197 Madison Street, New York, NY Lower East Side Corner Mixed-Use Building for Sale

Total Page:16

File Type:pdf, Size:1020Kb

197 Madison Street, New York, NY Lower East Side Corner Mixed-Use Building for Sale 197 Madison Street, New York, NY Lower East Side Corner Mixed-Use Building For Sale FOR SALE Asking Price: $10,950,000 Property Information Block / Lot 273 / 20 Lot Size 25' x 84.58' Lot SF (Approx.) 2,115 25' x 84.58' (1st Floor) Building Size (Approx.) 25' x 78' (2nd-6th Floors) Building SF (Approx.) 11,600 Stories 6 Retail Units 4 Residential Units 20 Total Units 24 Zoning R7-2 FAR 3.44 Air Rights (Approx.) None Historic District None RE Assessment (16/17) $310,050 RE Taxes (16/17) $39,944 Cushman & Wakefield has been retained on an exclusive basis to arrange for the sale of a six-story, mixed-use building located at the northwest corner of Madison Street and Rutgers Street. The property consists of 4 ground floor retail units and 20 residential units above. 15 of the residential units are free market and 5 are subject to rent stabilization. 15 of the units are newly renovated, the common areas have been gut renovated, and a new gas boiler was installed in 2013. The property sits on top of the F train entrance giving it great retail appeal and excellent commuter access. The retail units also benefit from over 84' of frontage on Madison Street and 25' of frontage on Rutgers Street. It is within close proximity to the Seward Park Urban Renewal Area which will drive foot traffic and long term value growth in the neighborhood. The property is also within a few blocks from 205 South Street where Extell is developing an 80-story, 850' tall tower and 247 Cherry Street where JDS has plans for a 77-story, 900' development. This is a rare opportunity to acquire a high cash flowing and low maintenance asset in an area that is rapidly growing. James Nelson Michael Decheser Mitchell Levine Mei Ling Wong Vice Chairman Executive Director Director Associate Director (212) 696 2500 x7710 (212) 660 7772 (212) 660 7761 (212) 660 7716 [email protected] [email protected] [email protected] [email protected] Cushman & Wakefield Copyright 2016. No warranty or representation, express or implied, is made to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any special listing conditions imposed by the property owner(s). As applicable, we make no representation as to the condition of the property (or properties) in question. 197 Madison Street, New York, NY RETAIL REVENUE UNIT TENANT LXP SF MONTHLY RENT RENT/SF ANNUAL RENT St. A 197 Deli Dec-21 600 $5,649 $113 $67,784 St. B Lamar's Bagels Oct-20 450 $3,131 $84 $37,577 St. C Young Jin Chen Sep-20 450 $3,429 $91 $41,151 St. D NB Net Solutions Oct-23 500 $5,150 $124 $61,800 TOTAL 2,000 $17,359 $104 $208,313 RESIDENTIAL REVENUE UNIT STATUS LXP TYPE MONTHLY RENT ANNUAL RENT 1FMVacant 2 BR $3,000 $36,000 2FMVacant 2 BR $2,850 $34,200 3FMVacant 2 BR $2,850 $34,200 4FMVacant 2 BR $2,700 $32,400 5FMVacant 2 BR $3,350 $40,200 6RSDec-16 2 BR $508 $6,091 7RSN/A 2 BR $146 $1,753 8FMVacant 2 BR $2,750 $33,000 9FMOct-16 2 BR $2,795 $33,540 10 RS N/A 2 BR $238 $2,859 11 FM Vacant 2 BR $2,850 $34,200 12 FM Sep-16 2 BR $2,850 $34,200 13 RS Mar-18 2 BR $187 $2,249 14 FM Vacant 2 BR $3,200 $38,400 15 FM Oct-16 2 BR $2,900 $34,800 16 RS Feb-17 2 BR $321 $3,847 17 FM Vacant 2 BR $2,850 $34,200 18 FM Vacant 2 BR $3,200 $38,400 19 FM Vacant 2 BR $2,900 $34,800 20 FM Vacant 2 BR $2,850 $34,200 TOTAL $45,295 $543,540 *Yellow denotes projection at asking rent EXPENSES METRIC AMOUNT RE Taxes (16/17) Actual $39,944 Water & Sewer As Provided $7,500 Insurance As Provided $7,500 Heating As Provided $12,500 Repairs & Maintenance Projected @ $250/Unit $6,000 Super As Provided $7,200 Management Projected @ 3% of EGI $22,908 TOTAL: $103,552 Retail Income $208,313 Residential Income $543,540 Ret. RE Tax Reimbursements (From Retail Tenants) $11,744 Total Gross Income $763,596 Less Expenses ($103,552) Net Operating Income $660,044 Cushman & Wakefield Copyright 2016. No warranty or representation, express or implied, is made to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any special listing conditions imposed by the property owner(s). As applicable, we make no representation as to the condition of the property (or properties) in question..
