preservation of human life and well-being. The International Transport Forum organises an Annual Summit of ministers along with leading representatives from industry, civil society and academia. The International Transport Forum was created under a Declaration issued by the Council of Ministers of the ECMT (European Conference of Ministers of Transport) at its Ministerial Session in May 2006 under the legal authority of the Protocol of the ECMT, signed in Brussels on 17 October 1953, and legal instruments of the OECD. The Members of the Forum are: Albania, Armenia, Australia, Austria, Azerbaijan, Belarus, Belgium, Bosnia and Herzegovina, Bulgaria, Canada, Chile, China (People’s Republic of), Croatia, Czech Republic, Denmark, Estonia, Finland, France, Former Yugoslav Republic of Macedonia, Georgia, Germany, Greece, Hungary, Iceland, India, Ireland, Italy, Japan, Korea, Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Mexico, Republic of Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Russian Federation, Serbia, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Turkey, Ukraine, United Kingdom and United States. The International Transport Forum’s Research Centre gathers statistics and conducts co-operative research programmes addressing all modes of transport. Its findings are widely disseminated and support policy making in Member countries as well as contributing to the Annual Summit.
    [Show full text]
  • Containerization of the Baltic
    CONTAINERIZATION OF THE BALTIC SEA - A COMPETITIVE PERSPECTIVE inspired by challenges of rivalry and interchange between the gateways of Kattegat/The Sound and Gdansk Bay Centre for Regional Analysis (CRA) School of Business, Economics and Law at University of Gothenburg Sten Lorentzon www.cra.handels.gu.se Working Paper 2014:1 CONTENTS Page Introduction 1 Approach 2 Background 5 Containerization; development of ships and ports 9 Main ports of northern Europe – an overview 10 Main ports of the Baltic Sea – an overview 12 Gateways of the Baltic Sea – competitive perspective 18 Ports of Gothenburg and Gdansk/Gdynia – 23 competition and cooperation Functions of the ports 23 Competitive challenges 25 Cooperative challenges 27 Concluding remarks 29 Appendix A: Baltic Link 34 Appendix B: Cargo ships in movement to destinations 35 in the Baltic Sea Appendix C: Ships of more than 200 metres length in the 36 Baltic Sea in movement northwards to Baltic destinations Appendix D: Flows of traffic of cargo ships with marking of 38 number of passages in both directions in 2011. References 39 Preface The introduction of new big container ships sends waves on established transport systems and illustrates the need to satisfy the demand for ports enabling efficient loading and unloading. This study is an attempt to throw light on the impact of containerization on the accessibility of ports at the Baltic Sea with attention paid to the changing conditions after the fall of the Wall. Former locked in areas have become hinterlands of ports serving the international market. EU has strengthened this integration in efforts made in Interreg-programs exemplified by the Baltic Link stretching from Trondheim in the North via Gothenburg to Adriatic ports in the South.
    [Show full text]
  • Ship Types & Sizes
    The Source for Maritime Information and Insight Chris Pålsson, Director, IHS Fairplay Copyright © 2011 IHS Inc. All Rights Reserved. 1 Size matters Copyright © 2011 IHS Inc. All Rights Reserved. 2 Endorsed by the IMSF 2011 Copyright © 2011 IHS Inc. All Rights Reserved. 4 Basis for size categories • Dimensional limitations – Passages, straits, canals, bridges, locks….. • Operational – Rate setting mechanisms – Cargo batch sizes – Type of service – Range of service – ….. Copyright © 2011 IHS Inc. All Rights Reserved. 5 Lingo • Handysize, small/large • VLCC • Handymax, large • ULCC • Supramax • VLGC • Panamax, sub/post/new • Feeder • Kamsarmax • ULCS • Capesize, mini • Seawaymax • VLOC • Chinamax • MR, small/large • Q-max • Aframax • Säfflemax • Suezmax • …. Copyright © 2011 IHS Inc. All Rights Reserved. 6 Dimensional limitations Copyright © 2011 IHS Inc. All Rights Reserved. 7 Panama Canal Panamax – L 294.1 m – B 32.3 m – D 12.04 m – H 61.3 New Panamax – L 366 m – B 49 m – D 15.2 m Copyright © 2011 IHS Inc. All Rights Reserved. – H 61.3 8 Suez Canal Suez Canal Bridge Shohada 25 January Bridge Egyptian-Japanese Friendship Bridge Max draft: 20.1 m, Max height: 68 m Copyright © 2011 IHS Inc. All Rights Reserved. 9 The Strait of Malacca Depth 25 m. Max draft 21 m. Copyright © 2011 IHS Inc. All Rights Reserved. 10 St Lawrence Seaway • L 225.6 m (740 feet) • B 23.8 m (78 feet) • D 7.9 m (26 feet) • H 35.5 m (116 feet) Copyright © 2011 IHS Inc. All Rights Reserved. 11 Qatar: Q-max • L 345 m (1,132 ft) • B 53.8 m (177 ft) • H 34.7 m (114 ft) Copyright © 2011 IHS Inc.
