Curl Curl Beach Landscape Draft Masterplan
Total Page:16
File Type:pdf, Size:1020Kb
CURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN 03 04 05 07 06 08 CURL CURL BEACH LANDSCAPE MASTERPLAN DRAFT MASTERPLAN JUNE 2014 CURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN KEY BENEFITS OPEN SPACE EXISTING = 25600m2 REMOVAL OF EXOTIC SPECIES PROPOSED = 29000m2 TO BE REPLACED WITH NATIVE VEGETATION NATURAL/LANDSCAPED AREA EXISTING = 36200m2 PROPOSED = 38450m2 VEGETATION AREAS TO BE FENCED OFF TO PROTECT VEGETATION AND WILDLIFE PARKING SPACES MAIN CAR PARK MAINTAIN ACCESS TO LAGOON EXISTING = 172 FOR DOG PLAY PROPOSED = 174 SOUTH CURL CURL SLSC MAIN OFF LEASH DOG AREA. EXISTING = 36 POTENTIAL FOR DOG PLAY PROPOSED = 36 EQUIPMENT COASTAL WALK CAR PARK DECOMPOSED GRANITE PATH EXISTING = 20 AROUND OFF LEASH DOG PLAY PROPOSED = 18 AREA PEDESTRIAN WALKS DECOMPOSED GRANITE MEETING CONCRETE = 860m 64 SPACES POINT DECOMPOSED GRANITE = 1290m BOARDWALK = 40m PEDESTRIAN LINK FROM BEACH TO ADAMS STREET OVAL AND ADJACENT PEDESTRIAN WALKS DECOMPOSED GRANITE SECONDARY PATH LINKING PRIMARY PATH TO DOG PLAY AREA OFF LEASH DOG PLAY AREA AND KICK-ABOUT SPACE. IMPROVEMENTS TO TURFED AREAS THROUGHOUT SITE REMOVAL OF EXOTIC SPECIES 28 SPACES TO BE REPLACED WITH NATIVE VEGETATION ENTRY FEATURE AND LINK TO CURL CURL BEACH FROM ADJACENT STREETS. CLEARING OF EXISTING VEGETATION TO CREATE VIEWS PRIMARY DECOMPOSED GRANITE PATH LINKING THE NORTH AND 24 SPACES SOUTH AREAS OF THE SITE REPLACEMENT OF SELECTED VEGETATION TO INCREASE SURVEILLANCE INTO SITE 32 SPACES INVESTIGATE NEW ENTRY OPTIONS TO IMPROVE TRAFFIC FLOW AND SAFETY START OF OFF LEASH DOG AREA. INFORMATION SIGN AND CHANGE 26 SPACES IN SURFACE IMPROVED EFFICIENCY AND SURFACE OF EXISTING PARKING IMPROVED CONNECTIONS FROM CAR PARK AND PRIMARY PATH TO BEACH EXTENSION OF GREEN SPACE WITH NEW SHELTERS AND BBQ FACILITIES TO CREATE VIEWING AREA PRIMARY CONCRETE PATH CONNECTION THROUGH SITE. CREATING SEPARATION FROM SAND DUNES BUS STOP TO REMAIN IN EXISTING LOCATION RAISED ACCESSIBLE RAMP ABOVE EXISTING DUNE VEGETATION FUTURE RESURFACING OF EXISTING PROMENADE IN FRONT OF SOUTH CURL CURL SLSC AND CONNECTION TO ROCK POOL FUTURE RESURFACING OF EXISTING CARPARK AND LOADING ZONE 52 SPACES ACCESSIBLE RAMP CONNECTING COASTAL WALK TO CURL CURL BEACH WALK IMPROVED EFFICIENCY AND SURFACE OF EXISTING PARKING 18 SPACES CURL CURL BEACH LANDSCAPE MASTERPLAN DRAFT MASTERPLAN JUNE 2014 CURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN - DOG PLAY AREAS KEY EXISTING OFF LEASH DOG PLAY PROPOSED OFF LEASH DOG PLAY CURL CURL BEACH LANDSCAPE MASTERPLAN DRAFT MASTERPLAN JUNE 2014 CURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN - 03 