PRE QUALIFICATION P.O.Box. 23532, DOHA – TEL. :44692498 / 44692499 FAX : 44692497 Web Site : www.eastpalaces.com E-Mail : [email protected] [email protected]

Index

1- COMPANY PREVIEW

2- MANPOWER DETAILES

3- VEHICLE LIST

4- VENDOR LIST

5- CLIENTELE LIST

6- PROJECTS IN HAND

7- PROJECTS HANDED OVER

8- DETAILS OF MANPOWER

9- THE METHOD OF STATEMENT

10- WORK COMPLETION CERTIFICATE

11- APPRECIATION LETTER

12- ISO CERTIFICATE

13-GYPSUM WORK.

14- W/P SITE PHOTOS

COMPANY PREVIEW

CONTACT US

East Palaces Co. W.L.L Tel: +974-44692499 / 98 Fax: +974-44692497 P.O. Box: 23532 Doha Qatar

E-mail: [email protected] [email protected]

Website: www.eastpalaces.com

Eng. Khalid Al Salmi. (General Manager) Hotline Contact: +974-55556105

Mr. Abdul Aziz (Sales Executive) Hotline Contact: +974-66902816

MDs' Message

With distinct pleasure, I welcome you, and I would like to introduce East Palaces Company to you. In recent years, Qatar has undergone tremendous changes with a whole lot of infrastructural and developmental activities taking place. East Palaces, which was established in 2001, has sensed this change and has been in the forefront of this progress.

Since inception, we have expanded our scope of activities from air conditioning works to waterproofing, trading and general services. We are the agents for Senator brand of air conditioners and Super Plats brand of colored decorative plasters.

I am proud to work amongst sincere, hardworking and professional people who consist of managers, engineers, fabricators, supervisors etc. We have a strong workforce of more than 200 people which are drawn up from different countries.

We, at East Palaces, aim for further expansion and achievements as the future holds good for everyone in Qatar. I would like to close my remarks by inviting you to navigate through our user-friendly and aesthetically-designed web pages

WATER PROOFING

This Division caters to the ever-growing requirements of the water proofing industry. We have provided efficient and reliable solutions to the water proofing needs of innumerable Villas and buildings. We have a well-qualified and experienced Engineer, Technicians and Workmen to carry out all kinds of water proofing works.

We have a range of products for the thermal insulation needs of buildings and villas, be it for wall, roof or floor applications. The advantages of thermal insulation are high comfort levels, increased building life and savings in energy.

The Manpower of this Division is as follows:

Engineers

Forman's

Technicians

Masons

Workers

MANPOWER DETAILS

VECHILES LIST

List Of Vehicles s/n Description Model

1 Land Cruiser 1997 2 Chevrolet Tahoe 2012 3 Mitsubishi Lancer - Salon 2005 4 Nissan Pathfinder 2005 5 Mitsubishi DC 3 Ton 2004 6 Mitsubishi Pick up 3 Ton 2008 7 Mitsubishi Crane 1986 8 Mitsubishi DC 1 Ton 2005 9 Mitsubishi DC 1 Ton 2005 10 Mitsubishi Pick up 1 Ton 2008 11 Mitsubishi DC 1 Ton 2006 12 Mitsubishi Pick up 1 Ton 2009 13 Toyota Hi-luxe DC 2006 14 Toyota Hi-luxe 4WD - DC 2000 15 Kia DC 2006 16 Mitsubishi Bus 2004 17 Mitsubishi Bus - (Rosa) - 30 Persons 2008 18 Coaster Bus 1997 19 Coaster Bus 1998 20 GMC Bus - 45 Persons 1997 21 Toyota Bus - Haice Van 2001 22 Kisa - Shawel 2003 23 Forklift - Kumatsu 1987 24 Honda CRV 2005 25 Mitsubishi Lancer - Salon 2006 26 Daihatsu Crane 1991 28 Mitsubishi Pick up 2007 29 Nissan Bus - Van - 15 Persons 2001 30 Nissan Bus - Van - 15 Persons 2001 1996 31 Chevrolet Breakdown

VENDOR LIST

CLIENTELE LIST

PROJECT IN HAND

PROJECT HANDED OVER The followings are some of our projects, which we did the water proofing works For:

Qatar Development Contracting & Trading Co. No. 2 Buildings B + G + 6 at Al Mansoura & AL Najma Area. Rivira Compound (15 Villa) Al Huhail Area. 22 Villas at the Airport Area. 3 Villas + S.Q at Area 6 Villas at AL Duhil Area. G + 5 Building at Bin Mohamed Area.