Recommended publications
  • 250 South Street ARTIST’S RENDERING
    250 south street ARTIST’S RENDERING THE BUILDING THE LOWER EAST SIDE THE NEIGHBORHOOD The section of the Lower East Side situated 250 between the Manhattan and Williamsburg Bridges 80 1020 150 72 6 5.5MM SF of existing offices space in a .25 mile STORY GLASS TOWER RESIDENCES & RENTALS BARS GALLERIES MUSEUMS radius with an additional 1.5MM sf under construction 3,866 total units coming to market south 50,000 residents in a .5 mile radius 100K 45K 91 107 15 25,000 employees work in a .5 mile radius SQUARE FEET SQUARE FEET ZAGAT COFFEE SHOPS SPECIALTY F train entrance at corner of Rutgers and Madison OF SERVICES OF PRIVATE RATED FOOD Streets, two blocks away from the building, with an street & AMENITIES OUTDOOR GARDENS RESTAURANTS MARKETS annual ridership of 4,752,739 ARTIST’S RENDERING RETAIL A RETAIL C RETAIL B RETAIL A RETAIL C RETAIL B RETAIL A OVERALL GROUND FLOOR PLAN OVERALL LOWER LEVEL FLOOR PLAN CHERRY STREET SERVICE RETAIL A RETAIL A CORRIDOR RETAIL B PIKE SLIP RETAIL B SERVICE RETAIL C CORRIDOR LOADING DOCK SOUTH STREET FLOOR PLANS - RETAIL SPACE A CHERRY STREET 115’ - 2 1/2” RETAIL A RETAIL A 78’ - 4 1/4” PIKE SLIP 36’ - 8 1/2” GROUND FLOOR LOWER LEVEL 8,029 SF 7,091 SF 21’-7” Ceilings 15’-3” Ceilings Approximately 220’ of wraparound frontage FLOOR PLANS - RETAIL SPACE B CHERRY STREET 43’ - 3 3/4” 24’ - 0” 9’ - 11 1/2” 8’ - 4” RETAIL B RETAIL B GROUND FLOOR LOWER LEVEL 14,068 SF 10,554 SF 21’-4” Ceilings 15’-9” Ceilings Approximately 80’ of frontage on Cherry Street Venting Permitted FLOOR PLANS - RETAIL SPACE C 23’ - 8 1/4” RETAIL C 29’ - 8 1/2” PIKE SLIP GROUND FLOOR 565 SF 21’-1” Ceilings Approximately 53’-4 3/4” of wraparound frontage/exposure Ground to Ceiling Glass Exterior AROUND THE NEIGHBORHOOD IN THE PRESENT LOOKING INTO THE FUTURE WATERFRONT RENAISSANCE SOUTH STREET SEAPORT WATERFRONT RENAISSANCE ESSEX CROSSING SOUTH STREET SEAPORT THE LOWLINE Actively programmed open spaces including parks, Unprecedented 1.9 Million Square Foot LES Revitalization of Manhattan’s Historic Seaport.
