Minutes of 103Rd SEAC-3 Meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21

Minutes of 103Rd SEAC-3 Meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21

Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. The following members were present. Shri. Anil Kale, IAS Rtd. Chairman 11-12-13-14 February, 2020 Dr.Shankar Vishwanath Member 11-12-13-14 February, 2020 Shri. Sudhir Yashwant Ghate Member 11-12-13-14 February, 2020 Dr. Rajesh B. Biniwale Member Ab-12-13-14 February, 2020 Shri. Pradeepkumar P. Joshi Member 11-12-13-14 February, 2020 Shri. Ajay Dhumal Member 11-12-13-Ab February, 2020 Dr. Ramesh Chillawar Member Absent Shri.Dattatray Thorat Member 11-12-Ab-14 February, 2020 Shri. Joy S. Thakur Secretary 11-12-13-14 February, 2020 Chairman welcomed the members to the 103rd SEAC III Meeting. Discussion Points: 1. The minutes of the earlier meeting were confirmed. 2. Agenda Items were taken up for consideration. ****** Secretary, SEAC-3 Chairman, SEAC-3 Page 1 of 52 Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. 14.02.2020 46. p.30 118223 D R GAVHANE LANDMARKS LLP. PP had submitted application for prior Environmental clearance stating following details: Proposal Number SIA/MH/MIS/118223/2019 “Destination Ostia” Mixed Use Development project by M/s D Name of Project R Gavhane Landmarks LLP Project category 8A (B2) Type of Institution Private Name Mr. Amit Damodar Gavhane Sr. No. 690/1A/1/1/1, KBG Classic, Above P Regd. Office N Gadgil, Pune- Nashik Road, Bhosari, address Project Proponent Pune. Maharashtra 411039 Contact number 9130045925 e-mail [email protected] Consultant Applied for Modification Details of previous EC Vide letter no. SEAC- 2013/CR- 321/TC- 2 Dated- 25th January, 2016 Gat no. 216/1B/1, Alandi- Dehu Road, Dudulgaon, Tal. – Haveli, Dist.- Location of the project Pune Latitude: 18°40'47.73"N Latitude and Longitude Longitude: 73°52'2.32"E Total Plot Area (m2) 21, 900.00 Deductions (m2) 3848.94 Net Plot area (m2) 18051.06 Proposed FSI area (m2) 33652.74 Proposed non-FSI area 29,978.95 (m2) Proposed TBUA (m2) 63,631.69 IOD received from PCMC vide letter No. TBUA (m2) approved by B.P./EC/DUDULGAON/06/2019 dated 07/10/2019 Planning Authority till date PCMC Ground coverage (m2) & % 45.32% Total Project Cost (Rs.) Rs. 103 Cr Activity Location Cost (Rs.) Duration 4 Nos. of solar panels in Pimpri Chinchwad CER as per MoEF & CC Municipal Schools defined Provision of circular dated 01/05/2018 by implementing agency, 36,00,000 2021-2024 solar panel 1) 1 No. in Chhatrapati Shri Shivaji Maharaj Boys School No.1, Bhosari Secretary, SEAC-3 Chairman, SEAC-3 Page 2 of 52 Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. 2) 1 No. in Chhatrapati Shri Shivaji Maharaj Boys School. No.2, Bhosari 3) 1 No. in Chhatrapati Shri Shivaji Maharaj High School, Bhosari 4) 1 No. in Savitribai Phule Prathmik School, Bhosari. 