Developmental Works - Some Glimpses INDIAN RAILWAYS

Out to Out FOB at Station

NEW RAILWAYS Retiring Room at Ujjain Station

A progressive journey since 2014 ON FAST TRACK DEVELOPMENT : 2014-PRESENT

INFRASTRUCTURE ENHANCEMENT : SOME IMPORTANT PHOTOS v New line Projects : New line projects of 521 Kms for 8,642 crore sanctioned since 2014 v Doubling Projects : Doubling projects of 1,720 Kms for `18,395 crore sanctioned since 2014 v Electrification Projects : Electrification projects of 2,539 Kms for `2,222 crore sanctioned since 2014 v Rail Fly Over Projects : Rail flyover projects of 56 Kms for `1,046 crore sanctioned since 2014

MADHYA PRADESH CONNECT : PASSENGER FOCUS v New Trains : 67 new trains introduced since 2014 Lift at Ujjain station v Trains Extended : 39 train extended since 2014 v Frequency Increased : for 12 trains since 2014

SAFETY : PRIME CONCERN v Use of drone by WCR in Madhya Pradesh is first in for disaster management, crowd management and project monitoring etc. v Use of GPS Tracker by WCR in Madhya Pradesh is first for India.

PASSENGER AMENITIES : PROVIDED AT ALL MAJOR STATIONS v Lifts and Escalators v Fast and free Wi-Fi facility : v Automatic Ticket Vending machines Increase in height of Platform no. 1 at station v Amrit Counters v Mechanized Cleaning v Water Vending machines v LED Lights

Foot Over Bridge at Ujjain station v Provision of Foot Over Bridge with steps, cover and lighting at. Rohalkhurd, Luni richha and Thuria INPUTS BY RAILWAY IN UJJAIN PARLIAMENTARY CONSTITUENCY v Provision of amenities for Divyang persons at 2 stations i.e. Vikramgarh and UJJAIN PARLIAMENTARY CONSTITUENCY Road. A. ASSEMBLY SEGMENTS v Provision of Data loggers, Earth Leakage Detectors and improvement of reliability of Mahidpur, /, Ghatiya, , , Ujjain dakshin, Alot, Ujjain uttar interlocked level crossing gates at 5 stations i.e. Rohilkhurd, Mahidpur Road, Thuria, Luni Richha, and Vikramgarh Alot. B. WORKS COMPLETED IN LAST FOUR YEARS v Provision of maintenance free earth at vital signalling and PI Road Relay Interlocking B1. Infrastructure Enhancement installation 5 stations i.e. Rohalkhurd, Mahidpur Road, Luni Richha, Vikramgarh Alot, and v Road Under Bridges provided at Level Crossing No. 16, 13, 15, 18, 26, 9 in between Thuria, stations. Mahidpur Road to Thuria Stations. v Replacement / upgradation of dataloggers A route on 05 stations i.e. at Rohalkhurd, v Nagda- - Replacement of paper quad RE cable by jelly filled 6-quad cables Mahidpur Road, Luni Richha, Vikramgarh Alot and Thuria. 