Union Qatar Contracting & Tracding Co. No. (4) Buildings B + G + 6 at Al Mansoura Area. No. (8) Villas At Rayyan al Kadeem Area. One Building at Mushaireb Area. Two Building at Bin Mahmoud Area

Medmac Co. Education City al rayyav.( Foundation )

Al baytour contracting Co. Al Reem tower at al Dafna area

National Trad. & Cont. Co. 103 Villas at Al Dafna Area (3 Complexs) 18 Villas + Club at Al Mirikh area. Two Building at Bin Mahmoud Area One Building at Bin Mahmoud Area

Ramco Trad. & Cont. Co. Al Asmakh Tower – At Al Dafna Area. Regency Tower – At Al Dafna Area. Tower at al Dafna area Al mana & Partners Twin Tower al Dafna area

Al Darwish Eng. Amwal Towers. at ( Foundation ) al Dafna area

Man Enterprice Co. Al Jajera Complex – At Al Saad Area. Al wasiel Tower At al Dafna area

Bldg & Engr. Bureau 22 villa – at markhia area 16 Villas - at markhia area One Building at Al mansoura Area

Shk. Mansour Bin gabr Al Thani Complex Building - At Al Saad Area. 22 Villa + Garage + H.C – At Om Zeghewa One hotel – At Wokra area. 80 Villas at al khoor area

Al Arabia Engineering Co. One building at khurutyat Area. 14 Villas at Al Azezyah 30 Villas at Ain Khalid area 52 villas at al gharafa area

And so many projects

Al Bayraq Construction Trad Co. 12 Villas at 10 Villa at Old Airport area.

Al Nahad Construction Trad Co. 3 villas at Al Marikh area. 2 villas at Abu Hamour area. One Palace at Al Rayyan Area Two Building at Bin Mahmoud Area One Building at Al Mansoura Area

And so many projects.

Al Omara Al Islamiya Construction Trad Three buildings at Al Mansourah area 35 Villa at Al Dafna area

Al Radi Construction Trad Co. One building at Al Saad area. One building at Bin Omran area. B + G + 7 Foundation at Al Saad area. 6 Villas complex + Externals at Al Duhil area. Three public house at Al duhil Area

Al Takamul Construction Trad Co. 30 Villas at Salwa Road area. One building at Bin Mohamed area.

Al Aali International Co. 8 Villas at Abu Hamour Area. 2 Building at Al Saad Area. 1 Building at Al Mansoura Area.

Alba Construction Trad Co. 2 Building at Al Saad area. 10 Villas at Ein Khalid Area

Al Badr Construction Trad Co. 10 public house at Abu hamour area. 2 Mosque at Al rayyan Area

Barada Construction Trad Co. 13 villas at Al Waab area. Administration building at Abu Hamour area. 7 public house at Abu hamour

Bin Barak Cont. Co. One villa at Shouq Waqif area. One building at Madina Khalifa area. 3 Villas at Dahl al hamam ( Al Markheia ) Two Villa + Ext. At Al Wakra Area One Mosque At al Wakra Area

Bo Matar Group. 12 villas at Al Duhil area. One villa at west bay lagon area. Girls University at west bay lagon area.

Bo Jomhoor Co. 2 Building at Al Ghrafa area. E.M.S + H.C + External at Al Ghrafa area. One school at Om Selal Mohamed E.M.S at Al Ghowairya Area

Eid Bin Mohamed est. One worker camp at Industrial area. 1 building B+G+8 at al Nasser area 3 villas at abo hamour area Three Building at Bin Mahmoud Area

G.L.C Co. 3 Villas at Al Duhil area. 7 villas at AL Wakra Area. One villa at Al Ghrafa area. 3 Public house at AL Wakra are. One Villa at Al Waab area.

