NAURU ANNEXES to the PROJECT DOCUMENT

Total Page:16

File Type:pdf, Size:1020Kb

NAURU ANNEXES to the PROJECT DOCUMENT United Nations Development Programme Country: NAURU ANNEXES to the PROJECT DOCUMENT Implementing a “Ridge to Reef” approach to protect biodiversity and ecosystem functions in Nauru (R2R Nauru). LIST OF ANNEXES Annex 1: CEO Endorsement form Annex 2: Inception Workshop Report Annex 3: Site Profiles Annex 4: UNDP Risk Log Annex 5: Letter of Co-financing Annex 6: Implementing partner Capacity Assessment Annex 7: Stakeholder Mapping and Analysis Annex 8: UNDP Environmental and Social Screening Procedure (ESSP) Annex 9: Terms of Reference of Key Project Staff/Project Steering Commitee Annex 10: GEF Tracking Tools – BD/IW/LD ANNEX 1: CEO Endorsement form (Refer to separated word files attached) Annex 2: Inception Workshop Report REPORT ON NATIONAL INCEPTION and PROJECT DESIGN WORKSHOPS NAURU RIDGE TO REEF PROJECT GEF 5 STAR PROJECT PREPARATION GRANT (PPG) This report summarises the activities undertaken and corresponding results achieved during the in country visits of the UNDP team, including changes identified between the PIF and PPG project and specific project activities, pilot project sites, management arrangements, baseline data reports and project connectivity and workshop programmes and attendance. The report has been prepared by the in country UNDP team consisting of Mr. Stephen Lindsay (Project Consultant), Ms. Emma Mario (UNDP Environmental Programme Analyst) and Ms. Shoko Takemoto (UNDP Regional Technical Specialist) (10 February through to 02.March, 2014). Introduction The GEF 5 STAF Nauru Ridge to Reef PPG inception and project design workshops were held in Nauru on Wednesday the 19 th and Wednesday the 26th of February, 2014, respectively. Nine (9) participants attended the Inception workshop and an additional 18 participants were met individually to discuss the inception programme and twenty seven (27) participants attended the project design workshop, including community representatives from each of the R2R project sites. The two workshops were well attended with helpful and constructive discussion and inputs provided by the participants who representative key government and Community Based Organisations (CBO) stakeholders. Annex 1 provides a list of all attendees at both the Inception and project design workshops and those stakeholders the UNDP team met individually. Key inception and project design workshop objectives and results included; 1. Awareness and support for the Nauru Ridge to Reef Project PPG and key Global Environment Facility/UNDP requirements and processes was achieved through the provision of background information; 2. Key national stakeholders were introduced to the UNDP consultant team, individual backgrounds, project roles, key meeting goals and information requirements; 3. Key national projects (recent past, current and pending) were highlighted, discussed and background information and reports provided to the UNDP consultant team. 4. Through discussions (formal and informal) full support for the R2R project was provided by both government and community stakeholders including the proposed mission programme, list of agencies and CBO’s to met to discuss the project and time frames. 5. Detailed project description was provided discussing the formulation of the PIF, UNDP/GEF review process, PIF acceptance and the PPG formulation and development including stakeholder roles and participation. Including outcomes and outputs, project management arrangements and delivery expectations, pilot sites, pilot activities and community participation and their respective roles in the implementation of the ridge to reef project. 6. Undertook extensive stakeholder dialogue, feedback and review of all aspects of the projects outcomes, outputs and specific actions were developed. Through consensus, agreements were reached on all aspects of the project and details documented, which are included in the draft PPG. 7. Project sites were discussed resulting in five (5) project sites agreed which include the communities in the districts of Ananbar, Anibare, Buada, Ijuw and Meneng and specific output and actions agreed. All districts and communities were visited by the UNDP team and specific activities confirmed. 