Karnataka Urban Development and Coastal Environmental Management Project

Total Page:16

File Type:pdf, Size:1020Kb

Karnataka Urban Development and Coastal Environmental Management Project Environmental Assessment Report Initial Environmental Examination Project Number: 30303 May 2006 India: Karnataka Urban Development and Coastal Environmental Management Project Prepared by [Author(s)] [Firm] [City, Country] Prepared by Wilbur Smith Associates Private Limited Prepared for [Executing Agency] [Implementing Agency] The views expressed herein are those of the consultant and do not necessarily represent those of ADB’s members, Board of Directors, Management, or staff, and may be preliminary in nature. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Final Report Karnataka Urban Infrastructure Development and Finance Corporation (KUIDFC) Karnataka Urban Development and Coastal Environmental Management Project (KUDCEMP) Initial Environmental Examination of the Proposed Airport Link Road, Mangalore May 2006 WSAPL Project No. 0506046 For and on behalf of Wilbur Smith Associates Private Limited Approved by: A.S.Harinath Prepared by: Suhas Gaonkar Date: This report has been prepared by Wilbur Smith Associates Private Limited, an arm of Wilbur Smith Associates Inc., USA, with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known. Any such party relies upon the report at their own risk. Initial Environmental Examination of Mangalore Airport Link Road Final Report Currency Equivalent Currency Unit - Indian Rupee/s (Re/Rs) Re. 1.00 = US$ 0.022 US$ 1.00 = Rs. 45 Abbreviations ADB Asian Development Bank AAI Airport Authority of India CPCB Central Pollution Control Board EIA Environmental Impact Assessment EMP Environmental Management Plan FGD Focus Group Discussions GoK Government of Karnataka GSI Geological Survey of India IMD India Meteorological Department IEE Initial Environmental Examination KSPCB Karnataka State Pollution Control Board KUDCEMP Karnataka Urban Development and Coastal Environmental Management Project KUIDFC Karnataka Urban Infrastructure Development & Finance Corporation, Bangalore MCC Mangalore City Corporation MSL Mean Sea Level NA Not Applicable NAAQS National Ambient Air Quality Standard NH National Highway NGO Non -Governmental Organisation RoB Rail over bridge RoW Right of Way SH State Highway SPM Suspended Particulate Matter WSAPL Wilbur Smith Associates Private Limited, Bangalore Karnataka Urban Infrastructure Development & Finance i Wilbur Smith Associates Private Limited Corporation Initial Environmental Examination of Mangalore Airport Link Road Final Report CONTENTS EXECUTIVE SUMMARY.....................................................................................................1 ES1. Introduction .....................................................................................................................1 ES2. Project Description...........................................................................................................1 ES3. Description of Environment ..............................................................................................2 ES4. Anticipated Environmental Impacts And Mitigation Measures .............................................3 ES5. Environmental Management Plan ......................................................................................6 ES6. Stakeholder Consultation ................................................................................................ 12 ES7. Conclusions and Recommendations ................................................................................. 12 CHAPTER 1 INTRODUCTION ..........................................................................................13 1.1 Background....................................................................................................................... 13 1.2. The Present Study............................................................................................................. 13 1.3 Scope of Work .................................................................................................................. 14 1.4 Approach & Methodology ................................................................................................. 14 1.5 Organisation of the Report ................................................................................................. 15 CHAPTER 2 PROJECT DESCRIPTION.....................................................................16 2.1 Introduction ...................................................................................................................... 16 2.2 Profile of Existing Road..................................................................................................... 16 2.3 Need of the Project Road ................................................................................................... 