Integration Construction Trad. Co. 30 villas at Mamourah area G + 3 Billas at Bin Mohamed area. 55 villas at Al Ghrafa area. Labour camp at Industrial area.

Mohd. Youssef Kaffod & Sons G + 7 at Al Rayan Street G + 6 at AL Mansourah area. G + 5 at Najma street One villa at west bay area. G + 2 at Old Airport area. G + 7 at AL Mansourah area. G + 8 at Al Mamourah area. 4 villas at Old Airport area. One building foundation at Mushireb G + 6 Mushireb

And So many projects

Red Line co. Complex house building at AL SAAD area G + 7 foundation at Al saad area. Hotel at al wakra area 1 building at al mansoura area 22 Villas at Area One Hotel At Al Salata Area One Hotel At Al wAkra Area 24 Villa at Zegowa Area 49 Villa at Abu Hamour Area

Third Dimension 2 Villas AL Mamourah area. 16 villa at al gharafa area 2 building at bin mahmoud area

United construction co Al sharq hotel at ras abo abboud

Bab ishtar Construction & Trad. Co 1 building at om ghuilina 20 Villas at al waab area 8 Villas at New Salata Al Ein Market At Salwa road

Marco Construction. Co 13 villa at al gharafa area 1 building at om ghwilina area 1 building at rass abo aboud

Bitak Construction Dev. Co 1 building foundation at new Doha 10 villas at old airport 1 building at al sad area 6 Villa At Al Azizia Area 8 Villa At Al Waab Area 2 Building At Al Saad Area 1 Building At Al Nasser Area 2 Buildings At C Ring Road

Al ofoq trading & cont. Co 1 building at al sad area 6 villa at al gharrafa area

Athar trading & cont. Co 1 building foundation at old ghanem area 2 villa at al dafna area

Al Andalusia trading & cont. Co 1 building foundation at om ghuilina 8 villa at al ein khaled area G+2 building at bin omran Al wajba palace at al rayyan area 12 Villa At Zegwa Area 1Villa At Zegwa Area 2 Labor Camp At Industrial Area Two Building At Al Sad Area

Saif al Arab trading & cont. Co Palace + externals at al rawda area 4 villas at merikh area

Conserve trading & cont. Co 6 villa at al dafna area 14 villa at ein khalid area

Al Mikhlafy trading & cont. Co Majles + external at al duhil area 5 villa + externals at al duhil area

Premium trading & cont. Co 6 villa + externals at al azizia area

United architecture cont. Co 40 villa + externals+ club at abo hamour area

Doha Qatar trading & cont. Co 4 villa at ein khalid area 1 villa at ein khalid area 8 villa at new salata area 1 mosque + accommodation at al mamoura area

Doha development trading & cont. Co

2 villa at al wakra area 5 villa + externals at al mamoura area 1 Building " Drug Control Office " at al shahanya Area I Building at Bani Omran Area

M&N trading & cont. Co

2 villa + externals at al khorityyat area 4 villa + externals at al Khissa area

Al wehda groop trading & cont. Co 1 villa at al Nasserya area 6 villa + externals at al waab area

Mecca cont. Co 1 building foundation al Helel area 2 buildings at al Najma area

Sinai carpets . Co Al jedah Market at Bin mahmoud area

Qatar world trading & cont. Co 2 villa at al mamoura area 3 villa + externals at Abo Hamour area 1 palace at Al Rayyan area

Gulf Stars trading & cont. Co 2 Villa – At Al Dafna area 3 Vill + externals + Gured room – At Al Dafna area 2 Building – At om Ghoilina Area

Wills trading & cont. C 16 Villa At Al Nasserya Area

Commitment trading & cont. Co 15 Vills At Al Maamoura Area 8 Villa At Abo Hamour Area

Amalco Co. 2 Building At Old airport Area

Aian Co. 9 Villa At Al merikh Area 1 Building At Al Saad Area 2 Villa At Al merikh Area 1 Villa + Ext At Al Wakra Area

Al Raied CO. 4 Villa + Ext At Al Wakra Area 2 Villa At Al Wakra Area Villa + Ext + G. Room At Al Wakra Area

THE METHOD OF STATMENT

The Method of statement

For laying the Under Ground membrane waterproofing. For the raft and the retaining walls

(1) For the raft foundation.

