2800 the Crescent BIRMINGHAM BUSINESS PARK - SOLIHULL
Total Page:16
File Type:pdf, Size:1020Kb
2800 The Crescent BIRMINGHAM BUSINESS PARK - SOLIHULL HEADQUARTERS OFFICE TO LET 8,401 sq ft (780.47 sq m) www.2800thecrescent.co.uk CONTENTS 4 Introduction 5 Aerial View 6 - 7 The Building 8 - 9 Summary Specification 10 - 11 Floor Plans 12 - 14 Detailed Specification 15 Location Maps 16 Contact Details 2 CONTENTS 4 Introduction 5 Aerial View 6 - 7 The Building 8 - 9 Summary Specification 10 - 11 Floor Plans 12 - 14 Detailed Specification 15 Location Maps 16 Contact Details 3 BE PART OF THE MOST ESTABLISHED BUSINESS PARK IN THE MIDLANDS 2800 The Crescent is a distinctive, Birmingham Business Park, The Park has won top cycling and The National Exhibition Centre, self-contained headquarters office set within 148 acres of mature walking location bronze status nearby, is a world renowned venue building providing 29,323 sq ft parkland, offers an unrivalled awarded by Transport for West for shows, exhibitions and events. (2,724 sq m) substantially location accessed from M6 J4 and Midlands. refurbished accommodation over M42 J6 with Birmingham Airport The recently developed ‘Resorts two floors. and Birmingham International Solihull Town Centre, 8 miles away World’ adjacent to the NEC, Station less than 5 minutes drive offers some of the regions best provides a 4 star hotel, 18 Following the recent lettings to away. shopping facilities at Touchwood restaurants and bars, 50 designer Align Technology and Veolia Water and Mell Square. In 2013 the outlet stores, conferencing Solutions, one suite remains A car share scheme has been uSwitch Quality of Life Index facilities and an 11 screen cinema available for immediate occupation created to promote sustainable named Solihull the ‘best place to complex. extending to 8,401 sq ft. travel and reduce single live’ in the United Kingdom. occupancy car journeys. 4 M42 16 10 12 ENTRANCE /EXIT 2800 9 8 The Crescent 11 BIRMINGHAM BUSINESS PARK - SOLIHULL 14 5 4 15 3 1 2 6 13 7 ENTRANCE /EXIT A PLACE TO WORK, 1 Day nursery 5 Hotel 9 Capita 13 Changan 2 Pane E Caffe 6 Public House 10 Ryder Trucks 14 EE NETWORK AND RELAX 3 WH Smith 7 Rolls Royce 11 IMI 15 Atos 4 Dry cleaners 8 Fujitsu 12 Goodyear 16 Uniper 5 THE BUILDING 6 7 SUMMARY SPECIFICATION The building has been substantially refurbished A high quality modern working including a remodelled reception, lift lobby and core at environment to include: ground floor level, new WC cores on both the ground • High quality finishes throughout and first floor and new entrance to the building. Generally the building has been stripped out back to • New reception area with ceramic floor tiles, plastered shell and core, raised floor and soffit to allow feature carpet, LED strip lighting and feature for the Grade A refurbishment. pendant lighting • Open plan office floor plates FIRST FLOOR - Suite 1 8,401 sq ft 780.47 sq m • Raised access flooring system throughout FIRST FLOOR - Suite 2 LET to Veolia Water Solutions including office areas, reception, cores and WC GROUND FLOOR LET to Align Technology areas (150 mm void) TOTAL 29,323 sq ft 2,724 sq m • 3 pipe fan coil VRF air conditioning • Armstrong metal Axal Vector microperforated ceilings (600 mm x 600 mm) • LED lighting providing LG7 compliance • American Walnut veneered doors to all areas • 1 x 12 person passenger lift • Male, female and disabled toilet facilities with showers • 46 car parking spaces (1:183 sq ft) • EPC rating of C62 8 9 1No Reception 1No 12 Person Boardroom 1No 10 Person Meeting Room 1No 8 Person Meeting Room 1No 4 Person Meeting Room 1No Staff Breakout 3No Offices LET to 1No Comms Room / Store 1No Business Centre Veolia Water 2No Informal Meeting Booths Solutions 1No collaboration Area 78No Open Plan Workstations FIRST FLOOR 8,401 sq ft (780.47 sq m) Medium Density Occupation Space Planning - 1 employee per 10 sq m 10 1No Reception 1No 12 Person Boardroom 1No 10 Person Meeting Room 1No Staff Breakout 2No Offices 1No Comms Room / Store 1No Business Centre LET to 2No Informal Meeting Booths 1No collaboration Area Veolia Water 98No Open Plan Workstations Solutions FIRST FLOOR 8,401 sq ft (780.47 sq m) High Density Occupation Space Planning - 1 employee per 8 sq m 11 DETAILED SPECIFICATION The development consists of the complete To the open plan office areas generally, mat Forbo Nuway Tuftiguard. Waiting Reception benefits from feature laminate refurbishment of 2800 The Crescent metal grid ceiling system, Armstrong area Walk The Plank, Buckeye by Interface panels being Light Grey Chicago Concrete including, reception, WC areas and ground metal Axal Vector microperforated Carpets. by Egger. and first floor offices. The works include RD1522 600mm x 600mm ceiling tiles reconfigured entrance, WC areas and with plasterboard transition BP9420 M6I2 WCs and showers have matching WCs have part tiled/part painted walls, office floor plates providing open plan with acoustic fleece. Fixed into Armstrong complimentary ceramic floor tiles by tiles are 600 x 300 