“Partnership & Performance”

CORPORATE PROFILE

Hanoi Naypyitaw Vientiane

Manila Bangkok Phnom Penh

Brunei Kuala Lumpur Singapore Kuching

Jakarta CONTENTS

SECTION ONE SECTION THREE Background Licenses & Registration Corporate Information Directors Profile SECTION FOUR Key Personnel Projects Profile (2021 – 2000) Projects Profile (1999 – 1984) SECTION TWO Our Vision and Mission SECTION FIVE Our Objectives Current Projects Core Services Past Projects - Highlights QSHE Management Policy Contact Us

Proposed Construction and Completion of Coastal Road Network - Package D3A: Proposed Second Kuching – Samarahan Trunk Road, Kuching & Samarahan Division (Bridge Over Sg. Sarawak)

“Partnership & Performance” SECTION ONE

Decorative Photo for Illustration Purposes Only

“Partnership & Performance” BACKGROUND

With business operations and experience that span over four decades, KACC Construction Sdn Bhd (“KACC”) has successfully built its reputation as a reliable, fully-integrated and significant construction company. Our specialisation is in the construction of large infrastructure works, industrial plants, factories, high rise buildings and more. Since inception, KACC has successfully delivered in excess of RM4 Billion worth of construction projects for both the public and private sectors within Malaysia. Among the long list of projects successfully undertaken by KACC includes completing construction of various landmark structures in Sarawak. These include the Federal Office Complex in Kuching, Universiti Pertanian Malaysia ( Campus), Industrial Estate Infrastructural Works, Bintulu Civic Centre, the Bintulu-Bakun Road, Pemerintahan Timur Army Head Quarters Complex at Kota Samarahan and the Police Marine Base at Muara Tebas, Kuching. KACC was involved in the construction of the Multimedia University (MMU) project in Cyberjaya Selangor. Recent projects include the current longest river crossing balanced-cantilever bridge of its kind in Sarawak - the Batang Sadong Bridge at 1.48km. KACC completed the project ahead of schedule and lower than expected cost. KACC has also made its mark in the oil and gas sector, specifically for civil and structural components at Bintulu Crude Oil Terminal, Bintulu Shell Middle Distillate Synthesis Plant, ASEAN Bintulu Fertilizer project, as well as MLNG- I, MLNG-II and MLNG-III plant and buildings. Today, KACC undertaking construction of the long-awaited Pan Borneo Highway Sarawak, under WPC 11 in Miri. KACC is also constructing the iconic 1.28km cable-stayed Sejingkat Bridge over Sg. Sarawak.

“Partnership & Performance” CORPORATE INFORMATION

Company : KACC Construction Sdn Bhd

Company No. : 197701000808 (31668-H)

Date of Incorporation : 17 March 1977

Authorized Capital : RM50,000,000.00

Paid-up Capital : RM26,000,000.00

Class of Firm : Private Limited Company

Company Status : 100% Malaysian-owned Bumiputera Company

Main Activity : Civil, Structural & Building Works Contractor

Main Registrations : BPKU G7 (Bumi), UPK Class A (Bumi), SPKK, CIDB G7, FF0 & Petronas

Bankers : Malayan Banking Berhad (MBB), Hong Leong Bank Berhad (HLBB), UOB (Malaysia) Berhad

Auditor : Hii & Hii (AF 1436)

Tax Agent : Hii & Hii Tax Services Sdn Bhd

Registrar : OBYU Corporate Services Sdn Bhd

Solicitors : Tan Yap & Tang Advocates

“Partnership & Performance” DIRECTORS PROFILE

Ir. Safuani Abdul Hamid

Ir. Safuani was appointed to the Board of KACC in February 2021. He is a Malaysian registered professional engineer with more than 30 years’ experience in construction project management and contract administration, with various involvement in public and private projects in Malaysia. Throughout his career, Ir. Safuani has served in the capacities as Design Engineer, Site Engineer, Construction Manager, Project Manager, Senior Project Manager, Project Director and CEO with a number of private-limited construction companies. Ir. Safuani holds a Bachelor of Science Degree in Civil Engineering from University of Missouri – Kansas City, USA (1988), and an MBA (Project Management) from University of Southern Queensland, Australia (2005). He is registered as a Professional Engineer with the Board of Engineers Malaysia and has been a Corporate Member of the Institution of Engineers Malaysia, since 1996.

Mohamad Nadziff Tan Sri Bustari

Mohd Nadziff was appointed to the Board of KACC in August 2019. He is currently Group Chief Executive Officer of OBYU Holdings Sdn Bhd, a conglomerate involved in power, property, construction and services. Prior to joining OBYU, Mohd Nadziff began his career in project management, property development and construction in Australia and Malaysia. He graduated with a Bachelor of Applied Science in Construction Management & Economics from Curtin University of Technology, Australia.

Siti Yuhaniz Tan Sri Bustari

Siti Yuhaniz was appointed to the Board of KACC in October 2014. She is currently Group Executive Director of OBYU Holdings Sdn Bhd. Prior to joining OBYU, she was attached to the Corporate Finance practice of PricewaterhouseCoopers Advisory Services in Kuala Lumpur where she built her expertise in valuations, market studies, business planning and financial analyses. Siti Yuhaniz holds a Bachelor of Commerce, Majoring in Finance & General Management from the University of Western Australia.

Mohd Subky Tan Sri Bustari

Mohamad Subky was appointed to the Board of KACC in February 2021. He is currently Deputy Group Chief Executive Officer of OBYU Holdings Sdn Bhd, as well as Chief Executive Officer of Petra Resources, a company involved in the oil & gas industry. Mohd Subky sits on the Board of several private companies active in marine assets ownership, oil & gas chartering, property development, power and construction. He holds a Bachelor of Arts degree in Commerce majoring in Asian Studies & Accounting from Curtin University of Technology, Australia, and began his career at Deloitte Consulting Malaysia where he worked at the Technology Integration practice. .

“Partnership & Performance” KEY PERSONNEL

Ir. Safuani Bin Abdul Hamid Director & Chief Executive Officer BSc. (Civil), MBA (Project Management), PEng, MIEM, ASEAN Eng.

Arnel R. Ascotia General Manager, Operations BSc. (Civil), P. Eng (PHI)

Mohd Azmir Bin Mustafa Head, Contracts & Cost Control Department BSc. (Hons) Quantity Surveying (UK), MSc. Human Resources Devt.(Unimas)

Ir. Sivakumar Jayaraman Head, Project Implementation Department BEng. (C&S) (UKM), PEng, MIEM, MIEAust CPEng, IntPE, ACPE, PTMBOT, PMIGRSM REAM, REAAA,

Tie Siew Huong Head, Admin & Finance Department MIA, ACCA, LCCI

Mohamad Haniff Bin Muhamad Yussof Head, Quality, Safety & Health Management Department Dip. Civil Engineering (UiTM), Cert. Building Services Engineering (PPK), QLASSIC Assessor, Registered IBS Installer, IEM

Yusman Bin Jumat Contracts Manager BSc. Quantity Surveying (UiTM)

Suhaili Md Salleh Senior Project Manager B.Eng (Hons) Civil Engineering (UK)

Rodney Mora Project Manager BSc. (Hons) Civil Engineering (USM), BEM, IEM

Roziman Bin Hajon Project Manager BSc. Civil Engineering (UPM), BEM, IEM

Chan Kuok Soon Planner & Scheduler BSc. Mechanical Engineering (USM)

“Partnership & Performance” SECTION TWO

Decorative Photo for Illustration Purposes Only

“Partnership & Performance” OUR VISION & MISSION VISION To be a valuable partner and preferred contractor in the region.