98 kms. v Provision of 05 no. standard Height gauge at Level Crossing. v Provision of additional sliding type Level crossing gate to ensure safety at interlocked v Nagda- Mathura section Interlocking of 8 non interlocked LC gate of higher TVUs at. Level Crossing gates at Gate Nos.25,11 between Mahidpur Road to Thuria. v Enhancing the reliability of 14 IBSs by provision of High availability Digital Axle Counters in Kota - Nagda section. B2. Improvement In Passenger Amenities v Provision of High availability Digital Axle Counters in 19 block sections in Nagda - v 4 lifts at Ujjain have been commissioned at Ujjain station. Mathura section. v Wi-Fi System has been started at Ujjain station. v Construction of Road Over Bridge between Mahidpur Road and Luni Richha on Level v Increase in height of Platform no. 4/5 at Nagda and Platform no. 1 at Berchha station. Crossing Gate No. 08 at Kms. 071408-10 on cost sharing basis. Railway Cost ` 09.02 v Construction of new FOB and extension of existing Foot Over Bridge at Ujjain station. Crore. v Computerised online booking of Retiring rooms and dormitories provided at Ujjain station. v Construction of Road Over Bridge between Luni Richha and Vikramgarh Alot on Level v Automatic Ticket Vending Machines (ATVM) has been commissioned at Ujjain (03 Crossing Gate No. 20 at Kms. 073412-14 on cost sharing basis. Railway Cost ` 09.38 numbers) station. Crore. v Water Filteration System at 'D' & 'E' category Railway stations under CSR by M/s.YES v Construction of Road Over Bridge between Virkamgarh Alot - Thuria on Level Crossing Bank Ltd, Mumbai. Gate No. 21 Kms. 073630-32 on cost sharing basis. Railway Cost ` 19.30 Crore. v Extension of cover over platform with aluminum sheet and provision of water booths, v Provision of cover shed improvement to drainage arrangement at Limited Height light, fans etc at Mahidpur Road station at a cost of 0.26 crore. Subway in lieu of Level Crossing between Nagda Rohalkhurd stations. v Improvement of Circulating area and provision of waiting hall at Vikramgarh Alot v Provision of cover shed improvement to drainage arrangement at Limited Height station. Subway on Level Crossing between Nagda and Mahidpur road stations. v Extension of cover over platform with aluminum sheet and provision of water booths, v Replacement / upgradation of dataloggers at 05 stations i.e. Rohilkhurd, Mahidpur light, fans etc at Mahidpur Road station. Road, Thuria, Luni Richha and Vikramgarh A lot. v Extension of Cover Over platform with aluminium sheet over Platform with water booth, v Doubling of Gambhir bridge between Nagda Junction-Ujjain section. light, fans benches kota stone flooring Under at Vikramgarh Alot station v Construction of upper class AC waiting hall at Ujjain station. v Extension of cover over platform with aluminum sheet and provision of water booths, light, v Installation of escalator at Ujjain station. fans etc at Thuria Station. v Extension of Cover Over Platform at Luni Richha station. v Extension of cover over platform to eliminate deficiencies in MEA-Rohalkhurd. v Upgradation of Retiring Room - Vikramgarh Alot, Up gradation of Passenger amenities by improving waiting halls, shelters, Platform surface, Foot Over Bridge covering, water booth toilets etc. at Mahidpur Road and Vikramgarh Alot stations.