    [Show full text]
  • Shop's (Expanding) House in 2009, Forest City Ratner Stunned the City
    SHoP’s (Expanding) House In 2009, Forest City Ratner stunned the city and fired starchitect Frank Gehry, whose vision for the Barclays Center in Brooklyn had ballooned to $1 billion. The developer, looking to cut costs at its controversial Atlantic Yards project, tapped Ellerbe Becket, an architecture firm known more for its cookie-cutter venues than its creative vision. But the move blew up in the developer’s face when the new design was widely panned as drab and generic. With all eyes on the site — which has since been rebranded as Pacific Park — Bruce Ratner made one last change-up: He brought on a then-virtually unknown firm, SHoP Architects, to clean up the mess and come up with a compromise design that was both acceptable and inspirational for the borough’s most high-profile project. In doing so, Ratner — who was reportedly acting on the advice of another starchitect, David Childs — launched SHoP onto a trajectory that’s continued at full speed. But at the time, SHoP had only a few relatively small projects to its name, including a 10-story condo in the Meatpacking District, a Hoboken condo conversion and a carousel project. All that changed after it landed the Barclays Center commission. In 2013, after the controversial Brooklyn arena was completed, developer Michael Stern called SHoP out of the blue to set up a meeting. The partners spent three hours talking to Stern in their office and another three the next day touring the under-construction Walker Tower that his firm, JDS Development, was working on.
    [Show full text]
  • Rage, Rage Against Croman
    The Voice of the West Village WestView News VOLUME 15, NUMBER 4 APRIL 2019 $1.00 All We Can Rage, Rage Against Croman Afford Is By Cynthia Chaffee and Mary Ann Miller Memories Whenever a New York restaurant closes, By George Capsis look under the nearest rock and you’ll usually find Steve Croman, the notorious Perhaps nothing has so suddenly drama- landlord who just spent several months in tized the loss of the “old” Village as the jail—not at Rikers where he was supposed sale of the building in which the beloved to go, but at the Manhattan correctional White Horse Tavern has sat unchanged center, a.k.a. “The Tombs.” since 1880. Generations and generations Add to the mix Eytan Sugarman and An- of young and not so young people have thony “The Mooch” Scaramucci, and this eased their way into a chair or booth there toxic trio may close the White Horse Tavern, to sip a lager or two and talked—just talk- the much beloved bar at Hudson and 11th ed—“Meet you at the White Horse.” streets in the far west Greenwich Village. Now, we have learned that Steve Cro- Welsh poet Dylan Thomas, probably man, the caricature of an ice-blooded it’s most famous patron, wrote, “Do not landlord, fresh from eight months in the go gentle into that good night...Rage, rage Tombs prison and still owning over 100 against the dying of the light.” He had his tenement buildings housing anxious rent- last drinks there and later died at St.
    [Show full text]
  • Manhattan New Construction & Proposed Multifamily Projects 4Q20
    Manhattan New Construction & Proposed Multifamily Projects 4Q20 83 85 82 12 41 62 ID PROPERTY UNITS 6 30 Morningside Drive 205 Total Lease Up 205 12 HAP Seven NY 129 15 418 West 126th Street 75 19 Victoria Theatre 191 15 Total Under Construction 395 19 37 Broadway Development 130 6 41 210 Wadsworth Avenue 98 46 Total Planned 228 43 96th Street 171 43 46 Frederick Douglass Blvd 100 37 62 4037 Broadway 132 82 The Heights on Broadway 171 83 Sherman Plaza 272 85 3875 9th Avenue 614 Total Prospective 1,460 2000 ft Source: Yardi Matrix LEGEND Lease-Up Under Construction Planned Prospective Manhattan New Construction & Proposed Multifamily Projects 4Q20 44 73 ID PROPERTY UNITS 1 The Smile 233 3 Convivium 140 45 4 Sixty 125 141 4 39 23 26 5 Two Waterline Square 435 Total Lease Up 949 1 74 13 75 10 Sendero Verde Phase II 361 22 24 13 One East Harlem 404 25 Total Under Construction 765 49 22 15 West 118th Street 51 38 23 1971 Madison Avenue 93 10 24 72 East 120th Street 218 77 25 77 East 118th Street 202 47 26 East 127th Street 152 38 La Hermosa Tower 160 39 2031-2033 5th Avenue 240 Total Planned 1,116 48 44 58 West 135th Street 100 45 64-74 West 125th Street 200 47 1987-1991 3rd Avenue 59 76 48 1988-1996 2nd Avenue 185 49 248 East 120th Street 86 50 308 East 86th Street 68 78 52 Lenox Hill Hospital 200 73 Lenox Terrace Phase II 1,642 74 1800 Park Avenue 670 50 75 2460 2nd Avenue 730 3 76 321 East 96th Street 1,100 77 East River Plaza 1,100 52 5 78 Holmes Towers NextGen Development 339 Total Prospective 6,479 1000 ft Source: Yardi Matrix LEGEND
    [Show full text]
  • Community Involvement in Redevelopment After the Expiration of Urban Renewal Plans