17 2.4 Description of the project road........................................................................................... 17 2.4.1 Proposed Project Road...................................................................................... 17 2.4.2 Disposal of surplus earth ................................................................................... 19 2.4.3 Project Cost ...................................................................................................... 19 CHAPTER 3 ENVIRONM ENTAL PROFILE OF THE PROJECT AREA.................23 3.1 Introduction ...................................................................................................................... 23 3.1.1 Delineated Study Area of IEE Study ................................................................... 23 3.2 Physical Environment ........................................................................................................ 23 3.2.1 Climate............................................................................................................. 23 3.2.2 Physiography.................................................................................................... 25 3.2.3 Water Resources ............................................................................................... 26 3.2.4 Ambient Air Quality .......................................................................................... 29 3.2.5 Noise Levels..................................................................................................... 29 3.3 Ecological Environment..................................................................................................... 30 3.3.1 Forests............................................................................................................. 30 3.3.2 Fisheries .......................................................................................................... 30 3.4 Socio Economic Characteristics.......................................................................................... 30 3.4.1 Demography..................................................................................................... 30 3.4.2 Occupational Pattern........................................................................................ 31 CHAPTER 4 SCREENING OF POTENTIAL ENVIRONMENTAL IMPACTS........32 4.1 Introduction ...................................................................................................................... 32 4.2 Impacts on Physical Environment ....................................................................................... 32 4.2.1 Impacts on Land ............................................................................................... 32 4.2.2 Impacts on Surface Water.................................................................................. 33 4.2.3 Impact on Ground Water ................................................................................... 34 4.2.4 Impact on Air Environment ................................................................................ 34 4.2.5 Impact on Noise Levels...................................................................................... 34 Karnataka Urban Infrastructure Development & Finance ii Wilbur Smith Associates Private Limited Corporation Initial Environmental Examination of Mangalore Airport Link Road Final Report 4.3 Impact on Ecological Environment ..................................................................................... 35 4.3.1 Forest and Vegetation ....................................................................................... 35 4.3.2 Fisheries .......................................................................................................... 35 4.4 Impacts on Socio Economic Environment ........................................................................... 35 4.4.1 Land Acquisition ............................................................................................... 35 4.4.2 Socio-economic Impacts.................................................................................... 35 4.4.3 Health and Safety Hazards ................................................................................ 36 4.5 Project Benefits................................................................................................................
Recommended publications
  • E-Mail:[email protected] Organization: ------Contact: Ph
