INDIA Preparatory Survey for Dedicated Freight Corridor Project (Phase 2)
Total Page:16
File Type:pdf, Size:1020Kb
INDIA Preparatory Survey for Dedicated Freight Corridor Project (Phase 2) Final Report February 2010 JAPAN INTERNATIONAL COOPERATION AGENCY PADECO Co., Ltd. Preparatory Survey for Dedicated Freight Corridor Project (Phase 2) Final Report Contents 1 General ..............................................................................................................................1-1 1.1 Background of the Preparatory Survey ..................................................................... 1-1 1.2 Objective and Method of Survey .............................................................................. 1-2 2 Present Status of Preparation Work for Section of Phase 2..........................................2-1 2.1 Technical Study and Survey for Railway Construction ............................................ 2-1 2.1.1 Project Outline of Technical Study and Survey for Railway Construction .... 2-1 2.1.2 Preliminary Works and Detailed Engineering Construction Survey for Construction of DFCC ................................................................................... 2-5 2.1.3 Following Preparation Work of Preliminary Works and Detailed Engineering Construction Survey ................................................................ 2-17 2.2 Environmental Pollution and Natural Environment................................................ 2-18 2.2.1 Introduction .................................................................................................. 2-18 2.2.2 Review on the Existing Environmental Study for the Project...................... 2-19 2.2.3 Findings through the Field Survey ............................................................... 2-24 2.3 Progress of Land Acquisition and Social Consideration Activities......................... 2-33 2.3.1 Comprehending the Progress of Land Acquisition Process ......................... 2-33 2.3.2 Comprehension of the Progress and Social Considerations Undertaken ..... 2-35 3 Required Preparation Work in Future to Apply for ODA Loan ..................................3-1 3.1 Technical Study and Survey for Railway Construction ............................................ 3-1 3.1.1 Confirmation and Revision of Documents/Drawings by DFCCIL ................ 3-1 3.1.2 Technical Study/Survey.................................................................................. 3-1 3.2 Natural Environment and Pollution Control ............................................................. 3-2 3.2.1 General ........................................................................................................... 3-2 3.2.2 Comprehensive EIA on Natural Environmental and Pollution Control ......... 3-3 3.3 Social Considerations................................................................................................ 3-7 3.3.1 Present Status and Necessary Steps for Social Considerations ...................... 3-7 3.3.2 Expected Study for Phase 2.......................................................................... 3-11 3.3.3 Preparatory Survey of Social Aspects for Phase 2 ....................................... 3-15 4 Conclusion and Recommendation...................................................................................4-1 4.1 Findings of Preparatory Survey................................................................................. 4-1 4.1.1 Remaining Works to be Completed before JICA Loan Appraisal.................. 4-1 4.1.2 Comparison of Fund Scheme for Next Step of Work..................................... 4-1 4.2 Implementation Schedule for Rail Technical Work................................................... 4-2 4.2.1 Preparatory Survey for Comprehensive EIA and RRP Establishment ........... 4-3 Appendices Appendix 1 Railway Technical Aspect Findings in the FLS Derivatives Appendix 2 Notification Issued by Ministry of Environment & Forests Appendix 3 Social Environmental Consideration i Preparatory Survey for Dedicated Freight Corridor Project (Phase 2) Final Report Figures Figure 1.1 Railway Network and Planed DFC Route............................................................ 1-1 Figure 1.2 Sections of Phase 1 & 2 Western Corridor........................................................... 1-2 Figure 1.3 Rationale of Preparatory Survey .......................................................................... 1-3 Figure 2.1 Flowchart of Consultants under the Jurisdiction.................................................. 2-2 Figure 2.2 Portion of the Section Covered by CPM/HQ ....................................................... 2-4 Figure 2.3 Comparison of Previous and FLS Assignment..................................................... 2-6 Figure 2.4 Kunde Vahal Detour ............................................................................................. 2-7 Figure 2.5 Panvel Detour....................................................................................................... 2-8 Figure 2.6 Diva Detour..........................................................................................................2-9 Figure 2.7 Vasai Detour....................................................................................................... 2-10 Figure 2.8 Dahanu Road Detour.......................................................................................... 2-11 Figure 2.9 Previous Alignment and FLS ............................................................................. 2-13 Figure 2.10 Environmental Studies for the Project................................................................ 2-23 Figure 2.11 Alignment and Location Map............................................................................. 2-25 Figure 3.1 Position of the Comprehensive EIA Study........................................................... 3-3 Figure 3.2 Proposed Organization for Implementing R&R................................................. 3-13 Tables Table 2.1 Confirmed Status of Preparation on the Indian Side............................................ 2-1 Table 2.2 Deliverables Status of Preliminary Technical Survey .......................................... 2-5 Table 2.3 Station List for Phase 2 Section ......................................................................... 2-14 Table 2.4 Summary of Project Cost for Phase 2 ................................................................ 2-16 Table 2.5 List of Sub Project Major and Important Bridges .............................................. 2-17 Table 2.6 Detour in the Section.......................................................................................... 2-20 Table 2.7 List of Important Rivers ..................................................................................... 2-20 Table 2.8 Preliminary Findings for Each Section .............................................................. 2-21 Table 2.9 Comparative Review of ESIMMS and S-ESIMMS........................................... 2-23 Table 2.10 Preliminary Analysis for Potentially Critical Sections in Detour Portions ........ 2-24 Table 2.11 Summary of the Findings through the Field Survey .......................................... 2-32 Table 2.12 Land Acquisition Progress by Sections and Districts......................................... 2-34 Table 2.13 Land Acquisition Procedures as Stipulated by RAA, 2008................................ 2-36 Table 3.1 Status of Preparation Confirmed at Preparatory Survey ...................................... 3-1 Table 3.2 Districts Affected by the Project........................................................................... 3-4 Table 3.3 JBIC Guidelines versus NRRP and RAA............................................................. 3-9 Table 3.4 Essential Size/Scale Factors Needed in Order to Plan Social Considerations ... 3-12 Table 3.5 Work Responsibilities for Experts...................................................................... 3-14 Table 3.6 Preliminary Estimates of Man Months Required to Execute Social Considerations.................................................................................................... 3-18 Table 4.1 Comparison of Fund Scheme for Next Step of Work........................................... 4-2 Table 4.2 Comparison of Fund Scheme for Each Work Field.............................................. 4-2 Table 4.3 Implementation Schedule of Rail Technical Work............................................... 4-3 Table 4.4 Implementation Schedule Preparatory Survey for Comprehensive EIA and RRP Establishment............................................................................................... 4-4 ii Preparatory Survey for Dedicated Freight Corridor Project (Phase 2) Final Report Abbreviations AA: Acquiring Agent AR&R: The Administrator for Rehabilitation and Resettlement ADB: Asian Development Bank AF: Affected Family AM: Assistant Manager CA: Competent Authority CPM: Chief Project Manager CRO: Chief Resettlement Officer DC: District Collector DFC: Dedicated Freight Corridor DFCCIL: Dedicated Freight Corridor Corporation of India Limited DyDC: Deputy District Collector EC: Environmental Clearance EIA: Environmental Impact Assessment EMAP: Environmental Management Plan EMOP: Environmental Monitoring Plan ESCS: Environmental and Social Considerations Study ESIMMS: Environmental & Social Impact Mitigation Measures Study ESZ: Eco-Sensitive Zone FLS: Final Location Survey FU: Field Unit GAD: General Arrangement Drawing GLD: Guideline Design GNIDA: Greater Noida Industrial Development Authority GOI: Government of India HSIIDA: