In the name of God

Disaster management center of Municipality Disaster management center of Kerman Municipality, in middle of January in 2004 after the earthquakes of Bam and Zarand by suggestion of Mr. Alavi, deputy of Bam earthquake task force and confirmation of governor, and the head of Kerman budget and planning organization was developed and from June of 2005 was begun to work as sample in Kerman municipality. The programs of this center have planned by consoler committee that comprised 20 professors of university and heads of different offices who effect on Bam.

Aims 1. Organizing and arrangement of executive factors of disaster management 2. Consideration of damages and different capabilities of city 3. the optimum usage of city capabilities and its neighbor cites 4. planning for enhancement of skills for reduction of damages 5. preparing of people group in order to hand over the relief and save tasks to them 6. developing on time responding group for national and international officer

These aims are according the structure of save and relief in country.

Mission 1. Establishment of organization 2. Consideration of damages and capabilities of city and priority of them 3. planning for enhancement of capabilities in structure of short planning ( 1 year ) middle planning ( 5 years) and long planning ( 15 years ) 4. accomplishment of one year planning and continuity of it for gaining conclusion at the end of 5 years planning 5. getting justification for training of CBDRM, DM, EOC, SAR, CERT from governmental management training center 6. pursuing of setting disaster management field in Bahonar University of Kerman in level of bachelor 7. pursuing of source obtaining in this university field

1 8. pursuing of resistant place built for disaster management

Structure of disaster management center

2 Development of short planning , middle planning and long planning for disaster management before crisis( preparing and prevention ) during the crisis ( the first 72 hours ) after crisis ( recovery ) and rebuilt

The time chart of performance plan in during of one year, five years and fifteen years This planning was started from 2005 Information gathering and analyses

One-year scheme 5-years scheme 15-years scheme

row Preparedness of Project First Second third Forth first Second Third Forth Fifth The The The planning title three three three three year year year year year first second third months months months months five five five years years years

Database development 1 of faults, historical and systematic earthquake Database development 2 of geology and geological log of city subsurface Database development 3 of electricity, gas, water etc. Educational need 4 scheme of offices that are related to crises Database development 5 of building type Social, economical and 6 facility database development of every family Every family population 7 database development Educational need 8 scheme of organizations that are related to crises Roads database 9 development City facility database 10 creation (parks, open spaces, religious centers …)

3 Database development 11 of city streets, alleys etc.

Database development of building type

Recognition of vulnerabilities row Preparedness of Project First Second third Forth first Second Third Forth Fifth The The The planning title three three three three year year year year year first second third months months months months five five five years years years 1 Unstable building and preparing vulnerability plan of residential houses 2 Danger of industries and vulnerability plan of them 3 Active faults 4 Narrow allay in old structure-preparing the plan for finding the way for destroyed area 5 Vulnerability population-the plan of population and 4 the scale of their vulnerability 6 The lake of relief equipments 7 The lake of technical information 8 The lake of knowledge among of people about the scale of risks 9 The lake of disaster management structure in offices and lack of relief team 10 The lack of disaster management structure and relief team in school 11 The lack of disaster management and relief team in local places

12 Unpreparedness people in disaster

5 Recognition of capabilities row Preparedness of Project First Second third Forth first Second Third Forth Fifth The The The planning title three three three three year year year year year first second third months months months months five five five years years years 1 Professional trainers in disaster management 2 Stable buildings 3 Resistant water, electronic, gas system and …. 4 The number of professional relive members 5 Safe place in disaster for sheltering 6 The number of ready doctors 7 The number of ready engineers 8 The number of ready nurses 9 Insurance organizations

10 Professional forces for preparing of disaster management soft ware

6 11 Training persons for development of teams

Mitigation of damages and vulnerability row Preparedness Project First Second third Forth first Second Third Forth Fifth The The The of planning title three three three three year year year year year first second third months months months months five five five years years years 1 Training of more technical trainers in disaster management 2 Training in schools 3 Training in Kindergartens 4 Training in offices 5 Training in local places and religious places 6 Training of trade centers 7 Development of medical teams 8 Development of Psychotherapy teams

