Federal Register / Vol. 60, No. 71 / Thursday, April 13, 1995 / Notices Adjacent to the Colorado River [VT±046±01±1430±00] Dated: April 5, 1995

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register / Vol. 60, No. 71 / Thursday, April 13, 1995 / Notices Adjacent to the Colorado River [VT±046±01±1430±00] Dated: April 5, 1995 18850 Federal Register / Vol. 60, No. 71 / Thursday, April 13, 1995 / Notices adjacent to the Colorado River [VT±046±01±1430±00] Dated: April 5, 1995. downstream from Parker Dam for the Stephen G. Kopach, Notice of Realty Action, Conveyance of operation of Parker and Headgate Dams. Chief Cadastral Surveyor. Detailed information concerning this Public Land in Garfield County, Utah, Panguitch City Airport, UTU±71137; [FR Doc. 95±9053 Filed 4±12±95; 8:45 am] action is available for review at the BILLING CODE 4310±GJ±M office of the Bureau of Land Correction Management, Yuma District, Havasu SUMMARY: In notice document UTU± [CO±942±95±1420±00] Resource Area, 3189 Sweetwater 71137 beginning on page 9393 in the Avenue, Lake Havasu City, Arizona. issue of Friday, February 17, 1995, the Colorado: Filing of Plats of Survey Upon publication of this notice in the lands to be conveyed are incorrectly Federal Register, the lands will be described. On page 9394, in the first April 5, 1995. segregated from all forms of column, under the heading, ``Panguitch The plats of survey of the following appropriation under the public land City Airport'', in the land description, in described land are officially filed in the laws, including the general mining laws, T. 34 S., R. 5 W., ``Section 14, Colorado State Office, Bureau of Land except for lease or conveyance under SW1¤4NW1¤4SW1¤4NE1¤4; Management, Lakewood, Colorado, the Recreation and Public Purposes Act W1¤2SW1¤4SW1¤4NE1¤4; effective 10 a.m. on March 31, 1995. and leasing under the mineral leasing S1¤2NE1¤4SE1¤4NW1¤4; The plat representing the dependent laws. For a period of 45 days from the SE1¤4NE1¤4SE1¤4NW1¤4; resurvey of a portion of the east date of publication of this notice in the E1¤2SW1¤4SE1¤4NW1¤4; SE1¤4SE1¤4NW1¤4'' boundary, a portion of the subdivisional Federal Register, interested persons should read ``Section 14, lines, and a portion of the subdivision may submit comments regarding the SW1¤4NW1¤4SW1¤4NE1¤4; of sections 1 and 2, T. 32 N., R. 13 W., proposed lease/conveyance or W1¤2SW1¤4SW1¤4NE1¤4; New Mexico Principal Meridian, classification of the lands to the Levi S1¤2NE1¤4SE1¤4NW1¤4; Colorado, Group No. 725, was accepted Deike, Area Manager, Havasu Resource SE1¤4NW1¤4SE1¤4NW1¤4; March 1, 1995. Area Office, 3189 Sweetwater Avenue, E1¤2SW1¤4SE1¤4NW1¤4; SE1¤4SE1¤4NW1¤4''. This survey was executed to meet Lake Havasu City, AZ 86406. FOR FURTHER INFORMATION: certain administrative needs of the CLASSIFICATION COMMENTS: Interested Detailed information concerning this Bureau of Indian Affairs. parties may submit comments on the action is available for review at the The plat representing the dependent suitability of the lands for park Kanab Area Office, 318 North 1st East, resurvey of a portion of the purposes. Comments on the Kanab, Utah 84741, telephone (801) subdivisional line between sections 13 classification are restricted to whether 644±2272. and 24, T. 3 N., R. 90 W., Sixth the land is physically suited for the Dated: April 7, 1995. Principal Meridian, Colorado, Group proposal, whether the use will No. 1057, was accepted December 16, G. Von Swain, maximize the future use or uses of the 1994. land, whether the use is consistent with Acting District Manager. The plat representing the dependent the local planning and zoning, or if the [FR Doc. 95±9101 Filed 4±12±95; 8:45 am] resurvey of a portion of the subdivision use is consistent with State and Federal BILLING CODE 4310±DQ±M of section 34, T. 6 N., R. 100 W., Sixth programs. Principal Meridian, Colorado, Group Any adverse comments will be No. 