MISSION To constantly improve productivity & efficiency by optimizing skills, output and learning curves. To deliver quality products and value-added services towards achieving the desired returns for all stakeholders.

CORE VALUES

Integrity Trust Innovativeness Accountability One Family, One Team

“Pursuing Engineering Excellence, Client Satisfaction and Strategic Growth” “Partnership & Performance” OUR OBJECTIVES

KACC’s principal objective is to plan, implement, execute and complete all its projects to the required Engineering quality and form, within the planned time and at Excellence optimum cost, thus providing value for its Stakeholders.

KACC shall strive to give Clients our full commitment and confidence, be sensitive to the competitive needs of Client today’s construction industry, and to the particular needs Satisfaction of our Clients.

Strategic KACC believes in the strength of the team and will Growth continuously seek to improve team work, knowledge and building a formidable team in all our operations.

KNOWLEDGE AMBITION To apply the latest To continually develop technological advances in our Company toward construction project competing effectively in management and quality the country and region management system K A

CONFIDENCE C C COMMITMENT To lead and creditably deliver To uphold ethics projects that meet or even in pursuit of engineering, exceed Stakeholders’ time, excellence, strategic growth cost and quality objectives and client satisfaction

“Partnership & Performance” CORE SERVICES

KACC’s core services includes:

Foundations, Civil & Buildings Oil & Gas Integrated Infrastructure & Engineering Construction Works Structural Works Project Works Management

KACC’s integrated Project Management System for Engineering, Procurement & Construction is enhanced via the application of the following:

Cost Management Schedule Management Scope Management

Quality Risk Management Management

Procurement Management Communications Management

Resource Management

▪ It is KACC’s utmost interest to be associated with clients who pursue visionary projects that will positively contribute towards the development of Malaysia, neighbouring countries and region. ▪ With a strong aspiration for success, duly backed by an experienced management team, KACC is committed to achieving excellent performance and prompt project delivery.

“Partnership & Performance” QUALITY, SAFETY, HEALTH AND ENVIRONMENT MANAGEMENT POLICY

KACC is dedicated to improving its organization by a commitment to maintain its ISO 9001:2015 and ISO 45001:2018 accreditation and compliance with requirements of the international standards in the construction industry through:

❖ Implementing and maintaining an Integrated Management System in accordance with the requirements of ISO 9001: 2015 and ISO 45001:2018;

❖ Supplying services and products that comply with the Clients’ agreed requirements and all the applicable statutory, legal and other regulatory requirements;

❖ Improving the business processes through the implementation of quality, safety, health and environmental objectives and targets;

❖ Establishing adequate infrastructure and resources to conform with the relevant requirements and taking appropriate actions to achieve sustainable development, with concerted efforts to mitigate pollution and prevent accidents, incidents and ill-health at the work places;

❖ Employing competent and committed employees with continual training and awareness to embrace the best work practices; and

❖ Taking appropriate action on risks and opportunities that can affect the conformity of services and products.

“Pursuing Engineering Excellence, Client Satisfaction and Strategic Growth”

“Partnership & Performance” SECTION THREE

Decorative Photo for Illustration Purposes Only

“Partnership & Performance” LICENSES & REGISTRATION

No Bodies Registration No. Class Head & Subhead Validity

Provision of Building, Civil URS (UKAS Quality Management) 29670/A/0001/UK/ Quality 1. Engineering and Infrastructure 07/08/2023 En ISO 9001: 2015 System Works

Health & Provision of Building, Civil Safety Management System ISO 29670/C/0001/UK/ Safety 2 Engineering and Infrastructure 13/01/2024 45001:2018 En Management Works System

Bahagian Pembangunan Kontraktor Bumiputera 3 0037 Gred A 8/06/2023 Kontraktor & Usahawan (BPKU) Berprestasi Tinggi (KBBT)

Lembaga Pembangunan Industri CIDB SCORE 4 1961114-SR014653 G7 21/01/2022 Pembinaan Malaysia (CIDB) Rating 3 Stars (3)

B (Pembinaan Bangunan) Sijil Perolehan Kerja Kerajaan CE (Pembinaan Kejuruteraan 5 1961114-SR014653 G7 8/01/2023 (SPPK) Awam) ME (Mekanikal Dan Elektrikal)

B(B01, B02, B04, B05, B10, B29) CE (CE01, CE02, CE03, CE08, Lembaga Pembangunan Industri 6 1961114-SR014653 G7 CE10, CE13, CE17, CE 19, CE21, 8/01/2023 Pembinaan Malaysia (CIDB) CE34, CE36, CE42, CE43) ME (M01, M15, M19)

Bahagian Pembangunan 7 Taraf Bumiputera G7 Pengiktirafan Status Bumiputera 8/01/2023 Kontraktor & Usahawan (BPKU)

Head I (1, 2, 3, 5) Unit Pendaftaran Kontraktor dan A Head II (1, 2, 3) 8 Juruperunding Negeri Sarawak UPK-K / 06316 7/08/2022 Head III (1, 2, 3) (UPK) Head IV (1, 2, 3, 4)

Unit Pendaftaran Kontraktor dan Ruj : SFS/UPK/A/455 9 A Pengiktirafan Status Bumiputera 7/08/2022 juruperunding Negeri Sarawak Vol.lV (10)

080101 10 Kementerian Kewangan Malaysia 357-3000025997 20/02/2024 - 090101

BPQ8323095377 Perakuan Pendaftaran Syarikat 11 Kementerian Kewangan Malaysia - 20/02/2024 2026560 Bumiputera

080101 12 Tenaga Nasional Berhad (TNB) 3055677 - 20/02/2024 090101

B (BO1, B02, B04 B05, B10 B29) CE (CE01, CE02, CE03, CE08, 13 Keretapi Tanah Melayu Berhad 8320 G7 CE10, CE13, CE17, CE19, CE21, 02/05/2021 CE34, CE36, CE42, CE43) M (M01, M15, M19)

“Partnership & Performance” LICENSES & REGISTRATION

No Bodies Registration No Class Head & Subhead Validity

Suruhanjaya Perkhidmatan Air SPAN/EKS/(PT)/800- 14 IPA C1 Pembetungan 27/04/2022 Negara (SPAN) 2C/1/12/373

