Dirty Froth Greets Govt Panel at Varthur Lake

Total Page:16

File Type:pdf, Size:1020Kb

Dirty Froth Greets Govt Panel at Varthur Lake 2 DECCAN HERALD B Friday, June 10, 2016 Metro Roza timings Metro Phase 2: Civil work starts on Mysuru Road-Kengeri stretch IFTAR: 6.45 PM (FRI) SEHRI: 4.29 AM (SAT) In brief Casting yard set up at Kanminike near Bidadi: BMRCL Naveen Menezes ||||||||||||||||||||||||||||||||||||||||||||||| terminal-Kengeri Extension of New stations western line is expected to cost A nine-member expert committee inspects Varthur lake on Foreign language BENGALURU: Bringing forth Rs 1,867.95 crore. Meanwhile, Thursday, as part of the government’s efforts to revive two courses a visible sign of progress on ■ Nayandahalli BMRCL has said that land ac- of the dirties waterbodies in Bengaluru. Mahendra Jain, the second phase of Namma ■ Rajarajeshwari Nagar quisition, road widening and Additional Chief Secretary, Urban Development Department, Bangalore University Metro, the Bangalore Metro ■ Bangalore University Cross shifting of utilities from Nayan- heads the committee. DH PHOTO »has invited applications Rail Corporation Limited ■ Pattanagere dahalli station to Kengeri arch from eligible candidates for (BMRCL) started erecting ■ Mailasandra bridge and Challaghatta depot admissions to various rebars on the eight-km-long ■ Kengeri is complete. Dirty froth greets courses in Certificate / Dipl- stretch between Mysuru The BMRCL has also com- oma / Higher Diploma / Ad- Road and Kengeri, the west- ||||||||||||||||||||||||||||||||||||||||||||||| pleted issuing compensation vance Diploma in foreign ern extension of Purple line. packages for properties, the re- languages like French, Ger- tions from Mysuru road station port stated. Moreover, the cor- govt panel at man, Spanish, Italian, Por- This is part of the Phase-II to Pattanagere Station at a cost poration has almost completed tuguese, Japanese, Chinese, of Namma Metro project, of Rs 327 crore. Soma Enter- issuing compensation pack- Korean, Finnish, Russian which will span over 72.095 km prise Limited would construct ages for property owners be- Varthur lake and Arabic. The candidates (13.79 km underground) and elevated structures (viaduct) of tween the proposed Baiyap- who have completed their 61 stations, of which 12 will be 4.869 km from Pattanagere panahalli to Whitefield Metro BENGALURU: A govern- immediate need to instal a pre-university course can underground. station (excluding) to the be- station. ment-appointed expert large sewage treatment plant apply. The application Consisting of extensions of Work begins on Mysuru Road to extend Metro’s western line ginning of Challaghatta depot. It has started the process of committee, which went on a at Bellandur lake and a smaller forms will be issued at the four existing lines and two new till Kengeri. DH PHOTO This will include two elevated acquiring land for the pro- field inspection of Varthur one at Varthur lake. “Our pri- Centre for Global Langua- lines (Gottigere to Nagawara stations at Mailasandra and posed lines between Nagasan- lake on Thursday, experi- ority is Bellandur lake as water ges (application fee is Rs and R V Road to Bommasan- ing and shifting of utilities was The construction work has Kengeri Station. The entire dra to Bangalore International enced during the four-hour flows downstream from here 300). Interested candidates dra), the BMRCL has estimat- complete and the civil work been awarded to two contrac- work will cost of Rs. 332 crore. Exhibition Centre, Puttenahalli visit what local residents to Varthur,” he said. may contact the coordinator, ed to spend Rs 26,405.14 crore. had already begun on Mysuru tors on the Mysuru Road to The preliminaryworks have Cross to Anjanapura Town- face every day: contaminat- On the request of locals, the Centre for Global Langua- Pradeep Singh Kharola, BM- road to Kengeri stretch that Kengeri stretch. IL&FS Engi- been undertaken at the casting ship, R V Road to Bommasan- ed froth flying all around team also visited Ammanikere ges, Bangalore University, RCL Managing Director, told connects Bangalore University neering Construction Compa- yard set up at Kanminike near dra and Gottigere to Na- and into their faces. in Kundlahalli, where waste is P K Block, Palace Road. For Deccan Herald that the process and Kengeri satellite bus sta- ny Limited is going to construct Bidadi, the BMRCL report gawara. The nine-member team had being illegally dumped. The details, contact: 2296 1280. of land acquisition, road widen- tion among others. 