    Venue:ONLINE 5 Day AICTE Sponsored Workshop Dept. of Information Technology on NITK Surathkal Quantum Computing and Quantum " Mangalore- 575025. Cryptography" 5 Day AICTE Sponsored Workshop on (June07th, 2021 to June 11th, 2021) Address for Communication "Quantum Computing and Quantum Cryptography" Dr. Bhawana Rudra Name of Participant------------------------------------------ (June07th, 2021 to June 11th, 2021) Dept :------------------------------------------------------- Department of Information Technology Gender : ------------------------------------------------------- National Institute of Technology, Karnataka Surathkal, Mangalore – 575 025 Designation: -------------------------------------------------- Qualification: ------------------------------------------------ E-mail:[email protected] Organization: ------------------------------------------------- ----------------------------------------------------------------- Contact: Ph. 0824 – 247 3560 Mobile No. --------------------------------------------------- Course Contents Email:---------------------------------------------------------- How is Quantum Computing Different than I agree to abide by the rules and the regulations governing the Workshop. classical computing? Quantum Computing Basics COORDINATOR Place: QuBits Practicals Dr. Bhawana Rudra Date: Signature of the Participant Quantum Machine Learning Dept. of Information Technology, NITK Quantum Computing architectures Mr./Ms./Dr./__________________________________ is a student/employee of our Institution and
    [Show full text]
  • Draft Initial Environmental Examination
    Initial Environmental Examination Document stage: Draft for Consultation Project Number: 43253-027 May 2018 IND: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) – Improvements for 24 x 7 Water Supply System for Town Municipal Council in Kundapura Package No. 02KDP01 Prepared by Karnataka Urban Infrastructure Development and Finance Corporation, Government of Karnataka for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 11 May 2018) Currency unit – Indian rupee (₹) ₹1.00 = $0.0149 $1.00 = ₹67.090 ABBREVIATIONS ADB – Asian Development Bank CFE – consent for establishment CFO – consent for operation CGWB – Central Ground Water Board CPCB – Central Pollution Control Board CRZ – Coastal Regulation Zone DLIC – District Level Implementation Committee EHS – Environmental, Health and Safety EIA – environmental impact assessment EMP – environmental management plan GRC – grievance redress committee GRM – grievance redress mechanism HSC – house service connection H&S – health and safety IEE – initial environmental examination IFC – International Finance Corporation KCZMA – Karnataka Coastal Zone Management Authority KIUWMIP – Karnataka Integrated Urban Water Management Investment Program KSPCB – Karnataka State Pollution Control Board KUDCEMP – Karnataka Urban Development and Costal Environmental Management Project KUIDFC – Karnataka Urban Infrastructure Development and Finance Corporation MoEFCC – Ministry of Environment, Forest and Climate Change NGO – nongovernment organization OHT – overhead tank O&M – operation
    [Show full text]
  • 07-2019 1.0 IMD Information 1.1 Rainfall Situation 1.1.1 Amount of Rainfall Recorded at 0830 Hours IST of Today (8 Cm Or More) As Per IMD
    Central Water Commission Daily Flood Situation Report cum Advisories 23 -07-2019 1.0 IMD information 1.1 Rainfall Situation 1.1.1 Amount of rainfall recorded at 0830 hours IST of today (8 cm or more) as per IMD Name of Place (State) Rainfall (in cm) Gossaigaon (Assam) 34 Kokrajhar (Assam) 32 Mathanguri (Assam) 29 Buxaduar (West Bengal), Ratnagiri (Maharashtra) 28 each Bhatkal (Karnataka) 23 Cherrapunji (Meghalaya), Kollur (Karnataka) 21 each Kumta (Karnataka), AIE NH Xing (Assam) 20 each Barabisha (West Bengal) 19 Shirali (Karnataka) 18 Vadakara (Kerala), Kota & Udupi (Karnataka), Matunga (Assam) 17 each Kundapur (Karnataka) 16 each Gerosoppa & Santeguli (Karnataka), Beki Road Bridge (Assam) 15 each Karwar, Mani & Ankola (Karnataka), Hosdurg (Kerala), Sankalang (Sikkim), Manas N H Crossing, Barpeta 14 each (Assam) Honavar, Siddapura & Bajpe (Karnataka) 13 each Chepan (WB), Mudubidre, Manki, Agumbe & Bantwal (Karnataka), Bahalpur (Assam) 12 each Kannur, Taliparamba & Kudulu (Kerala), Hasimara (West Bengal) 11each Mulki, Uppinangadi, Gokarna, Yennehole & Kadra (Karnataka) 10 each Coochbehar (West Bengal) 9 each Passighat (Arunachal Pradesh), Dhubri (Assam), Harnai (Maharashtra), Mangalore (Karnataka), Irikkur 8 each (Kerala) 1.1.2 Rainfall forecast for next 5 days issued on 23rdJuly, 2019 (Midday) by IMD 2.0 CWC inferences 2.1 Flood Situation 2.1.1 Summary of Flood Situation as per CWC Flood Forecasting network For detail bulletins refer to http://cwc.gov.in/sites/default/files/cfcr-cwcdfb-23072019.pdf 2.2 Flood Situation as per actual/ forecasted rainfall situation IMD has forecasted heavy to Very Heavy rain at a few places with isolated Extremely Heavy rainfall in Sub-Himalayan West Bengal, Sikkim, Assam & Meghalaya and Konkan & Goa on 24th July Heavy to Very Heavy rain at these places on 25th July and slow reduction after 26th July.
