July 6, 2020 Mr. Chris Flinn Town of Jericho Planning + Zoning Office

Total Page:16

File Type:pdf, Size:1020Kb

July 6, 2020 Mr. Chris Flinn Town of Jericho Planning + Zoning Office July 6, 2020 Mr. Chris Flinn Town of Jericho Planning + Zoning Office P.O. Box 39, 2nd Floor Jericho, VT 05465 Subject: Charron – 9 Lot Subdivision Zoning Application Dear Mr. Flinn: On behalf of Brenda and Lee Charron, we are pleased to provide you with the enclosed items which are intended to serve as Sketch Plan Review application for the proposed subdivision of a 115.97 acre parcel of land owned by the Charron’s off Route 15 in Jericho. The parcel is accessed via an existing curb cut off of VT Route 15 and is located in the Town zoned Forestry District (FOR) which has a minimum lot size of 10 acres. Based on our understanding of the Zoning Regulations, the allowable residential density allows for up to 11 lots. The Charron’s are proposing to only subdivide nine residential building lots as noted in this application. Improvements to the existing farm road are planned to upgrade it to Town standards. This private gravel roadway will provide access to the lots which are being designed to have individual onsite wastewater disposal systems and drilled water wells. For the Board’s review and consideration, we have enclosed: 1. Signed and completed Town of Jericho Zoning Permit Application Form, 2. Application fee in the amount of $100.00 payable to the “Town of Jericho”, 3. Project Narrative, 4. Listing of Adjoining Landowners, 5. Full size Survey Plat, prepared by Timothy Short, L.S. entitled “Proposed Boundary Line Adjustments, Lands of Brenda & Charles L. Charron, Southeasterly of Vermont Route 15, Jericho, Chittenden County, Vermont”, dated February 7, 2020, last revised March 13, 2020. 6. Full size subdivision plan, prepared by Otter Creek Engineering, Inc. titled ‘Brenda & L. Charles Charron, 9 Lot Subdivision, Jericho, Vermont”, dated July 6 2020. 7. Reduced scale (11 x 17) Natural Resource plan, prepared by Otter Creek Engineering, Inc. Brenda & L. Charles Charron, 9 Lot Subdivision, Jericho, Vermont”, dated July 6, 2020. Following your review of the materials provided, if you have any questions or require additional information, please feel free to contact me at your earliest convenience. We look forward to meeting with the Board as soon as practical to discuss this application. Sincerely, Brent F. Rakowski, P.E. Senior Project Engineer c: Brenda and Lee Charron Enclosures /7/ 970-001 P2 TOWN OF JERICHO – ZONING NARRATIVE Brenda & L. Charles Charron 9-Lot Subdivision July 6, 2020 Project Narrative Brenda and Lee Charron are the owners of a 115.97 acre parcel located along VT Route 15 in Jericho. The parcel along with other adjoining lands had previously been a part of a prior Town permit application process. The Charron’s understand that the timeline for those prior approvals has since expired and, similarly, their approach to the development of the property has changed. For this project, the Charron’s are seeking to subdivide the 115.97 acre parcel. The parcel is located in the Town zoned Forestry District (FOR). An existing curb cut off of VT Route 15 currently provides access to the property. In addition, an existing single family lot maintains an access easement across the Charron’s parcel and utilizes a portion of existing farm road to access their property. The remainder of the farm road continues up the hillside into the site. The Charron’s are seeking to subdivide this 115.97 acre parcel, depicted as Lot ‘C’ on the attached survey plat prepared by Tim Short, L.S. Per the Zoning Regulations, the allowable permitted residential density allows for the development of up to 11 lots. The Charron’s are proposing only 9 lots as part of the subdivision. Included in the application materials is the subdivision plan, which is also intended to serve as a Density Plan. Single family dwellings are a permittable use in the FOR District. With more than 3 proposed lots, the application is being developed to comply with the Planned Unit Development (PUD) standards. As such, the dimensional requirements for all lots, with exception to the buffer zone for Lot 1, have been established based on Table 5.8 of the Regulations. The 100 foot buffer provision for Lot 1 constricts the viability for building on this lot and offers little in terms of mitigating the effect on the neighboring residential parcel. A waiver of the 100 ft buffer requirement for this lot is requested to be revised to 15 feet. The plan provided Refer to the subdivision plan enclosed for lot sizes and setbacks. Based on our understanding of the Regulations, the proposed project will be reviewed as a major subdivision under the Subdivision, Planned Unit Development, and General Development review standards. Access to the