3.94 km viaduct and four sta- states. In all, the Mysuru Road DH News Service some unpleasant encounters. committee found that a portion It surveyed two waste weirs and of the lake land was under liti- Healthcare inlet points. It noticed con- gation with the Bangalore Wa- struction debris dumped on ter Supply and Sewerage initiative one side of the lake and unseg- Board (BWSSB), which needed The Apollo Hospitals 4 men rob regated waste lying on the oth- to be examined. »had organised medical er. Locals pointed to a portion camps in the City on Thurs- pharma staffer of the lake that had been en- Next course of action day, which covered people croached upon. The commit- The committee will meet next from Weavers Colony, Ban- of Rs 9L cash tee instructed the Revenue De- on June 16 and decide the next nerghatta Road, Jayanagar partment to survey the area course of action on reviving the and Shankar Mutt Park. BENGALURU: Four unidenti- and submit a report. two lakes. It will submit the re- As many as 9,000 doc- fied persons assaulted an em- The visit is part of the gov- ports of its field visits to the gov- tors from Apollo Hospitals ployee of a pharma company ernment’s efforts to revive Bel- ernment. across the country recently and made away with the cash landur and Varthur lakes, two The Cabinet will have to ap- took a pledge to make of Rs 9 lakh near Cemetery of the dirtiest waterbodies in prove the recommendations. healthcare affordable and Road in Shanthi Nagar on Bengaluru. Additional Chief Jain said people and nonprofits accessible to all, as part of Wednesday noon. Secretary, Urban Development could send suggestions to the an initiative. Under the ini- According to the police, Department, Mahendra Jain, Urban Development Depart- tiative, at least four medical Karthik, an employee of a pri- is chairperson of the commit- ment by June 16. camps were organised in vate pharmaceutical compa- tee. The committee had in- T V Ramachandra, commit- the city for the first time. ny, was going to a bank in spected Bellandur lake on June tee member and professor at At least 500 women who Shanthi Nagar to deposit Rs 9 2. The team was unable to sail Centre for Ecological Sciences, visited these camps were of- lakh cash in his bike. Four per- into Varthur lake in Army IISc, said the committee dis- fered free consultancy on sons in two bikes waylaid boats, as it had done in Bellan- cussed accepting a proposal to health and pregnancy. The Karthik and picked up an ar- dur. Poor communication be- revive the lakes. He said civic Apollo Hospitals will be gument with him for riding in tween the Bangalore Develop- officials had suggested divert- conducting free medical a rash and negligent manner. ment Authority (which is ing sewage downstream, but it camps across the city on 9th The gang of four thrashed custodian of the lake and or- was inappropriate as that of every month to address Karthik and made away with ganised the field inspection) would contaminate water the health issues. Rs 9 lakh cash kept in the utili- and the Army personnel led to downstream to villagers and ty box of his bike. Karthik has dropping of the plan. onward to Tamil Nadu. The Paediatric lodged a complaint in Ashok The committee has so far only solution is to treat the Nagar police station. met twice and made two field sewage, he said. ventilator donated DH News Service visits. Jain said there was an DH News Service A paediatric ventilator »was donated to the Kidwai Memorial Institute of Oncology on Thursday All expenses-paid trip under the Rotary Club of Bangalore Cantonment’s - “Project Hope.” The contribution was Now, go pick your own made possible with support received under the Corpo- rate Social Responsibility of CHOCK-O-BLOCK: The movement of vehicles was badly affected between Marathahalli and the Silk Board on the Outer Ring the Cognizant Foundation, Road after a large tree fell (inset) near Iblur Junction on Sarjapur Road on Thursday. DH PHOTO mangoes in orchards Syndicate Bank and with funds and efforts made by the Rotary Club members. Bosky Khanna ||||||||||||||||||||||||||||||||||||||||||||||| The machine costing over Tree fall near Iblur Jn causes massive traffic snarl The details Rs 20 lakh was donated to BENGALURU: Starting June the paediatric wing of the worsened the situation as ve- am and a team was rushed started to clear the branches,” 12, Bengalureans can visit ■ First trip on July 12. Two Kidwai Institute. Speaking Policemen hicles piled up in a long queue. there. “The police immediately he told Deccan Herald. The po- mango orchards in Kolar buses of 80 people each will on the occasion, President A team of only four policemen called up the BBMP control licemen had to rest every 30 and Chikkaballapur districts leave Cubbon Park, Bal Bha- D Ashok of the Rotary Can- struggle to clear of HSR Layout Traffic police room and informed them minutes due to the fire ants’at- for eight Sundays and pluck van gate. tonment said that it gave station made their best efforts around 11 am, but the BBMP tack. the fruits of their choice to ■ Registrations open on Fri- him immense pleasure to branches, to clear the tree, but in vain, team reached the spot only They could clear only a few take home.
