A Bus Information Strategy for Milton Keynes
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Stagecoach Group out in Front for 10-Year Tram Contract Responsible for Operating Tram Services on the New Lines to Oldham, Rochdale, Droylsden and Chorlton
AquaBus New alliance Meet the Sightseeing ready to forged for megabus.com tours' bumper set sail rail bid A-Team launch The newspaper of Stagecoach Group Issue 66 Spring 07 By Steven Stewart tagecoach Group has been Sselected as the preferred bidder to operate and maintain the Manchester Metrolink tram Metrolink bid network. The announcement from Greater Manchester Passenger Transport Executive (GMPTE) will see Stagecoach Metrolink taking over the 37km system and the associated infrastructure. The contract will run for 10 years and is expected to begin within the next three months. right on track It will include managing a number of special projects sponsored by GMPTE to improve the trams and infrastructure to benefit passengers. Stagecoach Metrolink will also be Stagecoach Group out in front for 10-year tram contract responsible for operating tram services on the new lines to Oldham, Rochdale, Droylsden and Chorlton. Nearly 20 million passengers travel every year on the network, which generates an annual turnover of around £22million. ”We will build on our operational expertise to deliver a first-class service to passengers in Manchester.” Ian Dobbs Stagecoach already operates Supertram, a 29km tram system in Sheffield, incorpo- rating three routes in the city. Ian Dobbs, Chief Executive of Stagecoach Group’s Rail Division, said: “We are delighted to have been selected as preferred bidder to run Manchester’s Metrolink network, one of the UK’s premier light rail systems. “Stagecoach operates the tram system in Sheffield, where we are now carrying a record 13 million passengers a year, and we will build on our operational expertise to deliver a first-class service to passengers in Growing places: Plans are in place to tempt more people on to the tram in Manchester. -
Members and Parish/Neighbourhood Councils RAIL UPDATE
ITEM 1 TRANSPORT COMMITTEE NEWS 07 MARCH 2000 This report may be of interest to: All Members and Parish/Neighbourhood Councils RAIL UPDATE Accountable Officer: John Inman Author: Stephen Mortimer 1. Purpose 1.1 To advise the Committee of developments relating to Milton Keynes’ rail services. 2. Summary 2.1 West Coast Main Line Modernisation and Upgrade is now in the active planning stage. It will result in faster and more frequent train services between Milton Keynes Central and London, and between Milton Keynes Central and points north. Bletchley and Wolverton will also have improved services to London. 2.2 Funding for East-West Rail is now being sought from the Shadow Strategic Rail Authority (SSRA) for the western end of the line (Oxford-Bedford). Though the SSRA have permitted a bid only for a 60 m.p.h. single-track railway, excluding the Aylesbury branch and upgrade of the Marston Vale (Bedford-Bletchley) line, other Railtrack investment and possible developer contributions (yet to be investigated) may allow these elements to be included, as well as perhaps a 90 m.p.h. double- track railway. As this part of East-West Rail already exists, no form of planning permission is required; however, Transport and Works Act procedures are to be started to build the missing parts of the eastern end of the line. 2.3 New trains were introduced on the Marston Vale line, Autumn 1999. A study of the passenger accessibility of Marston Vale stations identified various desirable improvements, for which a contribution of £10,000 is required from this Council. -