    [Show full text]
  • In the High Court of Karnataka at Bangalore Dated This the 10Th Day of September 2012 Before the Hon'ble Mr. Justice Ram Mohan
    1 IN THE HIGH COURT OF KARNATAKA AT BANGALORE DATED THIS THE 10TH DAY OF SEPTEMBER 2012 BEFORE THE HON'BLE MR. JUSTICE RAM MOHAN REDDY WRIT PETITION Nos.30513 - 517 & 31955-32099 OF 2012 (EDN-AD) BETWEEN 1. DIVYA AGED 20 YEARS D/O BATTYAPPA GATTY R/AT KALLUGUDDE HOUSE KONAJE POST, MANGALORE-574199 STUDENT OF GOVT. POLYTECHNIC FOR WOMENS, BONDEL , MANGALORE STUDENTS OF SHREE NIRANJANA SWAMY POLYTECHNIC (AIDED) COLLEGE SUNKADAKATTE, BAJPE 2. ANUSHA D. AGED 19 YEARS D/O DEVAPPA MADIVALA R/AT DASHITHLU HOUSE, VORKADY POST, MANJESHWARA VIA KASARGOD TALUK-671323 STUDENT OF GOVT. POLYTECHNIC FOR WOMENS, BONDEL , MANGALORE 3. POOJASHREE AGED 18 YEARS D/O UMESH POOJARY R/AT BITHAPADE HOSE, BONADANTHILA VILLAGE PADU POST, MANGALORE-29 STUDENT OF GOVT. POLYTECHNIC FOR WOMENS, BONDEL , MANGALORE 2 4. PRAVEEN AGED 18 YEARS S/O KARKI BADABETTU OPP. TO GREENLAND KANNYAN POST, KUNDAPURA STUDENT OF KAMATH INSTITUTE OF TECHNOLOGY, HOMBADI, KUNDAPURA 5. RAKSHITH SHETTY AGED 19 YEARS S/O RATHNAKAR SHETTY R/AT KALAVARA NAYAKARA MANE, KUNDAPURA STUDENT OF KAMATH INSTITUTE OF TECHNOLOGY, HOMBADI, KUNDAPURA 6. ASHOKA KUMAR G. AGE 20 YEARS S/O NAGARAJA SHETTY R/AT GULDADY HOSAMANE MANUR POST, KUNDAPURA, STUDENT OF KAMATH INSTITUTE OF TECHNOLOGY, HOMBADI, KUNDAPURA 7. VARNA SHETTY AGE 19 YEARS S/O VIRA RAJENDRA SHETTY R/AT BAGALKATTE HOUSE MOLHALLI POST, KUNDAPURA, STUDENT OF KAMATH INSTITUTE OF TECHNOLOGY, HOMBADI, KUNDAPURA 8. PRASANNA AGE 22 YEARS S/O RAMACHANDRA ACHARYA R/AT SEETHA LAXMI NILAYA MARAVANTE,KUNDAPURA STUDENT OF KAMATH INSTITUTE OF TECHNOLOGY, HOMBADI, KUNDAPURA 9. K. NAVEEN RAJ PONDE AGE 22 YEARS 3 S/O K.
    [Show full text]
  • District Disaster Management Plan- Udupi
    DISTRICT DISASTER MANAGEMENT PLAN- UDUPI UDUPI DISTRICT 2015-16 -1- -2- Executive Summary The District Disaster Management Plan is a key part of an emergency management. It will play a significant role to address the unexpected disasters that occur in the district effectively. The information available in DDMP is valuable in terms of its use during disaster. Based on the history of various disasters that occur in the district, the plan has been so designed as an action plan rather than a resource book. Utmost attention has been paid to make it handy, precise rather than bulky one. This plan has been prepared which is based on the guidelines from the National Institute of Disaster Management (NIDM). While preparing this plan, most of the issues, relevant to crisis management, have been carefully dealt with. During the time of disaster there will be a delay before outside help arrives. At first, self-help is essential and depends on a prepared community which is alert and informed. Efforts have been made to collect and develop this plan to make it more applicable and effective to handle any type of disaster. The DDMP developed touch upon some significant issues like Incident Command System (ICS), In fact, the response mechanism, an important part of the plan is designed with the ICS. It is obvious that the ICS, a good model of crisis management has been included in the response part for the first time. It has been the most significant tool for the response manager to deal with the crisis within the limited period and to make optimum use of the available resources.