9 development of Sociologist teams

7 10 Development of technical teams for estimating of damages in natural disaster 11 Insurance organizations

12 The control system of traffic in disaster management 13 Technical forces for developing of disaster management software 14 Developing of disaster management structure in school , offices, local places 15 Developing of Cert &Sar.EOC teams in offices, local places and schools 16 Preparing of relief equipments 17 Preparing equipped room to computer, GIS and GPS system and informational plan 18 Specifying the offices that are related to disaster and their duties 19 Specifying of realty ownership limitation by GPS

20 Specifying of cities according to damage scale 21 Preparing of maneuver plan and doing it in offices, school and local places 22 Recognition of safe place in disaster 23 Preparing of temporary settlement and fining location in natural

8 disaster Preparing of earthquake scenario row Preparedness Project First Second third Forth first Second Third Forth Fifth The The The of planning title three three three three year year year year year first second third months months months months five five five years years years 1 risk scale estimation of cities 2 Vulnerability scale of city 3 Preparedness of information layers of Kerman city by scale of 1/2000 and 1/25000 4 Estimation of relief equipments base on vulnerability plan and city population plan 5 The preparing plan for food basket: can food. Bread,oil,suger.salt .bottle of water, for 3 persons 6 The preparing plan for :small oven.plate,spoon.can opener, knife, metal bowl for 3 persons 7 The preparing plan for cloth: blanket, pillow, small carpet for 3 persons 8 The estimation plan of tent numbers for cold weather( waterproof, waterproof floor, can

9 be used easily by guideline leaflet) 9 The estimation plan of doctor and nurse, drug and brancard and ambulance numbers in city zone 10 The plan of informing people for encountering disaster( training of life save, helping to people that are under debries,removing debries,first aid training 11 The plan of relief teams development in local places, for every 100 families or in every local places one relief team is needed. training of save and relief team because they act so fast and are near to place and familiar with there and can be controlled 12 The plan of relief teams development in offices, for every 35 persons, one team is needed 13 The specifying plan of cities , giving data, activities limitation and city plan to them 14 Justification plan for communicating of different groups and the kind of their activities and their limitation 15 The equipped plan of save and relief team: suitable clothes,torch,mask,backpack, suitable shoes 16 Development plan of one team for preparing Brief report from events 17 Emergency plan for evacuation

10 and settle them in safety place 18 Temporary settlement of people in stable governmental building ,buses, safe private building, parks and tents 19 The preparation plan of financial sources ( in national and international levels ) 20 The preparation plan of disaster management software

11

Commander structure of disaster management emergency operation in Kerman municipality

12

Training 1- Training of trainers 1-1 Training of trainers in two training periods CBDRM & DM for 60 persons by support of IBC in turkey 1-2 Training of trainers in SOP-SAR-CERT-EOC for 123 persons in 90 days by support of ACT.NL 2- Training of governmental offices 3- Training of disaster management for 45 heads and mayors 4- Training of people 4-1 Training of relief teams of local places 5- Training of schools 5-1 Training of disaster management and preparing earthquake scenario to 415 persons in 51 schools 5-2 crisis scenario of Doctor Bakhoda high school 5-3 Training of preparedness and safety culture enhancement of natural disaster in schools 6-training of kindergartens 6-1 Training of disaster management and preparing of earthquake scenario 6-2 Earthquake scenario of Golhaye Daneshgah kindergarten 6-3 Training of preparedness and safety culture enhancement of natural disaster in kindergartens 7-training of quasi family of Behzisti 8- Training of Kerman Shahid Bahonar Hospitals personnel

13

Training licence In the name of God

Mr. Alavi The head of Kerman disaster management center By best regards, inform you, because of your cooperation and the pursuing of management and planning, research and training organization , the justification of four training courses ( crisis and natural disaster, CERT,EOC,SAR ) is given. So this management is ready to train governmental employees by cooperation of that center.