1066, was accepted December 16, reviewed by the Arizona State Director, [ES±960±9800±02] ES±047193, Group 85, 1994. Bureau of Land Management, who may Arkansas The supplemental plat amending the sustain, vacate, or modify this realty Filing of Plat of Survey; Arkansas labeling of three easement areas from action. In the absence of any adverse ``wetlands easement'' to ``flood comments, the classification will The plat, in four sheets, of the easement'' and ``public road easement'', become effective 60 days from the date dependent resurvey of the south in sections 13 and 24, T. 51 N., R. 7 W., of publication of this notice in the boundary, Township 15 North, Range 20 New Mexico Principal Meridian, Federal Register. West, a portion of the subdivisional Colorado, was accepted February 9, APPLICATION COMMENTS: Interested lines, the survey of the subdivision of 1995. parties may submit comments regarding certain sections, and the survey of The supplemental plat creating new the specific use proposed in the certain exceptions to U.S. Forest Service lots 12 and 13 from original lot 7 in application and plan of development, Tracts, Township 14 North, Range 20 section 24, T. 36 N., R. 6 E., New whether the BLM followed proper West, Fifth Principal Meridian, Mexico Principal Meridian, Colorado, administrative procedures in reaching Arkansas, will be officially filed in was accepted February 9, 1995. the decision, or any other factor not Eastern States, Springfield, Virginia at The supplemental plat, eliminating directly related to the suitability of the 7:30 a.m., on May 22, 1995. lot 42 and correcting the boundary and land for park purposes. The survey was requested by the U.S. area of lot 33 in the NW 1/4 of section FOR FURTHER INFORMATION CONTACT: Joe Forest Service. 18, T. 10 S., R. 84 W. Sixth Principal Liebhauser, Yuma District, Havasu All inquiries or protests concerning Meridian, Colorado, was accepted Resource Area Office at the address the technical aspects of the survey must March 17, 1995. above, or by telephone at (520) 855± be sent to the Chief Cadastral Surveyor These surveys were executed to meet 8017. for Cadastral Survey, Eastern States, certain administrative needs of this Bureau of Land Management, 7450 Bureau. Dated: April 6, 1995. Boston Boulevard, Springfield, Virginia The plat representing the dependent Maurenn A. Merrell, 22153, prior to 7:30 a.m., May 22, 1995. resurvey of portions of the east and Assistant District Manager, Administration/ Copies of the plat will be made north boundaries, a portion of the Acting District Manager. available upon request and prepayment subdivisional lines, the subdivision of [FR Doc. 95±9100 Filed 4±12±95; 8:45 am] of the reproduction fee of $2.75 per certain sections, and the metes-and- BILLING CODE 4310±32±P copy. bounds survey of parcel A and a portion Federal Register / Vol. 60, No. 71 / Thursday, April 13, 1995 / Notices 18851 of Parcel B, in section 14, T. 7 N., R. 85 INTERNATIONAL TRADE assume that any known Chilean W., Sixth Principal Meridian, Colorado, COMMISSION nontariff measures incompatible with Group No. 979, was accepted March 2, the rules of the NAFTA will not be 1995. [Investigation 332±359] applicable to U.S. products, and any The plat representing the dependent Chile: Probable Economic Effect on instance where the continued resurvey of a portion of the U.S. Imports, Industries, Consumers, application of such a Chilean nontariff subdivisional lines, T. 27 S., R. 57 W., and Exports of Accession to the North measure would result in different advice Sixth Principal Meridian, Colorado, American Free Trade Agreement and will be noted by the Commission. Group No. 1001, was accepted February The Commission expects to submit its Report on Services Trade 23, 1995. report by September 8, 1995. The plat representing the dependent AGENCY: United States International FOR FURTHER INFORMATION: Information resurvey of a portion