203702: Metadacite, Golden Grove Mine (Scuddles Member, Gossan Hill Formation, Murchison Supergroup, Murchison Domain, Youanmi Terrane, Yilgarn Craton)

Total Page:16

File Type:pdf, Size:1020Kb

203702: Metadacite, Golden Grove Mine (Scuddles Member, Gossan Hill Formation, Murchison Supergroup, Murchison Domain, Youanmi Terrane, Yilgarn Craton) 203702.1.pdf Geochronology Record 1259 203702: metadacite, Golden Grove mine (Scuddles Member, Gossan Hill Formation, Murchison Supergroup, Murchison Domain, Youanmi Terrane, Yilgarn Craton) Location and sampling Petrographic description Yalgoo (SG 50-2), Badja (2240) The sample is a porphyritic metadacite, consisting MGA Zone 50, 496097E 6816582N of about 65–70% aphanitic matrix, 20% plagioclase, 10% actinolite, and accessory chlorite, epidote, and Sampled on 18 December 2012 iron–titanium oxide minerals. The matrix is crypto- to microcrystalline (grain size up to 0.05 mm), and composed This sample was collected from the 804.40 – 808.77 m mainly of sericite, quartz, and feldspar. Plagioclase depth interval of diamond drillhole G12/501, at MMG’s (andesine, An30–34) forms subhedral to euhedral lath- Golden Grove copper–lead–zinc mine, located about shaped phenocrysts, up to 0.8 mm long, that are clouded 230 km east of Geraldton and 56 km southeast of Yalgoo. by saussurite and rimmed by albite. Actinolite occurs as The drillhole is located on the west side of a track, about sheaves of acicular, microcrystalline to fine-grained (up 4.1 km northeast of Minjar Well, 2.4 km north-northeast to 0.1 mm long) crystals. Minor resorption of plagioclase of Minjar Hill, and 2.2 km southwest of the southeast end phenocrysts suggests they were entrained in the magma of Golden Grove airstrip. prior to crystallization of the melt. Tectonic unit/relations Zircon morphology The unit sampled is a metadacite assigned to the Zircons isolated from this sample are colourless and Scuddles Member of the Gossan Hill Formation of the subhedral to euhedral. The crystals are up to 250 µm long, Murchison Supergroup (Van Kranendonk et al., 2013). The and equant to elongate, with aspect ratios up to 5:1. In 3000– 2700 Ma Murchison Supergroup consists mainly cathodoluminescence (CL) images, concentric zoning is of metabasalt, felsic metavolcanic and metavolcaniclastic ubiquitous, and many crystals exhibit sector zoning. A CL image of representative zircons is shown in Figure 1. rocks, and clastic and chemical metasedimentary rocks (Van Kranendonk et al., 2013). The 2963–2947 Ma Gossan Hill Formation consists of rhyolitic to dacitic Analytical details metavolcanic and metavolcaniclastic rocks, locally hosting economic massive sulfide mineralization (e.g. Sharpe This sample was analysed on 31 May – 1 June 2013, using and Gemmell, 2001). The Scuddles Member consists of SHRIMP-B, and 10–11 June 2013, using SHRIMP-A. porphyritic metadacite with lesser rhyodacite and felsic Analyses 1.1 to 17.1 (spot numbers 1–17) were obtained volcaniclastic rocks, and overlies felsic metavolcanic during the first session, together with 11 analyses of the rocks of the Golden Grove and Gossan Valley Members BR266 standard, of which eight analyses indicated an of the Gossan Hill Formation. Volcanic rocks of the external spot-to-spot (reproducibility) uncertainty of 0.55% (1σ) and a 238U/206Pb* calibration uncertainty of Gossan Hill Formation were coeval with metatonalite and 207 206 