    [Show full text]
  • 18.06.21.Final List of Applicants.Xlsx
    Date of Advertisement : 24-03-2021 Last date of submission of application: 16-06-2021 List of applicants who have applied for RO dealerships in KARNATAKA State within due date: 1264 List of Applications Received till closing Date - as per details furnished on application cover Loc.N Name of the Location Revenue District Category Name of the Applicant ooo 1 On LHS From Mezban Function Hall To Indal Circle On Belgavi Bauxite Road Belgavi Open Girish D 1 On LHS From Mezban Function Hall To Indal Circle On Belgavi Bauxite Road Belgavi Open Ambikadevi G 1 On LHS From Mezban Function Hall To Indal Circle On Belgavi Bauxite Road Belgavi Open Sureshkumar R R 2 On LHS From Kerala Hotel In Biranholi Village To Hanuman Temple ,Ukkad On Kolhapur To Belgavi - NH48 Belgavi Open Mrutyunjaya Yaragatti 3 Within Tanigere Panchayath Limit On SH 76 Davangere OBC Santosh G H 4 On LHS Of NH275 From Byrapatna (Channapatna Taluk) Towards Mysore Ramnagara SC Pavan kumar M 4 On LHS Of NH275 From Byrapatna (Channapatna Taluk) Towards Mysore Ramnagara SC Dhana Gopal 4 On LHS Of NH275 From Byrapatna (Channapatna Taluk) Towards Mysore Ramnagara SC Prabhakaravardhana 4 On LHS Of NH275 From Byrapatna (Channapatna Taluk) Towards Mysore Ramnagara SC Narasimhamurthy 4 On LHS Of NH275 From Byrapatna (Channapatna Taluk) Towards Mysore Ramnagara SC B V Srinivas 4 On LHS Of NH275 From Byrapatna (Channapatna Taluk) Towards Mysore Ramnagara SC Chalapathi 4 On LHS Of NH275 From Byrapatna (Channapatna Taluk) Towards Mysore Ramnagara SC Subramani Giridhar S 4 On LHS Of NH275 From
    [Show full text]
  • Franchisees in the State of Karnataka (Other Than Bangalore)
    Franchisees in the State of Karnataka (other than Bangalore) Sl. Place Location Franchisee Name Address Tel. No. No. Renuka Travel Agency, Opp 1 Arsikere KEB Office K Sriram Prasad 9844174172 KEB, NH 206, Arsikere Shabari Tours & Travels, Shop Attavara 2 K.M.C M S Shabareesh No. 05, Zephyr Heights, Attavar, 9964379628 (Mangaluru) Mangaluru-01 No 17, Ramesh Complex, Near Near Municipal 3 Bagepalli S B Sathish Municipal Office, Ward No 23, 9902655022 Office Bagepalli-561207 New Nataraj Studio, Near Private Near Private Bus 9448657259, 4 Balehonnur B S Nataraj Bus Stand, Iliyas Comlex, Stand 9448940215 Balehonnur S/O U.N.Ganiga, Barkur 5 Barkur Srikanth Ganiga Somanatheshwara Bakery, Main 9845185789 (Coondapur) Road, Barkur LIC policy holders service center, Satyanarayana complex 6 Bantwal Vamanapadavu Ramesh B 9448151073 Main Road,Vamanapadavu, Bantwal Taluk Cell fix Gayathri Complex, 7 Bellare (Sulya) Kelaginapete Haneef K M 9844840707 Kelaginapete, Bellare, Sulya Tq. Udayavani News Agent, 8 Belthangady Belthangady P.S. Ashok Shop.No. 2, Belthangady Bus 08256-232030 Stand, Belthangady S/O G.G. Bhat, Prabhath 9 Belthangady Belthangady Arun Kumar 9844666663 Compound, Belthangady 08282 262277, Stall No.9, KSRTC Bus Stand, 10 Bhadravathi KSRTC Bus Stand B. Sharadamma 9900165668, Bhadravathi 9449163653 Sai Charan Enterprises, Paper 08282-262936, 11 Bhadravathi Paper Town B S Shivakumar Town, Bhadravathi 9880262682 0820-2562805, Patil Tours & Travels, Sridevi 2562505, 12 Bramhavara Bhramavara Mohandas Patil Sabha bhavan Building, N.H. 17, 9845132769, Bramhavara, Udupi Dist 9845406621 Ideal Enterprises, Shop No 4, Sheik Mohammed 57A, Afsari Compound, NH 66, 8762264779, 13 Bramhavara Dhramavara Sheraj Opposite Dharmavara 9945924779 Auditorium Brahmavara-576213 M/S G.R Tours & Travels, 14 Byndur Byndoor Prashanth Pawskar Building, N.H-17, 9448334726 Byndoor Sl.
