Decisions on Planning Applications Accompanied by an EIAR January 2010 to September 2020
Total Page:16
File Type:pdf, Size:1020Kb
Decisions on Planning Applications Accompanied by an EIAR January 2010 to September 2020 Application EIS File EIS Date EIS Decision Received Applicant Development Description Development Address Requested Decision Number Required Received Date Date Date 20/5471 14/07/2020 Paul O'Leary Retention and completion of vehicular entrance and for permission to change existing Ballyarthur Td., Fermoy, Co. Cork, Yes 31/08/2020 Conditional vehicular entrance to pedestrian access only. Permission 20/5318 25/06/2020 Melissa Clancy To construct a dwellinghouse and garage with related site works. A Natura Impact Foilogohig, Ballydesmond, Mallow, Yes 25/06/2020 19/08/2020 Conditional Statement will be submitted to the planning authority in relation to this application. Co. Cork Permission 20/5318 25/06/2020 Noel Cremin To construct a dwellinghouse and garage with related site works. A Natura Impact Foilogohig, Ballydesmond, Mallow, Yes 25/06/2020 19/08/2020 Conditional Statement will be submitted to the planning authority in relation to this application. Co. Cork Permission 20/4948 12/05/2020 Kildorrery The renovation of the existing round roof building on the existing site. The building will Kildorrery Community Yard, Yes 15/07/2020 Conditional Community be for multiple community use, office, meeting and créche. Fermoy Road, Kildorrery, Co. Cork Permission Development Ltd 19/6784 22/11/2019 Axon Plant Sales The importation of soil and stone for the raising of an agricultural field in order to Gortacrue, Midleton, Co. Cork, Yes 22/11/2019 24/01/2020 Refused Ltd improve the agricultural output of the field and the construction of a temporary new haul road. A Natura Impact Statement (NIS) has been prepared and submitted to the authority with this application. 19/6783 22/11/2019 Belvelly Marino Demolition, site infrastructure improvements, and utility upgrade works to stabilise the Belvelly Port Facility, Marino Point, Yes 22/11/2019 22/07/2020 Conditional Development existing site and to provide capacity for future industrial development proposals at the In the townlands of Marino, Permission Company DAC Belvelly Port Facility. Demolition will comprise site clearance and demolition of all Belvelly and Oldcourt, Cobh, Co. existing derelict super structures, including prill tower, concrete tanks, workshops, Cork stores and office buildings; sub structures including foundations and floorslabs; and redundant services including piperacks, sumps and sea water cooling pipe. Site infrastructure improvements will comprise; i. Infilling of the lagoon located at the north east of the site using a combination of imported material and suitable site-won demolition material; ii. Site levelling works and construction of a flood protection revetment along the northern and north western perimeter of the site; iii. Upgrade of existing main site entrance and provision of new emergency access along the north eastern frontage of the site; new internal road layout and site lighting along the new roads; iv. Development of a new railway connection along the eastern boundary and restoration of the former rail siding at the north east of the site; v. Widening of access 19/6029 13/08/2019 Eli Lilly Kinsale Ltd. A 10 year Permission for development of a pharmaceutical manufacturing building Ballythomas East, Ballythomas Yes 13/08/2019 04/10/2019 Conditional extension, IE2b, located within the existing manufacturing facility consisting of: A West, Horse Hill More North, Permission pharmaceutical manufacturing building extension to the existing IE2 pharmaceutical Ballyvrin Lower, Dunderrow, manufacturing building, including production and plant accommodation over 3 floors Kinsale, Co. Cork and intermediate mezzanine floors and platforms, and a ground to parapet height of 27.5 metres with roof mounted equipment and associated external plant and equipment and local roof mounted vents. All located to the south of the existing IE2 Building. Modifications to the existing IE2 Building including the demolition of the existing single storey entrance lobby to accommodate the proposed extension. A single storey electrical building 7 metres high. Demolition of the existing forklift parking shelter located on the eastern side of building IE1. The installation of 3 dedicated manufacturing material supply vessels located inside the existing bunded tank farm located to the east of the IE2 Building. The installation of 2 additional bunded waste vessels adjacent to the existing bunded tank farm south of the IE4 Building and 19/5877 26/07/2019 Stryker Ireland Construction of an extension to the existing manufacturing facility and all ancillary site Stryker Ireland Limited (Anngrove), Yes 26/07/2019 18/09/2019 Conditional Limited works. The proposed development consists of a building ranging in height from 2 to 3 IDA Business Park, Anngrove, Permission storeys and comprising a new production floor over two levels, administrative offices, Carrigtwohill, Co. Cork canteen, labs, staff wellness centre and locker rooms and makes provision for roof top plant. Ancillary structures and site works including a gas compound, waste compound, powder store, multi store shelter, sprinkler tank, alterations to road layout within the site and staff car parking. Access to the site will be from the existing entrances to the IDA Business Park. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. 19/5675 01/07/2019 Greenvalley The importation of soil & stone for the raising of an agricultural field in order to Meadstown, Ballinhassig, Co. Cork, Yes 01/07/2019 26/08/2019 Refused Transport & Land improve the agricultural output of the field and the construction of a temporary new Reclamation Ltd haul road. A Natura Impact Statement (NIS) has been prepared and will be submitted to the authority with this application. 19/430 28/06/2019 Tracey and John The construction of a proposed dwelling house, garage, install waste water treatment Lonagh, Clonakilty, Co. Cork, Yes 19/08/2019 Refused Harte unit, and all associated site works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application 19/431 28/06/2019 Stephanie & the construction of a proposed dwelling house, install waste water treatment unit and Lonagh, Clonakilty, Co. Cork, Yes 19/08/2019 Refused Vincent O'Donovan all associated site works. A natura impact statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. 19/5560 13/06/2019 Andrew Boyle Glamping site with 17 no. glamping pods and a communal building consisting of toilets, Billeragh West, Araglin, Co. Cork, Yes 13/06/2019 05/08/2019 Refused office, kitchen, dining and lounge area, septic/settlement tank and an integrated constructed wetland system together with all associated site works. A Natura Impact Statement will be submitted to the Planning Authority with the application. 19/5411 30/05/2019 The Electricity A 55 MWe (electrical output) aero derivative gas fired turbine, including the following Aghada Generating Station, Yes 30/05/2019 02/10/2019 Conditional Supply Board (ESB) elements: (a) 1 No. Turbine module (c.535 sq.m., c.15.2m high) in a fully enclosed Ballincarroonig, Aghada, Permission weatherproof acoustic enclosure including a c.30m high stack, selective catalytic Whitegate, Co. Cork reduction (SCR), gas turbine and air intake; (b) supporting items of plant including: step up transformer with firewall (c.192 sq. m.); bunded station service transformer (c.11 sq. m.); single storey control/electrical room (c.150 sq. m.); bunded ammonia storage tank (c.20 sq. m.); gas compressor (c.128 sq. m); gas compressor cooler (c.28 sq. m.); single storey building containing a fire suppression system and gas bottle storage (c.79 sq. m.); fin fan coolers (c.53 sq. m.); lube oil skid (c.32 sq. m.); fenced gas receiving station (c.11 sq. m.); (c) external service areas including a maintenance laydown area and an ammonia unloading area; (d) connections to existing site services networks including: gas, liquid fuel, electrical, water, wastewater, and an underground surface water attenuation tank connecting to surface water drains; (e) all other ancillary and miscellaneous site works including site clearance; site access and a 19/4999 23/04/2019 Patrick and Construct a single storey dwelling, new entrance and all associated site works.A Natura Lyraneag, Rockchapel, Co. Cork, Yes 23/04/2019 17/06/2019 Refused Kathleen Mulcahy Impact Statement (NIS) will be submitted to the Planning Authority with this application. 19/4891 11/04/2019 The Electricity A c.159 MW capacity battery storage facility located within a secured compound, on a Lands to the east of the R630 in Yes 11/04/2019 04/06/2019 Conditional Supply Board (ESB) c. 3.2 Ha site, and will - subject to detailed design, commercial and technical the townlands of , Ballincarroonig Permission considerations, include: (a) up to 89 No. battery container units (c.14.7 m x 3.4 m x and Aghada located inside the , 3.8 m); (b) up to 36 No. inverter units (c.12.2 m x 2.4 m x 2.9 m); (c) a substation Aghada Generating Station, compound surrounded by a 2.6 m high palisade fence with a dedicated access gate Ballincarroonig, Whitegate, Co. Cork containing a single – storey control building (c. 240 sq.m.) and electrical plant including a bunded transformer (c. 200 sq.m. with a c. 8m high fire wall on one side); a bunded house transformer (c. 20 sq.m. surrounded on 3 sides by a c. 3 m high fire wall) and var support unit (4 m x 3 m x 3.4 m high); (d) a single storey battery control building (c. 156 sq.m.); (e) a 2.6 m high palisade fence and access gate, with primary access via the existing station and internal roadway network and temporary access via the existing boundary onto the R630; (f) ancillary structures including lightning masts (c.