proposed lots will be via the existing curb cut off VT Route 15. The existing farm road, however, will be upgraded and improved to comply with Town Road Standards. The Charron’s are seeking a waiver to two of the road standards: roadway width and cut/fill slopes. Specifically, since the private road will serve 9 lots, the standard of a 22 foot wide roadway with 2 foot shoulders is excessive in this instance and not in keeping with the rural character the Charron’s are attempting to maintain for the development. Instead, a roadway width of 18 feet (9 foot lanes) is proposed for this private development road. Parking for no less than 2 parking spaces is proposed to be provided on each individual lot and conceptual drive locations have also been depicted. A waiver of cut/fill slope requirements from 3 ft horizontal to 1 foot vertical to 2 ft horizontal to 1 ft vertical is also being requested. We understand that a formal request to the Town Selectboard is required for these two waiver requests. Based on the rural nature of the roadway (i.e. low volume, low speed), it is anticipated that the private development road will also serve to provide safe and convenient pedestrian access. Curbs and/or sidewalks for pedestrians installed along this private gravel road are not in keeping with the rural character of the proposed development. A plan depicting the lot layout and conformance with the regulations is included in these application materials. The rehabilitation and adjustment of the private development road is intended to retain and minimize as much of the natural terrain and slopes as possible. Work will be in compliance with applicable State Erosion Prevention & Sediment Control Standards and the State’s ‘Low Risk Handbook’. The Charron’s are considering the preserving up to 15% of the development area as easements. The area considered is the higher elevation portions of Lot 9 and keep it as open space in keeping with the Town goals for the overlay district. Water supply and wastewater disposal will be provided on each residential lot. New drilled wells are intended to provide water supply and in ground disposal field will be utilized to dispose of wastewater. State Potable Water Supply and Wastewater Disposal permit approval will be required. The design, permitting and construction of these systems will be in accordance with the State Rules. The layout of the development is in keeping with the rural landscape of this district. Encroachments into the steep slopes and prominent ridgelines and hillsides is minimized. No lighting or outdoor display of sales or display areas are proposed. These areas will be further defined and regulated as part of the deeds and covenants developed for this subdivision. Buried electrical, telecommunication and cable TV are anticipated to serve the development. These will be located within dedicated easements along the private roadway easement. The proposed project will create more than one acre of impervious surface, as such it will be subject to State Stormwater Permitting Standards. Accommodations for the conveyance and treatment of runoff will be in accordance with these standards. Proposed impervious surfaces will be treated primarily via infiltration into the underlay gravel and sandy soils. As noted previously, construction activities will follow with the Vermont handbook for Erosion Prevention and Sediment Control. An Erosion Control permit from the State will obtained for the proposed project. There is not expected to be any instances where, when measured at the property line, the Performance Standards as noted in Section11.14 of the Regulations will be exceeded. Deed and Covenant documents outlining the use of public/private lands, rights of way, and easements will be provided with subsequent application materials. BRENDA AND L. CHARLES CHARRON 9-LOT SUBDIVISION JULY 6, 2020 LISTING OF ADJOINING LANDOWNERS Parcel ID Name Address IF007 Geoffrey Cole & Katherine Morrow 7 Irish Farm Rd., Jericho, VT 05465 IF008 Kevin & Teri Hawley 8 Irish Farm Rd., Jericho, VT 05465 BT023 Randall & Emily Clark P.O. Box 7, Underhill, VT 05489 VT296 Robert & Barbara Milne 85 Garfield Rd., Potsdam, NY 13676 VT338X Jericho-Underhill Park District, Inc. P.O. Box 164, Underhill, VT 05489 VT325 Green Mountain Chipping, Inc. same as David Villeneuve VT309 David Villeneuve P.O. Box 360, Underhill, VT 05489 OTTERCREEK EN GINE E RING 404 East Main Street P.O. Box 712 East Middlebury, VT 05740 Telephone: 802 382-8522 Fax: 802 382-8640 ~ 110 Merchants Row 4th Floor, Suite 15 Rutland, VT 05701 Telephone: 802 747-3080 Fax: 802 747-4820 ~ E-mail: [email protected] 9 LOT ROUTE 15 SUBDIVISION JERICHO, VERMONT BRENDA & LEE CHARRON DATE ISSUED: 7/6/2020 DRAWN BY: RR CHECKED BY: BFR SCALE: 1"=400' PROJECT NO.: 970.000 TITLE: RESOURCE PLAN SKETCH NO. 2 REF. DRAWING:.