8. Minor changes to the original PIF were identified, agreed and documented by all stakeholders through the in country dialogue and activities. 9. There was no changes in the PIF indicative grant amount for the three focal areas, however increases in all three focal areas associated with the PPG Co financing was obtained during the in country visit. 10. Connectivity with existing conservation/management projects and development partners were identified, including potential collaboration and up scaling and incorporated into the final PG document; 11. Identification and collection of key data and information relevant to the compilation of the full sized proposal. Project Sites: Through considerable government and community stakeholder discussions, five (5) districts comprising of a single community per district were agreed to be the projects sites to undertake the work programme of the Nauru R2R project. This includes the districts of Ananbar, Anibare, Ijuw, Meneng and Buada. The first four communities include marine and terrestrial environments whilst the last community, Buada is land locked however possess a biological unique brackish water “lagoon” that is connected through the island to the ocean. The coastal areas within these districts covers approximately 6 kilometres which is roughly one third of the nation’s coast line and the land area covers roughly half of the nations land mass. A report outline of the projects site profiles report is included in Annex 2. The figure below provides the location of each of these districts in relation to the island and details the activities that have been agreed to be undertaken by the R2R project. Project Strategic Framework The agreed Project Strategic Framework PSF (Annex 3) was developed through extensive consultation with key Nauru government agencies and community representative stakeholders during the UNDP team in country assignment. All project outcomes, outputs and activities were discussed in detailed and agreements reached. Final R2R project budget allocation for all outcomes, outputs and activities aligned with the original agreed PIF budget allocations. Project Outcomes The four project outcomes detailed in the PIF remain the same for the full size PPG proposal. All stakeholders agreed that these outcomes represent the goal of the R2R project and were fully supported. Project Outputs The project outputs through individual stakeholder discussion and extensive discussion during the inception and PPG workshops have under gone review, refinement and change reflecting the consensus of all stakeholders. The agreed outputs have full support of all stakeholders. These changes are included (highlighted in green) in the table below which includes the PIF and PPG output for each outcome. PIF Outputs PPG Outputs Outcome 1 1.1.1 Network of locally managed marine areas 1.1.1 Network of locally managed marine areas (LMMAs) established covering at least 15% of (LMMAs) established covering at least 33% of Nauru’s total coastline, equivalent to about 2.8 Nauru’s total coastline, equivalent to about 6km km. through community actions and supporting through community actions and supporting enabling government actions such as enabling government actions such as ordinances ordinances and regular budget allocation and regular budget allocation. 1.1.2. LMMAs strengthened through 1.1.2. Same as the PIF. development and implementation of management plans following participatory approaches and Integrated Coastal Management to address threats, including climate change impacts; guidelines for utilizations of LMMAs including closed seasons and closed areas agreed on and implemented. Outcome 2 2.1.1 Biophysical, demographic and 2.1.1. Same as the PIF. socioeconomic assessments conducted in the entire island, focusing on the bottom-side and applicable ‘ridge’ areas and topside not covered by mining. 2.1.2. Integrated agriculture land-use plan 2.1.2 Integrated land-use plan developed for the developed for the bottom-side and applicable bottom-side and applicable ‘ridge’ and topside ‘ridge’ and topside areas that are not covered by areas that are not covered by mining through mining through review of the draft land-use plan review of the draft land-use plan and patterns of and patterns of land ownership for the project land ownership. districts/sites. 