ZOP INZENJERING D.O.O. Company Presentation
Total Page:16
File Type:pdf, Size:1020Kb
ZOP INZENJERING D.O.O. Company Presentation BELGRADE SERBIA INTRODUCTION -As Your potential partner for Your future projects, we would like to introduce You to activities of our company. Blok 11a – New Belgrade. Residential and office Herewith please find the basic space. Building 1 (GP6) 20.000,00 m2 and information about the Building 2 (GP5) 10.000,00 m2 company „ZOP Inzenjering d.o.o.“ - activities, employment structure with pictures of selected buildings. Dunavske Terase – Karaburma, Belgrade. 65.000,00 m2. Residential and office buildings are built in six phases from 2011 until 2013. In the past ten years, we tried to justify the trust of our investors with full effort, supreme quality, respecting deadlines and contractual obligations. What we wish to point out is, that the result of such work is successful cooperation with all of the investors and customers. Dunavske Terase – Karaburma, Belgrade. 65.000,00 m2. „ZOP Inzenjering d.o.o.“ is especially involved in rough construction works and employs experienced and proven professionals – engineers, technicians, foremen, carpenters, rebar workers, masons with auxiliary workers. Storage floor plant for wheat – Subotica, 2013 One of our main goals is to work with qualified workers and engineers. Therefore, „ZOP Inzenjering d.o.o.“ is blend of youth and experience, knowledge and hard work. In „ZOP Inzenjering d.o.o.“ works: 11 civil engineers (master of science) 3 civil engineers (bachelor of science) 7 technicians Hotel Crowne Plaza (ex Hotel Intercontinental) – reconstruction works Without our diligent workers nothing could be possible! • Foremen....................................................................................................4 • Carpenters................................................................................................49 • Masons.....................................................................................................41 • Rebar workers..........................................................................................15 • Auxiliary workers......................................................................................34 • Drivers, operators of construction machinery, Crane operators.............12 • Administrative and other staff...................................................................3 TOTAL 179 WORKERS Office building with two apartments – Jagićeva Street, Belgrade 2012-2013 Our spot on the Serbian market • Short deadlines, high quality level and fair prices; • Maximum respect of safety and health at work; • Introduced the Quality Management System ISO 9001; • ZOP Engineering is one of the top Serbian Civil Engineering companies; • Total or partial participation in almost all residential construction projects in Belgrade and industrial construction throughout Serbia. Flash – textile industry plant for dyeing and weaving, Apatin, Serbia Blok 67, Belville. Residential and office space built from 2007 until 2009 for Universiade in Belgrade. After Uiversiade, apartments and offices were sold to the costumers. -Zop Inzenjering built 2 buildings total area 15.000,00 m2 and garages total area 8.000,00 m2. Deep excavations in central city area In the last 10 years we were involved in contracting of buildings in central city areas (Vračar, Zvezdara...) where deep excavation was mandatory. Therefore, security of sorrounding buildings must be done properly. Jagićeva Street, Belgrade Stanislava Sremčevića Street, Belgrade Fulfill the high demands of the investors UNION DRVO – Office building in Pancevacki Put Street in Belgrade. There we met the high requirements in terms of quality of the concrete surface Industrial Buildings Messer Tehnogas - Bor FIAT Automobiles Factory in Kragujevac Relay and antenna stations for Telekom Serbia Industrial Buildings – FLASH Apatin, Serbia Plant for dyeing and weaving of textile Industrial Buildings – FLASH Apatin, Serbia Plant for dyeing and weaving of textile Waste water treatment plant within the factory From foundation to the roof and beyond... Museum of contemporary art, Belgrade Residential villa, Bul. Kneza Aleksandra street, Belgrade Braničevska street 2, Belgrade Reconstruction and contracting of new retail buildings Maxi - Vidikovac Maxi - Bečej ABlok – Blok 67a – High demanding residential block in New Belgrade ABlok – Blok 67a – 15.500 m3 of concrete (cast on the site) for 3.5 months ABlok – Blok 67a – Complete concrete structure was done one month before deadline ABlok – Blok 67a – Complete PERI formwork system for columns, walls and slabs AVIV PARK ZVEZDARA - GARDENIA Buisness-commercial building, Zvezdara, Belgrade Business commercial building within the first phase of the business and residential complex. AVIV PARK ZVEZDARA - GARDENIA Buisness-commercial building, Zvezdara, Belgrade Hotel Saint 10, street Svetog Save 10, Belgrade Located in the central city area, between two buildings. Deep excavation was mandatory, therefore, security of surrounding buildings must be done properly. Hotel Saint 10, street Svetog Save 10, Belgrade Central garden – Residential and office buildings Zentral Garden – Kneza Danila street, Belgrade. Residential and office buildings, first and second phases of whole complex. Central garden – Residential and office buildings Palilula, Belgrade Airport city Belgrade – business center, New Belgrade Big business center in New Belgrade, 2015 Construction of gypsum transporting trestle Thermal Power Plant, Kostolac Construction of gypsum transporting trestle in Kostolac, 2015-2016. 8000 m3 of concrete (cast on the site) for 5 months. The length of the conveyor is 1700 m. ISO STANDARDS – QUALITY ON THE TOP SPOT We have -9001 -14001 -18001 standards ZOP INZENJERING D.O.O. Contact Tel/fax: +381 11 6286 802 E-mail: +381 11 6286 803 [email protected] Address: Website: Karadjordjeva street 61, www.zopinzenjering.com 11000 Belgrade, Serbia Office address : Tax Identification number: Sumatovacka street 121. PIB: 102259644 11000 Belgrade, Serbia.