EXECUTIVE SUMMARY Proposed Fish Landing Complex and Breakwater at Punggai, Pengerang, Kota Tinggi, Johor DarulTa’zim Preliminary Environmental Impact Assessment EXECUTIVE SUMMARY INTRODUCTION 1. This report presents the salient findings of the Preliminary Environmental Impact Assessment (EIA) study that was carried out to assess the potential environmental impacts that could arise from the Proposed Fish Landing Complex and Breakwater at Punggai, Pengerang, Johor DarulTa’zim.Hereinafter it will be known as “The Project”. 2. The Preliminary EIA is a requirement under Section 34A of the Environmental Quality Act 1974 as the proposed Project is under ActivityNo. 5(a) –Construction of fishing harbours, according to the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 1987. 3. The Project Proponent and the correspondence address is as below: JabatanKerja Raya Malaysia Level 23,Menara PJD No. 50, JalanTunRazak 50400Kuala Lumpur Tel :+603-4041 1979 Fax :+603-4041 1988 Email :
[email protected] Contact person: Dato’ Ir. Roslan B. Md. Taha Position: Director (Department of Environment and Energy) 4. The owner of this project is the Fisheries Development Authority of Malaysia, Johor State Office. Lembaga Kemajuan Ikan Malaysia (Johor State Office) No. 6 & 8, JalanGeroda 1, Larkin 80350 Johor Bahru Tel: +607-223 1070 Fax: +607-223 2332 5. The consultant undertaking this EIA is: ERE Consulting Group Sdn. Bhd. 9, Jalan USJ 21/6 47630 Subang Jaya Selangor DarulEhsan. Tel: +603-8024 2287 Fax: +603-8024 2320 Email:
[email protected]/
[email protected] ERE Consulting Group ES-1 Issue 1.0/December 2014 Proposed Fish Landing Complex and Breakwater at Punggai, Pengerang, Kota Tinggi, Johor DarulTa’zim Preliminary Environmental Impact Assessment EXECUTIVE SUMMARY Contact person: Pn.