of the Third Trade Commission. on general topics may be obtained from Standard Parallel South (south ACTION: Institution of investigation and the project leader, Mr. James Lukes, boundary), a portion of the north scheduling of public hearing. Office of Industries (202±205±3426) or boundary, and a portion of the the assistant project leader, Ms. Gail subdivisional lines, T. 15 S., R. 85 W., EFFECTIVE DATE: April 6, 1995. Burns, Office of Industries (202±205± Sixth Principal Meridian, Colorado, SUMMARY: Following receipt on March 8, 2501) and on legal aspects, from Mr. Group No. 1060, was accepted January 1995, of a request from the U.S. Trade William Gearhart, Office of the General 27, 1995. Representative (USTR), the Commission Counsel (202±205±3091). The media These surveys were executed to meet instituted investigation No. 332±359, should contact Ms. Margaret certain administrative needs of the U.S. Chile: Probable Economic Effect on U.S. O'Laughlin, Office of Public Affairs Forest Service. Imports, Industries, Consumers, and (202±205±1819). Hearing impaired Carl F. Nagy, Exports of Accession to the North individuals are advised that information Acting Chief Cadastral Surveyor for Colorado. American Free Trade Agreement and on this matter can be obtained by [FR Doc. 95±9102 Filed 4±12±95; 8:45 am] Report on Services Trade, under section contacting the TDD terminal on (202± BILLING CODE 4310±JB±P 332(g) of the Tariff Act of 1930 (19 205±1810). For information on a U.S.C. 1332(g)) for the purpose ofÐ product basis, contact the appropriate [ID±942±7130±00±7661] (a) Advising the President, with member of the Commission's Office of respect to each item in chapters 1 Industries, as follows: Idaho: Filing of Plats of Survey; Idaho through 98 of the Harmonized Tariff (1) Agricultural and forest products, Mr. Schedule of the United States (HTS), as Douglas Newman (202±205±3328) The plats of the following described to the probable economic effect of (2) Chemical, energy-related, textile, land was officially filed in the Idaho providing, under the North American apparel, and footwear products, Mr.
Recommended publications
  • The Public Land Survey System for the Cadastral Mapper
    THE PUBLIC LAND SURVEY SYSTEM FOR THE CADASTRAL MAPPER FLORIDA ASSOCIATION OF CADASTRAL MAPPERS In conjunction with THE FLORIDA DEPARTMENT OF REVENUE Proudly Presents COURSE 2 THE PUBLIC LAND SURVEY SYSTEM FOR THE CADASTRAL MAPPER Objective: Upon completion of this course the student will: Have an historical understanding of the events leading up to the PLSS. Understand the basic concepts of Section, Township, and Range. Know how to read and locate a legal description from the PLSS. Have an understanding of how boundaries can change due to nature. Be presented with a basic knowledge of GPS, Datums, and Map Projections. Encounter further subdividing of land thru the condominium and platting process. Also, they will: Perform a Case Study where the practical applications of trigonometry and coordinate calculations are utilized to mathematically locate the center of the section. *No part of this book may be used or reproduced in any matter whatsoever without written permission from FACM www.FACM.org Table Of Contents Course Outline DAY ONE MONDAY MORNING - WHAT IS THE PLSS? A. INTRODUCTION AND OVERVIEW TO THE PLSS……………………………..…………1-2 B. SURVEYING IN COLONIAL AMERICA PRIOR TO THE PLSS………………...……..1-3 C. HISTORY OF THE PUBLIC LAND SURVEY SYSTEM…………………………….….…..1-9 1. EDMUND GUNTER……………………………………………………….………..…..…..……1-10 2. THE LAND ORDINANCE OF 1785…………………………………………..………….……..1-11 3. MAP OF THE SEVEN RANGES…………………………………….……………………………1-15 D. HOW THE PUBLIC LAND SURVEY SYSTEM WORKS………..………………………1-18 1. PLSS DATUM………..…………………………………………………….………………1-18 2. THE TOWNSHIP………..………………………………………………….………………1-18 DAY 1 MORNING REVIEW QUESTIONS……………………………………………..1-20 i Table Of Contents MONDAY AFTERNOON – SECTION TOWNSHIP RANGE A.