Financial Statements
FINANCIAL STATEMENTS 62 STATEMENT OF INCOME 65 NOTES TO THE FINANCIAL 76 LIST OF SHAREHOLDINGS STATEMENTS 62 BALANCE SHEET 86 AUDITOR’S REPORT > 67 Notes to the balance sheet > 62 Assets > 71 Notes to the statement > 86 Report on the financial > 62 Equity and liabilities of income statements > 86 Report on the management 63 STATEMENT OF CASH FLOWS > 72 Notes to the statement of cash flows report 64 FIXED AssETS SCHEDULE > 72 Other disclosures 62 DEUTSCHE BAHN AG 2014 MANAGEMENT REPORT AND FINANCIAL STATEMENTS STATEMENT OF INCOME JAN 1 THROUGH DEC 31 [€ mILLION] Note 2014 2013 Inventory changes 0 0 Other internally produced and capitalized assets 0 – Overall performance 0 0 Other operating income (16) 1,179 1,087 Cost of materials (17) –95 –91 Personnel expenses (18) –324 –303 Depreciation –10 –12 Other operating expenses (19) –970 –850 –220 –169 Net investment income (20) 794 583 Net interest income (21) –67 –37 Result from ordinary activities 507 377 Taxes on income (22) 37 –10 Net profit for the year 544 367 Profit carried forward 4,531 4,364 Net retained profit 5,075 4,731 BALANCE SHEET AssETS [€ MILLION] Note Dec 31, 2014 Dec 31, 2013 A. FIXED ASSETS Property, plant and equipment (2) 29 33 Financial assets (2) 26,836 27,298 26,865 27,331 B. CUrrENT ASSETS Inventories (3) 1 1 Receivables and other assets (4) 4,412 3,690 Cash and cash equivalents 3,083 2,021 7,496 5,712 C. PREpaYMENTS anD AccrUED IncoME (5) 0 1 34,361 33,044 EQUITY AND LIABILITIES [€ MILLION] Note Dec 31, 2014 Dec 31, 2013 A. -
South Eastern News Sheet 2002
Please send your reports, observations, and comments by Mail to: The PSV Circle, Unit 1R, Leroy House, 8 436 Essex Road, LONDON, N1 3QP by FAX to: 0870 051 9442 by email to: [email protected] REPUBLIC OF IRELAND & WALES NEWS SHEET 850-8-253 NOVEMBER 2010 WALES MAJOR OPERATORS ARRIVA CYMRU Limited (CN) (Arriva) Allocations 10/10: 689-93.AY; 801/2.LJ. Vehicles out 0352 (S352 PGA): Arriva Northumbria (ND) 2669 7/05. 0363 (S353 PGA): Arriva Northumbria (ND) 2663 9/05. 1127 (N671 GUM), 1128 (N682 GUM), 1325 (P825 RWU): PVS, Carlton (Q) 9/10, for scrap. Subsequent histories 0310 (R810 YJC), 0311 (R811 YJC), 0316 (R816 YJC), 0321 (R821 YJC), 0334 (R104 TKO), 0353 (R123 TKO): Dunn Line (NG) - COE: Veolia (NG) 7/10. 0350 (S350 PGA), 0352 (S352 PGA), 0359 (R112 GNW), 0361 (R129 GNW), 0362 (R130 GNW), 0363 (S353 PGA), 0373 (S823 MCC): Stafford Bus Centre, Cotes Heath (Q) 7/10 ex Arriva Northumbria (ND) 662/9/3/0/61/57/66. 1740 (G 40 YHJ): to (w) with Morris, Llanrhaeadr-ym-Mochnant (CW) 7/10; GHA, Ruabon (CNr) 8/10, Lelo Metals, Corwen (Q) 9/10, for scrap. 1776 (H276 LEF), 1787 (H 87 DVM): GHA, Ruabon (CN) 7/10 via Stafford Bus Centre, Cotes Heath (Q). 3008 (CWR 508Y): to (w) with Translux, High Wycombe (XBK) by10/09. 3012 (CWR 522Y), 3013 (CWR 523Y): believed gone to dealer/breaker c4/09 ex Translux, High Wycombe (XBK). 3065 (B965 WRN): to (w) with Movereturn, Pontycymer (CC) 3/10. MMM 501 (M501 AJC): gone from Arriva Tees (CD) 1552 7/10. -
Milton Keynes Bus Strategy