A. To clean the blinding surfaces and to be sure it’s dry and with smooth surface.. B. To apply the primer bituminous coat approved one. C. To start laying the first layer of the membrane the lower surface should be heated with a propane torch, taking in consideration the orientation to adjacent rolls should be laid, each overlapping the one next to it by l0cms on the side and 15cms at the ends. And all taking care not to change the orientation of each roll. D. Reverse the process until each has been re-rolled. E. There will be at the parameter extra 30cm membrane from the edges of the raft for the retaining walls. F. Making inspection for the completed work by the consultant and main contractor. G. To start laying the second layer of the membrane in according with point No C, D, E, & F. in the other direction. H. The main contractor to make the screed protection layer 7cm for the water proofing membrane. Taking in consideration our attached sketch.

(2) For the retaining walls.

A. To be sure that surface is clean smooth and dry and there are no any holes or other problems in the concrete surface. B. To apply the primmer bituminous coat (Derma Primmer) C. To start laying the overlap which exist at the blinding of the raft through angle filter. Please refer to our attached section. D. To start laying the first layer of the membrane, with the existing over lap. The lower surface should be heated with a propane torch, taking in consideration the orientation to adjacent roll should than be laid, each overlapping the one next to it by 10cm on the side and 15cms at the ends. And all taking care not to change the orientation of each roll. E. Reverse the process until each has been re-rolled. F. Making inspection for completion of 1st layer. G. To start laying the second layer of the membrane with the existing over lap and to the walls, the lower surface should be heated with a propane torch and in according with the method (D). H. To make inspection by the consultant for the completion of the second layer. I. Start layer of the bituminous protection board. J. To make inspection for completion of the above.

The Method of Statement "Underground Structures Waterproofing System"

Our method of making the water proofing roof type inverted system it's as following;

1) Cleaning the existing surface of sloped screed from any slurry and dust. 2) Painting the existing screed surface by the approved Bitumen Primer. 3) Laying the approved waterproofing membrane at the painted surface. 4) Making a water leaking test for the complete surface for 48 hours against any leakage and make inspection. 5) Laying the approved types of thermal insulation sheet. the Extruded Polystyrene sheet (5cm) with 32-35 Kg/m³ density

6) Upon getting the approvals, start laying the approval type of separation layer.

7) Laying the membrane water proofing one layer as Skirting with 20-30 cm height all around the parapet setting at grove. with a mastic sealant inside this grove.

That is our method of statement issuing you for our full complying for any instruction and assisting for any clarification.

The Method of Statement "Roof System"

Our method of making the water proofing roof type inverted system it's as following;

1) Cleaning the existing surface of sloped screed from any slurry and dust. 2) Painting the existing screed surface by the approved Bitumen Primer. 3) Laying the approved waterproofing membrane at the painted surface. 4) Making a water leaking test for the complete surface for 48 hours against any leakage and make inspection. 5) Laying the approved types of thermal insulation sheet. the Extruded Polystyrene sheet (5cm) with 32-35 Kg/m³ density

6) Upon getting the approvals, start laying the approval type of separation layer.

7) Laying the membrane water proofing one layer as Skirting with 20-30 cm height all around the parapet setting at grove. with a mastic sealant inside this grove.

That is our method of statement issuing you for our full complying for any instruction and assisting for any clarification.

The Method of Statement "Wet Area"

Our method of statement of making the water proofing system for the wet area it's as following;

1) Cleaning the existing smooth surface from any slurry and dust. 2) Applying the Bitumen primer to the surface. The approved type. 3) Laying the approved waterproofing membrane at the painted surface. 4) Making a water leaking test by filling water and keep it for 48 hours. 5) Making inspection and get it approved. .

That is our method of statement issuing you for our full complying for any instruction and clarification.