    [Show full text]
  • Federal Register / Vol. 60, No. 230 / Thursday, November 30, 1995 / Notices
    Federal Register / Vol. 60, No. 230 / Thursday, November 30, 1995 / Notices 61573 will not be offered for sale until at least next federal work day following the plat Dated: November 22, 1995. 60 days after the date of this notice acceptance date. Duane E. Olsen, Chief Cadastral Surveyor for Idaho. Gila and Salt River Meridian, Arizona FOR FURTHER INFORMATION CONTACT: [FR Doc. 95±29213 Filed 11±29±95; 8:45 am] T. 23 S., R. 24 E., (AZA 28238) Lance J. Bishop, Acting Chief, Branch of BILLING CODE 4310±GG±M Sec. 8, lot 6. Cadastral Survey, Bureau of Land The area described contains 0.1 acre. Management (BLM), California State T. 19 S., R. 25 E., (AZA 29330) Office, 2800 Cottage Way, Room E± [CA±050±1430±00; CACA 36304] All public land in sections 17, 18 and 20. 2845, Sacramento, CA 95825, 916±979± The area described contains 650 acres, 2890. Notice of Proposed Withdrawal and more or less. Opportunity for Public Meeting; SUPPLEMENTARY INFORMATION: The plats California SUPPLEMENTARY INFORMATION: Upon of Survey of lands described below have publication of this notice in the Federal been officially filed at the California AGENCY: Bureau of Land Management, Register, the lands will be segregated State Office of the Bureau of Land Interior. from appropriation under the public Management in Sacramento, CA. ACTION: Notice. land laws, including the mining laws, pending disposition of this action or 270 Mount Diablo Meridian, California SUMMARY: The Bureau of Land days from the date of publication of this T. 5 N., R. 11 E.,ÐSupplemental plat of the Management proposes to withdraw 150 notice , whichever occurs first.
    [Show full text]
  • Index of Standard Abbreviations (Sorted by Abbreviation) This Index Is Color Coded to Indicate Source of Information
    Index of Standard Abbreviations (Sorted by Abbreviation) This Index is color coded to indicate source of information. H-1275-1 - Manual Land Status Records (Revised Proposed 2001 Edition from Rick Dickman) Oregon/Washington Proposed Abbreviations (Robert DeViney - retired 2006) Oregon/Washington Proposed Abbreviations (Land Records Team - Post Robert DeViney) 1st Prin Mer First Principal Meridian 2nd Prin Mer Second Principal Meridian 3rd Prin Mer Third Principal Meridian 4th Prin Mer Fourth Principal Meridian 5th Prin Mer Fifth Principal Meridian 6th Prin Mer Sixth Principal Meridian 1/2 Half 1/4 Quarter A A A Acre(s) A&M Col Agriculture and Mechanical College A/G Anchors & guys A/Rd Access road ACEC Area of Critical Environmental Concern Acpt Accept/Accepted Acq Acquired Act of Cong Act of Congress ADHE Adjusted homestead entry Adm S Administrative site Admin Administration, administered AEC Atomic Energy Commission AF Air Force Agri Agriculture, Agricultural Agri Exp Sta Agriculture Experiment Station AHA Alaska Housing Authority AHE Additional homestead entry All Min All minerals Allot Allotment Als PS Alaska public sale Amdt Amendment, Amended, Amends Anc Fas Ancillary facilities ANS Air Navigation Site AO Area Office Apln Application Apln Ext Application for extension Aplnt Applicant App Appendix Approp Appropriation, Appropriate, Appropriated Page 1 of 13 Index of Standard Abbreviations (Sorted by Abbreviation) Appvd Approved Area Adm O Area Administrator Order(s) Arpt Airport ARRCS Alaska Rural Rehabilitation Corp. sale Asgn Assignment
    [Show full text]
  • Federal Register/Vol. 63, No. 99/Friday, May 22, 1998/Notices
