How Can Investors Source Data Centres in Hong Kong?

Total Page:16

File Type:pdf, Size:1020Kb

How Can Investors Source Data Centres in Hong Kong? May 13, 2020 How Can Investors Source Data Centres in Hong Kong? 1. Introduction 1.1 The rapid development of the information 1.2 Hong Kong’s position as an international and communications technology industry financial, trading and logistics centre (such as e-commerce and cloud means that data centres facilities are computing services) globally has driven essential in supporting the operations the demand for supply of data centre and continuous growth of the local as facilities globally in recent years. well as international corporations in According to a market study in 2019,1 the Hong Kong. According to the Final Hong Kong data centre market was worth Consultancy Report on Review of Land US$883 million in 2018, and it is projected Requirement for Grade A Offices, that this will increase to US$1.7 billion in Business and Industrial Uses issued in 2023. Meanwhile, the high price of a high- January 2017,3 given Hong Kong’s sound tier data centre site in Tseung Kwan O sold legal system and strategic geographical in 2018, which was about 5 times higher location, it will continue to be an ideal than the neighbouring high-tier data data centre destination for the financial centre site sold to the same purchaser in services industry and mainland 2013, correspondingly indicates a strong companies in the region. demand for data centre sites in Hong 1.3 However, despite this rosy picture, Kong.2 In recent months, we have also sourcing data centres in Hong Kong has received enquiries from clients keen to never been easy for investors. Against acquire data centres for investment this background, this article seeks to purposes. address the question: what are the 1 Hong Kong DCI Report 2019: Data Centre Colocation, Hyperscale Cloud & Interconnection, Structure Research, January 2019 2 The Growing Demand for Data Centres, Colliers Flash, Colliers International, 21 December 2018 (https://www.colliers.com/- /media/images/apac/hong%20kong/2018%20images/flash_report/20181221-data- centre/181221_colliers_hk_flash_data_centre_final_r1.pdf) 3https://www.hk2030plus.hk/document/Review%20of%20Land%20Requirement%20for%20Grade%20A%20Offices_Bu siness%20and%20Industrial%20Uses(Eng)_FCR.pdf sources of land supply for data centres 3. What are the sources of land in Hong Kong? supply for data centres in Hong Kong? 2. What has the government’s policy been? 3.1 If an investor intends to acquire or develop a data centre, there are the 2.1 The government has been reiterating its following primary alternatives:8 commitment to fostering Hong Kong as a prime location for data centres in the (a) land sale by the government; region.4 According to a discussion paper (b) conversion of existing industrial on Data Centre Development in Hong buildings by way of lease Kong issued by the Office of the modification or waiver pursuant Government Chief Information Officer to practice note(s) of the Lands (OGCIO) in March 2011,5 policy support Administration Office of the measures to encourage and facilitate the Lands Department (LandsD); development mid-tier data centres had and already been established. As government policy further evolved, the then-Financial (c) purchasing or renting9 readily- Secretary announced in the 2011-12 available data centre sites Budget Speech that the government was and/or building spaces in the exploring appropriate measures to open market. facilitate the development of more high- tier data centres in Hong Kong.6 4. Land sale 2.2 To meet the projected growth in 4.1 Back in 2012, the government was keen demand for data centres, OGCIO has to increase short-term land supply for 10 been implementing a number of data centres in Hong Kong. As a result, measures to facilitate data centre three sites were reserved in Tseung development in Hong Kong, such as Kwan O (i.e. Tseung Kwan O Town Lot setting up a Data Centre Facilitation Unit Nos.122, 123 and 127) for high-tier data and a thematic information portal to centre development. Subsequently, in provide coordinated services to 2013/14 and 2018/19, Tseung Kwan O 11 interested developers and investors on Town Lot No.122 and Tseung Kwan O matters related to setting up of data centres in Hong Kong and identifying sites for development of high-tier data centres and appropriate land disposal arrangements.7 4 Paper No.1/2011 (https://www.datacentre.gov.hk/en/downloads/paper_1-2011.pdf) 5 Ditto 6 Ditto, paragraph 8 7 https://www.ogcio.gov.hk/en/our_work/business/data_centre 8 https://www.datacentre.gov.hk/en/availablelands.html 9 This article focuses on the acquisition and development of data centres from the perspective of investors. If an operator intends to find a site to operate a data centre, it could also consider renting those premises that are readily-available in the market. 10 https://www.datacentre.gov.hk/en/downloads/2016%20Legco%20Brief%20on%20incentive%20measures%20itb- e.pdf 11 https://www.landsd.gov.hk/en/landsale/records/2013-2014.pdf 2 Mayer Brown | How Can Investors Source Data Centres in Hong Kong? Town Lot No.13112 (which were formerly other land has been sold specifically for Tseung Kwan O Town Lot Nos.123 and data centre use since 2011. Separately, 127) were sold through open tender, according to the latest Land Sale with the user being specifically restricted Programme,15 no land available exclusively to a high-tier data centre. Meanwhile, for setting up data centres of any kind Tsuen Wan Town Lot No.428 was also appears to be for sale in Hong Kong in the sold through open tender in 2018 with near future.16 Further, the government has permissible uses that included not announced any definitive plan or information technology and proposal on how to increase long-term telecommunications (ITT) industries. land supply specifically for data centres in According to the Land Sale Records of Hong Kong. LandsD, subsidiaries of SUNeVision 4.4 Although other lots with more general Holdings Limited (stock code: 1686) permissible uses have been sold in the bought all of these lots for operating past as mentioned above, given the data centres. generally limited land supply in Hong 4.2 For the sake of completeness, in Kong and the specific infrastructure addition to the relevant lots mentioned requirements for data centres, investors above that are specifically designated who are keen to develop data centres for high-tier data centres, the would have to compete for those government also sold other lots from suitable lots with others, who may 2015 to 2018 with other more general simply intend to acquire the relevant permissible uses that either include ITT lots for more general purposes. industries or otherwise may not be Considering the long investment cycle inconsistent with data centre use. For for data centres and that other asset example, Kwai Chung Town Lot No.495 classes could produce swifter or greater was sold to a subsidiary of Hon Kwok returns, if the government does not Land Investment Company Limited introduce more data centre-specific lots, (stock code: 160) in 2015 with the user it will be difficult for Hong Kong to restriction of “non-residential (excluding attract more investors to develop data hotel, petrol filling station and residential centres in the long run. care home) purpose” which is currently 5. Conversion of existing being developed into a data centre for industrial buildings producing recurring rental income and is scheduled for completion in 2020.13 5.1 Many existing industrial buildings in Hong Kong, with high ceilings, high 4.3 Looking back, according to the Land Sale floor loading and flexible floor layout, Records of LandsD since 2011 up to now,14 except for the Tseung Kwan O lots mentioned in paragraph 4.1 above, no 12 https://www.landsd.gov.hk/en/landsale/records/2018-2019.pdf 13 https://honkwok.com.hk/portfolio/hong-kong-kwai-chung 14 https://www.landsd.gov.hk/en/landsale/records.htm 15 https://www.landsd.gov.hk/en/landsale/programme_202021.htm 16 Only one industrial lot (i.e. Sha Tin Town Lot No.613) is forecast to be launched in April to June 2020 (https://www.landsd.gov.hk/en/landsale/forecast_202021q1.htm). However, because LandsD has not made the relevant tender documents available yet, the specific permissible uses of the lot (e.g. whether ITT industries will be included) are still uncertain. All other lots forecast to be launched up to March 2021 are for residential, commercial and commercial/hotel uses (https://www.landsd.gov.hk/en/landsale/programme_202021.htm). 3 Mayer Brown | How Can Investors Source Data Centres in Hong Kong? could be transformed into data centres conditions”,18 Furthermore, an (either entirely or in part).17 administrative fee is also payable for LandsD to process the application. 5.2 Apart from the technical requirements, whether an industrial building can be From 25 June 2012 to 31 December converted into a data centre is also 2017 (i.e. the period for which the Audit subject to land use restrictions in the Commission conducted its review) relevant land grant. If “data centre” is (Audit Period),19 LandsD received only not a permitted use, the owner(s) of that four such applications . One of them was industrial building will have to apply for withdrawn, and two were still being a lease modification or a waiver. The processed as at 31 December 2017.20 owner(s) should also consider whether The remaining application was town planning approval is necessary successfully completed by the execution having regard to the zoning of the area of a modification letter in 2015 where the relevant industrial building is concerning No.56 Ta Chuen Ping Street, situated.