Be successful Ali Baigzadeh The manager of training and research

14

Mr. Baigzadeh The manager of training and research management and planning By regard to the letter of 040/227 on 2005/6/5, and local training needs, there is no objection to begin disaster management courses just for disaster management center. Please send us one version of training sources of this period. Khosro Shokri The head of planning and training office

15

16

Training license

17

Training of trainers - Retraining of 340 persons from crescent societies of province by support of IFRC - Training of 123 trainer of SOP&Cert.EOC.SAR by support of NL.ACT - Training of trainers in two training periods CBDRM & DM for 60 persons by support of IBC in turkey -Training of 720 trainers for training two books in levels of elementary and guidance school by support of ITALI.CARITS - Training of 30 trainers from instructors of kindergartens

Training of trainers in two training periods CBDRM & DM for 60 persons by supporting of IBC in turkey

18

Training of trainers in SOP-SAR-CERT-EOC for 123 persons in 90 days by supporting of ACT.NL

19

Training of government offices Training of Kerman municipality staffs and organizing 11 save and relief teams

20

-Training of SAR & CERT to Education Organization, Water Company, Telecommunication Company, Electric Company, insurance, transportation, bus system and oil company staffs in 2005, 2006, 2007 -Training of professional primary removing debris period, logistic, firefighting, buried. Psychological supports for 340, 26, 66, 80, 40 staffs of Kerman municipality - professional training of EOC to 50 fire fighters of Kahnouj, , Manojan, Kouhbanan, Zarand, Reyhanshahr, Yazdanabad in 2006

3- Training of local places (CBDRM) -Training of 60000 people from 93 regions of city -training of people in Zarand from 15 local places

These training were done in 14 local places of Kerman and more than 100000 persons were trained.

21

Training of save relief team in local places

In five regions, 15 teams were trained

Firefighting maneuver of Firoozabad local place

The save and relief maneuver of Milad Local place (women)

22

The firefighting maneuver of Sarasiabfarsangi Local place

23

Inauguration of the first disaster management center of Shahzadehmohammad local place by governor

Inauguration of disaster management center in Firoozabad local place

24

7-training of schools

Training of disaster management and preparing earthquake scenario in 51 schools to 415 people with cooperation of education that support 25500 students.

Training of preparedness and safety culture enhancement of natural disaster in schools

25

Scenario of Doctor Bakhoda Highschool

The scenario of Doctor Bakhoda Highschool is as a sample

Kerman city is located in north of Kerman province and it is one of vulnerable cities. Kerman city has 724387 inhabitants. Its area is 44629/83 and it is the biggest city in this province. This city is in danger because of Golbaft- Kouhbana, - Baghin and faults.

The situation of school The high school of Doctor Bakhoda is located in south of Kerman in Aboozar street that is in suburb of city slightly. This school is new built and in two floors. It has been built in 1997 and because of its location that is in the way of highway, it has important communication ways, especially in earthquake and other disasters. Around of this building there aren’t any tall buildings so there isn’t danger of falling. Three side of this school is surrounded by allay and some small factory that make sound pollution. This school has other problems like moral, economical and cultural ones too.