15 Nos. of water purifier to Pimpri Chinchwad Municipal Schools, defined by implementing agency 1) 3 Nos. in Chhatrapati Shri Shivaji Maharaj Boys School No.1, Bhosari 2) 3 Nos. in Chhatrapati Shri Provision of Shivaji Maharaj Boys 2020 & 2022- water School No.2, Bhosari 8,55,000 2024 purifier 3) 3 Nos. in Chhatrapati Shri Shivaji Maharaj High School, Bhosari 4) 3 Nos. in Savitribai Phule Prathmik Boys/ Girls School, Bhosari 5) 3 Nos. in Savitribai Phule Madhyamik Vidyalay School, Bhosari 19 Nos. of Street lights to Pimpri Chinchwad Municipal Schools defined by implementing agency. 1) 4 Nos. in Chhatrapati Shri Shivaji Maharaj Boys School- No.1. Provision of2) 4 Nos. in Chhatrapati Shri solar street Shivaji Maharaj Boys 9,50,000 2022- 2024 lights in School- No.2. societies 3) 4 Nos. in Chhatrapati Shri Shivaji Maharaj High School 4) 4 Nos. in Savitribai Phule Prathmik Boys/ Girls School, Bhosari. 5) 3 Nos. in Savitribai Phule Madhyamik Vidyalay, Bhosari. Details of Building Configuration: <Please use following legends: Floor = F, Parking = Pk, Podium = Po, Stilt =St, Reason for Lower Ground = LG, Upper Ground = UG, Basement = B, Shops = Sh> Modification / Change Previous EC / Existing Building Proposed Configuration Secretary, SEAC-3 Chairman, SEAC-3 Page 3 of 52 Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. Building Height Building Height Configuration Configuration Name (m) Name (m) Bldg. A Bldg. A St + 12 F 34.80 G + 12 F 37.70 (Existing) (Existing) Bldg. B 34.80 Bldg. B St + 12 F Pk + 12 F 37.70 (Existing) (Existing) Bldg. C 34.80 Bldg. C St + 12 F Pk + 12 F 37.70 (Existing) (Existing) Bldg. D 2 Pk + 12 F 34.80 Bldg. D Pk + 8 F 26.60 Due to change Bldg. E 2 Pk + 11 F 31.90 Bldg. E1 Pk + Pk + 11 F 35.65 of planning Bldg. F 2 Pk + 12 F 34.80 Bldg. F1 Pk + Pk + 11 F 35.65 Bldg. G 2 Pk + 12 F 34.80 Bldg. G1 Pk + Pk + 10 F 35.95 Commercial G 4.65 Bldg. H1 Pk + Pk + 09 F 35.25 Bldg. 1 Commercial Club House G + 1 F -- G 6.20 Bldg. 1 Commercial -- -- -- G 5.55 Bldg. 2 -- -- -- Club House G + 1 F 7.90 Tenements: 586 Total number of tenements Commercial / Shops: 50 Dry Season (CMD) Wet Season (CMD) Residential: 264 Residential: 264 Fresh Water Commercial: 13 Fresh Water Commercial: 13 Total: 277 Total: 277 Recycled Recycled 12 NA (Gardening) (Gardening) Swimming Pool 40 Swimming Pool 40 Water Budget Residential: 132 Residential: 132 Flushing Commercial: 10 Flushing Commercial: 10 Total: 142 Total: 142 Total 431 Total 419 377 377 Waste water (Excess treated Waste water (Excess treated water to generation water to be generation be disposed- 198) disposed- 186) Water Storage Fire UG tank Capacity (cum): 400 Capacity for Domestic UG tank Capacity (cum): 415 (Residential + Commercial) Firefighting / Flushing tank Capacity (cum): 150.33 UGT Source of Pimpri Chinchawad Municipal Corporation (PCMC) water Pre- Monsoon: 15 to 20 m below ground level. Rainwater Level of the Ground water table: Harvesting Post- Monsoon: 6 to 8 m below ground (RWH) level. Size and no of RWH tank(s) and NA Secretary, SEAC-3 Chairman, SEAC-3 Page 4 of 52 Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. Quantity: 14 nos. of pits with bore Quantity and size of recharge pits: Size: 4.0 X 2.10 X 1.75 m Domestic UG tank Capacity (cum): 415 (Residential + Commercial) Details of UGT tanks if any: Flushing tank Capacity (cum): 150.33 Fire UG tank Capacity (cum): 400 Sewage generation in 377 Sewage and