Brick Clayminingproject Form-1 & Pre-Feasibility Report for Environmental Clearance of the Proposed “Brick Clay Mining
Total Page:16
File Type:pdf, Size:1020Kb
Brick ClayMiningProject Form-1 & Pre-Feasibility Report for Environmental Clearance of the Proposed “Brick Clay Mining Project” (Area: 1.27 hectares or 3.14 acre) Address of Mining Area Area Sr. no. Khata No. Khasra No. Location (Acres) (hectares) Mauza- Rasulpur P.O- Marhaura 10 46 3.14 1.27 1 Dist-Saran State-Bihar Total 3.14 1.27 Submitted By M/s R.K. Bricks Sri Rakesh Kumar Singh Mauza-Rampur, P.O-Marhaura Dist-Saran, State-Bihar Prepared By Ascenso Enviro Pvt. Ltd. Formerly Known as Ascenso Management & Consulting Services Pvt. Ltd AQCI (NABET) Accredited Environmental Consulting Organization & ISO9001:2008 Certified Organization. S.No. Summary PageNo. 1 FormI 1-12 2 Pre-Feasibility Report 1-18 3 AnnexureI-LandDocuments 4 Annexure II–Khasra Map 5 AnnexureIII–500m. GoogleMap 6 Annexure IV – Site Photographs 7 AnnexureV–IdentityProof FORM-I Form I of Proposed Brick Clay Mining Project for M/s R.K. Bricks at Mauza-Rasulpur, P.O- Marhaura, Dist- Saran, State- Bihar. FORM 1 (APPLICATION FOR CLAY MINING FOR BRICK KILN) (I) Basic Information Sl.No. Item Details 1. Name of the project(s) Brick Clay Mining Project M/s R.K. Bricks 2. S.No. in the schedule 1(a) 3. Proposed capacity /area/length/tonnage to be 4532 Tonnes Per Annum or 3486 cu.m./year handled/command area/lease area/number of Area of the proposed mine is 1.27 ha. wells to be drilled. 4. New/Expansion/Modernization New 5. Existing Capacity/Area etc. 3.14 Acres or 1.27 hectares 6. Category of Project i.e. ‘A’ or ‘B’ B-2 7. Does it attract the general condition? If yes, No please specify. 8. Does it attract the specific condition? If yes, No please specify. 9. Location Brick Kiln: Latitude - 25°55'34.26"N Longitude - 84°46'08.42"E Mining Site: 1 Latitude - 25°55'38.82"N Longitude - 84°46'25.12"E Plot/Survey/Khasra No. Khata No.10 Khasra No. 46 Village Mauza Rasulpur Tehsil Marhaura District Saran State Bihar 10. Nearest railway station/airport along with Paterahi Jalal Railway Station, approx. 3.5 distance in kms. km towards ESE Patna International Airport, approx. 49 km towards SE 11. Nearest Town, City, District Headquarters Nearest Town is Chhapra approx. 15 km along with distance in kms. towards South District Headquarters: Chhapra approx. 15 Km towards South 12. Village Panchayats, Zilla Parishad, Municipal Village Panchayat- Rasulpur approx. 350 m Corporation, Local body (complete postal towards ENE. addresses with telephone nos. to be given) 13. Name of the applicant Sri Rakesh Kumar Singh 14. Registered Address M/s R.K. Bricks Sri Rakesh Kumar Singh Mauza-Rampur,P.O-Marhaura Dist-Saran, State- Bihar 15. Address for correspondence: Name Sri Rakesh Kumar Singh Consultant: Ascenso Enviro Pvt. Ltd Page 1 of 12 Form I of Proposed Brick Clay Mining Project for M/s R.K. Bricks at Mauza-Rasulpur, P.O- Marhaura, Dist- Saran, State- Bihar. Designation (Owner/Partner /CEO) S/O Vramhadev Singh Address 73, village-Rampur,Anchal-Marhaura Dist- Saran, State- Bihar Pin code 841414 E-mail Telephone No. +91-9955411313 Fax No. 16. Details of Alternative Sites examined, if any. No alternative sites. Location of these sites should be shown on a Being site specific as clay is suitable for topo sheet. brick making. 17. Interlinked Projects? No 18. Whether separate application of interlinked Not Applicable project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, No 1980? ii. The Wildlife (Protection) Act, 1972? No iii. The C.R.Z. Notification, 1991? No 22. Whether there is any Government Order/Policy No relevant /relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending against No the project and/or land in which the project is propose to be set up? a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. Consultant: Ascenso Enviro Pvt. Ltd Page 2 of 12 Form I of Proposed Brick Clay Mining Project for M/s R.K. Bricks at Mauza-Rasulpur, P.O- Marhaura, Dist- Saran, State- Bihar. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate Yes/ S.No. Information/Checklist confirmation quantities /rates, wherever possible) with No source of information data 1.1 Permanent or temporary change in Yes Land will be used for mining of clay to be land use, land cover or topography used as raw material in manufacturing of including increase in intensity of land bricks. Mining will be carried out use (with respect to local land use scientifically; it does not involve any plan) permanent change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) of the lease hold area. Only temporary changes will be foreseen due to mining operations. 