2.1.3 Soil and water conservation measures 2.1.3. Soil and water conservation measures implemented, including through rehabilitation of implemented, including through rehabilitation of degraded land in ‘ridge’ and topside areas using degraded land in ‘ridge’ and topside areas using economic species such as fruit trees and economic species such as fruit trees and increase increase of communal water storage facilities in of communal water storage facilities in the projects four water-stressed areas to support home five water-stressed districts to support home gardens and household water supply. gardens and household water supply. 2.1.4 Drought- and salt-tolerant food crops 2.1.4. Same as the PIF. tested and practices disseminated to communities and households building on initiatives of bilateral and multilateral organizations. 2.1.5 Innovative measures implemented (e.g. 2.1.5. Same as the PIF. small scale solid and wastewater treatment systems, composting toilets and artificial wetland wastewater filtration) to reduce pollution loads by at least
Recommended publications
  • REPUBLIC of NAURU GOVERNMENT GAZETTE PUBLISHED by AUTHORITY ------No.14 17Th April 2002 Nauru ------G.N.No
    REPUBLIC OF NAURU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY --------------------------------------------------------------------------------------------------------------------- No.14 17th April 2002 Nauru --------------------------------------------------------------------------------------------------------------------- G.N.No. 69 /2002 PUBLIC SERVICE ACT 1998 SECTION : 25 NOTICE OF PROMOTION The provisional promotion of the following officers, with effect from 9th April,2002 is hereby notified. Department of Economic Development (Directorate of Civil Aviation) NAME FROM TO Pyon Deiye Trainee Flight Officer Assistant Flight Officer $11930 - $12254 pa $12349 - $12511 pa (T4) (T5) Curtis Solomon Trainee Flight Officer Assistant Flight Officer $11930 - $12254 pa $12349 - $12511 pa (T4) (T5) DATED this 18th day of April Two Thousand and Two. T.W. STAR CHIEF SECRETARY ______________________________________________________________________________ -2- --------------------------------------------------------------------------------------------------------------------- No.14 17th April 2002 Nauru --------------------------------------------------------------------------------------------------------------------- G.N.No. 70 /2002 PUBLIC SERVICE ACT 1998 PERMANENT APPOINTMENT The following permanent appointment with effect from 25th March 2002 is hereby notified. DEPARTMENT OF HEALTH & MEDICAL SEREVICE NAME DESIGNATION SALARY RATE Genevieve Adam Trainee Nurse $10756 - $11012 pa (T1) DATED this 16th day of April Two Thousand and Two. T.W. STAR
    [Show full text]
  • REPUBLIC of NAURU GOVERNMENT GAZETTE PUBLISHED by AUTHORITY ------No
    REPUBLIC OF NAURU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY ------------------------------------------------------------------------------------------------------------------------------ No. 73 25th July 2007 Nauru ------------------------------------------------------------------------------------------------------------------------------ G.N.No. 265 / 2007 PUBLIC SERVICE ACT 1998 SECTION 10 CREATION OF NEW POSITIONS Pursuant to the powers in that vested in me, under Section 10, subsection (1) Clause (a) of the Public Service Act 1998, I, LUDWIG SCOTTY, President and Minister responsible for the Public Service, DO HEREBY, with immediate effect, create the following new positions:- MINISTRY OF HEALTH & MEDICAL SERVICES DESIGNATION OF OFFICE NO. OF POSITIONS SALARY SCALE Project Coordinator 1 $ 7, 825 p.a (fixed rate) Project Support Officer 2 $ 5,608 p.a (fixed rate) Dated this nineteenth day of the month of July, Two Thousand and Seven. LUDWIG SCOTTY PRESIDENT & MINISTER RESPONSIBLE FOR PUBLIC SERVICE -2- ------------------------------------------------------------------------------------------------------------------------------ No. 73 25th July 2007 Nauru ------------------------------------------------------------------------------------------------------------------------------ G.N.No. 266 / 2007 PUBLIC SERVICE ACT 1998 SECTION 15 VACANCY Applications are invited from Nauruans, inside and outside the Public Service for temporary appointment, transfer or promotion to the following position: DEPARTMENT OF HEALTH & MEDICAL SERVICES