Marte Spazio Grigio by office accommodation across both floors Prelude 24mm suspension system Ceramique Internationale to be Marte Ceramique Internationale. with flexibility for subdivision. All existing plasterboard perimeter to full extent of Grigio Egeo. finishes have been renewed to provide a offices with proprietary transition using Vinyl sheet to cleaners store is heavy duty modern fit out. Office areas are modern Armstrong Ceilings BPT3210 plasterboard contract non slip flooring by Polyflor. Mechanical Services and neutral. Reception and WC areas are to tile trim in colour to match tiles. also modern and neutral with feature tiling, Carpet to core areas and offices is by HEATING & COOLING wall finishes and lighting. Installations are undertaken in full Interface Carpets; core areas are finished accordance with manufacturer’s in Walk The Plank, Buckeye and Offices in The open plan office spaces are thermally The existing building’s structure has been instructions and include all appropriate Yuton 104 Thunder. conditioned by Mitsubishi City Multi retained; columns, light shaft and stair suspension and support systems. All variable refrigerant flow (VRF) heat cores. Ceiling heights are generally 2.7m. ceilings achieve Euroclass fire rating of A2. All floor tiles have appropriate slip pump systems. The VRF systems include resistance as required by the building heat recovery technology to provide Hardwood doors, frames and architraves Plasterboard areas are British Gypsum regulations. are provided throughout to all principle wallboard 12.5mm with 2.5mm painted simultaneous heating and cooling areas with painted skirtings. plaster skim finish to soffits and throughout the building for maximum downstands on British Gypsum Gypliner RAISED ACCESS FLOORS efficiency. All existing structure has been fully system using Gypframe GL1 channel grid Metal faced solid timber composite raised The VRF system combines high refurbished to ensure a consistent finish hung from underside of existing structure. throughout between existing and new access floor plates, set to adjustable metal performance with optimum efficiency to interventions. pedestals, inset with new proprietary create a comfortable internal environment. DOORS INTERNAL services boxings. WC areas have feature solid surface trough The VRF heat pump system offers a simple basins with motion sensor taps, ceramic All new doors to office suites/core areas (We retained the original raised access and flexible solution for an open plan tiling to the walls and floors and new metal are quality solid core walnut veneered floor, and supplemented with matching office, with the ability for adaption. The ceilings with recessed lighting. Cubicles doors finished in a natural lacquer, good quality recycled tiles where missing systems are designed at an outdoor unit are high quality flush face full height with flush fitting with hardwood lipping with or damaged, to ensure dimensional diversity of 100%, allowing for additional self-closing doors and white sanitary matching frame and architrave. Suite doors stability – good for environmental units to be added to the system. ware. Mitsubishi Jet Towel hand dryers have large glazed panels. All performance credentials too in terms of recycling/not The VRF system includes external throughout. is as required by the building regulations. throwing away perfectly good tiles). condensing units and internal concealed Service area doors are all paint grade fan coil units. The fan coil units are located CEILINGS finished to blend into the adjacent walls all WALL FINISHES within the ceiling voids and deliver treated in line with current building regulations. air into the occupied spaces through Generally all areas have received a painted The reception area features a proprietary ducted ceiling mounted swirl diffusers. finish. Existing walls have been skimmed/ linear plank system with inset lighting The room air returns to the fan coil units lined as appropriate and all new studwork and services by Armstrong Ceilings FLOOR FINISHES utilising the ceiling void as a return air Metal R-H215 Microperforated 400mm x walls have received a 3mm plaster skim Reception area has large format feature plenum via dedicated ceiling mounted 2700mm x 40mm BP 3872 M6H2 + OP19 and paint finish in vinyl matt emulsion floor tiles with inset carpet to waiting area diffusers. acoustic fleece fixed into suspension paint. and primary barrier mat to the entrance system – concealed grid system H profile The fan coil units are fitted with filters lobby. Tiles are 900x900 Breccia Carsica Plasterboard is British Gypsum wallboard 35. A plasterboard perimeter runs to the that can be removed for cleaning or by Ceramique Internationale. Entrance 12.5mm or equal approved with plaster full extent of the reception. replacement. Access to the units is via skim finish. removable ceiling tiles. 12 The reception area is served by a separate Mitsubishi split heat VENTILATION to the passenger lift. Field wiring has ABOVE GROUND DRAINAGE (FOUL) pump system.