Perbadanan Perwira Harta 15 N/A N/A Panel Contractor N/A Malaysia

Syarikat Perumahan Negara 16 N/A N/A Panel Contractor N/A Berhad

Dewan Usahawan Bumiputera 17 K/0858 N/A Corporate Member N/A Sarawak

18 Institut Usahawan Bumiputera 009531 N/A Member N/A

W001001000, W001002000, W001003000, W001003000, W001005000, W001006000, W002001000, W002002000, W002003000, W003001000, Malaysia Airport Holdings 19 70641 Z002 W003002000, W003003000, 13/08/2022 Berhad (MAHB) W003005000, W003006000, W003008000, W003009000, W003010000, W003011000, W003012000, W003014000, W004001000, W004005000

11141200S 16/05/2022 20 Petronas - - 111114000S 30/11/2023 11111000S 30/11/2023

“Partnership & Performance” LICENSES & REGISTRATION

“Partnership & Performance” LICENSES & REGISTRATION

“Partnership & Performance” LICENSES & REGISTRATIONS

“Partnership & Performance” RECOGNITION & ACHIEVEMENTS

“Partnership & Performance” SECTION FOUR

Decorative Photo for Illustration Purposes Only

“Partnership & Performance” PROJECTS PROFILE (2021 – 2000)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Jabatan Kerja Packaged D3A: Second Kuching – Samarahan Trunk 1. Raya Sarawak ON-GOING 360 Mil Bridge Works Road (Bridge Over Sg. Sarawak at Sejingkat) (JKRS)

Sarawak Rural Construction And Completion Of Concrete Weir With Water Supply 2. Associated Ancillary Works At Suai Water Treatment ON-GOING 13.9 Mil Building Works Department Plan Raw Water Intake, Batu Niah, Miri Division (JBALB)

Projek Membina Jalan Dari Sibu Jaya – Kong Yit Kim Jabatan Kerja Road 3. ON-GOING 100 Mil Road, Sibu, Sarawak Raya Construction

Development and Upgrading of the Proposed Pan Lebuhraya Borneo Highway in the State of Sarawak, Malaysia – Road 4. Borneo Utara ON-GOING 1,825.25 Mil Phase 1 (“Project”) – Work Package Contract-WPC- Construction Sdn Bhd 11 (Sg. Tangap to Link Road)

Pembinaan Loji Rawatan Kumbahan Serantau Bina Tamsah Sewerage 5. ONGOING 399.3 Mil Batu Jinjang Kepong, Kuala Lumpur. Sdn Bhd Works

Pakej D43 – Pembinaan Rangkaian Paip Sewerage 6. Pembentungan di Batu, Jinjang, Kepong, Kuala JAKS Sdn Bhd ONGOING 199.5 Mil Works Lumpur (Reka & Bina)

Pan Borneo Highway Sarawak, Phase 1 Water Relocation 7. KURW Sdn Bhd ONGOING 128.7 Mil Relocation Works (WPC 08, WPC10, WPC 11) Works

PA4 - Proposed Upgrading and Pavement Improvement / Rehabilitation Works along the 8 JKRS ONGOING 11 Mil Pavement existing Kpg. Sg. Buloh / Sebuyau Coastal Road – Section 1(Q2017-1) From KM 0+100 to KM 9 +650

Provision of Repair and Maintenance of Access Roads and Slope Stabilization Works Within Right of PETRONAS Road & Slope 9. 2017 114.8 Mil Way (ROW) of Sabah Sarawak Gas Pipeline (SSGP) Carigali Sdn Bhd Construction Project (Sarawak Locations)

Construction And Completion of Jalan dan Jambatan Jabatan Kerja Road & Bridge 10. Melintasi Sungai Kanowit (Seksyen A), 2017 50.330 Mil Raya Sarawak Construction Kanowit, Sarawak.

Construction And Completion of Jambatan Batang Jabatan Kerja Bridge & 11. 2016 211 Mil Sadong, Kpg. Buloh, Samarahan Divison, Sarawak. Raya Infrastructure

“Partnership & Performance” PROJECTS PROFILE (2021 – 2000)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Construction And Completion of Proposed Samalaju Samalaju Building & 12. Port Development Project At Samalaju, Bintulu, Industrial Port 2015 122 Mil Infrastructure Sarawak, Malaysia Sdn Bhd

Redevelopment And Upgrading Of Sandakan Airport Infrastructure 13. Terminal Building, Sandakan, Sabah – DCA Control Musyati Sdn Bhd 2014 21.5 Mil Works Tower.

Penswastaan Pembinaan Kompleks 1 Divisyen dan Kem 4 Renjer Diraja di Muara Tuang, Kota Jendela Hikmat Building & 14. 2011 211 Mil Samarahan, Sarawak (Building, Infrastructure and Sdn Bhd Infrastructure M&E Package)

Kementerian Pembinaan Projek Pengkalan Polis Marin Wilayah Building & 15. Keselamatan 2011 230 Mil Sarawak di Muara Tebas, Kuching, Sarawak Infrastructure Dalam Negeri

Penswastaan Pembinaan Kompleks 1 Divisyen dan Jendela Hikmat 16. Kem 4 Renjer Diraja di Muara Tuang, Kota 2008 13.70 Mil Civil Works Sdn Bhd Samarahan, Sarawak (Site Clearing and Earthworks)

Site Clearing, Earthwork and Temporary Structure (For Ground Breaking Ceremony) for Penswastaan Jendela Hikmat 17. 2006 1.60 Mil Civil Works Pembinaan Kompleks 1 Divisyen dan Kem 4 Renjer Sdn Bhd DiRaja di Muara Tuang, Kota Samarahan, Sarawak

Design and Design, Construction, Completion and Javel Build – Civil, 18. Commissioning of Three Bay Bomba Station and Engineering 2005 18.133 Mil Building & Staff Quarters at Sibu Sarawak Sdn Bhd M&E Works

Construction, Completion & Commissioning of Bintulu Jabatan Kerja Civil and 19. Water Supply Phase 3, Water Treatment Plant and 2005 28.780 Mil Raya Building Works Associated Works (Contract 1)

Construction and Completion of Pembinaan Jalan PPES Works Road 20. Pantai Baru Dari Tanjung Kidurong-Suai-Bakam (Sarawak) 2004 41.500 Mil Construction Sarawak (Section A2-A3) Sdn Bhd

“Partnership & Performance” PROJECTS PROFILE (2021 – 2000)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

C01MRR234 Incinerator and F-13101 (Module 3) Malaysia LNG Piling & 21. 2002 1.569 Mil Piling and Civil Works Sdn Bhd Civil Works

C01T4009 Interior Decoration Works for MLNG Plant Malaysia LNG Interior 22. 2002 2.545 Mil Control Centre Building Project Sdn. Bhd Decoration

