Minutes of 103Rd SEAC-3 Meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21
Total Page:16
File Type:pdf, Size:1020Kb
Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. The following members were present. Shri. Anil Kale, IAS Rtd. Chairman 11-12-13-14 February, 2020 Dr.Shankar Vishwanath Member 11-12-13-14 February, 2020 Shri. Sudhir Yashwant Ghate Member 11-12-13-14 February, 2020 Dr. Rajesh B. Biniwale Member Ab-12-13-14 February, 2020 Shri. Pradeepkumar P. Joshi Member 11-12-13-14 February, 2020 Shri. Ajay Dhumal Member 11-12-13-Ab February, 2020 Dr. Ramesh Chillawar Member Absent Shri.Dattatray Thorat Member 11-12-Ab-14 February, 2020 Shri. Joy S. Thakur Secretary 11-12-13-14 February, 2020 Chairman welcomed the members to the 103rd SEAC III Meeting. Discussion Points: 1. The minutes of the earlier meeting were confirmed. 2. Agenda Items were taken up for consideration. ****** Secretary, SEAC-3 Chairman, SEAC-3 Page 1 of 52 Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. 14.02.2020 46. p.30 118223 D R GAVHANE LANDMARKS LLP. PP had submitted application for prior Environmental clearance stating following details: Proposal Number SIA/MH/MIS/118223/2019 “Destination Ostia” Mixed Use Development project by M/s D Name of Project R Gavhane Landmarks LLP Project category 8A (B2) Type of Institution Private Name Mr. Amit Damodar Gavhane Sr. No. 690/1A/1/1/1, KBG Classic, Above P Regd. Office N Gadgil, Pune- Nashik Road, Bhosari, address Project Proponent Pune. Maharashtra 411039 Contact number 9130045925 e-mail [email protected] Consultant Applied for Modification Details of previous EC Vide letter no. SEAC- 2013/CR- 321/TC- 2 Dated- 25th January, 2016 Gat no. 216/1B/1, Alandi- Dehu Road, Dudulgaon, Tal. – Haveli, Dist.- Location of the project Pune Latitude: 18°40'47.73"N Latitude and Longitude Longitude: 73°52'2.32"E Total Plot Area (m2) 21, 900.00 Deductions (m2) 3848.94 Net Plot area (m2) 18051.06 Proposed FSI area (m2) 33652.74 Proposed non-FSI area 29,978.95 (m2) Proposed TBUA (m2) 63,631.69 IOD received from PCMC vide letter No. TBUA (m2) approved by B.P./EC/DUDULGAON/06/2019 dated 07/10/2019 Planning Authority till date PCMC Ground coverage (m2) & % 45.32% Total Project Cost (Rs.) Rs. 103 Cr Activity Location Cost (Rs.) Duration 4 Nos. of solar panels in Pimpri Chinchwad CER as per MoEF & CC Municipal Schools defined Provision of circular dated 01/05/2018 by implementing agency, 36,00,000 2021-2024 solar panel 1) 1 No. in Chhatrapati Shri Shivaji Maharaj Boys School No.1, Bhosari Secretary, SEAC-3 Chairman, SEAC-3 Page 2 of 52 Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. 2) 1 No. in Chhatrapati Shri Shivaji Maharaj Boys School. No.2, Bhosari 3) 1 No. in Chhatrapati Shri Shivaji Maharaj High School, Bhosari 4) 1 No. in Savitribai Phule Prathmik School, Bhosari. 15 Nos. of water purifier to Pimpri Chinchwad Municipal Schools, defined by implementing agency 1) 3 Nos. in Chhatrapati Shri Shivaji Maharaj Boys School No.1, Bhosari 2) 3 Nos. in Chhatrapati Shri Provision of Shivaji Maharaj Boys 2020 & 2022- water School No.2, Bhosari 8,55,000 2024 purifier 3) 3 Nos. in Chhatrapati Shri Shivaji Maharaj High School, Bhosari 4) 3 Nos. in Savitribai Phule Prathmik Boys/ Girls School, Bhosari 5) 3 Nos. in Savitribai Phule Madhyamik Vidyalay School, Bhosari 19 Nos. of Street lights to Pimpri Chinchwad Municipal Schools defined by implementing agency. 1) 4 Nos. in Chhatrapati Shri Shivaji Maharaj Boys School- No.1. Provision of2) 4 Nos. in Chhatrapati Shri solar street Shivaji Maharaj Boys 9,50,000 2022- 2024 lights in School- No.2. societies 3) 4 Nos. in Chhatrapati Shri Shivaji Maharaj High School 4) 4 Nos. in Savitribai Phule Prathmik Boys/ Girls School, Bhosari. 5) 3 Nos. in Savitribai Phule Madhyamik Vidyalay, Bhosari. Details of Building Configuration: <Please use following legends: Floor = F, Parking = Pk, Podium = Po, Stilt =St, Reason for Lower Ground = LG, Upper Ground = UG, Basement = B, Shops = Sh> Modification / Change Previous EC / Existing Building Proposed Configuration Secretary, SEAC-3 Chairman, SEAC-3 Page 3 of 52 Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. Building Height Building Height Configuration Configuration Name (m) Name (m) Bldg. A Bldg. A St + 12 F 34.80 G + 12 F 37.70 (Existing) (Existing) Bldg. B 34.80 Bldg. B St + 12 F Pk + 12 F 37.70 (Existing) (Existing) Bldg. C 34.80 Bldg. C St + 12 F Pk + 12 F 37.70 (Existing) (Existing) Bldg. D 2 Pk + 12 F 34.80 Bldg. D Pk + 8 F 26.60 Due to change Bldg. E 2 Pk + 11 F 31.90 Bldg. E1 Pk + Pk + 11 F 35.65 of planning Bldg. F 2 Pk + 12 F 34.80 Bldg. F1 