    Federal Register / Vol. 63, No. 99 / Friday, May 22, 1998 / Notices 28411 New Mexico Principal Meridian, Group The plat representing the dependent of the 1891 meanders of the right bank 1137, Colorado, was accepted April 14, resurvey of portions of the subdivisional of the Clearwater River, and the 1998. lines and the subdivision of sections 10 subdivision of section 25, and the The plat representing the dependent and 15 in T. 3 N., R. 102 W., Sixth survey of lots 15 and 16 in section 25, resurvey of portions of the Eighth Principal Meridian, Group 1156, T. 36 N., R. 5 W., Boise Meridian, Idaho, Standard Parallel North (S. Bdy.), Colorado, was accepted March 30, 1998. Group 992, was accepted May 11, 1998. subdivisional lines, and the subdivision The plat representing the entire This survey was executed to meet of certain sections in T. 33 N., R. 9 W., record of the corrective dependent certain administrative needs of the New Mexico Principal Meridian, Group resurvey to correct the position of Cor. Bureau of Indian Affairs. All inquiries 1138, Colorado, was accepted May 5, No. 2, Tract 147, also affecting Tracts concerning the surveys of the above 1998. 94, 143, and 146 and to identify the described land must be sent to the These surveys were requested by the public land boundaries along the north Chief, Cadastral Survey, Idaho State Bureau of Indian Affairs for and east sides Tracts 130A and 147 in Office, Bureau of Land Management, administrative purposes. T. 1 S., R. 71 W., Sixth Principal 1387 South Vinnell Way, Boise, Idaho, Field notes only for the Meridian, Group 1167, Colorado, was 83709±1657.
    [Show full text]
  • The Ohio Surveys
    Report on Ohio Survey Investigation -------------------------------------------------------------------------------------------------------------------------------------------- A Report on the Investigation of the FGDC Cadastral Data Content Standard and its Applicability in Support of the Ohio Survey Systems Nancy von Meyer Fairview Industries, Inc For The Bureau of Land Management (BLM) National Integrated Land System (NILS) Project Office January 2005 i Report on Ohio Survey Investigation -------------------------------------------------------------------------------------------------------------------------------------------- Preface Ohio was the testing and proving grounds of the Public Land Survey System (PLSS). As a result Ohio contains many varied land descriptions and survey systems. Further complicating the Ohio land description scene are large federal tracts reserved for military use and lands held by other states prior to Ohio statehood. This document is not a history of the land system development for Ohio. The history of Ohio surveys can be found in other materials including the following: Downs, Randolf C., 1927, Evolution of Ohio County Boundaries”, Ohio Archeological and Historical Publications Number XXXVI, Columbus, Ohio. Reprinted in 1970. Gates, Paul W., 1968. “History of Public Land Law Development”, Public Land Law Review Commission, Washington DC. Knepper, George, 2002, “The Official Ohio Lands Book” Auditor of State, Columbus Ohio. http://www.auditor.state.oh.us/StudentResources/OhioLands/ohio_lands.pdf Last Accessed November 2, 2004 Petro, Jim, 1997, “Ohio Lands A Short History”, Auditor of State, Columbus Ohio. Sherman, C.E., 1925, “Original Ohio Land Subdivisions” Volume III of the Final Report to the Ohio Cooperative Topographic Survey. Reprinted in 1991. White, Albert C., “A History of the Public Land Survey System”, US Government Printing Office, Stock Number 024-011-00150-6, Washington D.C.