SITE KEY OFF LEASH DOG PLAY AREA. POTENTIAL FOR DOG PLAY EQUIPMENT DECOMPOSED GRANITE PATH AROUND OFF LEASH DOG PLAY AREA REMOVAL OF EXOTIC SPECIES TO BE REPLACED WITH NATIVE VEGETATION DECOMPOSED GRANITE PEDESTRIAN LINK CONNECTING BEACH TO ADAM STREET OVAL, ADJACENT DOG PLAY AREAS AND PEDESTRIAN TRAILS RELOCATION OF EXISTING SHOWER TURNING CIRCLE AND DROP OFF ZONE DECOMPOSED GRANITE MEETING POINT WITH SEATING AT END OF CAR PARK AND MAIN ENTRANCE TO NORTHERN END OF CURL CURL BEACH IMPROVED EFFICIENCY AND SURFACE OF EXISTING CAR PARK. NEW LANDSCAPING INCLUDING TREES AND MEDIAN PLANTING IMPROVED LANDSCAPING WITH IMPROVED TURFED AREAS AND CLEARING OUT OF WEEDS AND DEAD VEGETATION OFF LEASHED DOG PLAY AREA DECOMPOSED GRANITE WALKING PATH LINKING NORTH AND SOUTH AREAS OF SITE CURL CURL BEACH LANDSCAPE MASTERPLAN DRAFT MASTERPLAN JUNE 2014 CURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN - 04 SITE KEY IMPROVED EFFICIENCY AND SURFACE OF EXISTING CAR PARK KICK-ABOUT SPACE. IMPROVEMENTS TO TURFED AREAS THROUGHOUT SITE REMOVAL OF EXOTIC SPECIES TO BE REPLACED WITH NATIVE VEGETATION LINKING ROAD FOR NORTH AND SOUTH SECTIONS OF CAR PARK CLEARING OF EXISTING DENSE VEGETATION AND REPLACE WITH SUITABLE TREES TO INCREASE SURVELLIANCE INTO SITE AND CREATE STRONG VIEWS FROM STREET DECOMPOSED GRANITE PEDESTRIAN WALK LINKING NORTH AND SOUTH AREAS OF SITE DECOMPOSED GRANITE PATH CONNECTING MAIN BEACH PATHWAY LINK TO CARRINGTON PARADE PATHWAY PRIMARY PATH LINKING THE NORTH AND SOUTH AREAS OF THE SITE ENTRY FEATURE TO CURL CURL BEACH. VIEWS FROM CARRINGTON PARADE, GRIFFIN ROAD AND ADAM STREET TURNING CIRCLE FOR VEHICLES TO MINIMISE CONGESTION WHEN LOOKING FOR PARKING REMOVAL OF EXOTIC SPECIES TO BE REPLACED WITH NATIVE VEGETATION PROTECTION OF ADJACENT DUNE VEGETATION IMPROVED CONNECTIONS TO BEACH WALKWAYS IMPROVED EFFICIENCY AND SURFACE OF EXISTING CAR PARK CURL CURL BEACH LANDSCAPE MASTERPLAN DRAFT MASTERPLAN JUNE 2014 CURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN - 05 SITE KEY IMPROVED EFFICIENCY AND SURFACE OF EXISTING CAR PARK UPGRADED CAR PARK LANDSCAPING, INCLUDING NEW TREES AND MEDIAN PLANTING IMPROVED LANDSCAPING WITH MASS PLANTING OF TREES ALONG PEDESTRIAN WALK IMPROVED CONNECTIONS TO BEACH WALKWAYS REPLACEMENT OF SELECTED VEGETATION TO INCREASE SURVEILLANCE TURNING CIRCLE AND DROP OFF ZONE RETAIN EXISTING MEMORIAL SEATING EXTENSION OF GREEN SPACE WITH NEW SHELTERS AND BBQ FACILITIES PRIMARY CONCRETE PATH CONNECTION THROUGH SITE. CREATING SEPARATION FROM SAND DUNES NEW SEATING ALONG PEDESTRIAN WALKWAY UPGRADE OF EXISTING SITE FURNITURE REMOVAL OF EXISTING FURNITURE TO CREATE LARGER OPEN PLAY SPACE PROTECTION OF ADJACENT DUNE VEGETATION CURL CURL