metagranodiorite of the 2964–2945 Ma Bunnawarra Suite, 0.26% (1σ). Isotopic mass fractionation of Pb/ Pb which consists of deformed rafts within plutons of the ratios during the first session was corrected by reference to the OGC1 standard; measured ratios were increased c. 2750 Ma Rothsay Suite of the 2820–2735 Ma Annean by 0.71%. Analyses 18.1 to 35.1 (spot numbers 18–35) Supersuite (Van Kranendonk et al., 2013; Chen et al., in were obtained during the second session, together with prep.). The Gnows Nest Granodiorite of the Thundelarra 12 analyses of the BR266 standard, which indicated an Supersuite intrudes the base of the Gossan Hill Formation external spot-to-spot (reproducibility) uncertainty of and may be subvolcanic to the Scuddles Member (Chen 0.50% (1σ) and a 238U/206Pb* calibration uncertainty of et al., in prep.). Metarhyolite of the underlying Golden 0.20% (1σ). Isotopic mass fractionation of 207Pb/206Pb Grove Member, sampled at approximately 596–600 m ratios during the second session was corrected by depth in drillhole G12/501, yielded a crystallization age reference to the OGC1 standard; measured ratios were of 2963 ± 6 Ma (GSWA 203703, Wingate et al., 2015a). increased by 0.24%. Calibration uncertainties are included A metarhyolite of the Gossan Valley Member, sampled at in the errors of 238U/206Pb* ratios and dates listed in approximately 8–10 m depth in drillhole G12/501, yielded Table 1. Common-Pb corrections were applied to all a crystallization age of 2959 ± 5 Ma (GSWA 203704, analyses using contemporaneous isotopic compositions Wingate et al., 2015b). determined according to the model of Stacey and Kramers (1975). 1 203702.1.pdf Geochronology Record 1259 Figure 1. Cathodoluminescence image of representative zircons from sample 203702: metadacite, Golden Grove mine. Numbered circles indicate the approximate positions of analysis sites. 0.24 203702 3100 35 analyses of 35 zircons 0.23 3050 * Pb 0.22 206 Pb*/ 207 0.21 2900 2850 0.20 2800 0.19 1.31.4 1.51.6 1.71.8 1.92.0 2.1 238U/206Pb* Figure 2. U–Pb analytical data for sample 203702: metadacite, Golden Grove mine. Yellow squares indicate Group I (magmatic zircons). 2 203702.1.pdf Geochronology Record 1259 Table 1. Ion microprobe analytical results for zircons from sample 203702: metadacite, Golden Grove mine Group Spot Grain. 238U 232Th 232Th ƒ204 238U/206Pb 207Pb/206Pb 238U/206Pb* 207Pb*/206Pb* 238U/206Pb* 207Pb*/206Pb* Disc. ID no. spot (ppm) (ppm) 238U (%) ± 1σ ± 1σ ± 1σ ± 1σ date (Ma) ±1σ date (Ma) ±1σ (%) I 11 11. 1 110 131 1.24 0.029 1.717 0.024 0.21448 0.00125 1.718 0.024 0.21422 0.00126 2958 33 2938 10 -0.7 I 28 28.1 157 157 1.04 0.083 1.649 0.017 0.21556 0.00135 1.650 0.017 0.21483 0.00137 3054 25 2942 10 -3.8 I 33 33.1 229 246 1. 11 0.006 1.590 0.015 0.21566 0.00123 1.590 0.015 0.21561 0.00123 3146 23 2948 9 -6.7 I 18 18.1 123 115 0.97 0.021 1.692 0.019 0.21581 0.00139 1.692 0.019 0.21563 0.00140 2994 26 2948 10 -1.5 I 29 29.1 168 136 0.84 -0.023 1.799 0.019 0.21547 0.00143 1.799 0.019 0.21567 0.00144 2850 25 2949 11 3.4 I 3 3.1 312 396 1.31 0.045 1.758 0.017 0.21623 0.00082 1.759 0.017 0.21583 0.00083 2902 23 2950 6 1. 6 I 13 13.1 107 101 0.98 0.031 1.747 0.024 0.21634 0.00129 1.748 0.024 0.21606 0.00130 2917 33 2952 10 1. 2 I 32 32.1 167 182 1. 