FORM-1-APPENDIX (See Paragraph – 6)
Total Page:16
File Type:pdf, Size:1020Kb
Application form for Environmental Clearance Project Name: Pleasure Park residential project at Pune FORM-1-APPENDIX (See paragraph – 6) FORM 1 (I) Basic Information Sr. Item Details 1 Name of the project/s 'Pleasure Park' residential project at Mouje Kanhe by DevaDeva Space Private Limited 2 S. No. in the Schedule 8(a) Total plot area 20,350 m2 Deduction (D.P. road) - m2 Net plot area 20,350 m2 FSI area permissible 18,681.30 m2 FSI area proposed 18,680.00 m2 TDR - m2 FSI area 18,680.00 m2 Non-FSI area 10,234.00 m2 Total construction area 28,914.00 m2 Detailed Area statement is attached as Annexure I 4 New / Expansion / Modernization New project 5 Existing Capacity/ Area etc. Not applicable 6 Category of project i.e. A or B B2 Category 7 Does it attract the general condition? if yes, No please specify 8 Does it attract the specific condition? If yes, No please specify 9 Location Mouje Kanhe Plot/Survey/ Khasra No. 83/2A Village Kanhe Tehsil Maval District Pune State Maharastra 10 Nearest railway station/port along with Kanhe railway station 0.5 km. distance in kms. Pune airport Lohegaon: 36 km 11 Nearest Town, city, District Headquarters Pune along with distance in kms. 12 Village Panchayat,Zilla Parishad,Municipal Gat No. 25 & hissa no. 2/3,Village-Mouje Kanhe,Tal-Maval, Corporation, Local body(complete postal Pune, Maharashtra addresses with telephone nos. to be given) 9811875057 13 Name of the applicant Mr. Keshav Goel 14 Registered address DevaDeva Spaces Private ltd. c-82, DDA shed, okhla, phase-I, New Delhi 110020 15 Address for correspondence: Name Mr. Keshav Goel Designation(Owner/ Partner/ CEO) Authorized Signatory, Director Address C-2/32, kendriy vihar socii., sector 4, Moshi, PCNTDA, Pune, Maharastra Pin code 411018 E-mail [email protected], [email protected] Telephone No. 0129-2511452 Fax No. 16 Details of alternative sites examined, if any. Not Applicable Location of these sites should be shown on a topo-sheet. 17 Interlinked projects Not Applicable 18 Whether separate application of interlinked No project has been submitted? 19 If yes, date of submission Not Applicable 20 If No, Reason Stand alone construction project 21 Whether the proposal involves No approval/clearance under: if ,yes details of the same and their status to be given a) The Forest (Conservation) Act, 1980? b) The wildlife (protection) Act, 1972? c) The CRZ Notification, 1991? 22 Whether there is any Government No Order/policy relevant/relating to the site? 23 Forest land involved ( hectares) No forest land involved in proposed project site Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification amendment 4.4.2011 1 Application form for Environmental Clearance Project Name: Pleasure Park residential project at Pune 24 Whether there is any litigation pending No such litigation pending against the project against the project and/or land in which the project is propose to be set up? a) Name of the court b) Case No. c) Orders/ Directions of the court if any and its relevance with the proposed project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities /rates, confirmation wherever possible) with source of information data 1.1 Permanent or temporary change in Yes Permanent change in land use Land reserved for residential land use, land cover or topography project. including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No vegetation and buildings? 1.3 Creation of new land uses? Yes 1.4 Pre-construction investigations e.g. Yes Bore holes done &Soil samples taken within the plot bore houses, soil testing? premises for geotechnical investigation. 1.5 Construction works? No 1.6 Demolition works? No 1.7 Temporary sites used for No construction works or Housing of construction workers? 1.8 Above ground buildings, structures Yes Normal excavation for pile caps. or earthworks including linear Excavation quantity is 2,000 m3 structures, cut andfill or excavations 1.9 Underground works including No mining or tunnelling? 1.10 Reclamation works? No 1.11 Dredging? No 1.12 Offshore structures? No 1.13 Production and manufacturing No processes? 1.14 Facilities for storage of goods or No Only construction material will be stored in temporary materials? storage site 1.15 Facilities for treatment or disposal Yes Municipal Solid Waste Disposal System, Vermin Composting of solid waste or liquid effluents? and Sewage Treatment Plant 1.16 Facilities for long term housing of No operational workers? 1.17 New road, rail or sea traffic during No Movements of trucks for material transport while construction or operation? construction. 1.18 New road, rail, air waterborne or No Existing road will be used for the transport purpose. other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No or pipelines? 1.21 Impoundment, damming, No culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No 1.23 Abstraction or transfers of water No form ground or surface waters? 1.24 Changes in water bodies or the land No There will not be any changes in water bodies or the land surface affecting drainage or run- surface. off? 1.25 Transport of personnel or materials Yes Construction workers and construction material only during for construction, operation or construction phase. decommissioning? Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification amendment 4.4.2011 2 Application form for Environmental Clearance Project Name: Pleasure Park residential project at Pune 1.26 Long-term dismantling or No decommissioning or restoration works? 1.27 Ongoing activity during No There will not be any impact on the Environment. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Only construction workers will stay till construction temporarily or permanently? completes. 1.29 Introduction of alien species? No No introduction of alien species will occur as this is purely residential project 1.30 Loss of native species or genetic No No threat of species loss will occur diversity? 1.31 Any other actions? No No 2. Use of Natural resources for construction or operation of the Project (such as land, water, Materials or energy, especially any resources which are non-renewable or in short supply): Sr. Information/checklist Yes/No Details thereof (with approximate quantities /rates, confirmation wherever possible) with source of information data 2.1 Land especially undeveloped or No agricultural land (ha) 2.2 Water (expected source & Yes Water Particulars Unit competing users) unit: KLD Consumption Fresh water 229 m3/day Flushing 113 m3/day Gardening 21 m3/day Vehicle washing 3 m3/day Total water 341 m3/day 2.3 Minerals (MT) 2.4 construction material – stone, Yes All materials will be available within the 10 km radius aggregates, sand / soil (expected source – MT) 2.5 Forests and timber (source – MT) Yes Wooden door frame 2.6 Energy including electricity and fuels Yes Energy conservation (source, competing users) Unit: fuel Description Power requirement Unit (MT), energy (MW) Residential 1,512 kW 2.7 Any other natural resources (use No appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/rates, confirmation wherever possible) with source of information data 3.1 Use of substances or materials, No No hazardous material will be used for construction. which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease No or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. No Proposed project will not affect the welfare of people by changing living conditions? 3.4 Vulnerable groups of people who No Proposed project will not affect hospital patients, children etc. could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No 4. Production of solid wastes during construction or operation or decommissioning (Mt/month) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/rates, confirmation wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No 4.2 Municipal waste (domestic and or Yes Description Quantity Unit commercial wastes) Residential Sewage generation 273 kg/day STP capacity 300 kg/day Treated water 267 kg/day 4.3 Hazardous wastes (as per No No hazardous waste will be generated as this is residential Hazardous Waste Management project Rules) 4.4 Other industrial process wastes No No, this is a residential project Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification amendment 4.4.2011 3 Application form for Environmental Clearance Project Name: Pleasure Park residential project at Pune 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge Yes About 3 m3/day sewage sludge will be generated.