CD0T4010 Construction and Completion of Single Civil, Building Storey MLNG Plant Control Centre at MLNG Plant on Malaysia LNG 23. 2002 12.495 Mil & Mechanical Lot 29, Block 20, Land District, Bintulu Sdn. Bhd Works Sarawak JMSB/KMSB/ MLNG Tiga Plant Project Civil Work INQ S-000- 24. SIME 2002 61.560 Mil Civil Works J31000CV 1 Process Areas – LNG Trains 7 & 8 Consortium

Bintulu BDA/CT/41/99 Construction & Completion of JA-Drain Drainage 25. Development 2001 2.680 Mil Near Kampung , Bintulu Works Authority

T/INSU/99/108 Modification Works on the Main Shell MDS (M) Infrastructural 26. 2000 0.448 Mil Entrance/Balcony/ Car Park Sdn Bhd Works

Jabatan FD/98/9 Construction & Completion of Access Road, Perhutanan Road 27. Car Park and Associated R.C Drain Work at Similajau Sarawak / 2000 0.580 Mil Construction National Park WAHS & Sons Sdn. Bhd

BDA/Pembinaa BDA/CT/29/97 Kemena Industrial Estate Phase I Infrastructural 28. n Masrafan Sdn. 2000 8.488 Mil Extension, Bintulu – Package B Works Bhd

Shell SMDS C-5688-4-01 SMDS Reconstruction Project – Structural 29. (M)/ JGC (M) 2000 0.898 Mil Compressor Building Erection Steel Works Sdn Bhd

Shell SMDS Civil and C-5688-12-01 SMDS Reconstruction Project – Civil 30. (M)/ JGC (M) 2000 9.449 Mil Concrete and Concrete Works Sdn Bhd Works

C-5688-3-01 SMDS Reconstruction Project – Steel Shell MDS (M) Structural 31. 2000 2.650 Mil Structure Erection Sdn Bhd Steel Works

32. CSR/99/004/MRR Proposed MRR Office Building Malaysia LNG 2000 2.450 Mil Building Works

“Partnership & Performance” PROJECTS PROFILE (2021 – 2000)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Building Works of Zone 1 Comprising 2 Nos. Block Hostel Type B And 3 Nos. Block Non-Executive MEPS Joint 33. 2000 27.977 Mil Building Works Apartments For Multimedia University Development At Venture Cyberjaya, Selangor

TNB Substation and No. 1 Chiller Plant – Multimedia MEPS Joint 34. 2000 2.387 Mil Building Works University Venture

MEPS Joint 35. Piling Works Zone 2 – Multimedia University 2000 1.689 Mil Piling Works Venture

“Partnership & Performance” PROJECTS PROFILE (1999 - 1979)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Construction & Completion of the Proposed Extension Samling 36. to Existing Molded Fiber Doorskin Plant at Kemena Manufacturing 1999 0.670 mil Building Works Industrial Estate, Phase II, Bintulu Sdn Bhd Law Gek Soon Proposed Construction and Completion of the & Market Road Proposed 12 unit (2 blocks of 6 units each) of 4-storey Wooden 37. shophouses on Lease 3233, 3205, 3656, 3655, 3654, Shophouses 1999 3.238 mil Building Works 3194, 3231, 3193, 3237, 3234, 3653 and 3467 Bintulu Redevelopment Town District Committee, Bintulu

T/INSU/98/062 Reconstruction of Solidification Shell MDS(M) 38. 1999 3.238 mil Building Works Building, Compressor Shelter and Gate House Sdn Bhd

Samling Building Works Construction of Main Office Building at Kemena 39. Manufacturing 1998 0.400 mil Industrial Estate Sdn Bhd Srwk Entp. 1998 12.648 mil Civil Works 53P 96 983 PL8 Kidurong Power Station unit 7 & 8 – Company Bhd 40. 132kV Switchyard /Alsthom Export Malaysia S/B The Construction and Completion of the Proposed Sarawak Land 1998 0.123 mil Drainage 41. Pump Station and Sewerage System to Government (Kemena Park) Works Quarters at Jalan Tun Ahmad Zaidi,Bintulu Sdn Bhd Samling 1998 11.200 mil Civil and Proposed Molded Fiber Doorskin Plant at Kemena 42. Manufacturing Building Sdn Industrial Estate, Phase 2, Bintulu (Main Factory) Sdn Bhd Bhd Asean Btu 1998 0.145 mil Civil Works T&C/LOA 98/ CN-020 Water Proofing at Main Sub- 43. Fertilizer Station Sdn Bhd Samling 1998 0.400 mil Building Works Construction of Main Office Building at Kemena 44. Manufacturing Industrial Estate Sdn Bhd SMDS(M) Sdn 1998 0.45 mil Building Works C-5688-TEM-01 Reconstruction Project – Temporary 45. Bhd /JGC (M) Facilities Works Sdn Bhd BDA/CT/29/96 The Proposed Infrastructural Services Bintulu 1998 20.8 mil Road 46. for Kidurong Industrial Area (KINDA), Tanjung Development Construction Kidurong, Bintulu Authority Main Bazaar Proposed Construction and Completion of 12 units of Wooden 4-storey shophouses on Lease 4095, 3195, 3196, Shophouses 47. 1998 3.662 mil Building Works 3197, 3198, 3551, 3695, 3203, 3204, 3206,3209 and Redevelopment 3210, BTLD Jalan Main Bazaar, Bintulu Committee, Bintulu

“Partnership & Performance” PROJECTS PROFILE (1999 - 1979)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Main Bazaar Proposed Construction and Completion of 12 units of Wooden 4-storey Shophouses on Lease 3357, 3186, 3207, Shophouses 48. 1998 3.672 mil Building Works 3187, 3356, 3188, 3189, 3208, 3190, 3230,3191 and Redevelopment 3192, BTLD Jalan Main Bazaar, Bintulu Committee, Bintulu Sarawak Land The Construction and Completion of the Proposed Drainage 49. (Kemena Park) 1998 2.053 mil Main Sewerage System to Bintulu Park City, Bintulu Works Sdn Bhd

Hyundai Doz (M) 50. Bintulu LPG Facilities Project–Substation 39 & 40 1997 2.60 mil Building Works Sdn Bhd/ MLNG

ENG/4/95/070 Refurbishment of Compressor Houses Malaysia LNG Steel Structure 51. 1997 1.28 mil Wall Louvers Sdn Bhd Maintenance

Minor Services Contract No. T/SEM/4/043/94 – Shell MDS (M) 52. 1997 1.00 mil Scaffolding Provision of Scaffolding Services Sdn Bhd

BDA/CT/34/96 Bintulu Road 53. The Execution and Completion of the Proposed Development 1997 0.936 mil Construction Access Road Joining Tun Ahmad Zaidi Road/Kemena Authority Park, Btu Asean Bintulu ABF/EMTC/97/045 Water Proofing Membrane for 54. Fertilizer Sdn 1997 0.22 mil Civil Works Central Control Slab Roofing Bhd MTC/1996/008 Asean Bintulu 55. Proposed Construction of Equipment Foundations for Fertilizer Sdn 1997 1.00 mil Civil Works Second Ammonia Revamp Bhd Samling Fibre Piling, Board Sdn Bhd / 56. MMDF Plant and Chip Plant Project 1997 16.0 mil Concrete & JGC (M) Sdn Civil Works Bhd