Recommended publications
  • Last Mile Connectivity of “Namma Metro” Purple Line Corridor
    Assessing Metro rail system as a means of mitigation strategy to Climate change Foreword Bengaluru famed as the garden city has gained global acclaim for development in Information technology and Biotechnology. Due to its fast development and urbanization in recent years, the city, which was an air conditioned city around two decades back has slowly warmed up and with exponential increase in automobiles in the city roads, it has also gained the tag of being a highly polluted city. To reduce the vehicular density and increase the commuter comforts and also to bring in climate resilience in the city, the first Metro rail project in Bengaluru was planned in two corridors. The East-West Corridor (18.10km) from Baiyappanahalli (East) - Mysore Road (West) was commissioned in 2016. As per The Times of India report, August 4th, 2017, Bengaluru Metropolitan Transport Corporation (BMTC) has seen a drop of 2-3% in its revenue after Phase 1 of Namma Metro became fully operational in June, 2017. The Metro ridership has also increased to 34% from June 2016 to July 2017. The study entitled, “Assessing Metro Rail System as a means of Mitigation Strategy to Climate Change” conducted by the Centre for Climate Change in EMPRI during 2016-17 has assessed the utility and benefits from a commuter perception angle especially with reference to the economic and social perspectives. The commuter’s methods of reaching to the station are also evaluated. Time saved in travel and reduction in exposure to polluted air in the road are the major gains but there are some teething problems in relation to last mile connectivity.
    [Show full text]
  • Sl.No Major Pickup Points Timings
    COLLEGE TRANSPORT ROUTEWISE DETAILS I. ROUTE NO. : BMSIT - 1 Sl.No Major Pickup Points Timings 1 BMSCE 6.40 AM 2 Hanumanthanagar 50ft Road 6.45 AM 3 Srinivas Nagar 6.47 AM 4 Nagendra Block via sita circle 6.50 AM 5 Muneshwara Block 6.55 AM 6 Bapuji Nagar 7.00 AM 7 Maruti Madira via Attiguppe 7.03 AM 8 Vijayanagar bus stop 7.06 AM 9 Housing Board 7.10AM 10 Pavitra Paradise 7.12 AM 11 Basveshwara Nagar 7.14AM 12 Sankar Mutt 7.15 AM 13 Modi Hospital 7.16 AM 14 Navarang Theatre 7.20 AM 15 Mariappana Palya 7.25 AM 16 Vyallikaval Police Station 7.30 AM 17 BMSIT Campus 8.20 AM Note: Timings subject to change as per requirement Page | 1 COLLEGE TRANSPORT ROUTEWISE DETAILS II. ROUTE NO. : BMSIT – 2 Sl.No Major Pickup Points Timings 1 BMSCE 7.00 AM 2 RK Ashram 7.02 AM 3 Chamarajpet 7.08 AM 4 Goodshed Road 7.12 AM 5 Majestic 7.14 AM 6 Shivanda Circle 7.18 AM 7 Malleshwaram Circle 7.25AM 8 Malleshwaram 18th Cross 7.30 AM 9 Tata Institute 7.35AM 10 New BEL Road 7.40 AM 11 BEL Circle 7.45AM 12 MS Palya 7.50 AM 13 Puruvankara 8.00 AM 14 Yelahanka Dairy Circle 8.02 AM 15 BMSIT Girls Hostel 8.05 AM 16 BMSIT Campus 8.20 AM Note: Timings subject to change as per requirement Page | 2 COLLEGE TRANSPORT ROUTEWISE DETAILS III. ROUTE NO. : BMSIT – 3 Sl.No.