    Renewing Renewal: Community Involvement in Redevelopment After the Expiration of Urban Renewal Plans A Thesis Presented to the Faculty of Architecture, Planning and Preservation COLUMBIA UNIVERSITY In Partial Fulfillment of the Requirements for the Degree Master of Science in Urban Planning by Caroline Thompson May 2020 Abstract Communities impacted by urban renewal in the mid-twentieth century were largely unable to stop the changes brought to their neighborhoods. The plans that operationalized urban renewal remained in place for over 40 years, with significant legislative, legal, and financial effort required to make any alterations. In New York City, many of the urban renewal areas and their governing plans have since expired, ushering in market-driven development and neighborhood changes. This thesis uses a mixed-methods approach to analyze the subsequent built environment changes and to explore community involvement through case studies of redevelopment in the former Seward Park Extension Urban Renewal Area (SPEURA) and Two Bridges Urban Renewal Area (TBURA). While many lots remain unchanged since the urban renewal era, those that have changed reflect local development preferences or the results of major rezonings. The case studies reveal the wide variety of methods of community involvement in site redevelopment, with implications for future participation in redevelopment in the city. Key words: urban renewal, participation, Two Bridges, Essex Crossing, Large-Scale Developments ii Table of Contents List of Figures .......................................................................................................................
    [Show full text]
  • M 180507(C) Zsm
    CITY PLANNING COMMISSION December 5, 2018/Calendar No. 10 M 180507(C) ZSM IN THE MATTER OF an application submitted by Cherry Street Owner LLC and Two Bridges Apartments, L.P. for modification to the previously approved large scale residential development (CP-21885) to update the previously approved plans and zoning calculations to reflect a proposed as-of-right mixed use development on property located at 247 Cherry Street (Parcel 4A/4B - Block 248, Lots 15, 70 and 75), Borough of Manhattan, Community District 3. WHEREAS, on June 22, 2018 the applicant, Cherry Street Owner LLC and Two Bridges Senior Apartments, L.P., submitted an application (M 180507(C) ZSM) seeking a modification to the previously approved large-scale residential development (LSRD) (CP-21885) that would facilitate development of a new approximately 80-story, approximately 501,518 square feet residential building and the enlargement of an existing building with approximately 2,393 square feet of new ground-floor retail space located at 247 Cherry Street (Block 248, Lots 15, 70 and 75), in a C6-4 Zoning District, Borough of Manhattan, Community District 3; and WHEREAS, on August 28, 1985 the City Planning Commission approved (N 850737 ZAM) an authorization pursuant to ZR Section 78-311(e) to locate Building 4-3 without regard for height and setback regulations that would otherwise apply along Rutgers Slip, a street wholly within the LSRD, to allow development of a 10-story affordable senior building at 80 Rutgers Slip; and WHEREAS, on March 17, 1986 the City Planning
    [Show full text]
  • 28. Official Journal
    THE CITY RECORD. OFFICIAL JOURNAL. VOL. XXIII. NEW YORK, FRIDAY, AUGUST 23, 1895• NUMBER 6,78!. POLICE DEPARTMENT. 30. Edmund Bodine, clerk, 64 Grove st. Fifth Assembly District. POLICE DEPARTMENT OF THE CITY OF NEW YORK, No.300 MULBERRY STREET, G. Hixen Wilson, builder, 18 Commerce St. i. Frank Ledwith, clerk, 4 King st. BUREAU OF ELECTIONS, NEW YORK, August 19, 1895• 31. Asher M. Sachs, tobacconist, 49 Grove St. Francis \V. Powers, clerk, 4 King St. Notice is hereby given, in pursuance of a resolution of the Board of Police (August i5), that Moselyn Engler, cutter, 45 Grove St. 2. George 1'ortonova, porter, 179 Prince St. the following-named persons are under consideration for selection and appointment as Inspectors 32. William S. Gridley, painter, 12 Barrow St. William Weindorf, cigars, 24 Vandam St. of Election on behalf of the Republican party for the ensuing year. Henry Stanbach, painter, 129 Washington pl. 3. Joseph E. Mulrling, real estate, 477 W Objections thereto, if any exist, as to their character or qualifications, are hereby invited, to 33• William Crosbee, harness, 25 Christopher St. Broadway. the end that the same may be investigated before final action is taken. Jacob Stark, salesman, 151 Waverly pl. Thos. Sheridan, bookbinding, 482 W. T. F. RODENBOUGH, Chief of the Bureau of Elections. 34. Spencer 11. Horton, milk, 161 Sixth ay. Broadway. REPUBLICAN. James H. Dick, real estate, 15o W. iith St. 4. Abraham L. Frey, clerk, 122 Bleecker st. 35, Adolph Pieper, cigars, 9 Christopher st. Thomas P. Cawley, clerk, 136 Bleecker St. First Assembly District.