    [Show full text]
  • New Traffic Hub / Railway Station Near Bajpe Airport
    Infrastructure Development Department Government of Karnataka Bangalore FEASIBILITY STUDY FOR PROVIDING RAILWAY STATION NEAR BAJPE AIRPORT AND A HUB FOR MULTI MODAL TRANSPORT SYSTEM MANGALORE FINAL REPORT JANUARY 2010 INFRASTRUCTURE DEVELOPMENT CORPORATION (KARNATAKA) LIMITED Infra House, 39, 5th Cross, 8th Main, RMV Extn., Sadashiv Nagar, BANGALORE-560 080 In Association with Varna Engineering Consultants Pvt.Ltd #19/10, Mahalinga Chetty Street 3rd Floor, Mahalingapuram Chennai-600 034. TABLE OF CONTENTS KEY PLAN…………………………………………………………………………………….3 1. INTRODUCTION .................................................................................................................. 5 1.1. Background ........................................................................................................... 5 1.2. Industries & Trade ................................................................................................ 6 1.3. Tourist potential .................................................................................................... 8 1.4. Educational Centre ................................................................................................ 9 1.5. Location .............................................................................................................. 10 2. SCOPE OF WORK .............................................................................................................. 12 3. EXISTING FACILITIES ....................................................................................................
    [Show full text]
  • Gokarna, India 1 Gokarna, India
    Gokarna, India 1 Gokarna, India For other uses, see Gokarna, Nepal. Gokarna ಗೋಕರ್ಣ village Mahabaleshwara Temple Location in Karnataka, India [1] [1] Coordinates: 14.55°N 74.31667°E Coordinates: 14.55°N 74.31667°E Country India State Karnataka District Uttara Kannada Area • Total 10.9 km2 (4.2 sq mi) Elevation 586 m (1,923 ft) Population (2001) • Total 25,851 • Density 2,400/km2 (6,100/sq mi) Languages • Official Kannada Time zone IST (UTC+5:30) Vehicle registration KA-47 Gokarna (Kannada: ಗೋಕರ್ಣ) is a small temple town located on the western coast of India in the Uttara Kannada district of the Indian state of Karnataka. Tain temple and deity is Lord Shiva, who is also known as Gokarna, India 2 Mahabhaleshwara. This temple houses what is believed to be original image of Lord Shiva's lingam. There are many other temples all over this small town. Ankola and Kumta on Highway 17 are the main towns near Gokarna. Gokarna is historically known as one of the seven important Hindu pilgrimage centers and is located on what was once unspoiled beach near the estuary of river Aghanashini with its palm trees, other colorful tropical fruit and flower trees. Of late due to the numbers of tourists the character of this town has changed. This town is no longer just a center of pilgrimage though massive numbers of devotees still visit the town for the purposes of offering prayers and worship to Lord Shiva. Due to its laid back unspoiled and rustic nature, many younger western tourists started visiting Gokarna about a decade ago.