Pk + Pk + 11 F 35.65 Bldg. G 2 Pk + 12 F 34.80 Bldg. G1 Pk + Pk + 10 F 35.95 Commercial G 4.65 Bldg. H1 Pk + Pk + 09 F 35.25 Bldg. 1 Commercial Club House G + 1 F -- G 6.20 Bldg. 1 Commercial -- -- -- G 5.55 Bldg. 2 -- -- -- Club House G + 1 F 7.90 Tenements: 586 Total number of tenements Commercial / Shops: 50 Dry Season (CMD) Wet Season (CMD) Residential: 264 Residential: 264 Fresh Water Commercial: 13 Fresh Water Commercial: 13 Total: 277 Total: 277 Recycled Recycled 12 NA (Gardening) (Gardening) Swimming Pool 40 Swimming Pool 40 Water Budget Residential: 132 Residential: 132 Flushing Commercial: 10 Flushing Commercial: 10 Total: 142 Total: 142 Total 431 Total 419 377 377 Waste water (Excess treated Waste water (Excess treated water to generation water to be generation be disposed- 198) disposed- 186) Water Storage Fire UG tank Capacity (cum): 400 Capacity for Domestic UG tank Capacity (cum): 415 (Residential + Commercial) Firefighting / Flushing tank Capacity (cum): 150.33 UGT Source of Pimpri Chinchawad Municipal Corporation (PCMC) water Pre- Monsoon: 15 to 20 m below ground level. Rainwater Level of the Ground water table: Harvesting Post- Monsoon: 6 to 8 m below ground (RWH) level. Size and no of RWH tank(s) and NA Secretary, SEAC-3 Chairman, SEAC-3 Page 4 of 52 Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. Quantity: 14 nos. of pits with bore Quantity and size of recharge pits: Size: 4.0 X 2.10 X 1.75 m Domestic UG tank Capacity (cum): 415 (Residential + Commercial) Details of UGT tanks if any: Flushing tank Capacity (cum): 150.33 Fire UG tank Capacity (cum): 400 Sewage generation in 377 Sewage and CMD: Wastewater STP technology: MBBR Capacity of STP (CMD): 530 (Existing) Solid Waste Type Quantity (kg/d) Treatment / disposal Management Dry waste: 18 Collected by Ghanta gadi during Wet waste: 22 Collected by Ghanta gadi Construction Excavation: 29068.18 will be used for Backfilling within Construction waste Phase (Existing + Proposed) site. Type Quantity (kg/d) Treatment / disposal Existing Residential: 283 kg/day Proposed Will be handed over to authorized Dry waste: Residential: 303 kg/day agency Commercial: 76.35 kg/day Total: 662.35 kg/day Solid Waste Management Existing Residential: 424.5 kg/day during Proposed Treated in OWC machine within Operation Wet waste: Residential: 454.5 kg/day site Phase Commercial: 50.9 kg/day Total: 929.6 kg/day Hazardous waste: NA NA Biomedical waste NA NA Will be handed over to authorized E-Waste 5 agency STP Sludge (dry) 58 Kg/d Will be used as manure Total RG area (m2): 1805.11 Existing trees on plot: 35 Green Belt Required: 225 Number of trees to be planted: Development Proposed: 236 Number of trees to be cut: 8 Number of trees to be transplanted: 20 Source of power supply: MSEDCL During Construction Phase (Demand Load): 75 KW Power Existing: 1069.5 KW requirement: During Operation phase (Connected load): Proposed: 1539 KW Total: 2608.5 KW During Operation phase (Demand load): Existing: 936.19 KW Secretary, SEAC-3 Chairman, SEAC-3 Page 5 of 52 Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. Proposed: 766.12 KW Total: 1702.31 KW Existing: 2Nos. of 630 KVA Transformer: Proposed: 2Nos. of 630 KVA Total: 4 Nos. of 630 KVA DG set: Existing: 1 no. of 160 KVA Fuel used: Existing: 31 lit/hr Energy Conservation Measures in %: Total: 25.65 % 1) Solar PV Panels: 0.83 (24300 KWH / Annum) Details of 2) Auto Timer Logic Controller: 3.28 (95839.07 KWH / Annum) Energy saving 3) Electronic V3F Drive for Lifts: 0.64 (18788.01 KWH / Annum) 4) Solar Water Heater: 20.9 (611784 KWH / Annum) Environmental Type Details Cost Management Air, water, land, biological environment and Capital 13.5647344 plan budget socioeconomic environment during Construction O&M Air, water and Noise Monitoring 1.16 phase Capital (Rs. in Component Details O&M (Rs. in Lakh /Y) Lakh) Storm Water -- -- -- Sewage treatment STP 71.77 18.68 RWH Recharge pits 15.33 0.83 Solid Waste OWC 18.76 10.545 Swimming Pool -- 10.00 0.37 Environmenta Hazardous waste -- -- -- l e-waste -- -- -- Management Plantation 21.93516 2.70 Green Belt plan Budget Cost of Development 2.80 NA during transplantation Operation Existing: 29.34 Existing: 0.47 Solar water phase Proposed: 25.59 Proposed: 0.41 heating Total: 54.93 Total: 0.88 Energy saving Existing: 7.5 Existing: 0.38 Solar PV Proposed: 6.0 Proposed: 0.3 Total: 13.5 Total: 0.68 MoEF&CC Environmental EMP costing approved 21.08 Monitoring laboratory Disaster DMP Budgetary 66.295 6.01870 Management Allocation Type Required as per DCR Actual Provided Area per parking (m2) Traffic Covered per car area = 33.81sq.