    [Show full text]
  • 600 Bus Time Schedule & Line Route
    600 bus time schedule & line map 600 Banashankari T.T.M.C. Via Electronic City, Attibele, View In Website Mode Hoodi, Hebbala, Kengeri TTMC The 600 bus line Banashankari T.T.M.C. Via Electronic City, Attibele, Hoodi, Hebbala, Kengeri TTMC has one route. For regular weekdays, their operation hours are: (1) Banashankari T.T.M.C. Via Electronic City, Attibele, Hoodi, Hebbala, Kengeri Ttmc: 6:35 AM - 9:30 AM Use the Moovit App to ƒnd the closest 600 bus station near you and ƒnd out when is the next 600 bus arriving. Direction: Banashankari T.T.M.C. Via Electronic 600 bus Time Schedule City, Attibele, Hoodi, Hebbala, Kengeri Ttmc Banashankari T.T.M.C. Via Electronic City, Attibele, 160 stops Hoodi, Hebbala, Kengeri Ttmc Route Timetable: VIEW LINE SCHEDULE Sunday 6:35 AM - 9:30 AM Monday 6:35 AM - 9:30 AM Banashankari T.T.M.C. Tuesday 6:35 AM - 9:30 AM Sangam Circle Wednesday 6:35 AM - 9:30 AM Jayanagara 5th Block Thursday 6:35 AM - 9:30 AM 9th Main Road, Bangalore Friday 6:35 AM - 9:30 AM Marenahalli Petrol Bunk Saturday 6:35 AM - 9:30 AM Ragigudda Temple 1225 26th Main, Bangalore East End Jayanagara 600 bus Info Mico Layout Direction: Banashankari T.T.M.C. Via Electronic City, Outer Ring Road, Bangalore Attibele, Hoodi, Hebbala, Kengeri Ttmc Stops: 160 B.T.M Water Tank Trip Duration: 254 min Line Summary: Banashankari T.T.M.C., Sangam Udupi Garden 16th Main Circle, Jayanagara 5th Block, Marenahalli Petrol 13th Main Road, Bangalore Bunk, Ragigudda Temple, East End Jayanagara, Mico Layout, B.T.M Water Tank, Udupi Garden 16th B.T.M.Layout (Kuvempunagara) Main, B.T.M.Layout (Kuvempunagara), Central Silk Board, Rupena Agrahara, Bommanahalli, Garvebhavi Central Silk Board Palya, Kudlu Gate, Singasandra, Hosa Road, P.E.S.I.T.
    [Show full text]
  • Institution List.Xlsx
    Sl No code Name Address exist_inst_category pincode 1 S-10966 RR Polytechnic Bangalore professional 560090 2 C-20647 Mother Teresa College of Education Jalahalli Degree/ Professional 560013 3 C-59387 Rajarajeswari College of Physiotherapy Bangalore Professional/ Medical 560074 4 PR29000005 Raman ITI Kamakshipalya professional 560079 5 C-21135 Dr S Gopalaraju Government First Grade Anekal Degree/ Professional 562106 6 C-1362 IslamiahCollege Institute of Technology Bangalore Technical 560076 7 AN047 HASANATH PU COL FOR WOMEN DICKENSON ROAD NO 43 -BANGALORE 560042 560042 MALLESWARAM 14TH CROSS -BANGALORE 8 AN015 MLA PU COLLEGE FOR WOMEN 560003 560003 9 AN020 S NIJALINGAPPA BFR PU COL RAJAJINAGAR II BLOCK -BANGALORE 560010 560010 35 MUSEUM ROAD PBNO 25003-BANGALORE 10 AN028 ST JOSEPH EVENING PU COLL 560025 560025 11 AN051 ST ALOYSIUS PU COLLEGE COX TOWN -BANGALORE 560005 560005 CORPORATION GIRLS PU 12 AN067 CLEVELAND TOWN -BANGALORE 560005 560005 COLLEGE(CLEVELAND TOWN) 13 AN080 BEL COMP PU COLLEGE JALAHALLI -BANGALORE 560013 560013 14 AN154 VIDYAVAHINI PU COLLEGE ANANDANAGAR -BANGALORE 560024 560024 SRIGANDAKAVAL VISWANEEDAM-BANGALORE 15 AN091 SRIGANDHADAKAVAL PU COL 560091 560091 16 AN054 VVS PU COLLEGE RAJAJINAGAR I BLOCK -BANGALORE 560010 560010 17 AN072 ARYAVIDYASHALA PU COLLEGE GANDHINAGAR WH ROAD -BANGALORE 560009 560009 RAJAJINAGAR 5TH BLOCK CA2-BANGALORE 18 AN078 R PARENTS ASSO PU COLLEGE 560010 560010 19 AN075 BAPUJI PU COLLEGE MAGADI ROAD I CROSS -BANGALORE 560023 560023 20 AN133 NALANDA NATIONAL PU COL JC NAGAR PIPELINE RD WCRD-BANGALORE
    [Show full text]
  • (Lakes) in Urban Areas- a Case Study on Bellandur Lake of Bangalore Metropolitan City
    IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 7, Issue 3 (Jul. - Aug. 2013), PP 06-14 www.iosrjournals.org Scenario of Water Bodies (Lakes) In Urban Areas- A case study on Bellandur Lake of Bangalore Metropolitan city Ramesh. N 1, Krishnaiah. S2 1(Department of Civil Engineering, Government Engineering College, K.R.Pet-571 426, Karnataka) 2(Department of Civil Engineering, JNTUA College of Engineering, Anantapur -515 002, Andra pradesh) Abstract: Environment is made up of natural factors like air, water and land. Each and every human activities supports directly/indirectly by natural factors. India is facing a problem of natural resource scarcity, especially of water in view of population growth and economic development. Due to growth of Population, advancement in agriculture, urbanization and industrialization has made surface water pollution a great problem and decreased the availability of drinking water. Many parts of the world face such a scarcity of water. Lakes are important feature of the Earth’s landscape which are not only the source of precious water, but provide valuable habitats to plants and animals, moderate hydrological cycles, influence microclimate, enhance the aesthetic beauty of the landscape and extend many recreational opportunities to humankind .For issues, perspectives on pollution, restoration and management of Bellandur Lake Falls under Bangalore Metropolitan city is very essential to know their status but so far, there was no systematic environmental study carried out. Hence now the following studies are essential namely Characteristics, Status, Effects (on surrounding Groundwater, Soil, Humans health, Vegetables, Animals etc.,), resolving the issues of degradation, preparation of conceptual design for restoration and management.
    [Show full text]
  • “Structuring of Feeder Bus Services of Metro- a Case Study of East West Corridor of Namma Metro, Bangalore ”
    “STRUCTURING OF FEEDER BUS SERVICES OF METRO- A CASE STUDY OF EAST WEST CORRIDOR OF NAMMA METRO, BANGALORE ”. Under the Guidance of Dr.Ajaykumar,Independent Consultant, The World Bank, Washington D.C B.C.Renukeshwar Chief Personnel Manager/ Chief Traffic Manager BMTC, Bangalore. Aim To address feeder bus network design and scheduling problem (FNSDP) Objective • To promote mass transport and better connectivity for metro users by integrating bus services and metro service. • Channelling public transport routing into more focused, high frequency corridors • Improvement of access to captive users and attraction of non-captive users to the network About 0.15 million people move into the city each year. Continuing migration linked to new jobs and opportunities. Unorganized growth leading to Urban sprawl (2015 population is 8.4 Million) 3 YELAHANKA Population Growth BYATARANAPURA (CMC) 5.69 PEENYA JALAHALLI 4.1 3 KRISHANARAJAPURA 2.9 BANGLORE M.C (CMC) RAJAJI 2 NAGAR SHIVAJI K.R. MARKETNAGAR VIBHUTIPURA MAHADEVPURA 1.6 1573 (CMC) 6 VIJAYA MARTTAHALLI 0.4 NAGAR LALBAG 0.1 H 1 4 ADUGODI PATTANAGERE ITI 2001 TOWN 1537 2011 1981 1991 1971 1941 (CMC) 1871 KANGERI TOWN 1871 (TMC) MUNICIPALITY 1941 BANGLORE U.A.1971 BANGLORE U A 1981 BANGLORE U A 2001 Bangalore’s Bangalore’s growth BANGLORE UA 2011 Mode Share 7 Major City 24% 40% 19% 18% Corporations Bangalore 48% 42% 13% 2% Source: CTTP, Bangalore Public Transport Private Vehicles (2W/ 4W) IPT NMT Note : 7 major city corporations 1) Mumbai 2) Delhi 3) Chennai, 4) Hyderabad 5) Pune 6) Kolkata 7) Ahmedabad Bangalore Metro Metro feeder : early epoch • BMTC at its first step, introduced the feeder service together with the Reach-1 operation of BMRCL from Byappanahalli to M.G.Road.