    [Show full text]
  • Federal Register/Vol. 67, No. 136/Tuesday, July 16, 2002/Notices
    46686 Federal Register / Vol. 67, No. 136 / Tuesday, July 16, 2002 / Notices respondents, will be available for public Colorado, effective 10 a.m., June 27, DEPARTMENT OF THE INTERIOR review at the Palm Springs-South Coast 2002. All inquiries should be sent to the Field Office located at 690 W. Garnet Colorado State Office, Bureau of Land Bureau of Land Management Avenue, North Palm Springs, California, Management, 2850 Youngfield Street, [ID–957–1430–BJ] during regular business hours 8 a.m. to Lakewood, Colorado 80215–7093. 4:30 p.m., Monday through Friday, The plat representing the dependent Idaho: Filing of Plats of Survey except holidays. resurvey and survey of certain mineral AGENCY: Bureau of Land Management, SUPPLEMENTARY INFORMATION: The Santa claims in Protracted T. 42 N., R. 7 W., Interior. Rosa and San Jacinto Mountains New Mexico Principal Meridian, Group ACTION: Notice. National Monument was established by 1339, Colorado, was accepted April 22, act of Congress and signed into law on 2002. SUMMARY: The plats of the following October 24, 2000. The National described lands were officially filed in The plat (in 11 sheets) representing Monument was established in order to the Idaho State Office, Bureau of Land preserve the nationally significant Amended Protraction Diagram No. 18, Management, Boise, Idaho, effective 9 biological, cultural, recreational, which covers the protracted areas in a.m., on the dates specified: The plat geological, educational and scientific Townships 49, 50, and 51 North, Ranges constituting the entire survey record of values found in the Santa Rosa and San 17, 18, 19, and 20 West, New Mexico the dependent resurvey of a portion of Jacinto Mountains.
    [Show full text]
  • Federal Register / Vol. 60, No. 138 / Wednesday, July 19, 1995 / Notices Assigned Permit Number PRT–804479
    37068 Federal Register / Vol. 60, No. 138 / Wednesday, July 19, 1995 / Notices assigned Permit Number PRT±804479. by the Utah prairie dog, a threatened States in the event the patentee or its The requested permit, which is for a species. successor, used the land for purposes period not to exceed 2 years, would The Applicant considered a no action other than that specified in the patent. authorize the incidental take of the alternative. The prairie dogs are situated The land was not improved in threatened Utah prairie dog (Cynomys on the property in such a way that the accordance with the provision of the parvidens). The proposed take would proposed development cannot be plan of development on file with this occur as a result of development of a 33- planned to avoid them. Furthermore, Bureau; therefore, the land reverted acre housing community on privately- this is a small colony surrounded by back to the United States by operation owned property within the city limits of industrial and residential development, of law. Cedar City, Iron County, Utah. and a State highway. Implementation of At 10 a.m. on August 18, 1995, the The Applicant has prepared a habitat the no action alternative would cause land will be opened to the operation of conservation plan and an environmental loss of use of the private property, the public land laws generally, subject assessment for the incidental take resulting in an economic loss. to valid existing rights, the provisions of permit application. This notice is Authority: The authority for this action is existing withdrawals, other segregations provided pursuant to section 10(c) of the Endangered Species Act of 1973, as of record, and the requirements of the Act and National Environmental amended (16 U.S.C.