Recommended publications
  • Using Nepa to Arrive at an Affordable, Effective, and Environmentally Responsible Solution for Vermont’S Transportation Future
    ADDRESSING THE LAND USE, ENVIRONMENTAL QUALITY, AND TRANSPORTATION CONNECTION IN CHITTENDEN COUNTY, VERMONT: USING NEPA TO ARRIVE AT AN AFFORDABLE, EFFECTIVE, AND ENVIRONMENTALLY RESPONSIBLE SOLUTION FOR VERMONT’S TRANSPORTATION FUTURE James Murphy*† INTRODUCTION Sprawl is no accident. An offspring of the fossil fuel age, sprawl is the result of policy and investment choices our society has made over the last fifty to one hundred years. One of the most fundamental of these choices is the heavy investment we have made in highway infrastructure to accommodate the automobile. If we intend to address the environmental and other problems created by sprawl, we must recognize how major transportation infrastructure investments affect growth patterns. This Article concerns a major proposed belt-highway project in the Burlington, Vermont region. The highway’s projected cost is about $223 million and climbing—a once-in-a-generation transportation investment for the state. Vermont, which is known for its sound environmental stewardship, faces a major choice for its future. Proponents of the highway feel it is a long-delayed necessity to relieve congestion and foster economic growth. Opponents of the highway contend that it will do little more than open up undeveloped land to further sprawl with few benefits and tremendous expense. This Article will examine whether the National Environmental Policy Act of 1969 (NEPA)1—which requires that environmental impacts from major federal actions, like highway projects, be examined and that alternatives be considered2—has proved a useful tool for ensuring that * Wetlands and Water Resources Counsel for the National Wildlife Federation; LL.M. 2006, Vermont Law School; J.D.
    [Show full text]
  • 2016 Annual Town Report
    TOWN OF WESTFORD VERMONT 2016 ANNUAL REPORT July 1, 2015 – June 30, 2016 Please bring this report to Town Meeting NOTICE ANNUAL TOWN & SCHOOL MEETING Monday, March 6, 2017 7:00 pm Westford School All Non-Australian Ballot Articles will be voted on. Public Hearing for Australian Ballot Articles Monday, March 6, 2017 7:00 pm Westford School Australian Ballot Voting Tuesday, March 7, 2017 Westford School Polls Open 7:00 am to 7:00 pm All Australian Ballot Articles will be voted on including the town budget. On the cover: Aerial of Westford School TABLE OF CONTENTS DEDICATION WESTFORD SCHOOL ................................................................................................................................................. 1 TOWN OFFICE INFORMATION GENERAL INFORMATION .......................................................................................................................................... 5 ELECTED & APPOINTED TOWN OFFICERS ................................................................................................................ 6 TOWN MEETING 2016 TOWN MEETING ABSTRACT ............................................................................................................................. 9 2017 ANNUAL TOWN MEETING WARNING ............................................................................................................. 11 TOWN FINANCIALS EXPENSE BUDGET 2017-2018 ...............................................................................................................................