12 0.010 1.690 0.018 0.21630 0.00136 1.690 0.018 0.21621 0.00136 2996 26 2953 10 -1.5 I 19 19.1 55 49 0.90 0.000 1.590 0.025 0.21632 0.00177 1.590 0.025 0.21632 0.00177 3145 39 2954 13 -6.5 I 20 20.1 43 24 0.58 0.000 1.667 0.028 0.21661 0.00195 1.667 0.028 0.21661 0.00195 3030 42 2956 15 -2.5 I 12 12.1 63 32 0.54 -0.026 1.761 0.030 0.21638 0.00162 1.760 0.030 0.21661 0.00163 2900 41 2956 12 1. 9 I 6 6.1 132 96 0.75 0.020 1.676 0.020 0.21687 0.00108 1.676 0.020 0.21669 0.00108 3016 29 2956 8 -2.0 I 35 35.1 128 109 0.88 0.043 1.635 0.065 0.21725 0.00140 1.636 0.065 0.21686 0.00141 3076 101 2958 11 -4.0 I 17 1 7. 1 105 59 0.58 0.016 1.785 0.025 0.21720 0.00129 1.785 0.025 0.21706 0.00130 2868 33 2959 10 3.1 I 31 31.1 137 186 1.40 -0.021 1.660 0.018 0.21690 0.00140 1.660 0.018 0.21708 0.00141 3040 27 2959 10 -2.7 I 10 10.1 111 132 1.23 0.044 1.763 0.025 0.21749 0.00125 1.763 0.025 0.21709 0.00128 2896 33 2959 9 2.1 3 I 5 5.1 219 214 1. 01 0.017 1.710 0.017 0.21736 0.00085 1.711 0.017 0.21721 0.00086 2967 24 2960 6 -0.2 I 21 21.1 115 66 0.59 0.000 1.671 0.020 0.21732 0.00152 1.671 0.020 0.21732 0.00152 3024 29 2961 11 -2.1 I 23 23.1 122 71 0.60 -0.023 1.642 0.018 0.21747 0.00143 1.641 0.018 0.21767 0.00144 3067 27 2964 11 -3.5 I 24 24.1 91 83 0.94 -0.058 1.669 0.022 0.21740 0.00168 1.668 0.022 0.21791 0.00170 3027 32 2965 13 -2.1 I 7 7. 1 111 70 0.66 -0.013 1.705 0.022 0.21788 0.00119 1.705 0.022 0.21799 0.00120 2975 31 2966 9 -0.3 I 14 14.1 96 111 1. 19 0.174 1.747 0.025 0.21960 0.00868 1.750 0.025 0.21804 0.00871 2914 35 2966 64 1.
Recommended publications
  • Mining Industry Leader Enhances Energy Management Capabilities with Enernoc's Demandsmart
    June 26, 2012 Mining Industry Leader Enhances Energy Management Capabilities With EnerNOC's DemandSMART MMG Golden Grove Selects EnerNOC in Western Australia MELBOURNE, AUSTRALIA and BOSTON, MA -- (Marketwire) -- 06/26/12 -- EnerNOC, Inc. (NASDAQ: ENOC), a leading provider of energy management applications for commercial, institutional, and industrial energy users, announced today that MMG Golden Grove has joined EnerNOC's demand side management network in Western Australia (WA). MMG will leverage EnerNOC's DemandSMART™ application to participate in demand response and support reductions in energy consumption at its underground and open pit base and precious metals mine, located approximately 280 kilometres east of Geraldton, WA. MMG Golden Grove operates 24/7, year-round, and produces concentrates of zinc, copper and high precious metals that are exported to smelters in China, Korea, Japan, India, and Thailand. MMG will reduce its power consumption by as much as 15 megawatts (MW) when EnerNOC's network is dispatched by System Management, the entity that is responsible for managing the real-time operation of the regional power system. In return for this service, which supports safe, secure and reliable operation of the power system, MMG will earn substantial payments to help offset operational costs, including electricity usage. In addition, EnerNOC will work with MMG to incorporate demand side management into the mine's strategic energy management plan, with the goal of contributing to the company's ongoing energy performance targets. "MMG is committed to proactively managing our energy use, and EnerNOC's energy management software will enable us to strategically monitor our usage and help us meet our energy performance targets, while helping to support the reliability of our region's electric power grid," said Pierre Malan, MMG Golden Grove's General Manager.