T/SEM/96/003 – Off plot Mechanical / Civil Works for Shell MDS (M) Mechanical / 57. 1997 4.0 mil Boiler Project Sdn Bhd Civil Works

JKR / PPES Road 58. Bakun Access Road – Earthworks and Drainage 1997 30.24 mil Roads Sdn Bhd Construction

Design and Construction of Proposed New Ware- Daiken Sarawak 59. house at MDF Plant on Lot 2069, Block 26, Kidurong 1997 2.59 mil Steel Structure Sdn Bhd Industrial Estate, Bintulu

“Partnership & Performance” PROJECTS PROFILE (1999 - 1979)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Asean Bintulu Proposed Construction of Auxiliary Substation for 60. Fertilizer Sdn 1997 0.126 mil Building Works Second Ammonia Revamp Project Bhd BDA/CT/05/94 Construction & Completion of Urban Sub-Arterial Road A (Second Carriageway) and Link Bintulu Road 61. Road incl. Bituminous Surfacing, Drainage and Development 1997 8.2 mil Constructions Related Works Around Dewan Suarah Bintulu, Authority Sarawak Sarawak Shell BCOT Onshore Facilites Expansion – BSTAB 3 & 4 Civil and 62. Berhad / POG- 1996 15.48 mil Civil Works & Control Building Renovation Building Works EP FOCHI JV

Daiken Chipboard Factory Piling & Civil Foundation Daiken / JGC Civil and 63. 1996 24.00 mil Steel Structure & Building Works (M) Sdn Bhd Building Works

1000240 Proposed MCOT New Administration Bldg, Petronas 64. Mechanical Workshop, Guard House and Other Carigali Sdn 1996 1.31 mil Civil Works Associated Works Bhd Petronas Mechanical MLNG Dua Plant Project SC7004 Mech. Cleaning /JMSB-KMSB- 65. 1996 0.40 mil Cleaning Services SIME Services Consortium Construction & Completion of Bintulu Development BDA/ Pilecon 66. Authority Headquarters – Supply of Material and 1996 1.60 mil Road works Engineering Labour to Complete Road & Carpark Petronas / MLNG Dua Plant Project SC1006 – Misc. Civil Works JMSB-KMSB- 67. 1996 5.80 mil Road works & Road Works SIME Consortium BDA/CT/2194 Term Contract for the Supply, Delivery Bintulu Road 68. & Laying of Asphaltic Concrete Incl. Repair Works to Development 1995 0.463 mil Construction Jalan Sibiyu, Bintulu Authority JKR/PPES The Construction & Completion of the Proposed Road 69. Road 1995 32.87 mil Grigat – Selalang Road, Sri Aman / Sarikei Division Construction Construction BPSB/17/95 Construction of New Reinforced Concrete Pavement at Workshop/Bomba and Repair Bintulu Port Sdn Road 70. Work to Asphalt Surfaced Pavement at 1995 1.069 mil Bhd Construction Workshop/Bomba, Ts1/Ts2 Area, Bintulu Port Sdn Bhd

587476 Maintenance to Industrial Building at BCOT Sarawak Shell 71. 1995 1.40 mil Civil Works and Offshore Living Quarters Berhad

“Partnership & Performance” PROJECTS PROFILE (1999 - 1979)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

T/SEM/1009/93 Contract for the Replacing CS Shell MDS (M) 72. 1994 0.17 mil Piling Works Drinking Water Line to GRE Sdn Bhd

Civil and ENG/4/93/176Construction of New Materials Malaysia LNG 73, 1994 1.78 mil Structural Warehouse (PC 1351) Sdn Bhd Works

T/105/3/91 Construction & Completion of Batu Kawa - JKR/Mechunma Road 74. 1994 16.93 mil Tondong Road, Kuching Division Sdn Bhd Construction

MLNG Dua Plant Project SC2001M – Construction & Petronas/JMSB- 75. Completion of 3 units of Field Auxiliary Room and 3 KMSB-SIME 1994 4.46 mil Civil Works units of Analyzer Bldg Consortium Petronas/JMSB- MLNG Dua Plant Project SC1008M – Feed Gas 76. KMSB-SIME 1994 3.73 mil Civil Works Metering Station Civil Works Consortium Petronas/JMSB- MLNG Dua Plant Project SC1002M – On plot Civil 77. KMSB-SIME 1994 50.78 mil Civil Works Works Consortium Sarawak Shell BCOT Onshore Facilities Expansion – SSB 78. Berhad / POG- 1994 0.50 mil Building Works Temporary Office EP-FOCHI JV POG-EP-FOCHI Structural BCOT Onshore Facilities Expansion – SSB 79. JV/Sarawak 1994 0.80 mil Steel and Temporary Facilities Shell Berhad Building Works Bintulu BDA /CT /31/ 92 – Construction& Completion of 2 nos Drainage 80 Development 1994 4.70 mil Main Concrete Drains at Tanjung Batu Bintulu Works Authority Petronas/JMSB- MLNG Dua Plant Project SC4003M – The supply, KMSB-SIME Civil and Installation & Completion of Mech. Works (Piping, Consortium/ 81. 1994 1.85 mil Structural Insulation, Painting & Equipment Installation), Civil & Wong Heng Works Structural Works Engineering Sdn Bhd .587587 Extension & Remedial Works to Tropo Sarawak Shell 82. Building, Construction of Workers Shelter and 1993 0.48 mil Civil Works Berhad Renovation of Fire Station at BCOT Petronas/JMSB- MLNG Dua Plant Project SC1001M – Site Preparation Piling & Site 83. KMSB-SIME 1993 36.7 mil and Piling Preparation Consortium

“Partnership & Performance” PROJECTS PROFILE (1999 - 1979)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Bintulu Port Authority/ Construction & Completion of 2nd LNG Berth and 84. Percon 1993 15.52 mil Civil Works Associated Capital Dredging Works Corporation Sdn Bhd JKR/Pernas Miri Btu Trunk Road Contract 2-Sg.Niah to Sungai Road 85. Construction 1993 11.44 mil Suai (Chainage 51,000 to Chainage 60,204) Construction Sdn Bhd

ENG/4/92/122 Corrosion Protection to SCW Pipes Malaysia LNG Painting 86. 1992 0.24 mil (KSL 303 to KSL 310) Sdn Bhd Works

JMSB-KMSB- SC9001T MLNG Dua Plant Project Client & 87. SIME 1992 1.02 mil Building Works Contractor Temporary Office Building Consortium JGC Corporation / Mechanical 88. Shell MDS Project – Jetty Topworks 1992 1.68 mil SMDS (M) Sdn Works Bhd

Sarawak Shell 89. Soil Stabilization - BCOT 1992 3.089 mil Civil Earthwork Berhad