    [Show full text]
  • GOVERNMENT GAZETTE PUBLISHED by AUTHORITY ------No.3 16Th January 2002 Nauru ------G.N.No
    REPUBLIC OF NAURU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY ---------------------------------------------------------------------------------------------------------------------------- No.3 16th January 2002 Nauru ---------------------------------------------------------------------------------------------------------------------------- G.N.No. 8 / 2002 PUBLIC SERVICE ACT – 1998 RESIGNATION SECTION (53) IT IS NOTIFIED for general information resignation has been accepted, effective 30th November 2001. DEPARTMENT OF WORKS NAME DESIGNATION SALARY Mr. Stanley Seymour Carpenter $11,107 - $12,254 pa (T2/4) DATED this 17th day of January, 2002. ANTHONY GARABWAN ACTING CHIEF SECRETARY __________________________________________________________________________ G.N.No. 9 /2002 ENGAGEMENT TO MARRY NAME OF PARTIES WARLITO B. LUCAS JR from Philippines Manila and ESURERE KETNER of Ijuw District. ELKO-JOE AGIR of Aiwo District and RIA HUBERT also from Denigomodu District. DATE OF ENEGAGEMENT: 15th January, 2002 31st January, 2002 ROSS CAIN MINISTER IN CHARGE __________________________________________________________________________ -2- ---------------------------------------------------------------------------------------------------------------------------- No.3 16th January 2002 Nauru ---------------------------------------------------------------------------------------------------------------------------- G.N.No. 10 / 2002 BIRTHS, DEATHS AND MARRIAGES ORDINANCE 1957-1967 Births, Deaths and Marriages registered the week ended 29th November, 2001
    [Show full text]
  • Letter Post Compendium Nauru
    Letter Post Compendium Nauru Currency : Australian Dollar Basic services Mail classification system (Conv., art. 13.3; Regs., art. RL 120) 1 Based on speed of treatment of items (Regs., art. RL 120.2): Yes 1.1 Priority and non-priority items may weigh up to 5 kilogrammes (Regs., art. RL 122.1). Whether admitted No or not: 2 Based on contents of items (Regs., art. RL 122.2): No 2.1 Letters and small packets weighing up to 5 kilogrammes (Regs., art. RL 122.2.1). Whether admitted or No not (dispatch and receipt): 2.2 Printed papers weighing up to 5 kilogrammes (Regs., art. RL 122.2.2). Whether admitted or not for No dispatch (obligatory for receipt): 3 Classification of post items to the letters according to their size (Conv., art. 14; Regs., art. RL 121.2) Yes Optional supplementary services 4 Insured items (Conv., art. 15.2; Regs., art. RL 138.1) 4.1 Whether admitted or not (dispatch and receipt): No 4.2 Whether admitted or not (receipt only): No 4.3 Declaration of value. Maximum sum 4.3.1 surface routes: No limits 4.3.2 air routes: No limits 4.3.3 Labels (RL 138.6.3 et 138.6.4) . CN 06 label or two labels (CN 04 and pink "Valeur déclarée" (insured) - label) used: 4.4 Offices participating in the service: - 4.5 Services used: 4.5.1 air services (IATA airline code): ON (Nauru Airlines) 4.5.2 sea services (names of shipping companies): 4.6 Office of exchange to which a duplicate CN 24 formal report must be sent (Regs., art.
    [Show full text]
  • Gazette 17-21
    REPUBLIC OF NAURU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY ----------------------------------------------------------------------------------------------------------------------------------------------- No. 17 12th February, 2021 Nauru ----------------------------------------------------------------------------------------------------------------------------------------------- G.N.No. 44/2021 PUBLIC SERVICE ACT 2016 SECTION 27(2) NOTICE OF APPOINTMENT It is notified for general information that the following officer appointment is effective as of 1st July, 2018; DEPARTMENT OF JUSTICE AND BORDER CONTROL (Prison & Correctional Services) Name Position Salary Scale Gaunibwe Fritz Correctional Officer Band 5.1- $12,983 per annum DATED this 5th day of February, 2021 SASIKUMAR PARAVANOOR ACTING CHIEF SECRETARY ______________________________________________________________________________________________ G.N.No. 45/2021 PUBLIC SERVICE ACT 2016 SECTION 27 (2b) NOTICE OF APPOINTMENT It is notified for general information that the following officer appointment is effective as of 30th December, 2019; DEPARTMENT OF POLICE AND EMERGENCY SERVICES (Administration) Name Position Salary Scale Pinkey Agir Cleaner Band 1.1- $9,724 per annum DATED this 5th day of February, 2021 SASIKUMAR PARAVOONAR ACTING CHIEF SECRETARY _______________________________________________________________________________________________ -2- -----------------------------------------------------------------------------------------------------------------------------------------------