Environment Milton Keynes Bus Strategy December 2008 www.milton-keynes.gov.uk/bus-strategy MILTON KEYNES BUS STRATEGY (DECEMBER 2008) Milton Keynes Local Transport Plan 2006-07 to 2010-11 Milton Keynes Bus Strategy December 2008 1 MILTON KEYNES BUS STRATEGY (DECEMBER 2008) CONTENTS Page 1 EXECUTIVE SUMMARY 4 2 INTRODUCTION 5 Context and Background 5 Bus Patronage in Milton Keynes 6 The Challenges: Growth, Demographic Change, Public Perception and Legislation 9 Strategy Aims 11 History of the Milton Keynes Bus Strategy 12 Consultation and Review Process 12 Existing Situation 13 Accessibility 14 The Need to Influence Travel Behaviour and Manage Demand 15 3 THE CHALLENGES AND OPPORTUNITIES AFFORDED BY GROWTH 17 Milton Keynes Growth 17 Medium Term Growth to 2011, Long Term Growth to 2031 17 The Role of Development in Sustainable Accessibility 19 4 VISION, OBJECTIVES, AIMS, TARGETS AND MONITORING 22 Vision 22 LTP Objectives 23 Aims of the Bus Strategy 23 Delivery of the Bus Strategy Aims 23 Targets and Monitoring 27 5 DEVELOPING THE NETWORK - GENERAL 29 CAGoT Recommendations 29 Commercial Bus Services 29 Contracted Bus Services 30 Publicity, Promotion, Bus Stops and Shelters 31 Real Time Passenger Information 32 Fares and Ticketing 33 Travel Planning 34 Park and Ride 34 Coachway and Coach Travel 35 The Need for Bus Depots 36 2 MILTON KEYNES BUS STRATEGY (DECEMBER 2008) 6 DEVELOPING THE NETWORK - URBAN 37 The Long Term Public Transport Vision - Route Hierarchy 37 Central Milton Keynes 40 Transport Interchanges in Milton Keynes 41 7 DEVELOPING -
Greater London News Sheet 850-1-285 November 2010
Please send your reports, observations, and comments by Mail to: The PSV Circle, Unit 1R, Leroy House, 1 436 Essex Road, LONDON, N1 3QP by FAX to: 0870 051 9442 by email to: [email protected] GREATER LONDON NEWS SHEET 850-1-285 NOVEMBER 2010 MAJOR OPERATORS ABELLIO London Limited {abellio london} (LN) / ABELLIO West London Limited {abellio london / abellio surrey} (Abellio) Opening Fleet (1/6/10) updated information 8058 (Y864 KTF ex 1068 MW) transferred from Travel London (LN) 8058 Corrections 849-1-269 delete vehicle out 8005 (Y215 HWF) - (still in use 10/10). Allocations by9/10: 8478-87.TF. Vehicles out (Note all these are deleted from stock, but may well remain on depots awaiting collection by the lessors). 8006 (Y116 HWB), 8007 (Y117 HWB), 8008 (Y118 HWB), 8010 (Y 42 HVV), 8021 (BU 05 HDO), 8022 (BU 05 HDV): gone c9/10 8023 (BU 05 HDX): Ensign, Purfeet (Q) 9/10 8030 (BU 05 HFG), 8032 (BU 05 HFM), 8033 (BU 05 FFN), 8034 (BU 05 HFT), 8037 (BU 05 HFX), 8038 (BU 05 HFY), 8039 (BU 05 HFZ), 8075 (KN 52 NFO), 8076 (KN 52 NFP), 8077 (KN 52 NFR), 8078 (KN 52 NFT), 8079 (KN 52 NFU), 8080 (KN 52 NFV), 8081 (KN 52 NFX), 8082 (KN 52 NFY), 8083 (KN 52 NFC), 8084 (KN 52 NFD), 8085 (KN 52 NFE), 8096 (YT 51 DZZ), 8097 (YT 51 EAA), 8098 (YT 51 EAJ), 8099 (YT 51 EAP), 8401 (W401 UGM), 8402 (W402 UGM), 8403 (W403 UGM), 8404 (W404 UGM), 8407 (W407 UGM), 8408 (W408 UGM), 8409 (W409 UGM), 8411 (W411 UGM), 8412 (W412 UGM), 8413 (W413 UGM), 8721 (W601 UGM), 8722 (W602 UGM), 8723 (W603 UGM), 8724 (W604 UGM), 8725 (W605 UGM), 8726 (W606 UGM), 8727 (W607 UGM), 8728 (W608 UGM), 8729 (W609 UGM), 8731 (W611 UGM), 8732 (W612 UGM), 8841 (YT 51 EAW), 8842 (YT 51 EAX), 8843 (YT 51 EAY), 8844 (YT 51 EBA): gone c9/10. -
Cross Reference of Fleet Names to Operator Titles April 2014 Edition