    [Show full text]
  • District Census Handbook, Bangalore, Part XII-B, Series-11
    CENSUS OF IN,DIA 1991 Series· 11 KARNATAKA DISTRICT CENSUS HANDBOOK ~ . - - - - BANGALORE DISTRICT PART XII· R VILLAGE AND TOWN WISE PRIMARY CENSUS ABSTRACT SORHA NAMBISAN Director or Census Operntlons, Karnatuka CONTENTS Page No. FOREWORD v-vi PREFACE vii-viii IMPORTANT STATISTICS lX-Xli ANALYTICAL NOTE xv-liii PRIMARY CENSUS ABSTRACT Explanatory Notes 1-4 A. District Primary Census Abstract 6-72 (i) Villagcrrown Primary Census Abstract Alphabetical List of Villages - Andal CD.Block 75-80 Primary Census Abstract - Anekal CD.Bloek 82-109 Alphabetical List of Villages - Bangalore North CD.Block 113-118 Primary Census Abstract - Bangalorc North CD.Block 120-159 Alphabetica( List of Villages - Bangalore South CD.Block 163-169 Primary Census Abstract - Bangalon.: SmIth CD.Block 170-209 (ii) Town Primary Census Abstractn (Wan.lwise) Alphabetical List of Towns in the District 212-213 Anekal (TMC) 214-217 Dommasandra (NMCT) 214-217 Katigodi (NMCTT 214-217 Bangalore U A 214-261 B. District Primary Censu::. Abstract for Scheduled Castes 264-323 C. District. Primary Census Abstract for Scheduled Tribes 326-385 Appendix-I - District Primary Census Abstract Talukwise 388-429 Appendix-II - List of Schedukd Castes and Scheduled Tribes 431-432 Appl.:ndix-llI - Publication Plan 433-435 ILLUSTRATIONS Map of Karnataka showing the Administrative Divisons (xiii) Map of Bangalore District (xiv) (iii) FOREWORD Publication of the District Census Handbooks (DCHs) was initiated after the 1951 Census and is continuing since then with some innovations/ modifications after each decennial Census. This is the most valuable distriCsJevcl publication brought out by the Census Organisation on behalf of each State Govt./Union Territory administration.
    [Show full text]
  • 500LA Bus Time Schedule & Line Route
    500LA bus time schedule & line map 500LA Railway Station - Nayandahalli Metro Station View In Website Mode The 500LA bus line (Railway Station - Nayandahalli Metro Station) has 2 routes. For regular weekdays, their operation hours are: (1) Nayandahalli Metro Station: 6:55 AM - 4:45 PM (2) Railway Station: 8:30 AM - 6:30 PM Use the Moovit App to ƒnd the closest 500LA bus station near you and ƒnd out when is the next 500LA bus arriving. Direction: Nayandahalli Metro Station 500LA bus Time Schedule 42 stops Nayandahalli Metro Station Route Timetable: VIEW LINE SCHEDULE Sunday 6:55 AM - 4:45 PM Monday 6:55 AM - 4:45 PM K.R.Puram Railway Station Tuesday 6:55 AM - 4:45 PM Tin Factory Swamy Vivekananda Road, Bangalore Wednesday 6:55 AM - 4:45 PM Kasthuri Nagara Thursday 6:55 AM - 4:45 PM Friday 6:55 AM - 4:45 PM Ramamurthy Nagara Saturday 6:55 AM - 4:45 PM Vijaya Bank Colony Banasawadi Babusabpalya 500LA bus Info Direction: Nayandahalli Metro Station 80ft Road Kalyananagara Stops: 42 Trip Duration: 81 min Kalyananagara Line Summary: K.R.Puram Railway Station, Tin Factory, Kasthuri Nagara, Ramamurthy Nagara, Vijaya Bank Colony, Banasawadi, Babusabpalya, H.B.R. Layout 80ft Road Kalyananagara, Kalyananagara, H.B.R. Layout, Junction Of Nagavara, Manyatha Tech Park, Junction Of Nagavara Veerannapalya, Kempapura (Hebbala), Hebbala Bridge, Bhadrappa Layout, Devinagara Cross, Manyatha Tech Park Kuvempu Circle, B.E.L.Circle, B.E.L.Circle, Jalahalli Bakery, Jalahalli Village Gate, Alisda, Veerannapalya Goraguntepalya, Reliance Petrol Bunk Goraguntepalya,
