2012-05-15 Connecting Columbia Improvement Recommendations
Total Page:16
File Type:pdf, Size:1020Kb
Columbia Active Transportation Action Agenda DRAFT -- Improvement Recommendations -- DRAFT V. 3 - 05/15/2012 Primary Recommendation Type Location ID # Location Description Route Classification Length Cost Comments Operator Sidepath Connection 3 Columbia Road - from recommendation # 5 at 10 foot wide sidepath on north side of Columbia Road Primary Connect to recommendation # 9 Clarksville Pike to pathway entrance of Dorsey Hall Swim Club Sidepath Connection/Sidewalk 4 Columbia Road - between Community center pool drive 10 foot wide sidepath on south side of Columbia Road Primary Connect to recommendation # 5; widen existing sidewalk along Columbia Road Widening and Recommended Pathway Connection to the east of from Dorsey Hall to existing pathway connection east of Hemlock Cove Way Kingscup Court Sidepath Connection 5 Clarksville Pike - from path entrance east of Wood Road 10 foot wide sidepath on north side of Clarksville Pike to Columbia Road Sidepath Connection 6 Clarksville Pike - between Davidage Drive and Columbia 10 foot wide sidepath on south side of Clarksville Pike Road Sidepath Connection/Sidewalk 7 Clarksville Pike - between Ten Mills Road and existing 10 foot wide sidepath on south side of Columbia Road Widen existing facility Widening pathway Pathway Connection 9 From Columbia Road to Meadowbrook Athletic 10 foot wide pathway extending under Route 29 via Primary Connect to recommendation # 4 and crossing under Route 29 Complex trails tunnel Pathway Connection 10 From the Meadowbrook Athletic Complex trails to the 10 foot wide pathway Primary Connections to pass through Dower Drive and Wethered Drive and connect to Oakland Business Center existing paths and sidewalk connections Sidepath Connection 11 Rumsey Road - existing pathway to Red Branch Road 10 foot wide sidepath on west side of Rumsey Road Pathway Connection 12 Connection between two existing pathways to the 10 foot wide pathway Tertiary Close gap in existing pathway network at Oakland Business Center south of Red Branch Road Pathway Connection 13 Connection behind Columbia Palace - from existing 10 foot wide pathway Primary pathway at Red Branch Road to the intersection of Centre Park Drive and Old Annapolis Road Sidepath Connection 14 Phelps Luck Road - Old Annapolis Road to Graywing 10 foot wide sidepath on west side of Phelps Luck Road Primary Court Sidepath Connection 15 Phelps Luck Road - Graywing Court to existing pathway 10 foot wide sidepath on east side of Phelps Luck Road Primary (midway between Enberend Terrace and Halflight Garth) Pathway Connection 16 Connection along stream valley - existing pathway east 10 foot wide pathway Primary Connection along stream valley of Thunder Hill Road and Phelps Luck Road Pathway Connection 18 From the intersection of Basket Ring Road and Stevens 10 foot wide pathway Forest Road, north to existing pathways Sidewalk 19 Kilimanjaro Road - from high school entrance driveway 10 foot wide sidepath on north side of Kilimanjaro Road Primary Existing sidewalk to be widened to existing pathway 1 of 7 Columbia Active Transportation Action Agenda Primary Recommendation Type Location ID # Location Description Route Classification Length Cost Comments Operator Pathway Connection/Improvement 20 Improved pathway between Blandair Park and 10 foot wide pathway Primary Kilimanjaro Road along east side of Oakland Mills High School Sidepath Connection 21 Old Montgomery Road - from existing pathway at 10 foot wide sidepath on north side of Old Montgomery Primary Jeffers Pool to Tamar Drive Road Pathway Connection 22 Improved existing pathway west of Long Reach Village 10 foot wide pathway Secondary Center to Lambskin Lane Sidewalk Widening 23 Tamar Drive -- Cloudleap Court to Old Dobbin Road 10 foot wide sidepath on south side of Tamar Drive Widen existing sidewalk Pathway Connection 24 Along utility easement - from intersection of Little 10 foot wide pathway Patuxent Parkway and Dobbin Road to Stonecutter Road Sidepath Connection 25 Waterloo Road -- Brothers Partnership Court to 10 foot wide sidepath on east side of Waterloo Road Snowden River Parkway Sidepath Connection 26 Waterloo Road - from Snowden River Parkway to 10 foot wide sidepath on east side of Waterloo Road University Boulevard Sidepath Connection 27 Old Montgomery Road - existing pathway at Waterloo 10 foot wide sidepath on north side of Old Montgomery Elementary to Brightfield Road Road Sidewalk Widening 28 Old Dobbin Road - from Columbia Crossing at Dobbin 10 foot wide sidepath on east side of Old Dobbin Road Recommendation in County 2006 Pedestrian Plan #146; widen existing sidewalk Road to Tamar Drive Sidepath Connection 29 Dobbin Road - from McGaw Court to Dobbin Center 10 foot wide sidepath on