    [Show full text]
  • OXR ZXF Merger Announceme
    3 March 2008 AUSTRALIAN STOCK EXCHANGE AND MEDIA RELEASE OXIANA AND ZINIFEX TO MERGE TO CREATE A MAJOR DIVERSIFIED MINING COMPANY Oxiana Limited (“Oxiana”) and Zinifex Limited (“Zinifex”) today announce that they have entered into a definitive agreement to merge their businesses, creating a new major diversified base and precious metals mining company with global capability. The merged company will be re-named and will remain headquartered in Melbourne, Australia. Transaction Highlights • Zinifex shareholders will receive 3.1931 Oxiana shares for each Zinifex share they own. The terms reflect a merger of equals with the merged entity to be owned 50% by Oxiana and Zinifex shareholders, respectively. • The Board of Oxiana and the Board of Zinifex each believe that the new entity will be better positioned for growth than either company on a standalone basis. • The merger will combine two companies with highly complementary operational, development and exploration profiles and create a group with: o A market capitalisation of approximately A$12 billion, making it the 3rd largest diversified mining company listed on ASX. o The world’s second largest producer of zinc and a substantial producer of copper, lead, gold and silver. o Five competitive mining operations in Australia and Asia and three new mining projects in development. o A large portfolio of diversified development and exploration activities throughout Australia, Asia and North America. o A net cash balance of approximately A$1.9 billion (as at 31 December 2007) and combined EBITDA (in calendar year 2007) of approximately A$1.7 billion. o A strong platform to grow both organically and through acquisitions.
    [Show full text]
  • 203703: Metarhyolite, Golden Grove Mine (Golden Grove Member, Gossan Hill Formation, Murchison Supergroup, Murchison Domain, Youanmi Terrane, Yilgarn Craton)
    203703.1.pdf Geochronology Record 1260 203703: metarhyolite, Golden Grove mine (Golden Grove Member, Gossan Hill Formation, Murchison Supergroup, Murchison Domain, Youanmi Terrane, Yilgarn Craton) Location and sampling Petrographic description Yalgoo (SG 50-2), Badja (2240) The sample is a metarhyolite, and consists mainly MGA Zone 50, 496131E 6816811N of a strongly foliated assemblage of micro- to cryptocrystalline quartz (mostly <0.02 mm) intergrown Sampled on 18 December 2012 with aligned sericite (mostly <0.05 mm). Minor to trace components include possible sillimanite, chloritoid, This sample was collected from the 506.40 – 509.40 m clinozoisite, epidote, and iron–titanium oxide minerals. depth interval of diamond drillhole G12/501, at MMG’s Clouded pseudomorphs and irregular aggregates may Golden Grove copper–lead–zinc mine, located about represent unidentified deformed and recrystallized 230 km east of Geraldton and 56 km southeast of Yalgoo. components. The drillhole is located on the west side of a track, about 4.1 km northeast of Minjar Well, 2.4 km north-northeast of Minjar Hill, and 2.2 km southwest of the southeast end Zircon morphology of Golden Grove airstrip. Only 10 zircons were isolated from this sample, and they are colourless and anhedral to subhedral. The crystals are up to 300 µm long, and equant to slightly elongate, with Tectonic unit/relations aspect ratios up to 4:1. In cathodoluminescence (CL) The unit sampled is a metarhyolite assigned to the Golden images, concentric zoning is ubiquitous, and one zircon Grove Member of the Gossan Hill Formation of the exhibits sector zoning. A CL image of all zircons is shown Murchison Supergroup (Van Kranendonk et al., 2013).