    [Show full text]
  • Bangalore Urban Ward Details
    Ward Name District Taluka Hobli Ward Number Ward Name in English Area Comes Under Concern Ward in Kannada Govindapura, Kulappa Layout, Vasudevapura, Kendriya Vihar, Manchenahalli, Yelahanka (P), Yelhanka Airport Area, Maheshwari Nagar, Sai spring field colony, Gandhi Nagar, Lake view residency, Nehru Nagar, Venkatala, Surabhi Layout, Venkatappa Layout, Shobha Ultima villas, Bangalore Bangalore North Addl Yelahanka-1 Ward-1 Kempegowda ಂಡ Venkatala Layout, Mantri township, Vikas layout, Yelahanka Kere, Shankaranna Layout, Sathyappa Anjanappa Kempamma Layout, Shivanahalli (P), Maruthi Nagar, Sapthagiri Layout (P), Jayanna Layout, Basaveshwara Nagar (P), Bhadranna Layout Harohalli, Harohalli kere, Kanchenahalli, ISRO Layout, Naganahalli, Naganahalli new layout, KEB Layout Phase I, Balaji Layout, Vinayaka Layout, Ramanashree Califonia East Garden layout, Deo Marvel Layout, Mahalaxmi Bangalore Bangalore North Addl Yelahanka-1 Ward-2 Chowdeshwari ಶ Layout, Nisarga Layout, CRPF Quarters, Puttanahalli, Puttanahalli kere, Monte Carlo apartment, DG staff quarters, Central excise quarters, Wheel and Axle plant, FM Goetze plant, Chowdeswari Layout, Kamakshiamma Layout, East Colony, Yelahanka (P), KHB Colony Ananthapura, Chikka Bettahalli, Dodda Bettahalli, Bharat Nagar (MS Palya), Chandrappa Layout, Hill side meadows layout, Sai Nagar Phase I and II, Basavalingappa Layout, Netravathi Layout (P), Sai orchards, Best country 3, G Ramaiah Layout, Jyothi Nagar, GPF Layout, Muneshwara Layout 1st and 2nd Bangalore Bangalore North Addl Yelahanka-3 Ward-3
    [Show full text]
  • Bangalore Metro Rail Project Phase 2
    BMRCL PHASE-2 Bangalore Metro Rail Project Phase 2 1. BACKGROUND The DPR for the Phase-I of Bangalore Metro Rail Project was prepared by DMRC and submitted to BMRCL (erstwhile BMRTL) during May 2003 and DPR for extension of N-S line of Phase-I from Yeshwanthpur to Hesaraghatta Cross & R V Road Terminal to Puttenahalli cross was submitted during October 2007 & June 2008 respectively. The project has been sanctioned and is under implementation. The Phase-I comprises of two corridors. (i) East-West Corridor from Baiyappanahalli Terminal to Mysore Road Terminal – 18.10 km. (ii) North-South Corridor from Hesaraghatta cross Station to Puttenahalli cross – 24.20 km. Out of a total of 42.30 km system about 8.80 km is underground section and balance about 33.50 km is elevated. Total 40 stations are planned out of which 7 stations are underground, 2 at grade and 31 are elevated. On East West corridor a maintenance depot with full workshop facilities is being constructed at Baiyappanahalli whereas for North – South Corridor a maintenance depot with full workshop facilities has been constructed at Peenya. The Metro system is being implemented with 750 V DC Third Rail Traction System, Cab signaling with CATC, SCADA, and AFC. The rake interchange link is planned at Majestic station. In the DPR for the Phase-II, the south end of N-S corridor has extension from Puttenahalli to Anjanapura Township (Nice Road) along the Kanakapura Road and from Hesarghatta cross to Bangalore International Exhibition Center (BIEC) on Tumkur Road (NH-4). East-West Corridor is also proposed for extension on both ends.