JDC Corporation/ 90. Shell MDS Project – Main Construction Civil Works 1992 15.00 mil Civil Works JGC (M) Sdn Bhd/ Shell MDS JGC (M) Sdn Bintulu Shell Middle Distillate Synthesis Project HP- 91. Bhd/ Shell MDS 1991 49.60 mil Civil Works 5000SML Site Preparation Sdn Bhd JDC Shell MDS Project Main Construction Mechanical Corporation / Mechanical 92. 1991 2.00 mil Works JGC (M) Sdn Works Bhd / SMDS

93. Shell MDS Project MLNG - Interconnection JGC/SMDS 1991 0.65 mil Civil Works

JGC/SMDS Sdn Mechanical & 94. Shell MDS Project – JKR Waterline 1991 0.493 mil Bhd Civil Works

Construction & Completion of Lawas Treatment Plant, Public Works Civil & Building 95. 1991 2.83 mil Power Generator House & Associated Department Works

“Partnership & Performance” PROJECTS PROFILE (1999 - 1979)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Malaysia LNG 1991 0.30 mil Shoreline 96. Kidurong Club Shoreline Protection S.B Protection

Public Works 1991 9.59 mil Civil Works Construction & Completion of Proposed New Limbang 97. Department Water Supply Limbang Division

Asean Bintulu 1991 1.66 mil Civil & Civil & Structural Work Relating to the Construction of Fertilizer/P.T. Structural 98. Ammonia/ Urea Plant Revamp Project, Bintulu Rekayasa Works Industri Sarawak Shell 1990 2.90 mil Civil & Fabrication & Installation of Second E11 Trunkline & 99. Bhd/Saipen (M) Mechanical Associated Facilities at MLNG Site, Bintulu Sdn Bhd Works Sarawak Shell 1990 2.90 mil Civil & Fabrication & Installation of Second E11 Trunkline & 100. Bhd/ Saipen (M) Mechanical Associated Facilities at MLNG Site, Bintulu Sdn Bhd Works

Roadworks, Building Electrical & Ancillary Works for STM/Zublin (M) 1990 5.00 mil Road & 101. Proposed Microwave Station at Bukit Setiam, Bintulu Sdn Bhd Building Works

MLNG Sdn Bhd 1990 0.099 mil Civil Works 102. Repair to Road Shoulder

Supply & Delivery of Asphaltic Concrete for the Bintulu Port 1990 0.33 mil Supply of 103. Construction of Asphaltic Surfaced Pavement in Authority Asphaltic Bintulu Concrete Supply & Delivery of Asphaltic Concrete to BDA for Bintulu 1990 0.095 mil Supply of 104. the Sealing Work to the Carpark & Access Road at Development Asphaltic Tatau Old Shophouses Area, Tatau, Bintulu Authority Concrete Penyediaan Tapak Bagi Kawasan Perusahaan & Jabatan Kerja 1990 1.97 mil Earthwork 105. Perniagaan Serta Permainan Kg Sungei Kebun, Raya Peringkat 2, Brunei Bintulu 1989 0.73 mil Supply of Supply & Delivery of Asphaltic Concrete to BDA for 106. Development Asphaltic the Sealing Works to Sibiyu Road, Bintulu Authority Concrete Supply & Delivery of Asphaltic Concrete to BDA for Bintulu 1989 0.29 mil Supply of 107. the Sealing Works to Kemena Indusrtial Estate (KIE) Development Asphaltic Roads, Btu (Package A) Authority Concrete

“Partnership & Performance” PROJECTS PROFILE (1999 - 1979)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Construction and Completion of 1 unit 2- Storey Datuk Wong Civil & Building 108. 1989 0.24 mil Dwelling House at Jalan Bamfylde, Kuching Soon Kai Works

Construction of Premix at Sarikei Council Office Sarikei District Road 109. 1988 0.50 mil Compound, Sarikei Council Construction

Sarikei District Road 110. Construction of Premix at Bus Terminal, Sarikei 1988 0.10 mil Council Construction

Construction Of Premix at Jalan and Jalan Sarikei District Road 111. 1988 0.27 mil Bank, Sarikei Council Construction

Bintulu Construction& Completion of Kidurong Sewage 112. Development 1988 1.70 mil Civil Works Treatment Plant Works, Bintulu Authority

Upgrading, Improvement, Mile 30 ½ - 47 ½ (17 miles) Public Works Road 113. 1988 12.88 mil Bintulu / Miri Road, Bintulu Department Construction

Bintulu Construction &Completion of Btu Civic Centre at Lot Civil & Building 114. Development 1988 5.90 mil 2120, off Bintulu/Miri Road Works Authority Sarawak Construction& Completion of the Proposed Sarikei & Electricity Civil & Building 115. 1988 0.39 mil Bintangor 33 KV Sub Stations Supply Works Corporation

Soil Stabilization at Bintulu Crude Oil Terminal Bintulu, Sarawak Shell 116. 1988 4.10 mil Civil Works Sarawak Berhad

Premix Sealing of Jalan Kelupu from Jalan Bintang to Majlis Daerah Premix 117. 1988 0.16 mil Sungai Tutong Meradong Meradong Sealing

Malaysia Baram Civil and Preparatory Civil Construction Services Contract Work 118. Iol Development 1988 5.62 mil Infrastructural from Edward & Sons Co Ltd Works

Reinstatement of Roads & Culverts at Public Works 119. 1988 2.87 mil Civil Works Santubong/Teluk Bandung Rock, Sarawak Department

“Partnership & Performance” PROJECTS PROFILE (1999 - 1979)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Housing Earthwork, Main Drain, Roads & Services– Lambak 120. Development 1987 16.81 mil Civil Works Kanan Resettlement Scheme, Brunei Department

Proposed 18-Storey Federal Office Complex, Kuching, Public Works Civil & Building 121. 1987 5.96 mil Sarawak Department Works

Construction & Completion of Petroleum Jetty at Bintulu Port 122. 1988 5.80 mil Civil Works Bintulu Port, Bintulu Authority

Sarawak Shell Bintulu Condensate Stabilization Plant Phase III Mechanical 123. Bhd/ Chiyoda 1987 12.88 mil Project Mechanical Works Works Sdn Bhd

Kuala Belait Water Supply Contract 6 – 300,000 Gals Jabatan Kerja 124. 1986 10.10 mil Civil Works Reinforced Concrete Water Tower Raya

The Construction & Completion of University Pertanian Malaysia, the Works including of:- a) Water Reticulation Mains, R.C. Reservoir & Internal University Campus Core Drainage Civil, Building 125. Pertanian 1986 28.98 mil b) Sub-station, Turfing & Associate Works Turfing Works Malaysia c) Language Centre d) Library e) Hostel Building for Student & Staff Warga Hikmat Site Preparation Works for the Erection of a LP Steam Kejuruteraan 126. 1986 28.98 mil Civil Works Turbo Generator at MLNG`s Plant, Bintulu Sdn Bhd/ MLNG Sdn Bhd Construction &Completion of the Proposed Phase III Petronas/Bintulu 127. Houses (Package 3A) at K2 Area Kidurong Development 1986 10.50 mil Building Works Residential Estate, Bintulu Authority Warga Hikmat/ Main Construction Works for the Erection of a LP Mechanical 128. Kejuruteraan 1986 1.10 mil Steam Turbo Generator at MLNG`s Plant, Bintulu Works Sdn Bhd/ MLNG