Cross Reference of Fleet Names to Operator Titles April 2014 Edition This listing provides a cross-reference of all fleet names to operator titles in the most recent round of G-Lists published by the PSV Circle. Each county or area is represented by the most recently issued G-List for that county. As at the date of publication, this list comprises references to G-Lists in both the 6 th (G5xx) and 7 th (G6xx) editions. This list is updated to G-Lists published in April 2014. Fleet Name Operator’s Title G-List 001 Minibuses Najeeb, Rotherham (SY) G671 001 Minibuses Tingey, Hemsworth (WY) G575-6 001 Taxibus Oxford Contract Vehicles, Oxford (OX) G633 01256 Minibuses Stoneman, Basingstoke (HA) G621 1 to 1 Community Transport Kelsey & Davies, North Benfleet (EX) G525-6 1-16 Minibuses Jackman, Newport Pagnell (BK) G653 1919 Minibuses Lee, Woodley (GM) G565-6 1919 Minibuses Normansell, Bredbury (GM) G565-6 1919 Minibuses Wallis, Woodley (GM) G565-6 1919 Minibuses Wilson, Romiley (GM) G565-6 1957 Executive Welch, Baguley (GM) G565-6 1st AAA Coaches Thurbin, Haverhill (SK) G556 1st American Limousines Clegg, Scunthorpe (LI) G553 1st AP Travel Coles, Totnes (DN) G631 1st Avenue Limousines Chambers, Billericay (EX) G525-6 1st Bus Stop Thurbin, Istead Rise (KT) G622-3 1st Call Limos Ramzan, Luton (BD) G651 1st Call Limos Ramzan, Luton (BD) G551 1st Call Minibuses Mason, Merthyr Tydfil (CS) G584 1st Call Minibuses Zahid, Nottingham (NG) G641 1st Call Fox, Birley Carr (SY) G671 1st Choice Limos Wright, Cottingham (EY) G572 1st Choice Limos Wright, Cottingham -
Bus Strategy (December 2008)
MILTON KEYNES BUS STRATEGY (DECEMBER 2008) Milton Keynes Local Transport Plan 2006-07 to 2010-11 Milton Keynes Bus Strategy December 2008 1 MILTON KEYNES BUS STRATEGY (DECEMBER 2008) CONTENTS Page 1 EXECUTIVE SUMMARY 4 2 INTRODUCTION 5 Context and Background 5 Bus Patronage in Milton Keynes 6 The Challenges: Growth, Demographic Change, Public Perception and Legislation 9 Strategy Aims 11 History of the Milton Keynes Bus Strategy 12 Consultation and Review Process 12 Existing Situation 13 Accessibility 14 The Need to Influence Travel Behaviour and Manage Demand 15 3 THE CHALLENGES AND OPPORTUNITIES AFFORDED BY GROWTH 17 Milton Keynes Growth 17 Medium Term Growth to 2011, Long Term Growth to 2031 17 The Role of Development in Sustainable Accessibility 19 4 VISION, OBJECTIVES, AIMS, TARGETS AND MONITORING 22 Vision 22 LTP Objectives 23 Aims of the Bus Strategy 23 Delivery of the Bus Strategy Aims 23 Targets and Monitoring 27 5 DEVELOPING THE NETWORK - GENERAL 29 CAGoT Recommendations 29 Commercial Bus Services 29 Contracted Bus Services 30 Publicity, Promotion, Bus Stops and Shelters 31 Real Time Passenger Information 32 Fares and Ticketing 33 Travel Planning 34 Park and Ride 34 Coachway and Coach Travel 35 The Need for Bus Depots 36 2 MILTON KEYNES BUS STRATEGY (DECEMBER 2008) 6 DEVELOPING THE NETWORK - URBAN 37 The Long Term Public Transport Vision - Route Hierarchy 37 Central Milton Keynes 40 Transport Interchanges in Milton Keynes 41 7 DEVELOPING THE NETWORK - RURAL 44 8 CONCESSIONARY TRAVEL, COMMUNITY TRANSPORT HOME TO SCHOOL TRANSPORT, -
27. Group Undertakings