    [Show full text]
  • TOWN of JERICHO Planning and Zoning Office • PO Box 39 • Jericho, Vermont 05465 • (802) 899- 2287
    TOWN OF JERICHO Planning and Zoning Office • PO Box 39 • Jericho, Vermont 05465 • (802) 899- 2287 TOWN OF JERICHO – PLANNING COMMISSION NOTICE OF PUBLIC HEARING The Jericho Planning Commission hereby provides notice of a public hearing being held pursuant to Title 24, Sections 4384 for the purpose of hearing public comment regarding: Proposed Jericho Comprehensive Town Plan 2014 Update. The public hearing is scheduled for October 15, 2014 at 7:00p.m. in the Jericho Town Hall, located at 67 Vermont Route 15. The purpose of the proposed Town Plan update is an interim action to bring certain sections of the plan up to-date prior to the regular Town Plan renewal scheduled to take place in 2016 as required by the Vermont Municipal and Regional Planning and Development Act. The proposed Plan will affect all areas of the Town of Jericho. The 2014 proposed updates add information to the Town Plan, related to Floodplain Resiliency and the three Designated Village Centers. Table of Contents: Introduction, Vision and Goals, The Jericho Community, Land Use, Natural Resources, Cultural and Historic Resources, Economic Development, Housing, Education and Child Care, Transportation, Utilities Facilities and Services, Energy, Implementation, Maps Copies of the proposed Town Plan are available at the Jericho Town Hall, located at 67 Vermont Route 15. A digital copy may be viewed on the Town of Jericho Website at www.jerichovt.gov. TOWN OF JERICHO Planning and Zoning Office • PO Box 67 • Jericho, Vermont 05465 • (802) 899- 2287 MEMORANDUM To: Town of Underhill, Planning Commission Chair; Town of Westford, Planning Commission Chair; Town of Essex, Planning Commission Chair; Town of Williston, Planning Commission Chair; Town of Richmond, Planning Commission Chair; Town of Bolton, Planning Commission Chair; Chittenden County Regional Planning Commission, Executive Director; Department of Housing and Community Affairs.
    [Show full text]
  • Ss Registration Form1314.Indd
    Smugglers’ Notch Resort & T.S.L. Snowshoes Present The 13th ANNUAL NORTHERN VERMONT SNOWSHOE RACES AND FAMILY SNOWSHOE FESTIVAL! Sunday, February 9, 2014 • Registration begins at 9:00 am Smugglers’ Notch Nordic Ski & Snowshoe Adventure Center • Jeffersonville, Vermont 10:30 am • ½K (.3 mile) Kids Fun Run/Walk. $8 if received by February 6th, $10 thereafter. 11:00 am • 3½k (2.2 miles) Fun Run/Walk on friendly terrain with spectacular views. $18 if received by February 6th, $22 thereafter. 11:00 am • 8K* (4.97 miles) race on hilly, challenging loop course. $25 if received by February 6th, $30 thereafter. Age division prizes for 8k: 19 & under, 20-29, 30-39, 40-49, 50-59, 60 & over *This is the 2014 Vermont State Championship and an official qualifier for the 2014 U.S. Snowshoe Association National Championship Race Participants are encouraged to bring their own snowshoes. A limited number of snowshoes will be available, on a first come-first served basis, courtesy of Smugglers’ Notch Resort and TSL Snowshoes. Tasty refreshments for all snowshoers. Post race raffle will include a pair of TSL Snowshoes. A major portion of the proceeds will benefit the Ronald McDonald House & the Cambridge Food Shelf. First fifty advanced registrants receive silk-screened knit running gloves! DIRECTIONS: Vermont Route 15 to Jeffersonville. Take Vermont Route 108 South 5½ miles to main entrance to Smugglers’ Notch Resort. Look for race sign and follow the arrows to the proper parking lot. You will ride a Resort shuttle ½ mile to the Nordic Center, so plan to take your gear with you.
    [Show full text]
  • JOHNSON TOWN Lamoille County, Vermont
    JOHNSON TOWN Lamoille County, Vermont A Community Profile Prepared for the Vermont Council on Rural Development Community Visit April, 2004 By The Center for Rural Studies 207 Morrill Hall University of Vermont Community Profile – Johnson, VT A Note to the Reader Just as a community is never finished modifying, adapting, and organizing its natural, political, and social environments, an attempt to profile those dynamic processes must be a work in progress. Materials below are organized to reflect community characteristics and resources. Please join us in this profiling effort and call attention to omissions, inaccuracies, and errors of fact. Thank you, Fred Schmidt, Co-Director Chip Sawyer, Research Data Specialist Meaghan Murphy, Research Associate Bethany Eisel, Graduate Student Seth Herman, Student Intern The Center for Rural Studies, University of Vermont Website: http://crs.uvm.edu Phone: (802) 656-3021 Email: [email protected] ii Community Profile – Johnson, VT Table of Contents Section 1. - Town Organization.......................................................................................................................... 1 Section 2. - Human Resources............................................................................................................................ 4 Section 3. - Business and Infrastructure Resources............................................................................................ 9 Section 4. - Social Capital ...............................................................................................................................