Sarawak Shell 129. Renovation of Bridge 1986 1.50 mil Bridge Works Berhad

Construction &Completion of the Proposed Extension Jabatan Kerja 130. Water Treatment Plant No.2 & Associated Raya/ Maltimor 1986 4.25 mil Civil Works Works, Kuching Sdn Bhd

Construction of Historical Centre at Bandar Seri Jabatan Kerja 131. 1986 3.69 mil Building Works Begawan Raya

“Partnership & Performance” PROJECTS PROFILE (1999 - 1979)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Construction of Gadong Sewerage Pumping Station Jabatan Kerja 132. 1986 0.83 mil Civil Works No. 9 Raya

Construction of COB Indoor Ranges, Flotilla Base, Jabatan Kerja 133. 1986 4.65 mil Building Works Brunei Raya

Completion of Multipurpose Hall for Government Jabatan Kerja 134. 1986 0.62 mil Building Works School at Telisai, Tutong, Brunei Raya

Civil & Sabah Shell 135. Modification to Labuan Crude Oil Terminal 1985 1.20 mil Mechanical Berhad Works Petronas Civil, Building Construction of Basic Aviation Refueling facilities at 136. Dagangan Sdn 1985 0.25 mil & Mechanical Miri New Airport, Miri, Sarawak Bhd Works Bintulu Construction of the Kidurong Sewage Treatment Sewage 137. Development 1985 1.99 mil Works at Btu Works Authority Construction & Completion of Infrastructure Works including Site Preparation & Earthworks, Road Drainage Works Sewerage System & Water Bintulu 138. Reticulation Tree Plant & Turfing Including Development 1985 7.85 mil Civil Works Earthmoving Works on the Petronas/ABF Housing Authority Area (Phase I&II) for Phase III Petronas Housing Development for ABF Staff at Bintulu University Construction & Completion of Earthworks, Road Earthworks & 139. Pertanian 1985 4.20 mil Drainage & Palyfield for UPM Branch Campus, Bintulu Civil Works Malaysia Petronas Construction & Completion of the Phase 2A–29 units /Bintulu 140. (SS2) & Phase 2C-112 units (JS2) Houses at K2 1985 19.94 mil Building Works Development Area, Kidurong Residential Estate, Bintulu Authority Bintulu Site Clearing & Earthwork for the Bintulu Service 141. Development 1985 0.98 mil Earthworks Industrial Estate Phase II Sibiyu Road, Bintulu Authority Hyundai Asean Bintulu Fertilizer Plant Project – Supply Service Engineering 142. for Construction of Process & Non-Process Building 1985 15.78 mil Building Works Construction Works Company Ltd Construction of the Proposed Shell Service Station on Shell Marketing 143. Lot 754, Block 31, State Lands, Sibiyu Road Kemena Company of 1985 0.73 mil Civil & Building Land District, Bintulu Borneo Ltd

“Partnership & Performance” PROJECTS PROFILE (1999 - 1979)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Design, Construction & Completion for 162 units of Bintulu Double Storey Terrace Houses, 346 units of Single 144. Development 1985 11.00 mil Civil & Building Storey Houses of Rancangan Perumahan Rakyat on Authority Turnkey Basis at Kidurong Construction of 2 Block x 2 units Semi Detached Jabatan Kerja 145. Class C Quarters & 2 Block x 8 units Terrace for Fire 1985 1.58 mil Building Works Raya Brigade Kuala Belait Bandar Seri Begawan Water Supply Stage III Phase II Jabatan Kerja 146. Short Term Improvement Contract of Pipeline to 1985 6.96 mil Civil Works Raya Tutong Hyundai Building Works ABF Plant Project– Supply of Mechanical Building Engineering & 147. 1985 2.42 mil & Mechanical Services Construction Works Company Ltd Bandar Seri Begawan Water Supply Stage III Phase II Jabatan Kerja Civil & Building 148. Short Term Improvement Contract No 25 –Up rating of 1985 4.51 mil Raya Works Layong Headwork

149. Bintulu 13KV Substation & Tower – Civil Works SESCo 1984 0.63 mil Civil Works

150. Construction of 1 unit 11 WW Gas & Asst Work SESCo 1984 0.29 mil Civil Works

Sarawak Shell Mechanical 151. Asean Bintulu Fertilizer Gas Supply Pipe Line, Bintulu 1984 0.95 mil Berhad Works

Bintulu Site Preparation Works for Proposed Permanent 152. Development 1984 0.19 mil Civil Works Sewage Treatment Plant at Kidurong, Bintulu Authority Hyundai Engineering & 153. Asean Bintulu Fertilizer Plant Project – Piling Works 1984 0.20 mil Piling Works Construction Company Ltd Sarawak Bintulu Tanjung Kidurong Power Station Gas Turbine 154. Electricity 1983 0.73 mil Civil Works Set No.3 & Infrastructure Civil Works Supply Kobe Steel/ Hyundai Asean Bintulu Fertilizer Plant Temporary Facilities for 155. Engineering & 1983 1.40 mil Building Works Owner Construction Company Ltd

“Partnership & Performance” PROJECTS PROFILE (1999 - 1979)

Estimated Name of Date of Contract Services No Name and Location of Project Client Completion Sum Provided (RM)

Civil & Sarawak Shell 156. Civil & Structural Works Lutong Extension Project 1983 8.30 mil Structural Berhad Works Civil, Sabah Shell Mechanical & 157. Modification to Labuan Oil Terminal 1983 1.20 mil Berhad Instrument Works Petronas/ Proposed Petronas Service Station at Lot 721 Bintulu/ Bintulu Civil & Building 158. 1983 0.50 mil Miri (Sibiyu) Road, Btu Development Works Authority Proposed Infrastructural Service Including Road, Bintulu Drainage, Sewer & Water Reticulation Works, etc for 159. Development 1983 7.80 mil Civil Works Kidurong Low Cost Housing Estate (Phase I) at Authority Kidurong Bintulu Construction & Completion of Earthworks, Road, University Earthworks & 160. Drainage & Bridges for UPM Branch Campus in Pertanian 1982 11.99 mil Civil Works Bintulu Malaysia

Construction of MLNG Club House & Associated Malaysia LNG 161. 1982 10.00 mil Building Works Works (Including Swimming Pool & Kindergarten) Sdn Bhd