    [Show full text]
  • GEF Pacific Ridge to Reef Programme REPORT Second Meeting of The
    GEF Pacific Ridge to Reef Programme Ridge to Reef – Testing the Integration of Water, Land, Forest & Coastal Management to Preserve Ecosystem Services, Store Carbon, Improve Climate Resilience and Sustain Livelihoods in Pacific Island Countries REPORT Second meeting of the Regional Programme Steering Committee Nuku’alofa, Tonga, 31 July – 4 August 2017 1 SPC/GEF-R2R/RPSC 2 Report First published in Suva, Fiji Islands in 2018 by Pacific Community (SPC) Copyright @ 2018, Pacific Community (SPC) This publication may be reproduced in whole or in part and in any form for educational or non-profit purposes without special permission from the copyright holder provided acknowledgement of the source is made. The Pacific Community (SPC) would appreciate receiving a cop of any publication that used this publication as a source. No use of this publication may be made for resale or for any other commercial purpose without prior permission in writing from the Pacific Community (SPC). SPC/GEF/R2R Regional Project Co-ordinating Unit Geoscience Division, Pacific Community SPC - Private Mail Bag - Suva, Fiji Tel: (679) 337 0733/Fax: (679) 337 0040 Web: http://www.pacific-R2R.org DISCLAIMER: The contents of this report do not necessarily reflect the views and policies of the Pacific Community (SPC) the Global Environment Facility, or the Global Environment Facility Implementing Agencies. Cover Figure: [TO BE INCLUDED WITH FINAL HARD COPY PRINT VERSION] For citation purposes this document may be cited as: SPC, 2018 Pacific Islands Ridge-to-Reef National Priorities – Integrated Water, Land, Forest and Coastal Management to Preserve Biodiversity, Ecosystem Services, Store Carbon, Improve Climate Resilience and Sustain Livelihoods.
    [Show full text]
  • Republic of Nauru Government Gazette Published by Authority
    REPUBLIC OF NAURU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY ----------------------------------------------------------------------------------------------------------------- No.54 5th September 2001 Nauru ----------------------------------------------------------------------------------------------------------------- G.N.No. 219 /2001 ENGAGEMENT TO MARRY NAME OF PARTIES : CHADWICK MASSA TSIODE of Boe District and GLINDA HICKS from Fiji Island. BERNARD KOEPKE of Nibok District and ROMANA THERESE ADAM of Yaren District. TROY DETAGEOWA of Baitsi District and DOGIN- JULIA TANNANG of Meneng District. DATE OF ENGAGEMENT: 28th August, 2001 29th August, 2001 1st September, 2001 ROSS CAIN MINISTER IN CHARGE -2- ----------------------------------------------------------------------------------------------------------------- No.54 5th September 2001 Nauru ----------------------------------------------------------------------------------------------------------------- G.N.No. 220 /2001 Determination of the Beneficiaries of the Estate of the late REGINA JORAM of Meneng District. ESTATE 1. The Nauru Lands Committee has ascertained that the late REGINA JORAM had been determination by the decisions of the Nauru Lands Committee (or its predecessor the Lands Committee) to be the owner of the following lands:- DISTRICT PORT. TYPE OF NAME OF GAZETTE SHARE NO. LAND LAND NOTICE OF OWNERSHIP Anibare 35 c.l. Anera 66/82 1/4 Anibare 38 c.l. Anera 66/82 ¼ Menen 11 c.l. Emeden 66/82 ¼ Anibare 198 p.l. Bogetsiuw 66/82 13/144 Buada 46 p.l. Ijati 66/82 1/24 Menen 180 c.l. Anaoe 66/82 13/96 Menen 181 c.l. Anaoe 52/85 13/96 Menen 234 p.l. Ibea 66/82 1/12 Menen 424 p.l. Anaquen 10/94 1/12 Menen 435 p.l. Karawinuroro 30/89 7/45 Yaren 111 c.l. Arra 66/82 1/120 Yaren 227 p.l. Bairereab 66/82 1/8 Denigomodu 88 p.l.