    [Show full text]
  • Angle of Loll Calculation by Cubic Spline
    JOURNAL OF MARITIME RESEARCH Vol. X. No. 2 (2013), pp. 21 - 26 ISSN: 1697-4040, www.jmr.unican.es Angle of Loll Calculation By Cubic Spline I. Basterretxea1,2,*, I. Sotés1,3, A. López1,4 and I. Alcedo1,5 ARTICLE INFO ABSTRACT Article history: Several years ago the Basque Government supported the programming of the software ARKITSAS in order to provide Received 28 February 2013; all existing vessels with a specific software to calculate stability, cargo and longitudinal strength data. The aim of this in revised form 12 March 2013; article is to present the part of that research concerning the definition of the static stability curve by cubic spline in its accepted 25 May 2013 initial end when the metacentric height is negative. Taking into account that the slope at initial end is known, the pre- cision of the results for low heeling angles may be improved and, in this way, the accuracy in the calculation of loll should be enhanced. This method of calculation is compared to other traditional methods used for wall-sided ships by Keywords: the application to three different ships. Static stability curve, Cubic splines, Free and fixed end, Angle of loll. © SEECMAR / All rights reserved 1. Introduction within the initial stability more precise and, taking into ac- count that the angle of loll is usually small; its calculation The static stability curve represents the values of GZ arms for would be suitable by means of non-free end cubic spline the different heeling angles. However, the stability booklet method. usually provides GZ arms for every ten or fifteen degrees of When the ship is ‘wall-sided’ the approximate formula in heeling angles.
    [Show full text]
  • DRAFT: 2018/2019 Update to Inventory for Ocean-Going Vessels: Methodology and Results
    Update to Inventory for Ocean-Going Vessels DRAFT: 2018/2019 Update to Inventory for Ocean-Going Vessels: Methodology and Results January 15, 2019 AIR RESOURCES BOARD 1 Update to Inventory for Ocean-Going Vessels Contents 1. Summary and Background...................................................................................... 5 2. Ocean-Going Vessel Background and Description ................................................. 6 2.1. Ocean-Going Vessel Marine Engines and Operations ................................ 9 2.2. Geographical Areas..................................................................................... 9 3. General Emissions Inventory Methodology and Sources...................................... 12 3.1. Base Year Vessel Visits and Time At Berth............................................... 13 3.2. Vessel Visit Length .................................................................................... 15 3.3. Effective Power (EP) ................................................................................. 19 3.4. Emission Factors (EF) ............................................................................... 22 4. Future Year Forecasts........................................................................................... 22 4.1. Freight Analysis Framework ...................................................................... 23 4.2. Mercator Forecast for Ports of LA/LB ........................................................ 27 4.3. Engine Tier Availability and Introduction...................................................
    [Show full text]
  • 15 Facts About Freigh T
    o u s Ab t F c t re a ig F h t 5 1 T h s e t c n e u x d t o s r t p a r g u e i o n t o f he journey Matching traded cargo to the right vessel takes flexibility, meticulous planning and highly specialized knowledge. Louis Dreyfus Company (LDC) invests in world-class logistics and tracking technology, and continually upgrades its port facilities and chartered fleet around the world, to deliver the most efficient Freight services to our customers and partners. A brief history of maritime trade: 1450 - 1815 - 1950 - tomorrow 1815 1950 today Global trade blossoms after voyages Empires make use of new steam With the rise of bulk shipping, companies A greener and more of discovery reach the New World engines and steel hulls to further their turn to oil - and diesel-fueled machinery responsible shipping business model across the globe and welded steel hulls, enabling a new, notably through low-cost model emission reduction Maritime trade accounts for 11 BILLION TONS Today, the world’s main of goods traded annually shipyards are in around the world 90% 50% China Japan dry bulk, of which 15% of global trade is agri-products S.Korea Philippines It takes approximately Common life span of a cargo vessel is Right now, there are as many as 12 MONTHS to build a cargo ship 20-30 YEARS 60,000 VESSELS ON THE JOB Dry bulk carriers can carry grains, Wet tankers are for vegetable oils, Liners carry containers packed Refrigerated ships transport oilseeds, sugar, rice and minerals ethanol and biodiesel with coffee and cotton orange juice The QUANTITY A VESSEL
    [Show full text]