BEACH LANDSCAPE MASTERPLAN DRAFT MASTERPLAN JUNE 2014 CURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN - 06 SITE KEY PRIMARY PEDESTRIAN PATH CONNECTING SOUTHERN AND NORTHERN AREAS OF SITE RELOCATION OF EXISTING SITE SHOWERS 1 : 14 RAISED ACCESSIBLE RAMP OVER DUNE VEGETATION MAINTAIN EXISTING RAMP ACCESS UPGRADE EXISTING SITE FURNITURE AND LIFEGUARD VIEWING AREA MAINTAIN EXISTING STAIR ACCESS FROM CARRINGTON PARADE TO BEACH PROMENADE FUTURE RESURFACING OF EXISTING PROMENADE IMPROVED OUTDOOR DINING NEW STAIR CONNECTION FROM CARRINGTON PARADE. SEPARATING PEDESTRIAN AND VEHICULAR ACCESS ADJUSTED ENTRY RAMP TO CAR PARK FROM CARRINGTON PARADE TO ACCOMMODATE NEW PEDESTRIAN CONNECTION SCREENING FOR EXISTING BIN STORAGE AREA IMPROVED EFFICIENCY AND SURFACE OF EXISTING PARKING AREA AND LOADING ZONE FUTURE RESURFACING OF EXISTING PROMENADE AND CONNECTION TO ROCK POOL 1 : 13 ACCESSIBLE RAMP CONNECTING TOP CAR PARK WIDENING OF EXISTING STAIRS TO ROCK POOL VIEWING POINT WITH SEATING 1 : 13 ACCESSIBLE RAMP CONNECTING EXISTING COASTAL WALK TO CURL CURL BEACH AND PROPOSED PEDESTRIAN LINK NEW RETAINING WALL TO ALLOW FOR RECONFIGURATION OF CAR PARK NEW VIEWING AREA AND MEETING POINT AT END/BEGINNING OF COASTAL WALK IMPROVED EFFICIENCY AND SURFACE OF EXISTING CAR PARK ALLOWING EASY TURN AROUND POINT CURL CURL BEACH LANDSCAPE MASTERPLAN DRAFT MASTERPLAN JUNE 2014 CURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN - 07 SITE KEY PRIMARY PEDESTRIAN PATH CONNECTING SOUTHERN AND NORTHERN AREAS OF SITE IMPROVED BEACH ACCESS RELOCATION OF EXISTING SHOWER 1 : 14 RAISED ACCESSIBLE RAMP OVER DUNE VEGETATION AA’ PROTECTION OF ADJACENT DUNE VEGETATION MAINTAIN EXISTING RAMP ACCESS FUTURE RESURFACING OF EXISTING PROMENADE RETAIN EXISTING STAIR ACCESS EXISTING FOOTPATH RELOCATED SHOWER NEW DUNE VEGETATION WITH PROPOSED RAISED TIMBER BOARDWALK CURL CURL BEACH CONCRETE PATH SECTION AA’ - 1 : 100 CURL CURL BEACH LANDSCAPE MASTERPLAN DRAFT MASTERPLAN JUNE 2014 CURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN - 08 SITE KEY AA’ IMPROVED SURFACE TREATMENT TO EXISTING PROMENADE AND CONNECTION TO ROCK POOL WIDENING OF EXISTING STAIRS TO 1500mm WIDE VIEWING POINT WITH SEATING 1 : 13 ACCESSIBLE RAMP CONNECTING TOP CAR PARK AND COASTAL WALK TO CURL CURL BEACH NEW WHEEL STOPS TO ACT AS BARRIER FOR PEDESTRIAN WALK IMPROVED EFFICIENCY AND SURFACE OF EXISTING CAR PARK, MAINTAINING VIEWS TO BEACH BEGINNING/END OF EXISTING COASTAL WALK. NEW SEATING AND SHELTER TO CAPTURE SURROUNDING COASTAL VIEWS CARRINGTON PARADE RECONFIGURED CARPARK NEW HEADLAND EXISTING CONCRETE PROMENADE ROCK POOL CONCRETE PATH SECTION AA’ - 1 : 100 CURL CURL BEACH LANDSCAPE MASTERPLAN DRAFT MASTERPLAN JUNE 2014.