FORM –1 “Proposed Residential Development” at Sr. No 67/1, Kiwale
Total Page:16
File Type:pdf, Size:1020Kb
FORM –1 “Proposed Residential development” At Sr. no 67/1, Kiwale, Haveli, Pune, Maharashtra By Unique Chintamani Development LLP M/s. Ultra-Tech (Environmental Consultancy & Laboratory) NABET certificate no: NABET/EIA/1720/RA0094 APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information Sr.No. Item Details 1. Name of the project Proposed Residential development 2. S. No. in the schedule 8 (a) 3. Proposed Total Plot Area: 29,300.00 sq.m. capacity/area/length/tonnage to Deduction: 8207.69 sq.m. be handled/command area/lease Net Plot area: 21092.31 sq.m. area/number of wells to be drilled FSI: 48,527.40 Sq.m Non FSI: 59811.81 Sq.m Proposed Built Up Area: 1,08,339.21 Sq.m. Project Proposal: Building No. of Height of Type Floors building Building A (B+P+14) 44.80 Building B (B+P+14) 44.80 Building C (B+P+14) 44.80 Building D (B+P+14) 44.80 Building E (B+P+14) 44.80 Building F (B+P+14) 44.80 Building G (B+P+14) 44.80 Commercial B+G+3 13.45 A Commercial B+G+0 4.20 B Commercial B+G+0 4.20 C Club House G+1 6.70 1 718 Nos. + TOTAL 37 Shops + 24 offices 4. New/Expansion/Modernization New 5. Existing Capacity/ Area etc. NA 6. Category of project i.e.’ A’ or ‘B’ 8a (B2) 7. Does it attract the general Not Applicable condition? If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify. 9. Location Latitude - 18040’04.68’’N Longitude - 73044’19.01’’E Plot/Survey/Khasra No. Sr. No. 67/1 Form 1: PROPOSED RESIDENTIAL DEVELOPMENT Sr.No. Item Details Village Yerwada Tehsil Haveli District Pune State Maharashtra 10. Nearest railway station Akurdi Railway Station: 6.2 km Nearest airport Pune International Airport: 29.6 km 11. Nearest Town, city, Pune (Approx. 23 km) District headquarters Along with distance in kms. 12. Village Panchayats, Zilla Pimpri Chinchwad Municipal Corporation (PCMC) Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant Mr. Sumit Subhash Tayal 14. Registered Address Shop no 1,2,3, Unique Group, Ground Floor, Shree Darshan Apartments, Tank Road, Yerwada, Pune 15. Address for correspondence Shop no 1,2,3, Unique Group, Ground Floor, Shree Darshan Apartments, Tank Road, Yerwada, Pune Name Mr. Sumit Subhash Tayal Designation Director (Owner/Partner/CEO) Address Sr. No. 111/1, Shop No. 1,2,3, Shree Darshan Apartment, Tank Road Pin Code 411006 E-mail [email protected] Telephone No. 9881441991 Fax No. - 16. Details of Alternative Sites No examined, if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects Not applicable 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their Not applicable status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any Government Not applicable Order/Policy relevant/ relating to the site? Form 1: PROPOSED RESIDENTIAL DEVELOPMENT Sr.No. Item Details 23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. (II). Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities Sr. Information/Checklist Yes /rates, wherever possible) with source of No. confirmation / No information data 1.1 Permanent or temporary change No Project site is in residential zone as per DP in land use, land cover or remarks. The current land will be utilized for topography including increase construction of Residential Buildings. The in intensity of land use (with development will be as per the sanctioned respect to local land use plan) Development plan. 1.2 Clearance of existing land, No -- vegetation and building? 1.3 Creation of new land uses? No -- 1.4 Pre-construction investigation Yes -- e.g. bore houses, soil testing? 1.5 Construction works? Yes Residential and commercial Development 1.6 Demolition works? No - 1.7 Temporary sites used for Yes Temporary labour camp for construction construction works or housing workers on site with security. of construction workers? 1.8 Above ground building, structures Yes Excavation material & construction waste or earthworks including linear material shall be used at site only structures, cut and fill or excavations. 1.9 Underground works including No. -- mining or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- Form 1: PROPOSED RESIDENTIAL DEVELOPMENT Details thereof (with approximate quantities Sr. Information/Checklist Yes /rates, wherever possible) with source of No. confirmation / No information data 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes During construction phase temporary storage materials? facilities will be created to store the construction raw material. 1.15 Facilities for treatment or Yes Facilities will be provided for collection, disposal of solid waste or liquid treatment and disposal for solid and liquid waste effluents? • STP for treatment of sewage • Segregation of solid waste into non- biodegradable and biodegradable garbage • Biodegradable waste shall be treated in OWC. • Segregation of Non-biodegradable waste into recyclable & non-recyclable. ➢ Recyclable waste: To recyclers ➢ Non-Recyclable waste: To PCMC. ➢ Dried sludge from STP: As manure after treatment in OWC. 1.16 Facilities for long term housing No -- of operational workers? 1.17 New road, rail, or sea traffic No -- during construction or operation? 1.18 New road, rail, air waterborne No -- or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission No -- lines or pipelines? 1.21 Impoundment, damming, No -- culverting, realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or transfers of water No -- from ground or surface waters? 1.24 Changes in water bodies or the Yes By considering the runoff prior to development land surface affecting drainage and runoff after development there is some or run-off? increment in runoff of storm water. 1.25 Transport of personnel or Yes Transport of construction materials. materials for construction, Precautions taken to reduce the impact of the operation or decommissioning? vehicular movement by trying to avoid the vehicular trips during peak hours. Form 1: PROPOSED RESIDENTIAL DEVELOPMENT Details thereof (with approximate quantities Sr. Information/Checklist Yes /rates, wherever possible) with source of No. confirmation / No information data 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes There will be influx of people in proposed either temporarily or project, which includes 3590 resident and 501 permanently? commercial persons 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other actions? No -- 2.0 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sr. Information/checklist Yes Details thereof (with approximate quantities No. confirmation / No /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Yes Total Plot Area under development = 29,300.00 agricultural land (ha) sq.m. 2.2 Water (expected source & Yes During construction: competing users) unit: KLD Domestic water: 14.5 and for Flushing: 8 KLD (For workers) From Water Tankers: 10-20 KLD (Depending on construction activity) During Operation Phase: Quantity of water: About 338 KLD water from PCMC Recycled: 184 KLD (14 m3/day for gardening and 170 m3/day as excess water for flushing) 2.3 Minerals (MT) No -- 2.4 Construction material – stone, Yes List of raw materials used during construction aggregates, and / soil (expected phase is enclosed herewith as Annexure source – MT) 2.5 Forests and timber (source – MT) Yes Timber required for doors sourced from local suppliers. 2.6 Energy including electricity and Yes During Construction Phase: fuels (source, competing users) Demand Load: 18 kW Unit: fuel (MT), energy (MW) DG set as Power back-up during construction phase: 25 kVA Form 1: PROPOSED RESIDENTIAL DEVELOPMENT Sr. Information/checklist Yes Details thereof (with approximate quantities No. confirmation / No /rates, wherever possible) with source of information data During Operation phase: Connected load: 4898 kW Demand load: 2151 kW Transformer: 630 kVA x 4 Nos. DG set as Power back: 250 kVA x 1 No. and 100 kVA x 1 No. 2.7 Any other natural resources (use No -- appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details thereof (with approximate Sr. Information/Checklist Yes quantities/rates, wherever possible) with source No. confirmation / No of information data 3.1 Use of substances or materials, No -- which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No -- disease or affect disease vectors (e.g.