    [Show full text]
  • Community Resource Directory Is Published by the City of Meridian — Mayor’S Office 33 E
    Community Resource Guide Built for Business… Designed for Living Our City Leaders Introduction This resource directory is intended as a guide to most of the City services and human services in Meridian, Idaho, as well as others in Ada County. It is not an all-inclusive list, nor does inclusion in this directory constitute City endorsement. For additional information, contact the following: Treasure Valley Community Resource Center 2412 E. Chicago St. #110 Caldwell, ID 83605 (mailing only) 459-9263 or 1-800-228-2859 yor www.idahoconnections.org n Ma rd ridia Wee Me de Tammy 2-1-1 Idaho C/O Mountain States Group 1607 W. Jefferson St. Boise, ID 83702 336-5533, ext. 293 City Council TVCRC and 2-1-1 Idaho are health and human services information and referral programs providing a telephone and Charlie Rountree, online network linking people to resources. President David Zaremba, Vice-President Editor: Keith Bird Brad Hoaglun Sarah Wheeler, Planning Department, City of Meridian Layout, Photography, and Design: Department Directors Shelly Houston, Mayor’s Office, City of Meridian Finance Published: October 2008 Stacy Kilchenmann Fire Department Chief Ron Anderson Legal / HR / IT Bill Nary Parks & Recreation Steve Siddoway Planning Anna Canning Keep in Touch With Your Community! , and occasional e-mail Police Department CityNews Chief Jeff Lavey If you’d like to receive the City of Meridian’s quarterly Public Works online newsletter, Tom Barry updates regarding Meridian issues and events you may be interested in, simply send an e-mail to: [email protected] of Meridian’s asking e-mail to belist.
    [Show full text]
  • Cadastral NSDI Reference Document – July 2006
    Cadastral NSDI Reference Document – July 2006 Cadastral NSDI Reference Document July 2006 Purpose This document describes the Cadastral NSDI, its components and the public and private business processes that define the content. The Cadastral National Spatial Data Infrastructure (Cadastral NSDI) has been defined by the FGDC Cadastral Subcommittee as a minimum set of attributes about land parcels that is used for publication and distribution of cadastral information by cadastral data producers for use by applications and business processes. The standards for the data content of the Cadastral NSDI are derived from the Cadastral Data Content Standard1, which is a standard for all cadastral elements and extends beyond the minimum elements in the Cadastral NSDI. This standard and many other documents related to the Cadastral NSDI and the Cadastral Subcommittee can be found at http://www.nationalcad.org. Business Applications The goal of the FGDC Cadastral Data Subcommittee is to provide a uniform coverage of parcel data that provides a multi-jurisdictional view or private, state and federal lands, their ownership, use, structures and the value of private property. Figure 1 shows an example of the characteristics of a single parcel and the type of information that would be available for entire region. GIS analysis of a regional coverage allows users to identify the location of properties with specific characteristics within a region. A recent study of the utility of parcel data by emergency responders after a hurricane found that local parcel information was uniquely capable of answering questions that ranged from the identification of vacant lands that could be used for debris removal to the location of organic farms to avoid spraying them with insecticides.
    [Show full text]
  • Federal Register/Vol. 78, No. 78/Tuesday, April 23, 2013/Notices
    23952 Federal Register / Vol. 78, No. 78 / Tuesday, April 23, 2013 / Notices time available, the time for individual We will place a copy of the plats we Bureau of Land Management, Montana oral comments may be limited. described in the open files. They will be State Office, Billings, Montana, and was available to the public as a matter of necessary to determine Federal Leasable William Merhege, information. Mineral Lands. Deputy State Director, Resources. If BLM receives a protest against a The lands we surveyed are: [FR Doc. 2013–09489 Filed 4–22–13; 8:45 am] survey, as shown on the plat, prior to BILLING CODE 4310–AG–P the date of the official filing, we will Fifth Principal Meridian, North Dakota stay the filing pending our T. 148 N., R. 95 W. consideration of the protest. The plat, in three sheets, representing the DEPARTMENT OF THE INTERIOR We will not officially file the plats dependent resurvey of portions of the 14th Guide Meridian (west boundary) and the Bureau of Land Management until the day after we have accepted or dismissed all protests and they have south boundary, a portion of the become final, including decisions on subdivisional lines, and the adjusted original [LLES956000–L14200000–BJ0000– appeals. meanders of the former left and right banks LXSITRST0000] of the Little Missouri River through sections Dated: April 16, 2013. 29, 30, 31, and 32, the subdivision of sections Eastern States: Filing of Plats of Dominica Van Koten, 29, 30, 31, and 32, and the survey of the Survey Chief Cadastral Surveyor. meanders of the present left and right banks of the Little Missouri River through sections AGENCY: Bureau of Land Management, [FR Doc.