The structure of disaster management At the beginning of educational year, one meeting was hold in 19th of September for development of disaster management in this school. In this meeting the personality information of school personnel and their ability and knowledge were recorded and management was chosen as follow:

1- Head 2-deputy and deputies 3- Agent of teacher 26

4- Agent of students 5- Agent of parents 6- Sport trainer 7- Save and relief trainer 8- Basij force head of school 9- Priest of local place 10- Donors and trustworthy people 11- Consoler 12- Servant 13- Visual and vocal officer The member of group 1- Afshari nejad 2-Ahmadi 3-Tarmani 4- Shaghayegh 5-Dabestani 6-Bahremand 7-Darijani 8-Shaikh poorkhani

Disaster manager (school management) Second deputy First deputy (assistant) (assistant)

Public relation Preservation (teacher) (teacher )

Educational deputy Planning deputy Financial deputy Operation (Educational deputy) (Deputy of (Teacher) deputy officer) (Defensive trainer)

27

Operational deputy

Evacuation Physical management in Firefighting First aid Shelter Search and conservation emergency management management management rescue (teacher and (teacher) management (teacher) (Teacher) (teacher) trainer) (teacher)

Planning deputy

Assessment Control Analysis management management management (Teacher) (teacher) (teacher )

Logical deputy

Distribute Maintenance management Provision management (Teacher) management ( teacher ) (teacher )

Financial and administrative management

Accounting Financial source Human source management management management ( teacher ) (Teacher) (teacher)

28

Training of preparedness and safety culture enhancement of natural disaster in schools Training of 720 teachers and spreading of 26000 books in elementary and guidance schools

29

Training of kindergartens Training of disaster management and preparing of earthquake Scenario in Kerman Kindergartens

Preparation of the earthquake scenario in Kindergarten Golhaye Daneshgah

The personnel of kindergarten Educational degree and First name and surname row assignment Management ( BA) Maryam Baharestani 1

Deputy ( Diploma) Maryam Ezazi 2

Teacher ( Diploma) Marjan Mortezapour 3 Teacher ( Diploma) Maryam Abdollahi 4

Teacher ( Diploma) Farahnaz Islami 5

Teacher ( Diploma) Robabe Mirzaie 6 sub Teacher ( Diploma) Azam Taromi 7

sub Teacher ( Diploma) Farzaneh Nejad Mohannadi 8

sub Teacher ( Diploma) Akram Afshari 9 sub Teacher ( Diploma) Tahere Baloch 10

30

Crisis committee Sub-teacher teacher Major teacher management evacuation firefighting evacuation Planning search and rescue evacuation first aid Training Organization Maneuver evacuation

Crisis committee of Kindergarten Golhaye Daneshgah

Deputy: Management Ezazi of committee

Operation Logestic: Ezazi- Planning: Morteza Pour Baharestani

Coordinator: Assessment Evacuation Firefighting: First aid: Baharestani Baharestani : all the Abdollahi Morteza forces Pour- Islami-Ezazi

31

Training of preparedness and enhancement of safety culture in disaster for kindergarten 3o instructors of 10 kindergartens that were in vulnerability regions attended in 6 workshops and 2700 kids learnt about natural disasters

32

-festival of safety culture enhancement of natural disaster in kindergartens of Kerman This festival was done by attendance of sing, music and theater groups from Mother and Akhtar kindergartens in Ghaem and Mother Park in 2008

Three festivals that they were called Rabi in order to appreciate teachers, students, trainers and kids of kindergarten Rabi celebration and appreciation of 420 teachers and students

33

11. Training of quasi family in Behzisti office The workshop of disaster management and risk of Kerman city was done by attendance of 24 managers from quasi family center that are under supports of Behzisti in 2008

Membership of Kerman municipality disaster management center in metropolis disaster manager council in 2007

From left to right: Mr.Mohajeri (head of city council), Mr saifolahi (mayor), Mr Salehi (the chief of crisis of province), Mr Shiri (assistant of prevention in disaster management organization in country)

34

Professional period of disaster management for Mashhad municipality manager

training and risks of Disaster management cities to 45 Mashhad municipality managers in three periods (4 days (32 hours))

th The 7 meeting of metropolis crisis managers of country in 2011

Disaster management training period in Disaster management training period in Zanjan Alborz in 2009 for mayors of country in 2009 88

35

Training of CBDRM trainer (The personnel of organization and center in 2011)