Notes to the accounts (continued) 26. Acquisitions 27. Group undertakings In November 2009 the group acquired the remaining 20 per cent of the share capital of Eurobus Invest for £0.4 million. Detailed below is a list of those subsidiaries which in the opinion of the directors principally affect the amount of the profit or the amount of the assets of the group. The group percentage of equity capital is 100 per cent and the country of registration is England Prior year acquisitions: and Wales in each case, except where indicated. All subsidiaries operate within England and Wales, except where indicated: Adjustments in respect of prior year acquisitions are detailed in the table below: £m Passenger Transport Rental and Distribution of Buses and Coaches Hindsight period adjustments: Arriva Cymru Limited Arriva Bus and Coach Rental (4) Limited Trade and other receivables 0.1 Arriva Derby Limited Arriva Bus and Coach Limited Trade and other payables 1.4 Arriva Durham County Limited Corporation tax (0.1) Arriva East Herts & Essex Limited Investment Arriva International Trains (Leasing) Limited Deferred tax (0.2) Arriva Findiv Limited Arriva Kent & Sussex Limited Arriva International Limited* Decrease in fair values 1.2 Arriva Kent Thameside Limited Arriva Motor Holdings Limited* Consideration received (0.7) Arriva London North Limited Arriva Passenger Services Limited* Arriva London South Limited 0.5 MTL Services Limited* Arriva Medway Towns Limited Arriva Insurance Company (Gibraltar) Limited*12 Arriva Merseyside Limited Goodwill based on provisional fair values 50.1 Arriva International (Northern Europe) Limited Arriva Midlands Limited Arriva International (Southern Europe) Limited Arriva Midlands North Limited Goodwill based on final fair values 50.6 Arriva Malta Holdings Limited Arriva Noroeste SL2 Arriva (2007) Limited Arriva Northumbria Limited Arriva North West Limited Comparative amounts have not been restated following the final determination of fair value adjustments as the amounts involved Property are not material. -
Public Transport Local Model Validation Report
Northam ptonshire Strategic Transport M odel Public Transport Local M odel Validation Report Draft for Client Com m ents Northamptonshire County Council January 2010 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft for Client Comments Date January 2010 Prepared by Emily Butler Habiba Mukasa Signature Emily Butler Habiba Mukasa Checked by Nadia Lyubimova Signature Nadia Lyubimova Authorised by Craig Drennan Signature Craig Drennan Project number 10589510 File reference N:\Northants Multi Modal Transport Model\TEXT\REPORTS\LMVR\Northamptonshire PT LMVR_final.doc Northam pton Riverside House Riverside W ay Northam pton NN1 5NX Tel: +44 (0)1604 654659 Fax: +44 (0)1604 654699 w w w .m gw sp.co.uk May Gurney Ltd, Registered Office: Holland Court, The Close, Norwich, NR1 4DY Registered Number 00873179 England WSP Management Services Limited Registered Office: WSP House, 70 Chancery Lane, London WC2A 1AF Registered Number 02454665 England Contents 1 Introduction 1 2 Northamptonshire Strategic Transport Model - Overview 5 3 Summary of Public Transport Data Collection 12 4 Public Transport Network Development 13 5 Public Transport Assignment Model 23 6 Public Transport Matrix Development 29 7 Conclusions 35 [ List of Figures Figure 1.1: Strategic Transport Network within Northamptonshire .................................................. 3 Figure 2.1: Overall NSTM Structure................................................................................................. 9 Figure 4.1: Bus Network Coverage............................................................................................... -
Deutsche Bahn AG 2011 Management Report and Financial Statements
