Appendix – I

Form – 1

BASIC INFORMATION

RHYOLITE STONE MINING PROJECT

VILLAGE MODI BHAKARI, TEHSIL ROHAT, DISTRICT PALI, RAJSTHAN

AREA: 0.9517 HECT (NON FOREST LAND)

ML 22/2000

PROPOSED

PRODUCTION CAPACITY: 63,016 TPA

PROJECT PROPONENT

SHRI CHETAN SINGH

25, ADARSH NAGAR, PALI

TEHSIL-PALI

DISTRICT – PALI

STATE-

Form - I

APPENDIX I

(See paragraph – 6)

I. Basic Information S. No. Item Details 1. Name of Project Rhyolite Stone Mining Project Near Village Modi Bhakari ,Tehsil Rohat, District Pali, Rajasthan M.L. NO. 22/2000 2. Serial no. in the schedule 1 (A) 3. Proposed capacity 63,016 TPA of Rhyolite Stone 4. New expansion / Modernization Enhancement 5. Existing capacity / Area etc. 10,000 TPA 6. Category of project B 2 7. Does it attract general condition? No If yes, please specify. 8. Does it attract specific condition? No

9. Location Lease area 0.9517 ha is near village Modi Bhakari, Tehsil Rohat, District Pali, Rajasthan.

10. Nearest Railway station Pali ( NW Railway) 30 KM Nearest Airport

11. Nearest Town city, District HQ along Rohat ( 4 km) with distance, in km Pali (Dist HQ) 30 km

12. Village Panchayat, Zila Parishad, local Village Pancayat Modi Bhakari body Zilla Parishad Pali

13. Name of Applicant Shri Chetan Singh 14. Registered Address Near Village Modi Bhakari Tehsil - Rohat District- Pali Rajasthan 15. Address of correspondence Shri Chetan Singh 25, Adarsh Nagar, Pali Tehsil- Pali, Rajasthan 16. Details of alternative site examined, if Not considered\It is a site specific project mineral any mining project 17. Interlinked projects No 18. Whether separate application for Not Required

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Details thereof (with S.No Information/Checklist confirmation Yes/N approximate quantities /rates, . o wherever possible) with source of information data 1.1 Permanent or temporary change in land Yes The Mining activity shall change use, land cover or topography including land form of the project area to increase in intensity of land use (with some extent. Project area in due respect to local land use plan) cause shall be changed into a water reservoir at the end of life of mines. Out of 0.9517 hectare project area 0.50 hectare shall be converted into a water reservoir 1.2 Clearance of existing land, No The project is situated in vegetation and buildings? desertic sand dune country devoid of vegetation. There is no building existing within project which requires clearance. Mining operations will be carried out within project area to win mineral

1.3 Creation of new land uses? No At the end of life of mines 0.5 Hectare area will be converted into a water reservoir. 1.4 Pre-construction investigations e.g. No The area is part of existing Bore house, soil testing? mining project and the mineral potential is fully identified. 1.5 Construction works? Yes A Small office and rest shelter are already constructed.

1.6 Demolition works? No No demolition of any existing

structure is proposed. 1.7 Temporary sites used for construction No No temporary shelters shall be

works or housing of construction required to be erected. workers? Yes 1.8 Above ground buildings, structures or Above ground building earthworks including linear structures, structures like office, rest cut shelters have been created. and fill or excavations 1.9 Underground works including No No underground structures are mining or tunneling? in place nor shall be constructed in due course of time. 1.10 Reclamation works? No At the end of next five years excavated area shall acquire dimension of 100x 50x 10 m3. Part of the pit may be back filled.

1.11 Dredging? No No dredging 1.12 Offshore structures? No This an inland Project 1.13 Production and manufacturing Yes The area of mining project processes? covers 0.9517 ha non forest land.Mining Shall be done manually/ semi mechanized soil and overburden shall be removed by small excavator with the help of tractor trolley. The mining shall be carried out by hand tools like crowbar hammers and Picks. 1. Mining & Quarrying 0.50 2. Storage for top soil 0.00 3. o/B Dumps 0.02 4. Mineral Storage 0.10 Total 0.62 1.14 Facilities for storage of goods or No Small Partion 0.10 hactare shall materials? be used for storage of mineral produce. 1.15 Facilities for treatment or disposal of No No liquid and solid waste shall be solid waste or liquid effluents? generated and do not required any treatment or Disposal 1.16 Facilities for long term housing No A rest shelter shall be created of operational workers? within mining lease area. No long term housing is envisaged. 1.17 New road, rail or sea traffic No No new road rail or sea traffic during construction or operation? shall be created due to this project 1.18 New road, rail, air waterborne or No No alteration of existing road other transport infrastructure including rail air water transport new or altered routes and stations, ports, infrastructure airports etc? 1.19 Closure or diversion of existing No No diversion transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No No diversion or pipelines? 1.21 Impoundment, damming, No No impounding or diversion of culverting, realignment or other water courses of to hydrology of changes to the hydrology of the area watercourses or aquifers? 1.22 Stream crossings? No No crossing of streams 1.23 Abstraction or transfers of water form No No obstructions or transfer of ground or surface waters? water.

1.24 Changes in water bodies or the land No No change foreseen surface affecting drainage or run-off? 1.25 Transport of personnel or materials No No construction activity in next for construction, operation or five years no transport of man decommissioning? material is envisages 1.26 Long-term dismantling or No No dismantling of existing decommissioning or restoration works? structure shall take place

1.27 Ongoing activity during No No decommission of any kind decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in No No influx of workers either temporarily or permanently? 1.29 Introduction of alien species? No No induction of any alien species envisages 1.30 Loss of native species or genetic No No loss of native species diversity? 1.31 Any other actions? No No any other action is warranted