Training of CBDRM for 30 mayors of Kerman local places from December in 2011 till August in 2012

Training of CBDRM to mayors of Kerman Province in 2011

36

Total report of training in 2011-2012

Society-base crises management training scheme was done during 2 stages in this center by cooperation of OCHA (by Mr. Nazari, OCHA’s agent in ) in 2012. In the first stage, Society-base crises management was trained to crises managers of metropolis’s municipalities during 24 hours, in 2 days, and in the second stage, this training scheme was done to Kerman local places mayors and this center’s employees during 44 hours, in 3days. Also, Kerman local place mayors learned relief training during eleven sections, during 5 months (sum: 44 hours) by Mr. Alavi as a trainer. During this stage, Strengths and shortcomings of Kerman’s sectors in crises time were determined and local places map were gave them to determine parks, open spaces, hospitals and clinics, schools, police stations, offices, mosques and religious places, monuments, historical places and museums, stores and type of them, bridges and their width, allays name and their width. After that, they bring the maps to center to be used for prepare of building map and vulnerability map of local places against various natural hazards. At the end of these trainings, local places mayors were accorded to register two volunteer 33-person groups, for men and women and training cert and SAR (search and rescue) to them. This scheme is implementing now. This center by cooperation of women health society has performed medicine examination of women from first of 2012 until now in 12 local places of Kerman and this scheme is performing every week in one local place. After medical examination, women that have been realized with some healthy problem will introduce to specialist physicians and their treatment will be free. This scheme characterizes women health status.

37

Research - Study of risks in Kerman city by GIS - Gathering of base information in GIS (the 1:2000 city plans and 1:25000 regions and preparing of geology layers and faults and plan of village and cities of Kerman province and city equipments…..) - Study of Kerman risks in GIS - consideration of geology situation of Kerman by GIS in this research , like the risk of earthquake, subsiding or inflation of earth, sewage system, air and underground water pollution of Kerman were studied. - Assessment of earthquake risk of Kerman and analyzing

of its risk by analyzing and probable ways - Second degree mapping and analyzing of earthquake effect on Kerman by GIS

Preparing of Kerman city earthquake scenario 1- Preparing of 5 reports from geography, weather and geology reports of Kerman city and province B) assessment of earthquake risks C) preparing of quake plan of city D) gathering of information and preparing of base plan D) assessment of building and population vulnerability in Kerman city. 2- Preparing of KarmaniHazard software that in it a) the risks of underground water are distinguished. b) The risk of alluvial underground water is distinguished c) the risk plan by regarding of a and b parameters are indicated d) if the earthquake happens in 200 Kilometer height:

38

1- City damages will de indicated.2- injuries will be indicated: a) death b) hard injury c) the injuries need hospital d) healthy 3- The needs of injury people according to their injuries will be defined. The situations of village after the earthquake will be defined (until 30 kilometers height)

Cooperation by universities of country - research and analysis about city dominance zone by Parisa and Setareh Moradi from Research and Science University of Tehran - - Thesis of disaster management design of Kerman City by Mojtaba Rahim Zadeh from Azad University of Kerman - Research about flood risks inundation in Jiroft city by Zahra Hossaini from Bahonar University of Kerman - Thesis of finding shelter in forth zone in Kerman by Mr. Bagheri from Bahonar University of Kerman - Analysis of building specification and quake risks in ,Rafsenjan and by Ali Khodami from Azad University of Tehran - Flood risks inundation in river project by Mojgan Dehghan from Bahonar University of Kerman - Slip slide risk Analysis in Kerman city by Zahra Hossaini from Bahonar University of Kerman - The thesis about effective factors in discovering location for crescent societies station by considering disaster management in Jiroft city by Ismail Kahoori pour from Azad University of Kerman - Discovering location of relief stations in disaster ( forth zone of Kerman ) by forogh Rostami from industrial University of Kerman - Discovering location of medical center ( first zone of Kerman ) by Mehri Davtalab from industrial University of Kerman