    [Show full text]
  • Toxics in Vermont a Town-By-Town Profile
    Toxics In Vermont A Town-by-Town Profile 141 Main Street, Suite 6 – Montpelier, VT 05602 Phone (802) 223-4099 – fax (802) 223-6855 [email protected] – toxicsaction.org 1 Toxics In Vermont A Town-by-Town Profile January 2011 Report Author Jessica Edgerly, Vermont State Director, Toxics Action Center Henna Shaikh, Toxics Action Center Mapping Lauren DeMars, University of Vermont Ryan Emerson, Toxics Action Center Report Advisor Meredith Small, Executive Director, Toxics Action Center 141 Main Street, Suite 6 Montpelier, VT 05602 phone (802) 223-4099 fax (802) 223-6855 [email protected] toxicsaction.org About Toxics Action Center Toxics Action Center organizes with residents working to prevent or clean up pollution in their communities. Since 1987, Toxics Action Center has helped more than 650 communities clean up hazardous waste sites, decrease industrial pollution, curb pesticide spraying, and oppose the siting of dangerous waste, energy and industrial facilities. When the government won’t take action and the company denies that there is a problem, Toxics Action Center is a resource for residents concerned with pollution in their neighborhood. We provide residents with information about environmental laws, strategies for organizing, a network of activists around the region, and access to legal and technical experts. Toxics Action Center is funded by donations from 2 concerned citizens and grants from private foundations. This financial support enables us to provide our services free of charge to communities facing pollution threats. 3 Table of Contents Acknowledgements and Preface…………………………………………………………………………………………………………………4 Introduction to Toxics in Vermont..……..……………………………………………………………………………….…………….........5 Summary Map of Vermont Toxic Sites………………………………………….…………………………………………………..………. 7 Recommendations………...…………………………………………………………………………………………………………………….….. 8 Take Action with an Environmental Organization…………………………………………………………………………………… 11 Overviews and Maps: Air Pollution Point Sources………………………………………………………………………………………………..………….
    [Show full text]
  • A Century of Landslide Activity in Glaciolacustrine Deposits in Jeffersonville, Vermont, USA
    A Century of Landslide Activity in Glaciolacustrine Deposits in Jeffersonville, Vermont, USA Springston, G.E. MSc., Sevi, Adam F. P.E. Ph.D. & Kanat, Leslie. Ph.D. Department of Geology and Environmental Science – Norwich University, Northfield, VT, USA Department of Civil and Environmental Engineering – Norwich University, Northfield, VT, USA Department of Environmental and Health Sciences – Johnson State College, Johnson, VT, USA ABSTRACT At least five complex earth slide–flows have occurred over the past century on the side of a 46-m-high terrace adjacent to the Village of Jeffersonville, Vermont, USA. At least two of the landslides crossed the Brewster River and reached the edge of the village. Residences at the top could be at risk and the run-out zone for future slides could include a school, shops, and residences. The slope is underlain by varved glaciolacustrine sands, silts, and clays. The causes of instability include toe erosion by the river and high pore-pressure due to rain or snowmelt. Areas of concern have been identified along the northern part of the slope and above the school. RÉSUMÉ Au moins cinq glissement–écoulement de terrain complexes ont eu lieu depuis un siècle sur le flanc d'une terrasse de 46 m de haut près du Village de Jeffersonville, Vermont, USA. Au moins deux des glissements de terrain ont traversé la rivière Brewster et atteint le bord du village. Résidences au sommet pourraient être en péril et la zone de battement pour glissements futures pourrait comprendre une école, commerces et résidences. La pente est sous-tendue par les argiles, limons et sables glacio-lacustres varvées.