CMD: Wastewater STP technology: MBBR Capacity of STP (CMD): 530 (Existing) Solid Waste Type Quantity (kg/d) Treatment / disposal Management Dry waste: 18 Collected by Ghanta gadi during Wet waste: 22 Collected by Ghanta gadi Construction Excavation: 29068.18 will be used for Backfilling within Construction waste Phase (Existing + Proposed) site. Type Quantity (kg/d) Treatment / disposal Existing Residential: 283 kg/day Proposed Will be handed over to authorized Dry waste: Residential: 303 kg/day agency Commercial: 76.35 kg/day Total: 662.35 kg/day Solid Waste Management Existing Residential: 424.5 kg/day during Proposed Treated in OWC machine within Operation Wet waste: Residential: 454.5 kg/day site Phase Commercial: 50.9 kg/day Total: 929.6 kg/day Hazardous waste: NA NA Biomedical waste NA NA Will be handed over to authorized E-Waste 5 agency STP Sludge (dry) 58 Kg/d Will be used as manure Total RG area (m2): 1805.11 Existing trees on plot: 35 Green Belt Required: 225 Number of trees to be planted: Development Proposed: 236 Number of trees to be cut: 8 Number of trees to be transplanted: 20 Source of power supply: MSEDCL During Construction Phase (Demand Load): 75 KW Power Existing: 1069.5 KW requirement: During Operation phase (Connected load): Proposed: 1539 KW Total: 2608.5 KW During Operation phase (Demand load): Existing: 936.19 KW Secretary, SEAC-3 Chairman, SEAC-3 Page 5 of 52 Minutes of 103rd SEAC-3 meeting in 11-12-13-14 February, 2020 at Dalamal House, Nariman Point, Mumbai-21. Proposed: 766.12 KW Total: 1702.31 KW Existing: 2Nos. of 630 KVA Transformer: Proposed: 2Nos. of 630 KVA Total: 4 Nos. of 630 KVA DG set: Existing: 1 no. of 160 KVA Fuel used: Existing: 31 lit/hr Energy Conservation Measures in %: Total: 25.65 % 1) Solar PV Panels: 0.83 (24300 KWH / Annum) Details of 2) Auto Timer Logic Controller: 3.28 (95839.07 KWH / Annum) Energy saving 3) Electronic V3F Drive for Lifts: 0.64 (18788.01 KWH / Annum) 4) Solar Water Heater: 20.9 (611784 KWH / Annum) Environmental Type Details Cost Management Air, water, land, biological environment and Capital 13.5647344 plan budget socioeconomic environment during Construction O&M Air, water and Noise Monitoring 1.16 phase Capital (Rs. in Component Details O&M (Rs. in Lakh /Y) Lakh) Storm Water -- -- -- Sewage treatment STP 71.77 18.68 RWH Recharge pits 15.33 0.83 Solid Waste OWC 18.76 10.545 Swimming Pool -- 10.00 0.37 Environmenta Hazardous waste -- -- -- l e-waste -- -- -- Management Plantation 21.93516 2.70 Green Belt plan Budget Cost of Development 2.80 NA during transplantation Operation Existing: 29.34 Existing: 0.47 Solar water phase Proposed: 25.59 Proposed: 0.41 heating Total: 54.93 Total: 0.88 Energy saving Existing: 7.5 Existing: 0.38 Solar PV Proposed: 6.0 Proposed: 0.3 Total: 13.5 Total: 0.68 MoEF&CC Environmental EMP costing approved 21.08 Monitoring laboratory Disaster DMP Budgetary 66.295 6.01870 Management Allocation Type Required as per DCR Actual Provided Area per parking (m2) Traffic Covered per car area = 33.81sq.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    52 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us