    [Show full text]
  • 1873 Department of Docks
    Two Bridges Large Scale Residential Development SITE 4 (4A/4B) (BLOCK 248, LOTS 15, 70, AND 76); SITE 5 (BLOCK 247, LOTS 1 AND 2); AND SITE 6A (BLOCK 246, LOTS 1 AND 5) NEW YORK, NEW YORK Phase 1A Archaeological Documentary Study Prepared for: Cherry Street Owner, LLC and Two Bridges Senior Apartments LP 104 Fifth Avenue, 9th Floor New York, NY 10011 Two Bridges Associates, LP 4700 Wilshire Blvd Los Angeles, CA 90010 and LE1 Sub LLC 70 East 55th Street, 7th Floor New York, NY 10022 Prepared by: AKRF, Inc. 440 Park Avenue South New York, NY 10016 212-696-0670 JULY 2017 Management Summary CEQR Number: 17DCP148M Lead Agency: New York City Department of City Planning (DCP), acting on behalf of the New York City Planning Commission (CPC) Phase of Survey: Phase 1A Documentary Study Location Information Location: Manhattan Minor Civil Division: 06101 County: New York County Site 4 (4A/4B) Survey Area Block/Lot: Block 248, Lots 15, 70, and 76 Length: Approximately 210 feet Width: Approximately 330 feet Area: Approximately 1.59 acres Site 5 Survey Area Block/Lot: Block 247, Lots 1 and 2 Length: Approximately 450 feet Width: Approximately 330 feet Area: Approximately 3.33 acres Site 6A Survey Area Block/Lot: Block 246, Lots 1 and 5 Length: Approximately 400 feet Width: Approximately 200 feet Area: Approximately 1.60 acres USGS 7.5 Minute Quadrangle Map: Brooklyn Quadrangle Report Author: Elizabeth D. Meade, MA, RPA Date of Report: July 2017 i Two Bridges LSRD—Phase 1A Archaeological Documentary Study Table of Contents Management Summary ..............................................................................................................................
    [Show full text]
  • Development News Highlights MANHATTAN - MID 2ND QUARTER 2016 Looking Ahead
    Development News Highlights MANHATTAN - MID 2ND QUARTER 2016 Looking Ahead Midtown East Rezoning Proposal – Progress Update The massive up-zoning initiative initially proposed back in 2012 during the Bloomberg administration is slowly moving closer to being put into effect. Created in an effort to spark revitalization of the area anchored by Grand Central Terminal, as well as preserve historic landmarks, the proposal had been rejected by City Council members in November 2013; and ultimately withdrawn prior to former Mayor Bloomberg stepping down. Since the changeover of administrations, efforts were reinitiated by Mayor de Blasio. Recent news brought the welcomed announcement that the city administration is hoping to fi nalize their proposal and enter it into the Uniform Land Use Review Process (ULURP) before the end of the year. July 2014 a group called the East Midtown Steering Committee was created. Members of the group represented a wide range of interests including community members, elected offi cials, real estate executives and preservationists. The committee was assigned the task of spearheading the Greater Midtown East rezoning identifi ed as the 2nd Phase that will affect 73-blocks within the Midtown East neighborhood. By getting input upfront from the community and stakeholders prior to the ULURP public review process, it was hoped that the proposal would gain stronger support upon coming up for a vote. A detailed report presenting the committee’s draft plan with recommendations for the up-zoning initiative of the corridor roughly bound by East 57th- and East 39th Streets to the north and south, and 3rd- and 5th Avenues to the east and west was released in October 2015.