1.2 Clearance of existing land, vegetation No There are no trees or existing structures on and buildings? the proposed mining site. Hence no clearance is required. 1.3 Creation of new land uses? Yes The mining activity will result creation of new land uses. 1.4 Pre-construction investigations e.g. bore No No pre-construction investigations are houses, soil testing? required for the proposed brick clay mining project since existence of mineral has been assessed on the basis of mineral outcrop. 1.5 Construction works? No No construction works are envisaged. 1.6 Demolition works? No No demolition works are envisaged as the lease hold area is a vacant land. 1.7 Temporary sites used for construction No Nearby village people will be hired to work works or housing of construction at the mining site; hence no temporary sites workers? for housing of workers will be required. Only temporary shelters nearby the site for resting purpose will be provided to the workers. 1.8 Above ground buildings, structures or No The proposed project will involve mining of earthworks including linear structures, brick clay from vacant land. Workers will be cut and fill or excavations hired from nearby villages to work at mining site. No housing facility will be required. Therefore, no above ground buildings, structures or earthworks including linear structures, cut and fill or excavations will be there. 1.9 Underground works including mining No The proposed project is open cast mining. or tunneling? There will be no underground mining or tunneling. Consultant: Ascenso Enviro Pvt. Ltd Page 3 of 12 Form I of Proposed Brick Clay Mining Project for M/s R.K. Bricks at Mauza-Rasulpur, P.O- Marhaura, Dist- Saran, State- Bihar. 1.10 Reclamation works? No No reclamation is required. 1.11 Dredging? No The proposed project aims at excavation of brick clay from a vacant land therefore no dredging will be done. 1.12 Offshore structures? No There will be no off shore structures. 1.13 Production and manufacturing No No production will be carried out that could processes? change the land use pattern or topography of the area. 1.14 Facilities for storage of goods or No Minerals excavated will be loaded directly materials? into trucks/tractors for transportation to the Brick Kiln. Hence no storage facility will be required. 1.15 Facilities for treatment or disposal of No Insignificant amount of Solid Waste or liquid solid waste or liquid effluents? effluents will be generated at the site by the workers, hired for the project. The waste generated will be managed by the workers themselves. 1.16 Facilities for long term housing of No Only villagers from nearby villages will be operational workers? employed for the mining operation. Thus no housing facility is proposed. However, only temporary shelters nearby the mining site for resting purpose will be provided to the workers. 1.17 New road, rail or sea traffic during No The project site is well connected to Brick construction or operation? Kiln by village road. No new road, rail or sea traffic is proposed. Only exiting transport network will be used. 1.18 New road, rail, air waterborne or other No There is already an approach road connecting transport infrastructure including new the mine lease area to the Brick Kiln. No or altered routes and stations, ports, physical changes to new road, rail or other airports etc. transport infrastructure is envisaged. 1.19 Closure or diversion of existing No There will be no closure or diversion of transport routes or infrastructure leading existing transport routes or infrastructure, to changes in traffic movements? which could lead to changes the traffic movements. 1.20 New or diverted transmission lines or No There are no new or diverted transmission pipelines? lines or pipelines in the project site. 1.21 Impoundment, damming, culverting, No No impoundment, damming, culverting, realignment or other changes to the realignment or other changes to the hydrology of watercourses or aquifers? hydrology of watercourses or aquifers is envisaged. 1.22 Stream crossings? No No stream crossings are anticipated. 1.23 Abstraction or transfers of water form No There is no abstraction of water within lease ground or surface waters? hold area so impact is negligible. 1.24 Changes in water bodies or the land No Changes in water bodies or the land surface surface affecting drainage or run-off? affecting drainage or run-off is not anticipated.