    [Show full text]
  • GROUNDWATER MONITORING REPORT for CHITTENDEN MILLS BEVERAGE JERICHO, VERMONT (VTDEC Site # 94-1594)
    GROUNDWATER MONITORING REPORT FOR CHITTENDEN MILLS BEVERAGE JERICHO, VERMONT (VTDEC Site # 94-1594) July 2007 Prepared for: Champlain Oil Company 45 San Remo Drive South Burlington, VT 05407-2126 Prepared by: 368 Avenue D, Suite 15 P.O. Box 787 Williston, Vermont 05495 Phone: (802) 383-0486 Fax: (802) 383-0490 [email protected] KAS Project# 410040018 Groundwater Monitoring Report Chittenden Mills Beverage, Jericho, VT Table of Contents 1. INTRODUCTION..............................................................................................................1 2. GROUNDWATER MONITORING ................................................................................1 2.1. GROUNDWATER FLOW DIRECTION AND GRADIENT ...........................................................................................1 2.2. GROUNDWATER QUALITY................................................................................................................................1 2.3. QUALITY ASSURANCE AND CONTROL..............................................................................................................2 3. CONCLUSIONS & RECOMMENDATIONS................................................................2 APPENDICES Appendix A Maps • Site Location Map • Site Map • Groundwater Elevation Map • Contaminant Concentration Map Appendix B Liquid Level Monitoring Data Appendix C Groundwater Quality Data and LNAPL Recovery Summary Appendix D Analytical Laboratory Reports July 2007 i KAS # 410040018 VTDEC Site # 94-1594 Groundwater Monitoring Report Chittenden
    [Show full text]
  • Received Jul 0 8 2016
    NOTICE OF PUBLIC HEARING MORRISTOWN/MORRISVILLE PLANNING COUNCIL WARNED PUBLIC HEARING ON 16 AUGUST 2016 ON REVISIONS TO THE MUNICIPAL DEVELOPMENT PLAN, a/k/a TOWN PLAN The Morristown/Morrisville Planning Council hereby provides notice of a public hearing being held pursuant to State Law 24 VSA, Chapter I I 7, subchapter 5, Municipal Plan Development. The purpose of this hearing is to listen to public comments concerning a proposed amendment to the Morristown/ Morrisville Municipal Development Plan, a/k/a the Town Plan. The proposed amendment adds a new paragraph to the Land Use Chapter that explains how Morrisville's downtown designation has furthered the goals of the Town Plan. The amendment also includes an updated map that shows the unchanged boundaries of Morrisville' s designated downtown. This proposed Town Plan amendment is to comply with 24 VSA, Chapter 76a, §2793. The current Town Plan was approved by the Selectboard & Village Trustees on 6 July 2015. A public hearing for the proposed Morristown/Morrisville Town Plan is scheduled for: DATE: August 16, 2016 TIME: 7:00 PM. PLACE: The Community Meeting Room of the Tegu Building at 43 Portland Street Statement of Purpose: To amend the town plan to comply with 24 VSA, Chapter 76a, §2793 and to provide the Town of Morristown/Village of Morrisville with a Municipal Development Plan that meets State of Vermont statutory requirements, furthers the planning goals contained in §4302 ofVSA 24, Chapter I I 7 and provides a sustainable roadmap for the community's future. Geographic Area Affected:
    [Show full text]
  • TOWN of WESTFORD TRAFFIC ORDINANCE the Amended Westford Traffic Ordinance Printed on the Attached Document Was Adopted by the Se
    TOWN OF WESTFORD TRAFFIC ORDINANCE The amended Westford Traffic Ordinance printed on the attached document was adopted by the Selectboard on July 24, 2000. This amended Ordinance shall become effective on September 25, 2000 unless a petition signed by not less than 5% of the qualified voters of the Town requesting that the attached adopted amended ordinance be submitted to the voters of the Town at an annual or special meeting is presented to the Selectboard or the Town Clerk on or before September 8, 2000. Westford Selectboard Robert Bancroft, Chair Kenneth Tardie William Leach Adopted by the Westford Selectboard July 24, 2000 Received for Record July 25, 2000 at 8:30 a.m. Attest: Frena Phillips, Town Clerk TOWN OF WESTFORD TRAFFIC ORDINANCE Pursuant to the provisions of Title 23, Vermont Statutes annotated, Sections 1007 and 1008, and Title 24, Vermont Statutes Annotated, Sections 1971 and 2291 (1), (4) and (5), and such other general enactments as may be material hereto, it is hereby ordained by the Selectboard of the Town of Westford that the following amended Traffic Ordinance is adopted for the Town of Westford, Vermont. ARTICLE I The definitions of Title 23, Vermont Statutes Annotated, Section 4 are incorporated by reference. ARTICLE II The ordinance established special traffic regulations on public highways within the Town of Westford, Vermont. Section I It shall be unlawful for any person to disobey the direction of a traffic control device except in response of a law enforcement officer. Section II It shall be unlawful for any person to intentionally remove, injure, obstruct, deface alter or tamper with any traffic control device.