    [Show full text]
  • GOVERNMENT GAZETTE Published by Authority ------No.5 30Th January 2002 Nauru ------G.N.No.15 /2002
    REPUBLIC OF NAURU GOVERNMENT GAZETTE Published by Authority ----------------------------------------------------------------------------------------------------------------------------- No.5 30th January 2002 Nauru ----------------------------------------------------------------------------------------------------------------------------- G.N.No.15 /2002 PUBLIC SERVICE ACT 1998 SECTION 10 DEPARTMENT OF HEALTH CREATION OF OFFICE PURSUANT TO the powers in that behalf vested in me, under Section 10, subsection (1) clause (a) of the Public Service Act 1998, I REMY NAMDUK, MP., create the following position with immediate effect in the Department of Health. DEPARTMENT OF HEALTH & MEDICAL SERVICE Designation of Officer Number of position Salary Scale Medical Supplies Officer 1 $14806 pa - $16318 pa (AP5/6) Dated this 14th day of the month of January Two thousand and Two REMY NAMADUK ACTING PRESIDENT AND MINISTER RESPONSIBLE FOR PUBLIC SERVICE -2- ----------------------------------------------------------------------------------------------------------------------------------------- No.5 30th January 2002 Nauru ----------------------------------------------------------------------------------------------------------------------------------------- G.N.No. 16 /2002 LEGAL PRACTITIONERS ACT 1973-74 In exercise of the powers conferred upon me by Section 27 of the legal Practitioners Act 1973-74, I hereby appoint KERRY TERESE SMITH, Barrister and Solicitor, to be a Notary Public within Nauru for a period of three years from 8th February 2002. Dated
    [Show full text]
  • NAURU: National Assessment Report
    REPUBLIC OF NAURU: National Assessment Report National Assessment Report Republic of Nauru Ten Year Review of the Barbados Programme of Action 1 REPUBLIC OF NAURU: National Assessment Report TABLE OF CONTENTS Page Foreword 3 Map 4 Chapter 1: Socio-Economic Context 5 Key Characteristics 5 Key Challenges 8 Key Responses 17 Chapter 2: National Framework for Sustainable Development 19 Sustainable Development Policy Framework (National Environmental Management 19 Strategy (NEMS) and National Environmental Action Plan) Chapter 3: Sectoral Progress Made and Problems Encountered in the 23 implementation of the BPOA Climate Change and Sea level rise 23 Environment 24 Management of waste 24 Coastal and marine resources 26 Freshwater resources 27 Land resources 27 Energy resources 29 Tourism resources 29 Biodiversity resources 30 Transport and roads 31 Human resource development 31 Chapter 4: Cross Sectoral Areas 33 Financing and Investment for Sustainable Development 33 Trade and Investment 33 Capacity building 34 Infrastructure and Services 34 Chapter 5: Millennium Development Goals and Sustainable Development in 36 SIDS Poverty eradication 36 Education and Reduction of Child Mortality 36 Health and Nutrition Deterioration and Diseases such as HIV/AIDS 37 Gender equality and empowerment of women 38 Global/Regional partnership for development 39 Chapter 6: Emerging Concerns and Special Needs 41 2 REPUBLIC OF NAURU: National Assessment Report Foreword The Republic of Nauru’s National Assessment Report has been prepared following consultations with stakeholders and two National Workshops on Sustainable Development held in April 2002 and February 2004. Discussions at these two workshops focused on achievements and constraints faced by the country in the context of economic, social and environment issues.