    [Show full text]
  • Page Front 1-12.Pmd
    REPORT ON THE DEVELOPMENT OF KASARAGOD DISTRICT Dr. P. Prabakaran October, 2012 TABLE OF CONTENTS No. Topic Page No. Preface ........................................................................................................................................................ 5 PART-I LAW AND ORDER *(Already submitted in July 2012) ............................................ 9 PART - II DEVELOPMENT PERSPECTIVE 1. Background ....................................................................................................................................... 13 Development Sectors 2. Agriculture ................................................................................................................................................. 47 3. Animal Husbandry and Dairy Development.................................................................................. 113 4. Fisheries and Harbour Engineering................................................................................................... 133 5. Industries, Enterprises and Skill Development...............................................................................179 6. Tourism .................................................................................................................................................. 225 Physical Infrastructure 7. Power .................................................................................................................................................. 243 8. Improvement of Roads and Bridges in the district and development
    [Show full text]
  • Police Station List
    PS CODE POLOCE STATION NAME ADDRESS DIST CODEDIST NAME TK CODETALUKA NAME 1 YESHWANTHPUR PS BANGALORE 20 BANGALORE 1 Bangalore North 2 JALAHALLI PS BANGALORE 20 BANGALORE 1 Bangalore North 3 RMC YARD PS BANGALORE 20 BANGALORE 1 Bangalore North 4 PEENYA PS BANGALORE 20 BANGALORE 1 Bangalore North 5 GANGAMMAGUDI PS BANGALORE 20 BANGALORE 1 Bangalore North 6 SOLADEVANAHALLI PS BANGALORE 20 BANGALORE 1 Bangalore North 7 MALLESWARAM PS BANGALORE 20 BANGALORE 1 Bangalore North 8 SRIRAMPURAM PS BANGALORE 20 BANGALORE 1 Bangalore North 9 RAJAJINAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 10 MAHALAXMILAYOUT PS BANGALORE 20 BANGALORE 1 Bangalore North 11 SUBRAMANYANAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 12 RAJAGOPALNAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 13 NANDINI LAYOUT PS BANGALORE 20 BANGALORE 1 Bangalore North 14 J C NAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 15 HEBBAL PS BANGALORE 20 BANGALORE 1 Bangalore North 16 R T NAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 17 YELAHANKA PS BANGALORE 20 BANGALORE 1 Bangalore North 18 VIDYARANYAPURA PS BANGALORE 20 BANGALORE 1 Bangalore North 19 SANJAYNAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 20 YELAHANKA NEWTOWN PS BANGALORE 20 BANGALORE 1 Bangalore North 21 CENTRAL PS BANGALORE 20 BANGALORE 2 Bangalore South 22 CHAMARAJPET PS BANGALORE 20 BANGALORE 2 Bangalore South 23 VICTORIA HOSPITAL PS BANGALORE 20 BANGALORE 2 Bangalore South 24 SHANKARPURA PS BANGALORE 20 BANGALORE 2 Bangalore South 25 RPF MANDYA MANDYA 22 MANDYA 5 Mandya 26 HANUMANTHANAGAR PS BANGALORE
    [Show full text]
  • Item No. 1 Particulars of Organization, Functions and Duties ****
    Item No. 1 Particulars of Organization, Functions and Duties **** MANGALORE ELECTRICITY SUPPLY COMPANY LTD., (A Government of Karnataka Undertaking) PARTICULARS OF ORGANISATION, FUNCTIONS AND DUTIES The Govt. of Karnataka has embarked on optimistic policy of introducing reforms in the Power Sector of Karnataka in the year 1999 by enacting Karnataka Reforms Act. In the first step the erstwhile Karnataka Electricity Board (KEB), which was responsible for Power Transmission and Distribution in the State of Karnataka was corporatized into Karnataka Power Transmission Corporation Limited (KPTCL) w.e.f 01.08.1999. Subsequently, Transmission and Distribution functions of KPTCL were separated. KPTCL remained as a Transmission Company. Distribution of power was entrusted to 4 regional Distribution Company w.e.f. 01.06.2002 viz., BESCOM, HESCOM, MESCOM & GESCOM. One more Distribution Company Chamundeshwari Electricity Supply Corporation (CESC) was formed in Mysore w.e.f. 01.04.2005, bi-furcating the jurisdiction of MESCOM. Mangalore Electricity Supply Company Ltd., which was brought into existence as part of Reform process w.e.f 01.06.2002, has been entrusted with Distribution of Power in the Districts of Dakshina Kannada, Udupi, Shimoga and Chickmagalur. Profile as on 31.03.2019: Area covered : 24,049 Sq. KM District : 4 Population : 61.64 Lakhs Distribution Transformers : 75,080 No.s Length of 33 kv lines : 848.27 Rkms Length of 11 kv lines 38,772 Rkms Length of LT line : 82,959 Rkms No. of employees Sanctioned : 9,277 Working : 5,489 Total Assets as on 31.03.2018 Gross block : Rs. 2223.62 Crores Net block : Rs.
    [Show full text]