The Method of Statement For" waterproofing the Isolated footing and Boundary wall footing by Bitumen Rubberized Emulsion "

Our method of statement of making the water proofing system for the isolated footing and Boundary it's as following;

1) Cleaning the surface from any dust and slurry before starting Applying and it must be dry.

2) Applying one coat of AIM Rubberized Bitumen Emulsion 3510.

3) Applying another coat of AIM Rubberized Bitumen Emulsion 3510. If Required to Reatch DFT of 0.72mm after getting the first coat dray and inspected and making inspection.

4) Covering the painted service by polythen sheet 1000kg /m3 before starting the back filling to protect the applying surface.

That is our method of statement issuing you for our full complying for any instruction and clarification

The Method of Statement for "Membrane Self Adhesive 1.5mm"

Our method of making the water proofing system it's as following;

The Floors:-

8) The concrete surface of blinding must be properly floated finish clean and free from any avoid, honeycomb, laitance, coarse aggregates and sharp unevenness and from any traces of muster or curing compound to be removed, and must be completely dry.

9) Apply one coat of primer D-41 solvent based Bituminous allow the primer to dry overnight.

10) Start applying the layer of self-adhesive membrane by removing the release film by peeling back not more than 30cm at a time. Start to unroll the Adesobeit membrane keeping the adhesive side face-down on the primed surface. Press down the membrane by hand, and by special hand roller if required the minimum end lap should be 150mm.

11) Protecting the layer of self-adhesive laying by protection board and polythen sheet and screed of 3-6cm thick before laying any Reinforcement to the top of it.

For Wall:- 1. The concrete surface of blinding must be properly floated finish clean and free from any avoid, honeycomb, laitance, coarse aggregates and sharp unevenness and from any traces of muster or curing compound to be removed, and must be completely dry.

2. Apply one coat of primer D-41 solvent based Bituminous allow the primer to dry overnight.

3. Start applying the layer of self-adhesive membrane by removing the release film by peeling back not more than 30cm at a time. Start to unroll the Adesobeit membrane keeping the adhesive side face-down on the primed surface. Press down the membrane by hand, and by special hand roller if Required the minimum end lap should be 150mm.

4. Protecting the layer of self-adhesive laying by protection board and polythen sheet and screed of 3-6cm thick before laying any Reinforcement to the top of it.

5. Applying protection board and stick it to the Applied self Adhesive

That is our method of statement issuing you for our full complying for any instruction and assisting for any clarification.

WORK COMPLETION CERTIFICATE

APPRECIATION LETTER

ISO CERTIFICATE

GYPSUM WORKS

We are also trader and contractor for Interior Gypsum works with a team of well- trained and well-motivated employees so that we can provide our clients with highest Quality of service that they deserve. The brand we deal is ABS Gypsum, Turkey who is the manufacturers for new eco- friendly construction materials.

Advantages of ABS Gypsum Boards:

- Higher resistance and fire resistance through fiber reinforcement. - Quick, clean and dry separation wall, production of suspended ceilings and coating possibility. - Possibility of high flexibility with regard to planning and application. - Convenience for mechanic and electrical installations. - Possibility to achieve high noise and heat isolation - Possibility to increase the fire resistance in buildings - Possibility to achieve separation walls that are light and earthquake resistant. - Light - Can be painted

Types of ABS Gypsum Boards: 1. (R) Normal Plasterboard 2. (WR) Water- Resistant Plasterboard 3. (FR) Fire- Resistant Plasterboard 4. (WR+ FR) Water and Fire- Resistant Plaster boards 5. and all the related accessories.

Application Areas:

In Internal area of building as separation walls in the construction of suspended ceilings as dry plaster (it will be applied with methods such as adhesion, in construction, stapled wall enveloping).

Projects Handed Over:

Villa for for Mr. Mesfer Hemaid Mohammad Al Shahwani Al Thakira Area- Proposed (B+G+1st+Ph), Qatar

Al Kateam Restaurant Mid- Mac, Doha- Qatar

American International Contracting INC. (AICI Al Udeid Air Base- Qatar

Aama Trading and Distribution Co. Shahaniya : Doha -Qatar

SITE PHOTO

W/P SITE PHOTO

SWITCH OFF