    [Show full text]
  • State of Vermont Agency of Natural Resources Department of Environmental Conservation
    Permit No. 6809-INDS.A Project ID No. BR04-0432 STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION STORMWATER DISCHARGE PERMIT STORMWATER RUNOFF TO WATERS OF THE STATE In compliance with provisions of 10 V.S.A. §1264, the Stormwater Management Rule and in accordance with "Terms and Conditions" hereinafter specified, R.L. Vallee, Inc. 282 South Main St. St. Albans, VT 05478 And Aubuchon Realty Co., Inc. 23 West Main St. Westminster, MA 01473 Impervious Area: 1.13 acres the permittee, is hereby granted permission to discharge stormwater runoff from Morrisville Mobile located at 33 VT Route 15 West in Morristown, Vermont to an unnamed tributary of the Lamoille River and groundwater in the Lamoille River watershed. This individual permit amends and replaces previous authorized permit 6809- INDS. 1. Expiration Date: Five years from issuance date of final permit. Note: This permit, unless revoked, modified or suspended, shall be valid until the designated expiration date not withstanding any intervening change in water quality, effluent, or treatment standards, or classification of the receiving waters including groundwater. However, any such changed standard or classification, and any applicable requirement in a total maximum daily load (TMDL) shall be applied in determining whether or not to renew this permit, and in determining the conditions of a renewed permit. The permittee shall reapply for a renewed discharge permit ninety days prior to the expiration date of this permit. 2. Revocation: 10 V.S.A. §1267 provides as follows: The Secretary may, after notice and opportunity for a public hearing, revoke, modify or suspend this permit if it is found that the permittee submitted false or inaccurate information in its application or has violated any requirement, restrictions, or condition of this permit, or if there is any change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge.
    [Show full text]
  • Town Report 2017
    Cambridge, Vermont FISCAL YEAR 2017 ANNUAL REPORT Cambridge Greenway Trail Bridge Based on a flood modeling study the Cambridge Greenway/Railroad Bridge over the Brewster River was determined to be significantly undersized. The former bridge had a span of 52 feet and a low chord elevation of 454.1’ For reference, this was below the 100-year flood elevation (460.57’ and the 10-year flood elevation (457.43) As a result, the bridge was impacted by flood waters on an almost annual basis. The bridge was replaced with an adequately sized and proportioned bridge. The project involved removing the existing abutments and restoring the floodplain in the vicinity of the abutments. The longer, higher bridge span will allow passage of more water out of the village and reduce the constriction of the channel. This will reduce the potential of flooding in the Village of Jeffersonville. A second separate but nearby flood mitigation project will be constructed during spring 2018 to replace two culverts that pass under Vermont Route 15 in Jeffersonville. Additional native plantings will be added to the floodplain and bank areas in the spring. Old bridge removal Flooding August 2017 event February 2017 Welcome to Town Meeting! Explanation of Some Common Phrases You Will Hear Welcome! This fl yer is provided as background to them when necessary. A few of the more commonly help all Vemont town meeting voters participate used elements are included here. fully. The Moderator is trained to make sure all voters are heard and their The Main Motion questions answered. If you have Example: “I move to accept Article 6 as written.” Each any questions, just raise your tRemember, article on the warning must hand and ask.
    [Show full text]