Recommended publications
  • The Chief Executive's 2020 Policy Address
    The Chief Executive’s 2020 Policy Address Striving Ahead with Renewed Perseverance Contents Paragraph I. ‌Foreword: Striving Ahead 1–3 II. ‌Full Support of the Central Government 4–8 III. ‌Upholding “One Country, Two Systems” 9–29 Staying True to Our Original Aspiration 9–10 Improving the Implementation of “One Country, Two Systems” 11–20 The Chief Executive’s Mission 11–13 Hong Kong National Security Law 14–17 National Flag, National Emblem and National Anthem 18 Oath-taking by Public Officers 19–20 Safeguarding the Rule of Law 21–24 Electoral Arrangements 25 Public Finance 26 Public Sector Reform 27–29 IV. ‌Navigating through the Epidemic 30–35 Staying Vigilant in the Prolonged Fight against the Epidemic 30 Together, We Fight the Virus 31 Support of the Central Government 32 Adopting a Multi-pronged Approach 33–34 Sparing No Effort in Achieving “Zero Infection” 35 Paragraph V. ‌New Impetus to the Economy 36–82 Economic Outlook 36 Development Strategy 37 The Mainland as Our Hinterland 38–40 Consolidating Hong Kong’s Status as an International Financial Centre 41–46 Maintaining Financial Stability and Striving for Development 41–42 Deepening Mutual Access between the Mainland and Hong Kong Financial Markets 43 Promoting Real Estate Investment Trusts in Hong Kong 44 Further Promoting the Development of Private Equity Funds 45 Family Office Business 46 Consolidating Hong Kong’s Status as an International Aviation Hub 47–49 Three-Runway System Development 47 Hong Kong-Zhuhai Airport Co-operation 48 Airport City 49 Developing Hong Kong into
    [Show full text]
  • Procedure and Practice Adopted by the Board in Conducting Its Business So That Consistency Can Be Ensured
    PART I - INTRODUCTION Preamble 1.1 The conduct of the Town Planning Board (the Board or TPB) is subject to the provisions of the Town Planning Ordinance (the Ordinance) (Cap. 131) and the general principles of administrative law that it must act fairly and reasonably. This document incorporates the procedure and practice adopted by the Board in conducting its business so that consistency can be ensured. This document is subject to revision as and when considered necessary. Establishment and Functions of the Board 1.2 The Board is a statutory body established under section 2 of the Ordinance. 1.3 The Board’s main functions are laid down in section 3 of the Ordinance, i.e. to undertake the systematic preparation of plans for the layout of such areas of Hong Kong (i.e. Outline Zoning Plans and Development Permission Area Plans) as well as for the types of buildings suitable for erection therein with a view to the promotion of the health, safety, convenience and general welfare of the community. The Board also considers applications for amendment of plan under section 12A, for planning permission under section 16 and amendment to planning permission under section 16A of the Ordinance and conducts, under section 17, reviews on its decisions on section 16 and section 16A applications. 1.4 Furthermore, under section 25 of the Urban Renewal Authority (URA) Ordinance, Cap. 563, the URA may submit any plan prepared under subsection (3)(a) of the URA Ordinance to the Board for consideration. Upon the submission of a plan so prepared by the URA, the Board may deem the plan as suitable for publication, with or without amendments, or may refuse to deem the plan as being suitable for publication.
    [Show full text]
  • For Discussion
    Annex 1 Proposed Job Description Chief Town Planner/District Urban Renewal Forum Rank : Chief Town Planner (D1) Responsible to : Assistant Director/Metro Major Duties and Responsibilities – 1. To perform the role of Secretary to the advisory platform of District Urban Renewal Forum (DURF) in the pilot areas. 2. To supervise and manage the provision of secretariat services and professional advice to enable effective operation and functioning of DURFs. To closely engage the major stakeholders in the process and attend meetings with various committees, professional groups, trade-related bodies, and non-government organisations (NGOs) as directed by DURFs as well as other liaison meetings / discussion forums / workshops / briefings to gauge the views of the stakeholders / organisations / concerned groups. 3. To help commission and manage the consultants in undertaking consultancy studies proposed by DURFs, formulate Urban Regeneration Plans for the areas, and to translate them, where appropriate, into detailed Action Area Plans for implementation. To keep in view other urban renewal initiatives by the government sector and the non-government sector in the pilot districts with a view to formulating an integrated urban renewal blueprint at the district level. 4. To help commission and manage the public engagement exercises, and present the findings to DURFs and, where appropriate, to present those findings to the relevant committees, professional groups, trade-related bodies, NGOs and any other bodies to facilitate the implementation of proposals. 5. To provide briefings for policy bureaux, departments, public utility agencies, the mass media and the general public on DURF related matters in the pilot districts. - 2 - 6. To review and report the effectiveness of the pilot DURFs with a view to recommending the way forward of this pilot framework within the intended timeframe.