    [Show full text]
  • 18. Geologic Terms and Geographic Divisions
    18. Geologic Terms and Geographic Divisions Geologic terms For capitalization, compounding, and use of quotations in geologic terms, copy is to be followed. Geologic terms quoted verbatim from published ma- terial should be left as the original author used them; however, it should be made clear that the usage is that of the original author. Formal geologic terms are capitalized: Proterozoic Eon, Cambrian Period. Structural terms such as arch, anticline, or uplift are capitalized when pre- ceded by a name: Cincinnati Arch, Cedar Creek Anticline, Ozark Uplift . See Chapter 4 geographic terms for more information. Divisions of Geologic Time [Most recent to oldest] Eon Era Period Phanerozoic ................ Cenozoic ............................ Quarternary. Tertiary (Neogene, Paleogene). Mesozoic........................... Cretaceous. Jurassic. Triassic. Paleozoic .......................... Permian. Carboniferous (Pennsylvanian, Mississippian). Devonian. Silurian. Ordovician. Cambrian. Proterozoic ................. Neoproterozoic ............... Ediacaran. Cryogenian. Tonian. Mesoproterozoic ............. Stenian. Ectasian. Calymmian. Paleoproterozoic ............. Statherian. Orosirian. Rhyacian. Siderian. Archean ....................... Neoarchean. Mesoarchean. Paleoarchean. Eoarchean. Hadean. Source: Information courtesy of the U.S. Geological Survey; for graphic see http://pubs.usgs.gov/fs/2007/3015/ fs2007-3015.pdf. 343 cchapter18.inddhapter18.indd 334343 111/13/081/13/08 3:19:233:19:23 PPMM 344 Chapter 18 Physiographic regions Physiographic
    [Show full text]
  • Federal Register/Vol. 77, No. 16/Wednesday, January 25, 2012
    Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012 / Notices 3791 other half of the surface estate is owned percent (3%) of the gross realization of DEPARTMENT OF THE INTERIOR by various private entities with a small all coal mined and sold from the Subject amount owned by a Peabody Energy Property.’’ Bureau of Land Management Corporation subsidiary. The tract will be leased to the [LLID9570000.LL14200000.BJ0000] The tract contains surface mineable qualified bidder of the highest cash coal reserves in the Wyodak-Anderson amount provided that the high bid Idaho: Filing of Plats of Survey coal zone currently being recovered in the adjacent, existing mines. On the meets or exceeds the BLM’s estimate of AGENCY: Bureau of Land Management, LBA tract, there are two mineable the fair market value (FMV) of the tract. Interior. seams, the Wyodak-Anderson 1 The minimum bid for the tract is $100 ACTION: Notice of filing of plats of (Anderson) and the Wyodak-Anderson 2 per acre or fraction thereof. No bid that surveys. (Canyon), located in the southern is less than $100 per acre, or fraction thereof, will be considered. The bids SUMMARY: The Bureau of Land portion of the LBA that merge into a Management (BLM) has officially filed single seam in the northern portion. The should be sent by certified mail, return receipt requested, or be hand delivered. the plats of survey of the lands total coal thickness averages about 77 described below in the BLM Idaho State The BLM Wyoming State Office Cashier feet with the shallower Anderson seam Office, Boise, Idaho, effective 9 a.m., on will issue a receipt for each hand- slightly thicker than the deeper Canyon the dates specified.
    [Show full text]