north side of Dobbin Road Primary Recommendation in County 2006 Pedestrian Plan #146 Way Sidepath Connection 30 Dobbin Road - from Dobbin Center Way to Columbia 10 foot wide sidepath on south side of Dobbin Road Recommendation in County 2006 Pedestrian Plan #146 Crossing Circle; Columbia Crossing Circle to Snowden and 10 foot wide sidepath on north side of Dobbin Road River Parkway Sidepath Connection 32 Columbia Crossing Circle -- Access to Columbia Crossing 10 foot wide sidepath Recommendation in County 2006 Pedestrian Plan #146 Shopping Center from Dobbin Road Sidepath Connection 34 Stanford Blvd - Dobbin Road to existing pathway on the 10 foot wide sidepath on south and west sides of west side of Stanford Blvd Stanford Blvd Pathway Connection 36 Utility Line Crossing - East end of Tamar Drive to Dobbin 10 foot wide pathway across floodplain/wetland to Primary Recommendation in County 2006 Pedestrian Plan #136 Center Way Tamar (Bridge/boardwalk) Pathway Connection 37 McGaw Road - From existing county pathway behind 10 foot wide pathway from existing pathway to along Pathway connection behind Dobbin Center to Wegmans Dobbin Center to Snowden River Parkway east side of McGaw Road with possible bridge/boardwalk Pathway Connection 38 Existing pathway located east of Oakland Mills Road to 10 foot wide pathway with possible bridge/boardwalk Community Gardens Sidewalk Widening 39 Oakland Mills Road - Pathway tunnel to Dasher Court 10 foot wide sidepath on west side of Oakland Mills Widen existing sidewalk with existing Minibus Right of Way Road 2 of 7 Columbia Active Transportation Action Agenda Primary Recommendation Type Location ID # Location Description Route Classification Length Cost Comments Operator Sidepath Connection 40 Snowden River Parkway - Little Patuxent Parkway to 10 foot wide sidepath on north side of Snowden River Primary Recommendation in County 2006 Pedestrian Plan #132, 133 (sidewalk Waterloo Road Parkway improvements on south side of Snowden River Parkway) Sidepath Connection 41 Waterloo Road - Little Patuxent Parkway to Old 10 foot wide sidepath on east side of Waterloo Road Primary Recommendation in County 2006 Pedestrian Plan #130 (sidewalk improvements to Montgomery Road Columbia Gateway) Pathway Connection 42 Columbia Gateway Drive (east) to Little Patuxent 10 foot wide pathway Parkway (175) Sidepath Connection 43 Alexander Bell Drive - From existing pathway to 10 foot wide sidepath on south side of Alexander Bell Primary Columbia Gateway Drive Drive Sidepath Connection 44 Robert Fulton Drive - from Columbia Gateway Drive to 10 foot wide sidepath on south side of Robert Fulton Primary County Capital Improvement project #139 (entire length of Robert Fulton Drive Solar Walk Drive with sidewalk improvements) Pathway Connection 45 From west of Robert Fulton Drive to potential rail 10 foot wide pathway Primary Connect to Recommendation #46 corridor Pathway Connection 46 Along existing rail corridor to Berger Drive 10 foot width pathway along rail line (Rail to Trail or Primary Rail with Trail) Sidepath Connection/Pathway 49 Guilford Road/Gerwig Lane/Open Space Area - 10 foot sidepath on south side of Guilford Road and Primary Connect to Recommendation #46; widen existing sidewalk along Guilford Road Connection/Sidewalk Widening Hammond Hill HS to rail line Gerwig Road/10 pathway in open space area Pathway Connection 50 Parallel to Guilford Road, between Hammond HS and 10 foot wide pathway Primary Possible education pathway in stream valley Kings Contrivance Commercial Center Pathway Connection 51 Utility Easement - from Skyrock Court to Rain Flower 10 foot wide pathway Way Pathway Connection 52 From Huntington Pool to existing pathways at Kings 10 foot wide pathway Primary Crossing through King Contrivance Park Contrivance Park Pathway Connection 53 From existing King Contrivance Park (county trail) south 10 foot wide pathway Tertiary to Vollmerhausen Road and Early Spring Way Pathway Connection 54 From end of Moonride Lane off of Sweet Grass Ridge to 10 foot wide pathway Tertiary existing pathway Pathway Connection 55 From existing pathway off Second Time Lane to Sweet 10 foot wide pathway Primary Hours Way Pathway Connection 56 Connection behind townhomes on Setting Sun Way to 10 foot wide pathway Primary single family homes along Kindler Road Sidewalk Widening 57 Eden Brook Drive - From pathway entrance to the west 10 foot wide sidepath on north side of Eden Brook Primary Widen existing sidewalk of Setting Sun Way and Sweet Hours Way Drive Sidewalk Widening 58 Kindler Road - from west end of First League to Little 10 foot wide sidepath on south side of Kindler Road and Primary Widen existing sidewalk Bird Path First League Pathway Connection 59 Stream valley path - from Montpelier Road to existing 10 foot wide pathway Primary Cross Old Columbia