    [Show full text]
  • REPUBLIC of NAURU GOVERNMENT GAZETTE PUBLISHED by AUTHORITY ------No
    REPUBLIC OF NAURU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY ----------------------------------------------------------------------------------------------------------------------------------------------- No. 03 14th January, 2021 Nauru ----------------------------------------------------------------------------------------------------------------------------------------------- G.N.No. 03/2021 PUBLIC SERVICE ACT 2016 SECTION 11A ESTABLISH AND ALTER A SECTION PURSUANT TO the powers in that behalf vested in me, under Section 11A Subsection (a) and (b) of the Public Service Act 2016, I, LIONEL ROUWEN AINGIMEA, M.P., President and Minister responsible for the Public Service, DO HEREBY, effective immediately alter and establish Sections within the Department of Foreign Affairs & Trade as follows: DEPARTMENT OF FOREIGN AFFAIRS & TRADE Alteration of Section Designation CURRENT SECTION TITLE PROPOSED SECTION TITLE Regional Affairs Pacific Affairs Division International Affairs International - Multilateral Affairs Division Trade & Protocol Asia & Protocol Division Creation of Section International - Bilateral Affairs & Trade Division Dated this 7th day of January, 2021 H.E. HON. LIONEL ROUWEN AINGIMEA, M.P. PRESIDENT AND MINISTER RESPONSIBLE FOR PUBLIC SERVICE ______________________________________________________________________________________________ -2- ----------------------------------------------------------------------------------------------------------------------------------------------- No. 03 14th January, 2021 Nauru -----------------------------------------------------------------------------------------------------------------------------------------------
    [Show full text]
  • REPUBLIC of NAURU GOVERNMENT GAZETTE PUBLISHED by AUTHORITY ------No.26 3Rd May 2006 Nauru ------G.N.No
    REPUBLIC OF NAURU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY ----------------------------------------------------------------------------------------------------------------------- No.26 3rd May 2006 Nauru ----------------------------------------------------------------------------------------------------------------------- G.N.No. 91 / 2006 COURTS ACT 1972 DISTRICT COURT APPOINTMENT OF ACTING RESIDENT MAGISTRATE In exercise of my powers under sub-section 9 (4) of the Courts Act 1972, I, LUDWIG SCOTTY , President of Nauru, hereby appoint Peter Hamilton MacSporran to be Acting Resident Magistrate of the District Court of Nauru, The appointment of Peter Hamilton MacSporran as Acting Resident Magistrate will continue until the appointment of the Resident Magistrate. Given under my hand this twenty seven day of April, Two Thousand and Six. LUDWIG SCOTTY PRESIDENT G.N.No. 92 / 2006 COURTS ACT 1972 SUPREME COURT APPOINTMENT OF ACTING REGISTRAR In exercise of my powers under sub-section 6 of the Courts Act 1972, I, LUDWIG SCOTTY, President of Nauru, hereby appoint Peter Hamilton MacSporran to be Acting Registrar of the Supreme Court of Nauru. The appointment of Peter Hamilton MacSporran as Acting Registrar will continue until the appointment of the Registrar. Given under my hand this twenty seven day of April, Two Thousand and Six. LUDWIG SCOTTY PRESIDENT -2- ----------------------------------------------------------------------------------------------------------------------- No.26 3rd May 2006 Nauru -----------------------------------------------------------------------------------------------------------------------
    [Show full text]
  • Synthesis Report Review of Nauru Water and Sanitation Master Plan
    SYNTHESIS REPORT Review of Nauru water and sanitation master plan SYNTHESIS REPORT REVIEW OF NAURU WATER AND SANITATION MASTER PLAN March 2021 Authors Peter Sinclair Aminisitai Loco Tony Falkland Professor Ian White Dr. Louise Bouchet Cover photo credit: https://en.wikipedia.org/wiki/Nauru#/media/File:Nauru_satellite.jpg Geoscience, Energy, Maritime Division – Pacific Community Suva, Fiji 1 © Pacific Community (SPC) 2021 All rights for commercial/for profit reproduction or translation, in any form, reserved. SPC authorises the partial reproduction or translation of this material for scientific, educational or research purposes, provided that SPC and the source document are properly acknowledged. Permission to reproduce the document and/or translate in whole, in any form, whether for commercial/for profit or non-profit purposes, must be requested in writing. Original SPC artwork may not be altered or separately published without permission. Original text: English 1 Contents 1. INTRODUCTION ..................................................................................................................... 2 2. METHODOLOGY..................................................................................................................... 2 3. TECHNICAL REVIEW OF WATER SUPPLY & SANITATION.................................................. 3 4. REVIEW OF EXISTING POLICY AND GOVERNANCE ARRANGMENTS .............................. 6 5. REVIEW OF INSTITUTIONAL CAPACITY .............................................................................
    [Show full text]