    [Show full text]
  • Mt Gibson Iron Ore Mine and Infrastructure Project
    Mt Gibson Iron Ore Mine and Infrastructure Project Mount Gibson Mining Limited Report and recommendations of the Environmental Protection Authority Environmental Protection Authority Perth, Western Australia Bulletin 1242 November 2006 Environmental Impact Assessment Process Timelines Date Progress stages Time (weeks) 06/09/04 Level of assessment set (following any appeals upheld) 0 18/04/06 Proponent document released for public comment 84 30/05/06 Public comment period closed 6 14/09/06 Final proponent response to the issues raised 15 27/11/06 EPA report to the Minister for the Environment 10 ISBN. 0 7307 6881 3 ISSN. 1030 - 0120 Assessment No. 1538 Summary and recommendations Mount Gibson Mining Limited proposes to mine and process iron ore (hematite and magnetite) from Extension Hill and Extension Hill North. The proposal also includes the construction of a pipeline to transport the magnetite slurry to Geraldton Port, and infrastructure at the port to strip the ore from the slurry for export. The operation will yield approximately 13 million tonnes of hematite over 8 years and 230 million tonnes of magnetite over 20 years. Extension Hill and Extension Hill North are part of a ridge of Banded Ironstone Formations (BIFs) within the Mt Gibson ranges in the Mid West region of Western Australia. This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal. Section 44 of the Environmental Protection Act 1986 requires the EPA to report to the Minister for the Environment on the key environmental factors relevant to the proposal and on the conditions and procedures to which the proposal should be subject, if implemented.
    [Show full text]
  • China Minmetals Corporation Sustainability Australian Report 2010 China Minmetals Corporation Sustainability Australian Report
    Thinking Global, Acting Local 2010 China Minmetals Corporation Sustainability Australian Report 2010 China Minmetals Corporation Sustainability Australian Report Address of headquarters: No. 5, Sanlihe Road, Haidian District, Beijing, China Postal code: 100044 Tel: 0086–10–68495086, 0086–10–68495112 Fax: 0086–10–68495010 Email: [email protected] You may also read the PDF version of this Report in Chinese and English under “Sustainability” on the official website of China Minmetals Corporation as well as other updates related to the social responsibility activities of the Corporation: Website: http://www.minmetals.com.cn/srm.jsp Environmental considerations in publication of this report Paper:The report is printed on recycling paper. Ink:100% soy ink was used aiming to decrease air pollution. Notes to this Report Table of Contents This report is the first sustainability report of China Minmetals Corporation for Message from the President 02 Australia. For the purpose of writing and reading, China Minmetals Corporation is also hereinafter referred to as China Minmetals, the Corporation, the Group and China Minmetals’ enterprises in Australia is also hereinafter referred to as About Us 04 (I) Profile of China Minmetals Corporation 04 we/us. (II) Profile of China Minmetals’ Enterprises in Australia 05 This report has been prepared according to ISO26000: Guidance on Social Responsibility of the International Organization for Standardization, the Approach to Sustainability 12 Sustainability Reporting Guidelines 2006 of the Global Reporting Initiatives
    [Show full text]
  • The Mineral Industry of Australia in 2011
    2011 Minerals Yearbook AUSTRALIA U.S. Department of the Interior September 2013 U.S. Geological Survey THE MINERAL INDUSTRY OF AUSTRALIA By Pui-Kwan Tse Slow growth in the economies of the Western developed Minerals in the National Economy countries in 2011 negatively affected economic growth in many counties of the Asia and the Pacific region. China Australia’s mineral sector contributed more than $100 billion, continued to have rapid economic growth in the first part of or about 8%, to the country’s GDP in 2011. The mineral sector the year and helped to sustain demand for Australia’s mineral employed 205,000 people. Expectations of sustained levels products. By mid-2011, however, China’s economic growth of global demand for minerals led to increased production of had moderated. Also, extreme weather conditions across the minerals and metals in Australia, and the mineral industry was States of Queensland, Victoria, and part of New South Wales expected to continue to be a major contributor to the Australian caused disruptions to regional economic activities in the economy in the next several years (Australian Bureau of first quarter of 2011. As a result, Australia’s gross domestic Resources and Energy Economics, 2012b, p. 12). product (GDP) increased at a rate of 2.3% during 2011, which Government Policies and Programs was lower than the 2.7% recorded in 2010. The lower annual growth rate was attributed to weaker export growth, including The powers of Australia’s Commonwealth Government are in the mineral sector. Australia was one of the world’s leading defined in the Australian Constitution; powers not defined in the mineral-producing countries and ranked among the top 10 Constitution belong to the States and Territories.