    [Show full text]
  • 242 Broome – 6Sqft
    By Michelle Colman March 28, 2018 For many New Yorkers, the Lower East Side is one neighborhood that still has a lot of authenticity and good ‘ole New York grit left. It has been described as Manhattan’s “last frontier of cool. The promise land of old as well as new… Where the Godfather lives side by side with a hipster movie.” Put more tangibly by Benjamin Baccash of Taconic Investment Partners, the developer of LES’s Essex Crossing, “The Lower East Side has wonderful restaurants, art galleries, and a great street life. It’s a real neighborhood and that’s what a lot of people are looking for.” In addition to great diversity, personality, and transportation, the city is undertaking huge improvements on the east river waterfront, and developers are erecting new developments at all corners of the ‘hood. Ahead, 6sqft takes a look at everything that’s keeping the Lower East Side a vestige of old New York during its contemporary resurgence, from massive projects like Essex Crossing to a booming art gallery scene. History A pushcart vendor selling Jewish goods on Orchard Street in 1938 Located between the Bowery and the East River/FDR Drive and Canal Street and Houston Street, the LES was traditionally an immigrant, working-class neighborhood. Most of the immigrants who came to New York City in the late 19th and early 20th centuries settled on the Lower East Side and lived in rundown tenements. The area saw an influx of German, Greeks, Hungarians, Polish, Romanians, Russians, Slovaks and Ukrainians. “Little Germany” contained half of New York’s German population and was the third-largest German-speaking community in the world, after Berlin and Vienna.
    [Show full text]
  • Real Estate Record and Builders^ Guide
    REAL ESTATE RECORD AND BUILDERS^ GUIDE. YoL. XXYI. NEW YOEK, SATUEDAY, OCTOBEE 2, 18S0. No. 655 Published Weekly by shares. They had been unduly depressed; No state of permanent war can (jxi.st, and the business of the country, especially the hence we look for an increase of tlie liusi- '€^t 'Mml Estate %mx^ %BBomixan.West , was at low ebb ; they were wanted as ness of the country that will give the roads TERMS. links between old roads or continuations all they can do and add to the desirability of into new regions, and hence the extraordi­ investments in railway securities. No mat­ ONE YEAR, in advance.. ..$10.00. nary rise in Iron Mountain, Kansas Pacific, ter if there is a panic on a small scale due to Communications should be addressed to Kansas & Texas, San Francisco, and other dear money. Suppose we should liave one more obscure jiroperties. No doubt there is or two bad harvests. We can now aft'ord C. W. SWEET, money yet in many low priced stocks, es­ them. The country is increasing in popula­ No. 137 BROADWAY pecially those in our mineral regions west of tion, in wealth, and in business so rapidly, the Missouri, where the tides of emigration that all our railways, iivliether they are East We receive frequent comj)laints from our are taking up new lands, and new crops or West or North or South, are certain to subscril:)ers at the mauuer in wliicli they are have to be moved or new mines opened. appreciate in value as the years roll by.
    [Show full text]
  • L+M and CIM Group Reveal Plans for Massive Project in Two Bridges Area
    L+M and CIM Group Reveal Plans For Massive Project in Two Bridges Area Expanded retail on Cherry Street is part of the new development plan. Rendering by Handel Architects. L+M Development Partners and the CIM Group are unveiling plans tonight for a new project at 260 South St. that will add more than one-million square feet of residential and commercial space in the Two Bridges neighborhood. The development team outlined the proposal for two towers, the tallest measuring nearly 800 feet, in an interview with The Lo-Down earlier this week. They briefed local residents in a neighboring complex, which the developers also own, this evening. The massive complex is one of four large-scale projects set to transform the Two Bridges community in the next several years. It will include up to 1350 apartments, as many as 338 of the units set aside for low-income and/or middle-income families. Some senior housing is anticipated. The developers also plan new ground floor retail on Cherry Street, new green spaces and upgraded flood protection systems. L+M and CIM Group partnered in 2013 to purchase 265-275 Cherry St. (also known as Lands End II), Section 8 rental towers with 490 apartments. The following year, they picked up an adjacent parking lot on South Street, which is where the new towers are going to rise. In our interview Wednesday morning, David Dishy, L +M partner and president of development and acquisition; Katherine Kelman, L+M associate director; and Alex Kafenbaum, associate with the CIM Group walked us through preliminary details of the ambitious project.
    [Show full text]