    [Show full text]
  • Audit Commission Hong Kong 25 October 2010
    CHAPTER 3 Hong Kong Observatory Hong Kong Observatory Audit Commission Hong Kong 25 October 2010 This audit review was carried out under a set of guidelines tabled in the Provisional Legislative Council by the Chairman of the Public Accounts Committee on 11 February 1998. The guidelines were agreed between the Public Accounts Committee and the Director of Audit and accepted by the Government of the Hong Kong Special Administrative Region. Report No. 55 of the Director of Audit contains 11 Chapters which are available on our website at http://www.aud.gov.hk. Audit Commission 26th floor, Immigration Tower 7 Gloucester Road Wan Chai Hong Kong Tel : (852) 2829 4210 Fax : (852) 2824 2087 E-mail : [email protected] HONG KONG OBSERVATORY Contents Paragraph PART 1: INTRODUCTION 1.1 Background 1.2 Financial provision and staffing 1.3 – 1.4 Audit review 1.5 Acknowledgement 1.6 PART 2: AUTOMATIC WEATHER STATIONS 2.1 Automatic weather station network 2.2 Removal of automatic weather 2.3 stations and weather element sensors Audit observations and recommendation 2.4 – 2.5 Response from the Administration 2.6 Maintenance of meteorological 2.7 equipment at automatic weather stations Audit observations and recommendations 2.8 – 2.11 Response from the Administration 2.12 Maintenance of non-meteorological equipment 2.13 by the Electrical and Mechanical Services Department Audit observations and recommendations 2.14 – 2.17 Response from the Administration 2.18 – 2.19 Site selection for new automatic weather stations 2.20 Audit observations and recommendations
    [Show full text]
  • Minutes of 994 Meeting of the Town Planning Board Held on 14.10.2011
    Minutes of 994 th Meeting of the Town Planning Board held on 14.10.2011 Present Mr. Stanley Y.F. Wong Vice-Chairman Mr. Walter K.L. Chan Mr. B.W. Chan Mr. Raymond Y.M. Chan Mr. Y.K. Cheng Mr. Felix W. Fong Ms. Anna S.Y. Kwong Professor Paul K.S. Lam Mr. Rock C.N. Chen Mr. Timothy K.W. Ma Professor P.P. Ho Professor Eddie C.M. Hui Dr. C.P. Lau Ms. Julia M.K. Lau Mr. Clarence W.C. Leung Mr. Laurence L.J. Li - 2 - Mr. Roger K.H. Luk Ms. Anita W.T. Ma Professor S.C. Wong Dr. W.K. Yau Mr. Stephen M.W. Yip Principal Assistant Secretary (Transport) Transport and Housing Bureau Ms. Elsa Cheuk Deputy Director of Environmental Protection Mr. Benny Wong Assistant Director (2), Home Affairs Department Mr. Frankie Chou Director of Lands Miss Annie Tam Director of Planning Mr. Jimmy Leung Deputy Director of Planning/District Secretary Miss Ophelia Y.S. Wong Absent with Apologies Mr. Thomas Chow Chairman Mr. K.Y. Leung Ms. Maggie M.K. Chan Professor Edwin H.W. Chan Dr. James C.W. Lau Mr. Maurice W.M. Lee Dr. Winnie S.M. Tang Dr. W.K. Lo Ms. Pansy L.P. Yau - 3 - In Attendance Assistant Director of Planning/Board Mr. C.T. Ling Chief Town Planner/Town Planning Board Miss H.Y. Chu Senior Town Planner/Town Planning Board Ms. Maggie Chin - 4 - Agenda Item 1 [Open Meeting] Confirmation of Minutes of the 993 rd Meeting held on 30.9.2011 [The meeting was conducted in Cantonese.] 1.