B3. Improvement In Train Services v from 19.02.2018 Introduction of New Trains v 12476 Mata vaishnao devi Katra to Hapa has given Experimental Halt at Vikramgarh Alot v Train no. 19312/19311 Indore -Pune-Indore Bi-weekly Express started w.e.f. 29/06/2016. from 19.02.2018 v Train no. 19332/19331 Indore –Kochuveli - Indore weekly Express started w.e.f. v 12477 jamnagar to Mata vaishnao devi Katra has given Experimental Halt at Vikramgarh 01/07/2016. Alot from 19.02.2018. v Train no. 19305 /19306 Indore-Guwahati-Indore Weekly Express started w.e.f. v 12478 Mata vaishnao devi Katra toJamnagar has given Experimental Halt at Vikramgarh 07/07/2017. Alot from 19.02.2018. v Train no. 14319 / 14320 Indore -Bareily – Indore weekly Exp. has been started from v 12465 Indore – Jodhpur express has given Experimental Halt at from 01/10/14. 22.03.2018. v Train no. 22941/22942 Indore – Jammu Tavi Weekly Superfast Exp. has been started v 18243 Bilaspur – Bhagt Ki Kothi Express has given Experimental Halt at Vikramgarh Alot from 29/12/14. from 25.03.2018. v v Train no. 09415/09416 Indore - Ahmedabad – Indore weekly special from 04/04/14 to 18244 Bhagt Ki Kothi - Bilaspur Express has given Experimental Halt at Vikramgarh Alot from 25.03.2018. 28/06/14. v 18245 Bilaspur – Bikaner express has given Experimental Halt at Vikramgarh Alot from v Train no. 09309/09310 Indore – Sealdah -Indore weekly special from 04/04/14 to 25.03.2018 29/06/14. v 18246 Bikaner- Bilaspur express has given Experimental Halt at Vikramgarh Alot from v Train no. 09301/09302 Indore – Bandra Term.- Indore weekly special from 03/04/14 to 25.03.2018. 27/06/14 and 02/10/14 to 31/10/14. v 12466 Jodhpur – Indore Express has given Experimental Halt at Mehidpur Road from v Train no. 09305/09306 Indore- Patna-Indore bi-weekly special from 06/04/14 to 30/06/14 22.03.2018. and 05/10/14 to 02/11/14. Increase in frequency v Train no. 09307/09308 Indore – Jammu Tawi- Indore weekly special from 07/04/14 to v Train no. 11103 /11104 Indore – Jhansi Exp. from weekly to bi-weekly w.e.f. 28/09/2014. 01/07/14 and 06/10/14 to 29/10/14. v Train no. 19312/ 19311 Indore – Pune Exp. from four days a week to five days a week v Train no. 09312/09311 Indore – Pune – Indore was run on 27/10/14 and 28/10/14. w.e.f. 01/03/2015. v On occasion of Mahashivratri Special train was run between between – Ujjain on Extension of trains 17/02/15. v Train no. 11703/11704 Rewa – Indore Express has been extended upto Dr. Ambedkar Stoppage to passenger trains Nagar w.e.f. 07/07/2017. v Train no. 12947 /12948 Ahmedabad - Patna Exp. at Nagda station w.e.f. 04/12/2014. v Train Number 12415 Indore – Nizamuddin, has been extended from Nizamuddin to v Train no. 12941 / 12942 Bhavnagar Terminus – Asansol Exp. at Nagda station w.e.f. Delhi Sarai Rohilla with effect from 14.12.2015. 05/12/2014. v Train Number 12415 Indore – Nizamuddin, has been extended from Nizamuddin to v Train no. 12227 / 12228 Mumbai Central – Indore Exp. at Ujjain station w.e.f. 01/01/2016. Delhi Sarai Rohilla with effect from 14.12.2015. v Train no. 12951 / 12952 New Delhi - Mumbai Central Rajdhani Exp. at Nagda station v Train No. 12471 Bandra – Jammu Tawi, has been extended from Jammu Tawi to Shri Mata w.e.f. 01/10/2016. Vaishno Devi Katra with effect from 01.09.2015. v Train no. 22971 / 22972 Madurai – Jaipur Suvidha Spl. at Nagda and Ujjain station w.e.f. v Train No. 12473 Ahmedabad – Jammu Tawi, has been extended from Jammu Tawi to Shri 01/10/2016. v A new Train No. 22941, Indore to Jammu Tavi Superfast Express, introduced on Mata Vaishno Devi Katra with effect from 03.09.2015 29.12.2014 that passes through Kota division with stoppages at Bhawanimandi, Kota, v Train No. 12475 Hapa – Jammu Tawi, has been extended from Jammu Tawi to Shri Mata Sawaimadhopur and Gangapur City. Vaishno Devi Katra with effect from 02.09.2015. v A new Train No. 16864, Mannargudi to Bhagat ki Kothi, introduced on 09.02.2015 that v Train No. 12477 Jamnagar – Jammu Tawi, has been extended from Jammu Tawi to passes through Kota division stoppages at Bhawanimandi, Kota and Sawaimadhopur. Shri Mata Vaishno Devi Katra with effect from 06.09.2015. v 12473 Ahmedabad – Jammutavi has given Experimental Halt at Vikramgarh Alot from 19.02.2018 C. ON GOING WORKS v 12474 Jammutavi -Ahmedabad has given Experimental Halt at Vikramgarh Alot from v Doubling of Indore – – Ujjain. 19.02.2018 v Gauge conversion of Ujjain – Fatehabad section. v 12475 Hapa to Mata vaishnao devi Katra has given Experimental Halt at Vikramgarh Alot v Work of long haul loop lines is in progress at Thuria station.