    [Show full text]
  • New VMS Target Discovered at Golden Grove North, EM Survey Imminent
    ASX Announcement Tuesday, 28 April 2020 Ref: /VMS/606/VMS0537 New VMS Target discovered at Golden Grove North, EM survey imminent. Venture Fast Facts ASX Code: VMS and VMSOB Shares on Issue: 806.9m ▪ A second new Volcanic Massive Sulfide (VMS) target has been Listed Options: 143.2m Market Cap: $10.5m discovered along strike of the world class Golden Grove Zinc- Cash: $1.95m (31 Dec 2019) Copper-Gold Mine (see Figure One); Board & Management ▪ The new target, identified within the Golden Grove Mine Non- Executive Chairman Sequence, is considered high priority for follow up exploration Mel Ashton (see Figures One & Two); Managing Director ▪ Recent examination of historic data unveiled highly anomalous Andrew Radonjic Copper (Cu) and VMS pathfinder elements intersected in Non-Executive Directors Hamish Halliday shallow drilling piercing the Mine Sequence (see Table One); John Jetter ▪ Land based Electromagnetic (EM) survey using a SQUID sensor Company Secretary (designed to detect massive sulfide deposits beneath conductive Jamie Byrde clays) will commence next month on both Vulcan (Refer to ASX Recent Announcements Announcement 20 February 2020) and the newly discovered Neptune VMS New VMS Target discovered targets. at Golden Grove North Project (20/02/2020) Venture Minerals Limited (ASX code: VMS) (“Venture” or the “Company”) is pleased to announce that it has discovered another VMS target (“Neptune”) which is located RIU Explorers Conference along strike from the world class Golden Grove VMS Mine. Neptune is interpreted to Presentation – February 2020 sit within the Golden Grove Mine Sequence which hosts all VMS deposits (20/02/2020) discovered in the Golden Grove Camp (Mine), that make it Western Australia’s premier VMS district.
    [Show full text]
  • AUSTRALIA's Identified Mineral Resources 2009
    AUSTRALIA’S IDENTIFIED MINERAL RESOURCES 2009 AUSTRALIA’S IDENTIFIED MINERAL RESOURCES 2009 ­­Australian Government Geoscience Australia Resources, Energy and Tourism Portfolio Minister for Resources, Energy and Tourism: The Hon. the Hon Martin Ferguson AM, MP Geoscience Australia Chief Executive Officer: Dr Neil Williams © Commonwealth of Australia, 2008 This work is copyright. Apart from any fair dealings for the purposes of study, research, criticism, or review, as permitted under the Copyright Act 1968, no part may be reproduced by any process without written permission. Copyright is the responsibility of the Chief Executive Officer, Geoscience Australia. Requests and enquiries should be directed to the Chief Executive Officer, Geoscience Australia, GPO Box 378, Canberra ACT 2601. ABN: 80 091 799 039. Geoscience Australia has tried to make the information in this product as accurate as possible. However, it does not guarantee that the information is totally accurate or complete. Therefore, you should not rely solely on this information when making a commercial decision. ISSN 1327-1466 Bibliographic reference: Geoscience Australia 2009. Australia’s Identified Mineral Resources 2009. Geoscience Australia, Canberra. FRONT COVER: Iron ore loading at Cape Lambert port facilities, Western Australia (Rio Tinto Iron Ore). DESI GN AND LAYOUT: Henry Pippan, Geoscience Australia AUSTRALIA’S IDENTIFIED MINERAL RESOURCES 2009 Foreword Geoscience Australia provides important information on Australia’s future mineral production capacity. Australia’s Identified Mineral Resources is an annual nation-wide assessment which takes a long term view of what is potentially economic. Data on mining company estimates of ore reserves, which are generally based on short to medium-term commercial considerations, are included for comparison.