    [Show full text]
  • TOWN PLANNING BOARD Minutes of 540 Meeting of the Metro Planning Committee Held at 9:00 A.M. on 21.8.2015 Present Director Of
    TOWN PLANNING BOARD Minutes of 540th Meeting of the Metro Planning Committee held at 9:00 a.m. on 21.8.2015 Present Director of Planning Chairman Mr K. K. Ling Mr Roger K.H. Luk Vice-chairman Professor P.P. Ho Ms Julia M.K. Lau Mr Clarence W.C. Leung Mr Laurence L.J. Li Dr Wilton W.T. Fok Mr Sunny L.K. Ho Mr Dominic K.K. Lam Mr Patrick H.T. Lau Mr Stephen H.B. Yau Mr Frankie W.C. Yeung Dr Lawrence W.C. Poon - 2 - Assistant Commissioner for Transport (Urban), Transport Department Mr W.L. Tang Chief Engineer (Works), Home Affairs Department Mr Martin W.C. Kwan Principal Environmental Protection Officer (Metro Assessment), Environmental Protection Department Mr Ken Y.K. Wong Assistant Director (R1), Lands Department Ms Doris M.Y. Chow Deputy Director of Planning/District Secretary Mr Raymond K.W. Lee Absent with Apologies Ms Bonnie J.Y. Chan Mr H.W. Cheung In Attendance Assistant Director of Planning/Board Miss Fiona S.Y. Lung Chief Town Planner/Town Planning Board Ms Lily Y.M. Yam Town Planner/Town Planning Board Ms Floria Y.T. Tsang - 3 - Agenda Item 1 Confirmation of the Draft Minutes of the 539th MPC Meeting held on 7.8.2015 [Open Meeting] 1. The draft minutes of the 539th MPC meeting held on 7.8.2015 were confirmed without amendments. Agenda Item 2 Matters Arising [Open Meeting] 2. The Secretary reported that there were no matters arising. [Ms Michelle M.S. Yuen, Senior Town Planner/Tsuen Wan and West Kowloon (STP/TWK), was invited to the meeting at this point.] Tsuen Wan and West Kowloon District Agenda Item 3 Section 16 Application [Open Meeting (Presentation and Question Sessions Only)] A/K1/250 Proposed Eating Place, Shop and Services, Place of Entertainment, Place of Recreation, Sports or Culture in “Open Space”, “Other Specified Uses” annotated “Cultural Square and Public Open Space with Underground Commercial Complex and Car Park”, “Commercial (7)” Zones and Area shown as ‘Road’, Salisbury Garden, the Avenue of Stars and Tsim Sha Tsui Promenade, Tsim Sha Tsui, Kowloon (Kowloon Inland Lot 10978 and adjoining Government Land) (MPC Paper No.
    [Show full text]
  • Observation of Meetings of the Town Planning Board and Its Committees
    OBSERVATION OF MEETINGS OF THE TOWN PLANNING BOARD AND ITS COMMITTEES Any person who wishes to observe the open meetings of the Town In case that the seats for a meeting are over-subscribed, the All observers must behave in an orderly manner and remain seated Planning Board (the Board) or its Committees should carefully read the Secretariat of the Board will inform those persons whose during the broadcasting of the meeting. following notes and rules. The Secretariat of the Board may refuse to reservations of seats cannot be entertained. Smoking and eating are prohibited in the PVR. allow any person to observe the meeting if he/she fails or refuses to Walk-in observers (including the press) will be entertained only if Use of mobile phone is prohibited in the PVR during the follow any of the rules. seats in the PVR are available. broadcasting of the meeting. Introduction Registration Clamour, shouting and commotion are prohibited. Any person may observe the open meetings of the Board or its The PVR will be open around 10 minutes before the scheduled Any observer who fails/refuses to follow any of the above rules or Committees in the Public Viewing Room (PVR) which is located meetings. causes any disturbance to the observation of the meeting will be at 1/F, North Point Government Offices, 333 Java Road, North required to leave the PVR immediately. Point, Hong Kong. Before entering the PVR, an observer must register with the Secretariat of the Board at the reception counter by providing his/ Decisions, Minutes and Audio Recordings of Meeting The agenda of an open meeting will be uploaded to the Board's her name and relevant information/document(s) for verification Website at http://www.info.gov.hk/tpb/ four days before the and record purposes.