    [Show full text]
  • Proposed Office Building at Yashwanthpur- Bangalore (Vol-1)
    Report On Proposed Office Building at Yashwanthpur- Bangalore (vol-1) M/s Intelligent Traffic Solutions Innovative Traffic, Transportation and Infrastructure Technology #90, Sri Ranga, 12th main, Vijayanagar, Bangalore-560 040 Ph No: 080-2340 3232, E-mail: [email protected] Sl Contents Pg. No. No 1. 1.0 Introduction 2 2. 2.0 General guidelines & best practices to be followed for 4 Purvankara-Office Building 2.1 Parking-General (On-street or Off-street surface parking) 5 2.2 Various standard and specification is given below. 5 2.3 Drainage 8 2.4 Ramp for basement parking 8 3. 3.0 Existing Traffic Scenario Studies and Analysis 13 3.1 Introduction 14 3.2 Reconnaissance Inventory 14 3.3 Classified Traffic Volume studies 14 3.4 Google Image for Office Building (Commercial) 16 3.5 Location map for Office Building (Commercial) 17 3.6 Road Geometric Scenario 17 3.7 Speed Spectrum for the study roads 18 3.8 Existing Traffic Scenario for Office Building 18 3.8.1 Real time traffic scenario along Dr. Rajkumar Road towards 18 Navrang ( 2-lanes ) 3.8.2 Vehicle Composition and Traffic flow distribution along Dr. 19 Rajkumar Road towards Navrang (2-lanes) 3.8.3 Real time traffic scenario along Dr. Rajkumar Road towards 21 Chord Road ( 2-lanes ) 3.8.4 Vehicle Composition and Traffic flow distribution along Dr. 22 Rajkumar Road towards Chord Road (2-lanes) 3.8.5 Real time traffic scenario along Chord Road towards Mysore 24 road (2-lanes) 3.8.6 Vehicle Composition and Traffic flow distribution along Chord 25 Road towards Mysore road (2-lanes)
    [Show full text]
  • District: Benga
    Details of Respective area engineers of BESCOM (Row 2 - District name) (Column 10 - Alphabetical order of Areas) District: Bengaluru uban Sl No Zone Circle Division Sub Division O&M Unit Areas 1 2 3 4 5 6 7 8 9 10 11 12 13 Service Superintending Executive Assistant Executive Assistant Engineer / Junior Name Chief Engineer Name Name Name Name Station Engineer Engineer Engineer Engineer Number Sri.T.S Chandran AE Sri. Venkatesh 9449864538 Abbigere F-2:- Raghavendra L/o, Old KG Halli, Abbigere F-3:-Lakshmi Pura, Vaderahalli (V), Sri. B.G Umesh Sri. Lakshmish Assistant Executive 94498 44988 JE Sri. Lingaraju 9449631101 Abbigere F-5:- Lakshmi Pura Main Rd, Singa Pura, Lakappa L/o, Singa Pura L/o, Abbigere Indl Area, BMAZ 8277892599 82778 93904 Engineer Sri. Mylarappa 1 North 080-22350436 Jalahalli C3 ABBIGERE JE Sri. Somashekar Reddy 94484 32824 9448365156 Abbigere F-7:- Abbigere (V), Pipe Line Rd, Venkateshwara l/o, Suraj L/o, NORTH [email protected] [email protected] senorthcircle.work@gmail A 9449844643 JE Sri. Yacob 9900723350 Abbigere F-8:- Kala Nagar, KG Halli,Abbigere F-9:- Vishweshwaraiah l/o, [email protected] n .com [email protected] JE Sri. Sunkaiah 9342892872 HVVY Vally, Kuvempu Nagar, Abbigere F-10:- KashVaderahalli L/o, Muneshwara l/o, Renuka L/o, Sri. M Sri.Thippesamy, Chennakeshava Assistant Executive Sri.Sriramegowda 9449877444 Adugodi, Koramangala 7th Block, 8th Block, Koramangala Village, KR Garden Village, Balappa L/o, 94498 44613 Engineer Sri. Manoj BMAZ 9449045888 sesouthcircle.work Koramangal AE 9449868075 Munikrishnappa L/o, AK Colony, Rajendra Nagar, Ambedkar Nagar, LR Nagar, Devegowda Block, 2 South eeadnlsouth.work@ S4 Kumar 9449844664 ADUGODI JE Sri.
    [Show full text]