    [Show full text]
  • Standards Were Submitted at the Rate of 1 for Every 20 Normal Samples Including Blank Material Sourced Locally
    OZ Minerals Limited Mineral Resources Explanatory Notes as at 30 June 2008 TABLE OF CONTENTS 1 MARTABE MINERAL RESOURCES STATEMENT - 30 JUNE 2008 3 2 SEPON COPPER MINERAL RESOURCE STATEMENT - 30 JUNE 2008 8 3 SEPON GOLD MINERAL RESOURCE STATEMENT - 30 JUNE 2008 27 4 PROMINENT HILL MINERAL RESOURCE STATEMENT - 30 JUNE 2008 45 5 CENTURY MINERAL RESOURCES STATEMENT - 30 JUNE 2008 56 6 DUGALD RIVER MINERAL RESOURCE STATEMENT - 30 JUNE 2008 70 7 GOLDEN GROVE MINERAL RESOURCES STATEMENT - 30 JUNE 2008 77 8 ROSEBERY MINERAL RESOURCE STATEMENT - JULY 2008 98 9 AVEBURY MINE AREA RESOURCES - JANUARY 2008 107 10 HIGH LAKE MINERAL RESOURCE STATEMENT - 30 JUNE 2008 113 11 IZOK LAKE MINERAL RESOURCE STATEMENT - 30 JUNE 2008 123 OZ Minerals Limited Mineral Resources Explanatory Notes - 30 June 2008 - FINAL.doc Page 2 of 132 Mineral Resources 2008 Explanatory Notes 1 MARTABE MINERAL RESOURCES STATEMENT - 30 JUNE 2008 1.1 Introduction The Martabe June 2008 Mineral Resource Statement incorporates the gold and silver Mineral Resources at the Martabe Project in North Sumatra Indonesia. Since the previous Mineral Resource Statement in December 2007, remodelling of the Pit 1 (previously reported as Purnama) Mineral Resource has been completed. An infill program in the central part of Pit 1 between 167100N and 167300N was completed in late December 2007. A total of 35 additional holes for 6086m were drilled to infill drill the selected area using 25-meter spaced holes. There have been no changes to the Barani (previously named Pelangi) and Ramba Joring (previously
    [Show full text]
  • Annual Report 2016
    ANNUAL REPORT 2016 HKEX: 1208 ASX: MMG 02 CHAIRMAN’S REVIEW 04 CHIEF EXECUTIVE OFFICER’S REPORT 07 RESOURCES AND RESERVES 19 MANAGEMENT DISCUSSION AND ANALYSIS 37 DIRECTORS AND SENIOR MANAGEMENT 42 DIRECTORS’ REPORT 58 CORPORATE GOVERNANCE REPORT 68 ENVIRONMENTAL, SOCIAL AND GOVERNANCE APPROACH AND PERFORMANCE 71 INDEPENDENT AUDITOR’S REPORT 77 FINANCIAL STATEMENTS 146 GLOSSARY IBC CORPORATE INFORMATION Cover: Local employee from the Province of Cotabambas pictured at the Las Bambas concentrator plant. At MMG we mine for progress. Our vision is to build the world’s most respected diversified base metals company. A long-term outlook, our pride in mining, our commitment to international standards and our respect for people, land and culture underpin our success. 2 CHAIRMAN’S REVIEW The appointment Dear Shareholder support from its major shareholder. The Company actively optimised its of former Chairman I would like to extend my heartfelt portfolio, improved its operational Mr Jerry Jiao as the thanks to shareholders for their efficiencies, and set the stage for support of MMG. greater, more rapid growth, with its new CEO demonstrates international operational experience, On behalf of the Board, I present high-quality assets, diversity of the Board’s strong the Company’s 2016 annual report customers and outstanding people desire to ensure the to shareholders. achieving the promises made to the continuity of MMG’s MANAGEMENT AND market and shareholders. BOARD CHANGES unique and successful The achievement of commercial business model. In February 2017 we announced the production at Las Bambas in July and appointment of a new Chief Executive a focus on cost reductions across the Officer, changes to the Board of organisation contributed to revenue Directors and I was appointed growth, which was 28% higher at Chairman.