Central Luconia Gas Development Project On-Shore Civil, Building, Sarawak Shell 162. Condensate Stabilization Plant & other Project at 1982 11.00 mil Mechanical Berhad Bintulu Crude Oil Terminal Works Bintulu Bintulu Development Authority Shopping Arcade, Interior 163. Development 1981 0.50 mil Bintulu Renovation Authority Kellogg Oversea Site Preparation & Road Construction for Malaysia Construction Earthmoving & 164. 1981 4.00 mil LNG Sdn Bhd Company/MLN Road Works G Sdn Bhd

Construction & Completion of Extension of Ng. Sama Public Works 165. 1981 0.34 mil Building Works (As1188) Primary School at Batang Rejang, Kapit Department

Construction of Artery Road at Pulau Batam, Otorita Batam, 166. 1980 8.40 mil Road Works Indonesia Indonesia

Earthmoving Earthmoving & Civil Works at Labuan Crude Oil Sabah Shell 167. 1979 3.50 mil and Civil Storage Terminal Berhad Works

“Partnership & Performance” SECTION FIVE

Decorative Photo for Illustration Purposes Only

“Partnership & Performance” CURRENT PROJECTS

Development & Completion of Pan Borneo Highway in the State of Sarawak Phase 1 (WPC11)

The Proposed Development & Completion of the Pan Borneo Highway in the State of Sarawak is a 4-lane dual carriageway of JKR R5 standard design. The Pan Borneo Highway was officially launched in 2015. KACC & Perbena Emas formed Konsortium KPE Sdn Bhd to take on Works Package Contract 11 from Sg. Tangap to Pujut Link in Miri.

Covering a distance of 79.8 km though hilly terrain and urban areas, construction of the highway includes 4 Interchanges (Beluru, Bekenu, Miri Airport, Pujut Link Road), 1 Rest Service Area at Lambir, 8 Bridges, 64 Bus shelters and 7 Pedestrian Bridges.

Pakej D43 – Pembinaan Rangkaian Paip Pembentungan dan Rasionalisasi Loji Rawatan Kumbahan di Batu Jinjang Kepong, Kuala Lumpur (Reka & Bina)

As part of Kuala Lumpur’s ‘River of Life’ project, the new wastewater facility will transform the Klang and Gombak rivers into a vibrant livable waterfront with high economic value.

KACC is involved in river development works, specifically installation of 42km of new sewer lines, decommissioning and demolition of older sewage treatment plant, and construction of five (5) pumping stations to support the new centralized sewage treatment plant for the Batu, Jinjang Keping and Kuala Lumpur catchment area.

“Partnership & Performance” CURRENT PROJECTS

Proposed Second Kuching – Samarahan Trunk Road (Bridge Over Sg. Sarawak at Sejingkat)

The proposed construction of a new alternative route linking Kuching and Samarahan, including a crossing over Sg. Sarawak at Sejinkat, is to reduce traffic congestion during peak hour along the existing Kuching/Samarahan Expressway.

The total length of the alignment is approximately 1.71km, comprising 1.281km long bridge connecting the existing road at Tg. Bako with Sejingkat, together with construction of two major junctions, one at each end.

Pembinaan Loji Rawatan Kumbahan Serantau Batu Jinjang, Kepong, Kuala Lumpur (CSTP)

The proposed CSTP with inlet works is to cater for an ultimate PE of 1,000,000, and an STP to be designed and constructed for 750,00PE. KACC as the Design & Build contractor.

The new CSTP Batu will cover two current STP land, KLR 301 (15,000PE) at Taman Mastiara and KLR 342 (13,000PE) at Kpg Batu Muda, Kuala Lumpur. The project is estimated to be completed on March 2021.

“Partnership & Performance” CURRENT PROJECTS

Water Relocation Works for Pan Borneo Highway State of Sarawak, Phase 1

KACC is undertaking water pipe relocation works as part of the development of Pan Borneo Highway Sarawak for selected Works Packages 8 (Selangau - Balingian), 10 (Bakun – Niah) and 11 (Beluru – Miri).

Construction and Completion of Road from Sibu Jaya to Jalan Kong Yik Khim, Sibu

This new 6.2km road with two RC bridges and other associated works will provide an alternative bypass route from Sibu Jaya to Durin and Sibu town.

“Partnership & Performance” CURRENT PROJECTS

Construction & Completion of Concrete Weir with Associate Ancillary Works at Suai Water Treatment Plant Raw Water Intake, Batu Niah, Miri Division.

Located at Sg. Niah near to Suai Water Treatment Plant, construction of the concrete weir involves of piling, site clearing, construction of R.C storage/jetty pond, platform and gate control system.

By constructing a new Mass Concrete Weir, Suai raw water level sufficiency is expected to be resolved.

Proposed Upgrading and Pavement Improvement / Rehabilitation Works along the existing Kpg. Sg. Buloh / Sebuyau Coastal Road – Section 1(Q2017-1) From KM 0+100 to KM 9 +650

KACC is the main contractor for this Coastal Road project at Kampung Sg. Buloh / Sebuyau. Contract period: 15 months. Target completion: 2021

“Partnership & Performance” PAST PROJECTS - HIGHLIGHTS

Construction and Completion of Batang Sadong Bridge, Kpg Buloh, Samarahan Division

Pembinaan Kompleks 1 Divisyen dan Kem 4 Renjer DiRaja Di Muara Tuang, Kota Samarahan, Sarawak – Buildings, infrastructure and M&E Package

“Partnership & Performance” PAST PROJECTS - HIGHLIGHTS

Pembinaan Projek Pengkalan Polis Marin Wilayah Sarawak, Muara Tebas, Kuching

“Partnership & Performance” PAST PROJECTS - HIGHLIGHTS

Multimedia University Campus Development at Cyberjaya, Selangor

Construction And Completion of Samalaju Port Development Project, Samalaju, Bintulu

“Partnership & Performance” PAST PROJECTS - HIGHLIGHTS

Bintulu Water Supply Phase 3-Water Treatment Plant & Associated Works

Bintulu 4-Storey Shophouse

“Partnership & Performance” PAST PROJECTS - HIGHLIGHTS

Bintulu Civic Centre

ASEAN Bintulu Fertilizer Project (Civil & Structural Works)

“Partnership & Performance” PAST PROJECTS - HIGHLIGHTS

Sungai Kanowit Bridge

Federal Government Complex, Kuching

“Partnership & Performance” CONNECT WITH US

KUCHING HEAD OFFICE KUALA LUMPUR LIAISON OFFICE

7K-L, Ban Hock Road, Level 13, Menara OBYU 93100 Kuching, Sarawak, Malaysia Jalan PJU 8/8A, Bandar Damansara Perdana Tel: 082-242 912 47820 Petaling Jaya, Selangor, Malaysia Fax: 082-259 912 Tel: +6 03-77337678 Contact Person: Fax:+6 03-7732 4194

Sharifah Dewi Bt Wan Othman Admin Executive Email: [email protected]

Azlan Nuraqmal Bin Hj. Rambli Special Officer to CEO Email: [email protected]

“Partnership & Performance”