    [Show full text]
  • Application for Open Storage and Port Back-Up Uses Under Section 16 of the Town Planning Ordinance
    TPB PG-No. 13F (Revised March 2020) TOWN PLANNING BOARD GUIDELINES FOR APPLICATION FOR OPEN STORAGE AND PORT BACK-UP USES UNDER SECTION 16 OF THE TOWN PLANNING ORDINANCE (Important Note : The Guidelines are intended for general reference only. Any enquiry on this pamphlet should be directed to the Secretariat of the Town Planning Board (15th Floor, North Point Government Offices (NPGO), 333 Java Road, Hong Kong - Tel. No. 2231 4810 or 2231 4835) or the Planning Enquiry Counters of the Planning Department (Hotline: 2231 5000) (17th Floor, NPGO and 14th Sha Tin Government Offices, 1 Sheung Wo Che Road, Sha Tin). The Guidelines are subject to revision without prior notice.) 1. Scope and Application 1.1 The Town Planning Board (the Board) recognises that the proliferation of open storage activities in the New Territories has led to considerable degradation of the rural environment and caused serious problems related to impacts of noise and air pollution, flooding and visual intrusion as well as traffic congestion and safety. In order to prevent further uncontrolled sprawl of activities and minimise adverse environmental impacts resulting from these land uses, “Open Storage” (“OS”) and “Other Specified Uses” annotated “Port Back-up Uses” (“OU(PBU)”) zones are designated in appropriate areas on statutory town plans with a view to meeting the demand for open storage and port back-up sites and to regularising the already haphazard proliferation of such uses within these zones. The intention is to provide for the rational development of open storage of materials which cannot be accommodated in conventional godown premises.
    [Show full text]
  • G.N. 1737 TOWN PLANNING ORDINANCE (Chapter 131) It Is
    G.N. 1737 TOWN PLANNING ORDINANCE (Chapter 131) It is hereby notified that, in exercise of the powers conferred by section 2(1) of the Town Planning Ordinance (Chapter 131), the Chief Executive the Honourable C. Y. LEUNG, G.B.M., G.B.S., J.P. has appointed the following persons or post-holders as Members and Secretary of the Town Planning Board for a period of two years with effect from 1 April 2014:— Members:— Permanent Secretary for Development (Planning and Lands) (Chairman) Mr. Stanley WONG Yuen-fai, S.B.S., J.P. (Vice-chairman) Mr. Roger LUK Koon-hoo, B.B.S., J.P. Professor WONG Sze-chun, J.P. Ir. CHAN Fuk-cheung Ms. Bonnie CHAN Jo-ying Dr. Eugene CHAN Kin-keung, J.P. Professor CHAU Kwai-cheong, J.P. Mr. CHEUNG Hau-wai, S.B.S. Ir. Dr. Wilton FOK Wai-tung Mr. Ivan FU Chin-shing Mr. Sunny HO Lap-kee, J.P. Professor HO Puay-peng, J.P. Mr. Lincoln HUANG Ling-hang Professor Eddie HUI Chi-man Mr. IP Tak-kong Ir. Janice LAI Wai-man Mr. Dominic LAM Kwong-ki Dr. LAU Chi-pang, J.P. Mr. Patrick LAU Hing-tat Ms. Julia LAU Man-kwan Ms. Christina LEE Maisenne Mr. LEUNG Hing-fung Mr. Clarence LEUNG Wang-ching Mr. Laurence LI Lu-jen Mr. David LUI Yin-tat Ms. Anita MA Wing-tseung Mr. Stephen YAU How-boa, S.B.S., M.H., J.P. Dr. YAU Wing-kwong, J.P. Mr. Frankie YEUNG Wai-chung (alias Mr. Frankie YEUNG Wai-shing), M.H., J.P.