    [Show full text]
  • Oz Minerals Annual Report 2009 Oz Minerals Limited Abn 40 005 482 824 Oz Minerals Annual Report 2009 Contents
    OZ MINERALS ANNUAL REPORT 2009 OZ MINERALS LIMITED ABN 40 005 482 824 OZ MINERALS ANNUAL REPORT 2009 ANNUAL REPORT CONTENTS 1 Results for announcement to the market 2 Chairman’s letter 4 Managing Director & CEO’s letter 6 Corporate Governance 13 Directors’ report 27 Remuneration Overview 29 Remuneration Report 47 Auditor’s Independence Declaration 48 Consolidated income statements 49 Consolidated statements of comprehensive income 50 Consolidated statements of changes in equity 52 Consolidated balance sheets 53 Consolidated statements of cash flows 54 Notes to the financial statements 119 Directors’ declaration 120 Independent audit report 122 Shareholder information 124 Contact details RESULTS FOR ANNOUNCEMENT TO THE MARKET The key information for the consolidated entity is set out below: 12 months 12 months Movement Movement ended ended $m % 31 December 31 December Consolidated entity results 2009 2008 Revenue from continuing operations – A$m 608.5 – 608.5 n.a. Revenue from discontinued operations – A$m 764.9 1,218.4 (453.5) (37%) Consolidated revenue – A$m 1,373.4 1,218.4 155.0 13% (Loss) after tax attributable to equity holders of OZ Minerals Limited – A$m (517.3) (2,501.7) 1,984.4 (79%) Net tangible assets per share – cents 82.2 103.3 Dividends paid on: Cents per share Record date 29 September 2008 – 156.1 5.0 3 September 2008 9 April 2008 – 61.8 4.0 19 March 2008 Since there are no retained earnings or profit for 2009, the Directors do not propose to pay any dividends for the year ended 31 December 2009.
    [Show full text]
  • Statistics Digest 1997-98
    1997-1998STATISTICSDIGEST CONTENTS Page FOREWORD ..................................................................................................... 1 1. ECONOMIC AND SOCIAL ENVIRONMENT .................................................... 2 1.1 World Economy Review ..................................................................................... 2 1.2 Review of the Western Australian and Australian Economies ...................... 5 1.3 Economic Factors Affecting the Mining Industry ........................................... 7 1.4 Social and Political Factors Affecting the Mining Industry ........................... 9 2. REVIEW OF MAJOR MINERALS AND PETROLEUM IN WA ......................... 14 2.1 Overview and Outlook ....................................................................................14 2.2 Petroleum...........................................................................................................15 2.3 Iron Ore .............................................................................................................18 2.4 Gold ....................................................................................................................20 2.5 Alumina ..............................................................................................................23 2.6 Nickel .................................................................................................................25 2.7 Heavy Mineral Sands ........................................................................................28
    [Show full text]