- Thesis about development of sewerage system by using of software TAG-R-online by vahid reza Amir Ismaili from industrial University of Kerman

- Thesis about the aunt colony optimum algorithm ( ACO ) in discovering location of shelter after earthquake by Mohsen Ghotb aldini from Shahid Beheshti University of Tehran

- The research about disaster management and discovering settlement location for homeless people in earthquake ( second zone of Kerman )by Ali Azizi from industrial University of Kerman

- Thesis about analysis and planning for city nonmilitary defense by usage of GIS ( first zone of Kerman ) by Hesam adin Saleh Gohari from Zabol University

39

Maneuver and congress Congress of safe room by attending 500 civil engineers Maneuver of firefighting by cooperation of governmental and nongovernmental organization Festival of enhancement of preparedness culture against natural disaster for expressing gratitude from kindergarten children and their instructors

Congress of prevention from damages and enhancement of safety in disaster by cooperation of medical science university

Festival of enhancement of safety culture in Kerman Kindergartens The special conger for kids for supporting of Gaze kids and anniversary of revolution Attending in exhibition of 30 year achievements of revolution

Attending in revolution exhibition and doing the firefighting maneuver

Celebration for supporting of ghaze kids in 2008

40

The maneuver of community team in Mashhad The maneuver of community team by attendance of 170 people (7 relief team among of men and women) in Mashhad in torogh Park for 5 days. The preparedness level of teams and preparing vulnerability plan of region were evaluated.

Maneuver of disaster manager and relief and save teams in Firoozabad

Publishing books Publishing of 19 volumes by support of municipalities, NL, ACT, ITALI, CARITAS 1. color with earthquake uncle 2. knowledge about earthquake 3. earthquake…earthquake be careful 4. learn with each other 5. What happen? What happen? The earth shakes 6. become familiar with natural disaster 7. be prepared, don’t be injured 8. preparedness in anywhere… in anytime 9. Preparedness in disaster 10. Earthquake is in ambush 11-search and rescue 12 community emergency response team 13. Community base disaster risk management 14. Emergency response guideline (ERG) 15- Reduction of risks and preparedness 16- Are you ready? 17- Disaster management 41

18-planning in emergency 19-Earthquake risk management

Publishing of 360000 volumes for kids in 2009 by order of world Bank and Kerman municipality Preparing of two kinds of training CD (uncle quake) 60000 numbers by order of World Bank Publishing of 90000 volumes by support of Kerman municipality

The name of books that will be published in future: Standards- disaster response and recovery-NFPA

42

43

44

10 types Leaflets and Brochures These leaflets in the field of preparedness and disaster management in 500000 numbers were published and distributed between people. By supporting of disaster management, Kerman municipality, World Bank, province municipalities, ITALI CARITAS, NL ACT

45

46

47

Publishing and distribution of 12 kinds of leaflet about natural disaster in 240000 numbers

48

49

Website of center: www.kdmc.ir

This site has contents about disaster management, natural disaster, preparedness ways in disaster and scientific essay. It is in Farsi language from 2006 and its English language will be ready very soon.

50

Built of disaster management organization building with 1500 square meters

51

Built of gymnasium (storehouse) (15×50) with 750 square meters

52

Inauguration of disaster management organization (center) building by attendance of Mr Gadami the head of disaster management organization of country

53

Sources: Internal sources: Kerman Governor and municipality External sources: IBC Turkey, Merlin, Caritas Italy, ACT NL, CORDIED .NL were supporter from the beginning and now Japan ,Australia Embassy , Relief International UK, UNICEF, UNOCHA, SDC declare that they are ready for supporting this organization. But it should be reminded that the most reliable organization was Caritas Italy that has supported this organization financially from 2005 and in 2008 we signed one MOU with them for built of 310 square meter building and 750 square meter big storehouse.

.

** everyone should try to keep one more life **

54