Deutsche Bahn AG 2011 Management Report and Financial Statements 1 CONTENTS 2 CHAIRMAN’S LETTER 7 MANAGEMENT REPORT 50 ANNUAL FINANCIAL STATEMENTS 86 REPORT OF THE SUPERVISORY BOARD Deutsche Bahn AG : 2 2011 Management Report and Financial Statements Chairman’s letter 2 CHAIRMAN’S LETTER D ear ladies and gentlemen, T he 2011 financial year was a very good year for DB Group. Our concerted efforts enabled us to post record revenues of € 37.9 billion, which equates to an increase of more than 10 percent year on year. Every day last year, we demonstrated to our customers what it means to be proactive about service quality. We implemented large-scale infrastructure projects. We entered new markets, both in regional and rail freight transport. And we hired close to 10,000 new employees and some 3,600 trainees, whom we welcomed into our corporate family. A ll of this took a tremendous team effort. The entire Group Management Board would therefore like to thank all of our 295,000 employees for their hard work. We would also like to thank our customers and partners, who continued to place their trust in us in 2011 as we grow to become the world’s leading mobility and logistics company. This trust formed the foundations of our favorable financial results in 2011. Our newly established business unit DB Arriva contributed to our record revenues with additional revenues of roughly € 2 billion, due to the first-time full inclusion. But revenues of € 35.9 billion on a comparable basis are still significantly above the pre-crisis 2008 level and 4.3 percent higher than in the previous year. -
West Northamptonshire Joint Core Strategy Local Plan (Part 1) SA Addendum Scoping Report
West Northamptonshire Joint Core Strategy Local Plan (Part 1) SA Addendum Scoping Report Statement of Community Engagement and Consultation September 2013 1 Contents Page 1 Introduction 3 Purpose of this statement 3 What is the West Northamptonshire Joint Core Strategy? 3 Overview of the consultation process to date 4 Public Examination 5 What is a Sustainability Appraisal/Strategic Environmental 5 Assessment? What is a Scoping Report? 6 2 The West Northamptonshire Joint Core Strategy SA 7 Addendum Scoping Report Representations to the Scoping Report 8 3 Next Stage 9 Appendix 1 10 Appendix 2 20 Appendix 3 21 2 Introduction Purpose of this statement 1.1 This statement sets out the community engagement and consultation undertaken to date on the West Northamptonshire Joint Core Strategy SA Addendum Scoping Report. What is the West Northamptonshire Joint Core Strategy? 1.2 West Northamptonshire is the area covered by Daventry District, Northampton Borough and South Northamptonshire Councils. It includes the towns of Northampton, Daventry, Towcester and Brackley and all the villages and rural areas within the three Councils’ administrative areas. 1.3 The West Northamptonshire Joint Strategic Planning Committee was established by Statutory Instrument in 2008. The Committee is responsible for plan-making in West Northamptonshire. The Committee is supported by the West Northamptonshire Joint Planning Unit (JPU). 1.4 The Joint Core Strategy (JCS) has been prepared by the JPU on behalf of the three Councils of Daventry District, Northampton Borough and South Northamptonshire working together with Northamptonshire County Council. 1.5 The West Northamptonshire Joint Core Strategy provides a planning framework for the West Northamptonshire area up to 2026.