PUNJAITHURAIYAMPALAYAM ROUGH STONE QUARRY LEASE APPLIED AREA (1.00.0HA) The proponent Mr. J.K.M.Jeyaprakash has applied for Environmental clearance for the proposed quarry Rough stone for over an extent of 1.00.0Ha in S.F.No: 10 (Part) at Punjaithuraiyampalayam Village, Taluk, District and Tamilnadu Salient features of the proposal are as follows: 1. Name of the Owner + Firm : J.K.M.Jeyaprakash, Page No: S/o. J.K.K.Muniraja, 19,51,107,137 330, Salem main road, Annai Illam, Kumarapalayam, Tiruchengode Taluk, Namakkal District. Mobile No: 7598614661 2. Location of the quarry- : S.F.No: 10 (Part) at Punjaithuraiyampalayam 17,51,107,137 S.F.No. Village, , Erode District 3. Purpose of Application : It is a Rough stone Quarry project in 17,51,107,137 Punjaithuraiyampalayam Village. 4. Extent of quarry in Ha- : 1.00.0Ha 17,51,107,137

5. Land use planning : Area at the 23,93,141 Present area a) Mining Description end of lease in (Ha) b) Storage of Topsoil over period (Ha.) burden c) Infrastructure Road Area Under Quarrying 0.19.0 0.66.5 Infrastructure Nil 0.01.0 d) Utilized Area Roads 0.01.0 0.02.0 Total Green belt Nil 0.05.0 Unutilized 0.80.0 0.25.5

Grand Total 1.00.0 1.00.0 6. Production (quantity in m3) : The proposed quantity of reserves for remaining 17,83,139 plan period is to be mine is 55685m3(or) 9838 Lorry Loads of Rough stone up to a depth of 30m from the top of the hill for a period of Five years.

Rough stone Description in m3 Geological Resources 228830 Available Mineable reserves 55685 Five years plan period As in the 55685 approved mining plan 7. Top soil & overburden : There is no overburden; the rough stone formation 81,83 (quantity in m3) is clearly visible right from the existing quarry, There is no interbred found in the area. There is no waste anticipated in the Rough stone quarrying, the entire quarried out material will be sold to required customers at different categories. 8. Method of Mining : The quarrying operation will be carried out by 23,79,141 Semi Mechanized Opencast Method in conjunction with conventional method of mining using Jack hammer drilling and slurry blasting, excavation, loading and transportation of Rough stone to the needy crushers. 9. Life of Mine as per approved : The lease deed was executed 03.05.2010 and the 51,71,107,139 mining plan lease will get expiry on 02.05.2020. The remaining lease period is about five years. 10. Height / width of the bench : Height 5.0 m & Width 5.0 m. 23,81,159 11. Source of water / quantity Quantity Source 31,91,143 required required (in litres) a. Drinking & Domestic 0.3 KLD Approved Water vendors Purpose b. Dust Suppression 0.3KLD Nearby well or water vendors c. Green belt development 0.4KLD Nearby well or water vendors 12. Waste water There is no waste water. 41,91,175 Sewage water : The septic tank is constructed on permanent structure with in the quarry lease area. Mode of disposal : To local Panchyat Authority 13. APC Measures : 1.Mist Spray using water tankers, 37 2. Enclosed covered system. (Tarpaulin) for transportation. 14. Ariel distance of nearest : Approxima 45,93,171 te distance habitation S. Approximat Name of the Village & Direction No e population from lease area 1. Pudhu Thottam 6km – NE 700 2. Kempanaickenpalayam 10km- NW 800 3 PujaiThuraiyampalayam 4km -SE 600 4 Kavandampalayam 3km - SW 500

15. Ariel distance from Reserve : Wildlife sanctuary-Nil 45,143 forest, Sensitive areas, Forest, National Park – Nil Bird sanctuaries, Wild life Monuments – Nil sanctuaries, National parks, Tiger Reserve (Guthiyalathur Monuments etc., within 15km Reserve forest) is located 100m on the Northern side of the lease area. 16. Land owner ship document : It is a Government land, the lessee has obtained 73,107, Own patta land : tender from the Government. Lease : Govt. Poromboke 17. Land use classification : It is a Fresh Quarry lease of Rough stone quarry 17,51,107,141 (the area has been quarrying operation earlier) in Punjaithuraiyampalayam Village 18. Mining plan A.Jagannathan, BE, F.C.C., M.M.E.A., 53,105,121 Prepared by : RQP/MAS/019/87/A Approved by : The Mining Plan was got approval by the 51 Assistant Director, Department of Geology and Mining, Erode vide Rc.No. 10911/2015-16/X-1 Dated: 02.07.2015 19. Precise area statement : The proceeding letter was received from the 107 Approved by District Collector, Erode vide Rc.No. 19669/2010 /X-1 Dated: 03.05.2010 20. Nearby quarries : There is few quarry is present within 500m radius 127,199 21. Nearby lake / river/ odai / : Kunderippallam Dam is situated about 6km away 89 channel etc. from the North-western side of the area. There are no major water bodies like river, Pond, lake, etc., within 500m radius. 22. Latitude / Longitude : 11031’36’’N to 11031’40’’N 17,73,141 77023’37’’E to 77023’43’’E 23. Topo Sheet No. : 57 E/06 73,141 24. Total Project cost (Fixed : The Project cost: 69,101,179 asset cost + Operational Cost A. Fixed asset cost =Rs. 9,65,000/- + EMP cost) B. Operational cost= Rs.42,00,000/- C. EMP cost = Rs. 4,16,000/- Total cost = Rs. 55,81,000/- The total project cost including EMP cost (A+B+C) is about Rs.55,81,000/-(Rupees fifty five lakhs eighty one thousand only) 25. EMP cost : The total EMP cost is around Rs. 4,16,000/- ( 101,179 Rupees four lakhs sixteen thousand only ) 26. Water table : The Ground water is about 45mt depth from 29,75,141 ground level. 27. Interstate boundary : There is no interstate boundary within the radius 45,143 of 15km 28. Western Ghats : The lease area falls in Western Ghats region. 45,143