    [Show full text]
  • Tpb Pg–No. 40 Town Planning Board Guidelines For
    TPB PG-NO. 40 TOWN PLANNING BOARD GUIDELINES FOR APPLICATION FOR TUTORIAL SCHOOL UNDER SECTION 16 OF THE TOWN PLANNING ORDINANCE (Important Note: The Guidelines are intended for general reference only. Any enquiry on this pamphlet should be directed to the Secretariat of the Town Planning Board (15th Floor, North Point Government Offices (NPGO), 333 Java Road, North Point, Hong Kong – Tel. 2231 4810 or 2231 4835) or the Planning Enquiry Counters of the Planning Department (Hotline: 2231 5000) (17th Floor, NPGO and 14th Floor, Sha Tin Government Offices, 1 Sheung Wo Che Road, Sha Tin). The Guidelines are subject to revision without prior notice.) 1. Introduction 1.1 Tutorial school is commonly found in commercial buildings, the commercial portion of composite commercial/residential buildings and the ground and upper floors of residential buildings. For the former two situations, planning permission from the Town Planning Board (the Board) is usually not required as tutorial school subsumed under school is always permitted according to the Notes of the statutory plans. However, for development of tutorial school in pure residential buildings or the domestic portion of composite commercial/residential buildings, planning control is considered necessary to ensure the proposed school would not cause nuisance or not be incompatible with other uses within the same building or surrounding developments. The main concern of the Board on tutorial school is whether the application premises is suitable for such a use from the planning point of view. 1.2 This set of Guidelines aims at listing the main planning criteria for the Board to consider planning applications for tutorial school in certain land use zones including “Residential (Group A)”, Residential (Group B)”, “Residential (Group C)”, “Residential (Group D)”, “Residential (Group E)”, “Comprehensive Development Area” and “Commercial/Residential”, “Village Type Development, “Other Specified Uses (Mixed Use)” and “Other Specified Uses (Rural Use)”.
    [Show full text]
  • PLANNING DEPARTMENT A. General Procedures for Application For
    Appendix 1 PLANNING DEPARTMENT A. General Procedures for Application for Permission under Section 16 of the Town Planning Ordinance for School Use (S16 Application) 1. Any person who wishes to submit an application for planning permission can obtain an application form from the Secretariat of the Town Planning Board (the Board) at 15/F, North Point Government Offices, 333 Java Road, North Point, Hong Kong or from the Planning Enquiry Counters of the Planning Department (PlanD) at 17/F, North Point Government Offices, 333 Java Road, North Point, Hong Kong or 14/F Sha Tin Government Offices, 1 Sheung Wo Che Road, Sha Tin, New Territories. [PlanD enquiry hotline: 2231 5000]. The application form can also be downloaded from the Board’s website (http://www.info.gov.hk/tpb/). 2. Accompanying the application form is a set of Guidance Notes which gives a brief description of the planning permission system, provides general guidelines on the preparation of an application and sets out the procedures on processing of an application. 3. An applicant should submit sufficient copies of the completed application form, together with supporting documents, if any, as specified in the Guidance Notes, to the Secretary of the Board by hand or by post. The processing of an application may be refused if the required particulars and/or the required copies are incomplete. 4. Since 18 December 2015, the public can choose to submit planning applications online through Electronic Planning Application Submission System (EPASS). Please refer to the corresponding Guidance Notes on the Board’s website for the general information and guidance on how to use EPASS to submit application (http://www.info.gov.hk/tpb/en/forms/Guidance_Notes/EPASS_GN-e ng.pdf).
    [Show full text]
  • Invest HK$22Bn in an 11M Sf “Gateway to the World”
    2.1: Invest HK$22bn in an 11m sf “Gateway to the World” commercial complex to showcase Hong Kong’s world-class services (retail, medical, hospitality, credibility, arts, NGO’s and many others) and re-plan Tung Chung as befits its potential of becoming the gateway city of the affluent Pearl River Delta, home to 70m people Recognising the community imperatives outlined below, we Situated at the heart of the propose the construction in the district of Tung Chung, two PRD and >HK$160bn of sizeable projects – one for commercial use and the other for new infrastructure (HK$2m community purposes the final names for both will be determined per resident), the humbly by the public in due course. The first one is tentatively named named Tung Chung (a tiny “Gateway to the World” (“環球薈”). It is an 11m sf commercial brook towards the east) has facility (first phase opening 2016, last phase 2020) in the existing a far bigger destiny -- to grounds of the airport. Abbreviated as “GTTW”, the name become the most convenient signifies the project’s significance as the gateway to the World and environmentally-friendly City of Hong Kong – by air, via the airport and by land, via the community in the World City of Hong Kong-Zhuhai-Macau Bridge from the west and the likely Hong Kong Tuen Mun-Chek Lap Kok Link from the north. 61 The second project is the residential city of Flying Dragon (“飛 We propose two projects: (1) 龍”). It comprises the existing new town of Tung Chung (a tiny Gateway to the World (“GTTW”) brook towards the east) and will be built mostly on reclaimed land to offer the best services of our over the coming 20-30 years.
    [Show full text]